Page 1: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

3D Geophysics

For InfrastructurePhil Sirles - Olson Engineering

Page 2: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Geo-Modeling - Interpretation

How to Make

Sense of the

Model?

GeoVisualization

Page 3: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Visualization – Out of Lego-Space

Page 4: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Modeling and Analysis Package (MAP)

For Near-Surface Imaging

(i.e., Subsurface Characterization)

Modeling Definitions / Approach

VERY BASIC

3D Case Histories

Geotechnical Foundation Investigation –

Vail, CO

Roadway Subsidence Investigation –

Blue Ridge Pkwy., NC

Dam Stability / Sinkhole Analysis –

Knoxville, TN

Evaporite Karst Investigations –

sorry confidential site(s) – active projects

Page 5: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

3D Modeling Capabilities

Loading Small Strains - Seismic waves

Large Strains - static & dynamic load analysis, subsidence, slope failure

Discontinuities (NDE) Cracks, crack propagation, distinct layers, blocks of

arbitrary shape

Linear supports (NDE) soil nails, roof bolts, rebar

Page 6: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

3D Model Future Abilities

Optimized for seismic wave propagation,

for both forward and inverse modeling

Supports tomographic and holographic

inversion: Tolography

Soon - full-waveform seismic inversion (FWI)

Built-in signal processing capabilities via AI

TM

Page 7: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Value of MAP Approach

The MAP approach combines & optimizes the discrete

element method of numerical modeling with particle flow

code, material point method, and finite differencing to

produce 2D & 3D MODELS of the subsurface

… NOT IMAGES of the subsurface.

These calibrated models can then be used for further

engineering evaluations (e.g., large-strain cracking,

subsidence, or slope-stability; or, small-strain static or

dynamic loading).

Page 8: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Earthen Dam Investigation

Chilhowee Dam, TN

Page 9: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Project Site

Chilhowee Dam was built

in 1957 on the Little

Tennessee River ~72km

(45 miles) south of

Knoxville

The dam is owned and

operated by Alcoa Power

Generating, Inc.

Page 10: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Chilhowee Dam – Plan and Elevation Drawings

405m / 1330 ft

20m / 65 ft

Embankment EmbankmentConcrete Mid-section

& Powerhouse

u/s

d/s

Page 11: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Chilhowee Dam – Typical Section

20m

Upstream-sloping

impermeable clay core

ShellShell

Filter

System

65ft

Crest Elev. 269.1m (883 ft)

Page 12: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D
Page 13: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D
Page 14: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D
Page 15: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Gate

Posts

Page 16: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

N Gate Posts

Sinkhole

Borings

3D Grid Layout

- Blue = Geophone

- Red = Hammer Point

Page 17: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

START WITH BASE / CONCEPTUAL MODEL DEVELOPMENT – USE AS-BUILTS

Page 18: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

BUILD CARTESIAN GRID

Page 19: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

CROSS-SECTION MODEL DEVELOPMENT WITH

AS-BUILT DAM SECTIONS

Page 20: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D
Page 21: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D
Page 22: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

(5) 24-Ch DAQ’s

(120) 14-Hz Phones

(156) 10-blow SP’s

19,344 Ray Paths

FIELD WORK – 3D ACTIVE GRID OF GEOPHONES (120 ch’s)

Page 23: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D
Page 24: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Ground Surface

B-2B Boring Location and NumberClay

Soft Clay

Gravel

Rockfill

Bedrock

Borehole Lithology

Surface Feature

LEGEND:

Geophone

Shot

Point

3D Model

– Ground

Limits

3D Model –

Limits

Velocity (ft/s *1000)

Page 25: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

3D Perspective View – Full MAP Model Space

A total of 246,310 elements were used,

with a total of 2,864,508 velocity links.

12 hour run-time for the

Desired 2-foot resolution

12,300 sq f t &

48 ft DOI

= 590,400 cubic feet.

Page 26: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Prospective View

(Angle 100 )

Base of Low-

velocity

“trough”

Axis of Low-

velocity

“trough” o

Page 27: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Elevation Slice

at 875 feet,

~middle of low-

velocity

‘trough’ (8’

below crest

elevation)Low-

velocity

“trough”

Page 28: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Elevation Slice

at 875 feet,

~middle of low-

velocity

‘trough’ (8’

below crest

elevation)

Ground Surface

B-2B Boring Location and

Number

Clay

Soft Clay

Gravel

Rockfill

Bedrock

Borehole Lithology

Surface Feature

LEGEND:

Geophone

Shot

Point

Page 29: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Elevation Slice

at 867 feet,

~base of low-

velocity

‘trough’ (16’

below crest

elevation)Low-

velocity

“trough”

Page 30: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Elevation Slice

at 867 feet,

~base of low-

velocity

‘trough’ (16’

below crest

elevation)

Page 31: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Chilhowee Won the “Construction Project of

the Year” award (for PB) at the USSD 2018

Annual Convention! Michael McCaffrey was

PB’s Principal Engineer (EOR)

McCaffery, M., Sirles, P., et.al.,,

2009, Using Geophysics to

Evaluate an Embankment Dam

Sinkhole – Chilhowee Dam, TN, in

Proceedings for the 29th Annual

USSD Conference

Page 32: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Tight 3D Seismic Investigations

for 3D ‘Foundation’

Investigations (1-2 ac sites)

Karst Problems

Page 33: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Tic-Tac-Toe Pattern: 96 Channels & 37 Shot points

Page 34: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Ray Coverage Tic-Tac-Toe Pattern: 96 Channels & 32 Shot points

Page 35: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Star Pattern: 96 Channels & 32 Shot points

Page 36: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Ray Coverage Star Pattern: 96 Channels & 32 Shot points

Page 37: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

How to look “inside” a

3D volume of data:

Lots of plots?

Or …Slice and Dice

Page 38: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Visual & Useful Results To

Give To The Client 3D Output

Oasis GeoSoft Montaj

Geophysics Package

• Data Analysis & Processing

• Visualization of Results

• FREE Viewer of (3D) Results

Page 39: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D
Page 40: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D
Page 41: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D
Page 42: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D
Page 43: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Visual & Useful Results To

Give To The Client 3D Output

Oasis GeoSoft Montaj

Example Project Video OutputGeotechnical Site Characterization

(China Lake Naval Weapons Facility)

Page 44: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

MAP at a 22-ac Site to 250 feet below ground – 3D Imaging

SITE 3

Blue=Soil

Red=Hard Rock

Orange=Weathered Rock

Page 45: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D
Page 46: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D
Page 47: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

GRM Results Layered Solution:

Images (Cross-Sections)!

Page 48: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Tomography Results Pixel Solution:

Images are Cross-Sections

Line 5

Weathered

Rock (Ls)

Competent Rock (Ls)

Colluvial

Soils (Qc)

Page 49: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

MAP Results 3D Model Output

Page 50: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

Prospective View

(Angle 100 )

Base of Low-

velocity

“trough”

Axis of Low-

velocity

“trough” o

Page 51: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

GeoSoft Results 3D Digital Output!

Page 52: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D

CONCLUSIONS

Numerical Modeling is a powerful tool that

can / should be used (when appropriate)

Calibration and validation are available w/

geology and geotech info

Models deliver more than an image

MAP is an evolving software (not done

yet!)

Full waveform evaluation will be valuable

Page 53: 3D Geophysics For Infrastructure · 2009, Using Geophysics to Evaluate an Embankment Dam Sinkhole –Chilhowee Dam, TN, in Proceedings for the 29th Annual USSD Conference. Tight 3D