3) issues in tsurumi river basin - mlit.go.jpfrom river-mouth to 16km height of a river floor rose...
TRANSCRIPT
-
3) Issues in Tsurumi River basin
Flood Concentration Time: 10 hours → 2 hours
Doubled peak discharge and Greatly reduced flood concentration time
Flood Concentration Time
Peak Discharge: Doubled
1,300m3/s
770m3/s
Comparison by the simulation of the same rainfall
As of 1990(Urbanization ration: 78%)
As of 1958(Urbanization ration: 10%)
Flood discharge
10 155(Hour)0
-
開発による流出土砂が堆積し、流下能力減少
600,000
400,000
200,000
Sedim
ent D
ischarge
1960 1965 1970 1975
The amount of annual Sediment Discharge
From River-mouth to 16km
Height of a river floor rose about 150mm/year.
Accumulation of the discharged sediment due to the development decreased the river channel discharge capacity
3) Issues in Tsurumi River basin
-
Frequent Flood damageSeptember 1976
Kohoku Ward
3) Issues in Tsurumi River basin
-
3) Issues in Tsurumi River basin
Frequent Flood damageSeptember 1982
Tsurumi Ward
-
Increased damage of the Torrential Rain
Increased rainfall of over 100mm per hour in the urban areas
1994 Shinyokohama
神戸の地下鉄浸水写真Increasing threats of underground complex in the urban areas 1999 Fukuoka city
3) Issues in Tsurumi River basin
-
Increased anxiety of the Torrential Rain
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
30日0時 30日12時 31日0時 31日12時 1日0時日時
水位(m)
0
20
40
60
80
100
120
140
160
180
200
30日0時 30日12時 31日0時 31日12時
日時
雨量(㎜)
流域平均雨量
計画高水位
危険水位
警戒水位
指定水位
亀の子橋
Water level
Rainfall
Hourly-max.55mm
More than 5m during
1hour
July 1998 Flood(16km point)
3) Issues in Tsurumi River basin
Basin average rainfall
Design high water level
Bankful water level
Warning water level
Advisory water level
Kamenoko Bridge
Wat
er le
vel(
m)
Rain Precipitation (m
m)
30 0:00 30 12:00 31 0:00 31 12:00 1 0:00
-
Increased damage of the Torrential Rain and landside water
3) Issues in Tsurumi River basin
Ratio of sewage System installation
(%)
Populationin the basin(Ten thousand)
Changes in population, sewage system installation ratio and river water quality of Tsurumi River basin
Otsuna Bridge environmentalstandard value
Under BOC10mg/ℓ
Ratio of sewage system
installation
Population in the basin
BOD Average of theOtsuna bridge
-
N‐BOD Measure
Water quality measure for the rainy day
New water quality issue
= Endocrine Disrupter
Issues in water quality improvement
3) Issues in Tsurumi River basin
-
3)Issues in Tsurumi River basin
Bypass by the Sewage System Improvement
concrete block revetment
(Shutoff of groundwater inflow)
→Decreased water volume in upper reach
Yagami River (Tributary)
Shinpukuji River(Tribunary)
Normal Discharge Issue
-
Normal Discharge Issue
Abundant water volumein the downstream due to sewer discharge
Flow of water supply etc.
Tokyo Bay
Tama River
Ara RiverEdo River
Tone River
Sagami River
Sakai River
Tsurumi River basin
Water resource for municipal water:98% from other basin
3)Issues in Tsurumi River basin
-
Decreased rainfall infiltration
Decreased river dischargeDecreased clean water
3)Issues in Tsurumi River basin
-
Issue in river improvement emphasizing flood control
Inappropriate for utilization in times of earthquake/fire
Revetment-Difficult access to the water-Unsuitable for inhabitation and
growth of creatures
Crowded urban areaSteep revetment
3)Issues in Tsurumi River basin