27
KPI General Meaning Targets CS RRC Setup and Access Completion Ratio Cell BBH >=96% Cell BBH >=96% Cell BBH <=1% PS and HS RAB Setup Success Rate Cell BBH >=96.5% CS and Video RAB Setup Success Rate Cell BBH >=96.5% Voice Drop Call Rate CS NBH <=1.75% PS Drop Call Rate RAB drop (R99 only) PDP Busy Hour <2% HS Drop Call Rate RAB drops pertaining to HS PDP Busy Hour <2% Including IRAT per call CS BBH IRAT : >95% Best of three days out of five days (excluding Saturday and Sunday). (Greenfield) 80% of the KPIs are must to pass the Final Site AT. Above KPIs shall be applicable for new 3G circles. (Green Field Circle+ Existing NSN Signature: Bharti Signature: Time Period for measurement Existing Cells achieved KPI in case of infill site Achieved KPIs for new site Setup and Access should be taken for calculation including all types of congestion Successful CS RRC connections / Total CS RRC connection request PS (All Bearer) RRC Setup and Access Completion Ratio Setup and Access should be taken for calculation including all types of congestion Successful PS RRC connections / Total PS RRC connection request CS and PS (all Bearer) call blocking due to Call Admission Control Success RAB connection completion / Total RAB connection Request Success RAB connection completion / Total RAB connection Request RAB drop (with respect to the total number of calls ending in 3G), counting only the drops on the best serving cell including all AMR Drops CS Inter System Handover Success Rate( 3G - 2G, 2G-3G) Average HSDPA DL Throughput per user (Cell Data Busy Hour) HSDPA Download Throughput per user ( User perceived Throughput) Cell Data Busy Hour 1 Mbps and CQI 16 with more than 5 MB download If any KPI target for any respective cell is not achieved more than 1 months, Both the teams (Bharti and NSN) will validate the reasons and close. (Green Field Circle+ Existing Circle) For new Cell/Site addition in the existing cluster, Existing cells achieved KPIs should not degrade. Target of new cell shall be either as per the existing cluster achieved targets (Average of 5 working days) or above given targets for respective KPIs and the same will be achieved post for new site (Average of 5 working days). (Existing Circles)

Upload: kalpit-shrivastava

Post on 16-Sep-2015

230 views

Category:

Documents


1 download

DESCRIPTION

3G ACCEPTANCE_REPORT

TRANSCRIPT

OSS_KPI_AcceptanceKPIGeneral MeaningTime Period for measurementTargetsExisting Cells achieved KPI in case of infill siteAchieved KPIs for new siteCS RRC Setup and Access Completion RatioSetup and Access should be taken for calculation including all types of congestion Successful CS RRC connections / Total CS RRC connection requestCell BBH>=96%PS (All Bearer) RRC Setup and Access Completion RatioSetup and Access should be taken for calculation including all types of congestion Successful PS RRC connections / Total PS RRC connection requestCell BBH>=96%CS and PS (all Bearer) call blocking due to Call Admission ControlCell BBH=96.5%CS and Video RAB Setup Success RateSuccess RAB connection completion / Total RAB connection RequestCell BBH>=96.5%Voice Drop Call RateRAB drop (with respect to the total number of calls ending in 3G), counting only the drops on the best serving cell including all AMR DropsCS NBH=-12 dB for 90% samples to 95% samplesConnection9Voice Call Setup Success rate (MO & MT)YYY99%100%99%100%99%100%MOC & MTC >= 99%10Video Call Setup Success rate (MO & MT)YYY98%100%98%100%98%100%MOC & MTC >= 98%PS11PS Setup Success rateYYYY98.5%100%98.5%100%98.5%100%98.50%12HSUPA Setup Success rateYYYY98.5%100%98.5%100%98.5%100%98.50%13HSDPA Setup Success rateYYYY98.5%100%98.5%100%98.5%100%98.50%14HSDPA ThroughputYYYY1313.5139.51312.1More than 13 Mbps peak without any bandwith bottleneck. E2E backhaul to be provided with a 20% Overrate to meet this target

Target shall be applicable with Dongle in static condition15R99 Throughput (DL)Y0.5120.560.5120.590.5120.64>=512 Kbps16HSUPA ThroughputYYYY3.54.33.52.43.52.8More than 3.5 Mbps without any bandwith bottleneck. E2E backhaul to be provided with a 20% Overrate to meet this target

Target shall be applicable with Dongle in static condition17R99 Throughput (UL)Y0.0640.340.0640.360.0640.46> =64 KbpsHandover18Handover FunctionYYYY192G to 3G and 3G to 2G (IRAT handover -both ways)YYYY98%100%98%100%98%100%For Voice Call : 3G to 2G at all cells and 2G to 3G whereever applicable.For PS calls : 2G to 3G at all cells and 3G to 2G whereever applicable.Target >=97.5%203G to 3GYYYY98%100%98%100%98%100%Both Soft and Softer Handover needs to be checked.Target >=98%21PS Soft HOYYYY98%100%98%100%98%100%Target >=98%22PS Softer HOYYYY98%100%98%100%98%100%Target >=98%23PS Hard HOYYYY97%100%97%100%97%100%Target >=97%24PDP context activation Success rateYYYY100%100%100%25PS & CS CCSRYYYY100%100%100%26Latency( R99,HSPA)YYYY200,90350,200200,90310,205200,90320,215Static tests only. Average of all samples. R99: 200msec,HS: 90 msec

Target shall be applicable with Dongle in static conditionMultiple 512 byte pings with 5-second interval. Minimum of 100 pings attemptPING TEST DONE WITH HTTP SERVER AS FTP SERVER WAS NOT WORKING27CS & PS call setup timeYYYY4.64.24.328CS & PS drop call rateYYYY000CS