4 estidama program upc
TRANSCRIPT
![Page 1: 4 Estidama Program UPC](https://reader034.vdocuments.mx/reader034/viewer/2022052216/54069e20dab5cafa7b8b46db/html5/thumbnails/1.jpg)
Estidama:Estidama: Development With a New
Mindset
![Page 2: 4 Estidama Program UPC](https://reader034.vdocuments.mx/reader034/viewer/2022052216/54069e20dab5cafa7b8b46db/html5/thumbnails/2.jpg)
4 Pillars of Estidama
EnvironmentalEconomicS i lSocialCultural
![Page 3: 4 Estidama Program UPC](https://reader034.vdocuments.mx/reader034/viewer/2022052216/54069e20dab5cafa7b8b46db/html5/thumbnails/3.jpg)
A Regional Solutiong
• Estidama was developed with local climate, culture, economic & environmental issues in mind
• Sustainability initiative with support of Abu Dhabi y ppleadership, government policy, finance,& regulationg
• The Driving Force of Plan Abu Dhabi 2030
![Page 4: 4 Estidama Program UPC](https://reader034.vdocuments.mx/reader034/viewer/2022052216/54069e20dab5cafa7b8b46db/html5/thumbnails/4.jpg)
Frameworks for 2009
Existing BuildingsCommunities New Buildings
![Page 5: 4 Estidama Program UPC](https://reader034.vdocuments.mx/reader034/viewer/2022052216/54069e20dab5cafa7b8b46db/html5/thumbnails/5.jpg)
Foundation DocumentResource Imperatives
Aspirations / Principles / Concepts
Design Guidelines
SitesStrategies / Techniques
BuildingsStrategies /
Technologies
stid
ama
Core CriteriaReference Standard /
Calculations Submittals
Core CriteriaReference Standard/
Calculations SubmittalsAssessmentem fo
r Es
Calculations SubmittalsCalculations Submittals
New Buildings
Community
Assessment Method
Voluntary Rating
sign
Sys
teea
rls D
es Neighborhood ExistingBuildings
Public Sector Resource Guides
Pe Schools
Civic
Health CarePublic Realm
Infrastructure Industrial
![Page 6: 4 Estidama Program UPC](https://reader034.vdocuments.mx/reader034/viewer/2022052216/54069e20dab5cafa7b8b46db/html5/thumbnails/6.jpg)
PLAN 2030
ESTIDAMA FOUNDATION Aspirations | Principles | Concepts
Pearl System
1,2,3,4,5
Pearl Rating
1,2,3,4,5
Pearl Rating
Pearl System Review and Certification:• Estidama ‘Council’
VoluntaPearl Rating Pearl Rating ary
BUILDINGSCOMMUNITY
FDR
EA
Building Code
Review and Compliance:
Review and Compliance:
Requi
EA Requirements
Code• UPC• EAD
Compliance:• DMA
ired
Regulatory DocumentsRegulatory Documents
![Page 7: 4 Estidama Program UPC](https://reader034.vdocuments.mx/reader034/viewer/2022052216/54069e20dab5cafa7b8b46db/html5/thumbnails/7.jpg)
Focus on Integrative Design Process:Focus on Integrative Design Process: Effective Sustainability Policy Making & Enforcement
Within UPCWithin UPC
• IDP builds sustainability into projects from pre-• IDP builds sustainability into projects from pre-application stage
• Creates positive opportunities for consultants to beCreates positive opportunities for consultants to be innovative and collaborative- no check list inhibitions
• Enables planners to track sustainability at multiple p y pstages
![Page 8: 4 Estidama Program UPC](https://reader034.vdocuments.mx/reader034/viewer/2022052216/54069e20dab5cafa7b8b46db/html5/thumbnails/8.jpg)
holleychant@upc gov [email protected]