    Standing Committee on Concrete Technology Annual Concrete Seminar 2007

    High Workability Concrete for Bored Pile Construction

    CC Wai, Alan Wan Gammon Construction Limited

  • iR

    l

    l

    A

    .

    d

    e

    t

    m

    i

    i

    L

    n

    o

    i

    c

    t

    u

    r

    s

    t

    n

    o

    C

    n

    o

    m

    m

    a

    G

    6

    0

    0

    2

    2

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

  • Week 2

    Week 3

    Week 1

    Sequence of Work in Bored Pile Construction

    Sun Mon Tue Wed Thu Fri Sat

    Excavation

    Excavation Rock Drilling

    Rock Drilling Airlifting Concrete Cage

    2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    3

  • .

    d

    v

    e

    r

    s

    e

    e

    R

    s

    t

    h

    g

    i

    R

    l

    l

    A

    .

    d

    e

    t

    i

    m

    i

    L

    n

    o

    i

    c

    t

    u

    r

    s

    t

    n

    o

    C

    n

    o

    m

    m

    a

    G

    6

    0

    0

    2

    4

  • Presentation Scope

    Method of Concreting Bored Pile

    Problems and Defects

    Deficiencies in Current Practice

    Proactive Approach

    The Way Forward

    2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    5

  • Concreting of Bored Pile

    .

    d

    v

    e

    r

    s

    e

    e

    R

    s

    t

    h

    g

    i

    R

    l

    l

    A

    .

    d

    e

    t

    i

    m

    i

    L

    n

    o

    i

    c

    t

    u

    r

    s

    t

    n

    o

    C

    n

    o

    m

    m

    a

    G

    6

    0

    0

    2

    6

  • General Setup

    2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    Ramp

    Skip

    Tremie Pipe

    Concreting Platform

    Concrete Truck

    Concrete

    7

  • m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    Stages in Bored Pile Concreting

    (1) (2) (3) (4)

    Extract Tremie Pipe Extract Temporary Casing

    Concrete Overbreak

    Drop in Concrete

    Head

    Tremie Pipe

    Temporary Casing

    2

    0

    0

    6

    G

    a

    m

    8

  • 2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    9

    Cement Grout

    Concrete

  • QA / QC

    Slump tests / Flow table

    Check temperature ( 32o)

    Cube samples to determine concrete strength

    2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    10

  • 2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    11

    Concreting Takes Many Hours

    12:00 14:00

    18:00 21:00

  • 30

    25

    o

    u

    r

    s

    )

    20

    (

    h 15

    10

    T

    i

    m

    e

    5

    0 0 20 40 60 80 100

    Pile Length (m)

    Concreting Time Varies With Pile Length

    2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    12

  • 2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    13

    Slump Varies With Time

    Time

    S

    l

    u

    m

    p

  • Common Problems Encountered

    Temporary casing cannot be withdrawn

    Tremie pipe cannot be withdrawn

    Blocked tremie pipe

    Reinforcement cage rides up with temporary casing

    2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    14

  • 2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    15

    Defects

  • 2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    16

    Honeycomb

    Reduced workability affects self compaction

  • 2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    17

    Air Voids

  • Entrapped Air Inside Concrete During Pouring

    2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    Air Voids

    (1) (2) (3) 18

  • 2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    19

    Segregated Concrete

    Additive quantity needs fine-tuning

  • Remedial Actions

    Grouting

    High pressure water jet to remove weak concrete, followed by pressure grouting

    Stitched pile

    Additional pile

    2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    20

  • 2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    21

    Deficiencies in Current Practice

  • First In . Last Out

    2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    16

    17

    1 *

    2

    3

    18

    First few truckloads need to remain workable throughout concreting

    * Indicate order of truckload

    22

  • Deficiencies in Current Practice

    2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    Large piles / deep piles mean large concrete volume

    Specification / Contract Document Single slump value specified on drawing Workability vs time not considered Lack of flexibility in interpretation

    Quality control Need to control consistency in material

    properties

    23

  • The Proactive Approach

    2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    Need to Consider .. Specification Concrete volume (related to pile size

    and depth) Site constraints (physical or

    environmental restrictions) Site location (travel time to site from

    batching plant) 24

  • Pile Acceptance

    Time

    Concrete Performance

    Material Consistency

    Concrete Site Construction Volume Constraints Procedure

    Route to Pile Acceptance

    2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    25

  • Delivery ~ 3 hours

    Grade 45/20 Designed slump 200mm

    Workability 5 hours

    SUCCESS STORY

    2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    Hong Kong Shenzhen Western Corridor

    26

  • SUCCESS STORY Hong Kong Shenzhen Western Corridor

    2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    Supplier formulated a special concrete mix with enhanced workability

    Engineer relaxed concreting time to 5 hours

    Contractor checked workability prior to pouring

    Side-effect : minor segregation, need to pour additional concrete to avoid undercasting

    27

  • 2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    28

    Way Forward

  • Concrete Triangle

    2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    Designer

    Contractor Concrete Supplier

    Concrete Quality / Performance

    Constructability

    Slump Retention Consistency

    29

  • 2

    0

    0

    6

    G

    a

    m

    m

    o

    n

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    L

    i

    m

    i

    t

    e

    d

    .

    A

    l

    l

    R

    i

    g

    h

    t

    s

    R

    e

    s

    e

    r

    v

    e

    d

    .

    30

    The End

    Structure Bookmarks2005 Gammon Construction Limited. All Rights Reserved Standing Committee on Concrete Technology. Annual Concrete Seminar 2007. High Workability Concrete for. Bored Pile Construction. High Workability Concrete for. Bored Pile Construction. CC Wai, Alan Wan. Gammon Construction Limited. 2006 Gammon Construction Limited. All 2 Sequence of Work in Bored Pile Construction. Sequence of Work in Bored Pile Construction. Sun Sun Sun Mon Tue Wed Thu Fri Sat

    Week 1 Week 2 Excavation Excavation Excavation Rock Drilling Week 3 Rock Drilling Rock Drilling Rock Drilling Airlifting

    Concrete Cage 2006 Gammon Construction Limited. All Rights Reserved. 2006 Gammon Construction Limited. All Rights Reserved. 4

    Presentation Scope. Presentation Scope. Method of Concreting Bored Pile.

    Problems and Defects

    Deficiencies in Current Practice.

    Proactive Approach

    The Way Forward

    2006 Gammon Construction Limited. All Rights Reserved. 2006 Gammon Construction Limited. All Rights Reserved. 6 Concreting of Bored Pile

    General Setup. General Setup. 2006 Gammon Construction Limited. All Rights Reserved. Ramp Skip Tremie Pipe Concreting Platform Concrete Truck Concrete

    Stages in Bored Pile Concreting. Stages in Bored Pile Concreting. (1) (2) (3) (4) Extract Tremie Pipe Extract Temporary Casing Concrete Overbreak Drop in Concrete Head Tremie Pipe Temporary Casing 2006 Gam 2006 Gammon Construction Limited. All Rights Reserved. 9 Cement Grout Concrete

    QA /QC. QA /QC. . . . Slump tests / Flow table

    . . Check temperature ( 32) o

    . . Cube samples to determine concrete strength

    2006 Gammon Construction Limited. All Rights Reserved. 2006 Gammon Construction Limited. All Rights Reserved. 11 Concreting Takes Many Hours 12:00 14:00 18:00 21:00 Concreting Time Varies With Pile Length. 2006 Gammon Construction Limited. All Rights Reserved. Time (hours) 30. 25. 20. 15. 10. 5. 0. Figure0 20 40 60 80 100. Pile Length (m). 0 20 40 60 80 100. Pile Length (m).

    2006 Gammon Construction Limited. All Rights Reserved. 13 Slump Varies With Time Time Slump

    Common Problems Encountered. Common Problems Encountered. Temporary casing cannot be withdrawn.

    Tremie pipe cannot be withdrawn

    Blocked tremie pipe

    Reinforcement cage rides up with temporary casing

    2006 Gammon Construction Limited. All Rights Reserved. 2006 Gammon Construction Limited. All Rights Reserved. 15 Defects 2006 Gammon Construction Limited. All Rights Reserved. 16 Honeycomb Reduced workability affects self compaction 2006 Gammon Construction Limited. All Rights Reserved. 17 Air Voids

    Entrapped Air Inside Concrete During Pouring. Entrapped Air Inside Concrete During Pouring. 2006 Gammon Construction Limited. All Rights Reserved. Air Voids (1) (2) (3) 2006 Gammon Construction Limited. All Rights Reserved. 19 Segregated Concrete Additive quantity needs fine-tuning

    Remedial Actions. Remedial Actions. Grouting

    High pressure water jet to remove weak. concrete, followed by pressure grouting.

    Stitched pile

    Additional pile

    2006 Gammon Construction Limited. All Rights Reserved. 2006 Gammon Construction Limited. All Rights Reserved. 21 Deficiencies in Current Practice

    First In . Last Out. First In . Last Out. 2006 Gammon Construction Limited. All Rights Reserved. First few truckloads need to remain workable throughout concreting 16 17 1 * 2 3 18

    * Indicate order of truckload

    Deficiencies in Current Practice. Deficiencies in Current Practice. 2006 Gammon Construction Limited. All Rights Reserved. . . . Large piles / deep piles mean large concrete volume

    . . . Specification / Contract Document

    . . . Single slump value specified on drawing

    . . Workability vs time not considered

    . . Lack of flexibility in interpretation

    . . Quality control

    Need to control consistency in material properties

    The Proactive Approach. The Proactive Approach. 2006 Gammon Construction Limited. All Rights Reserved. Need to Consider .. Specification

    Concrete volume (related to pile size and depth)

    Site constraints (physical or. environmental restrictions).

    Site location (travel time to site from batching plant)

    Route to Pile Acceptance. Route to Pile Acceptance. Pile Acceptance Time Concrete Performance Material Consistency 2006 Gammon Construction Limited. All Rights Reserved. Concrete Site Construction. Volume Constraints Procedure.

    SUCCESS STORY. SUCCESS STORY. 2006 Gammon Construction Limited. All Rights Reserved.

    Hong Kong Shenzhen Western Corridor. Hong Kong Shenzhen Western Corridor. Delivery ~ 3 hours Delivery ~ 3 hours Figure

    Grade 45/20

    Designed slump 200mm

    Workability 5 hours

    Figure

    SUCCESS STORY. Hong Kong Shenzhen Western Corridor. SUCCESS STORY. Hong Kong Shenzhen Western Corridor. 2006 Gammon Construction Limited. All Rights Reserved. Supplier formulated a special concrete mix with enhanced workability

    Engineer relaxed concreting time to 5 hours.

    Contractor checked workability prior to pouring

    Side-effect : minor segregation, need to pour additional concrete to avoid undercasting

    2006 Gammon Construction Limited. All Rights Reserved. 28 Way Forward Concrete Triangle. 2006 Gammon Construction Limited. All Rights Reserved. Designer Contractor Concrete Supplier Concrete Quality / Performance Constructability Slump Retention Consistency 2006 Gammon Construction Limited. All Rights Reserved. 30 The End