39th Ave Greenway connecting & enhancing neighborhoods WELCOME Open House to the 39th Avenue Greenway and Open Channel July 24, 2018

Upload: others

Post on 19-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 39th Ave WELCOME - Denver · WELCOME Open House . to the 39th Avenue Greenway and Open Channel . July 24, 2018 . ... Existing Pipe. 40TH AVE CLAYTON ST MONROE ST FOREST ST 38TH &

39th Ave Greenway connecting & enhancing neighborhoods

WELCOME

Open House to the

39th Avenue Greenway and Open Channel

July 24, 2018

Page 2: 39th Ave WELCOME - Denver · WELCOME Open House . to the 39th Avenue Greenway and Open Channel . July 24, 2018 . ... Existing Pipe. 40TH AVE CLAYTON ST MONROE ST FOREST ST 38TH &

SMITH RD

BLAKE ST

INTRODUCTION|Drainage Improvement Projects

LEGEND Greenway I-70GLOBEVILLE LANDING OUTFALL & 1 Detention Area Proposed Pipe

PARK EXPANSION/UPGRADES 40TH & COLORADO TRANSIT STATION Existing Pipe

CLAY

TON

ST

MO

NRO

E ST

FORE

ST S

T

40TH AVE 38TH & BLAKE

TRANSIT STATION 39TH AVE 39TH AVE

PARK HILL GOLF 39TH AVENUE GREENWAY CLUB 2

PARK HILL DETENTION 4 & STORMWATER PIPES

MLK BLVD

26TH AVE

3 CITY PARK GOLF COURSE RE-DESIGN

MO

NAC

O P

KWY

DO

WN

ING

ST

YORK

ST

CITY PARK

COLO

RAD

O B

LVD

17TH AVE

COLFAX AVE

39th Ave Greenway connecting & enhancing neighborhoods

17-062 07/23/201817-062 07/23/2018

Page 3: 39th Ave WELCOME - Denver · WELCOME Open House . to the 39th Avenue Greenway and Open Channel . July 24, 2018 . ... Existing Pipe. 40TH AVE CLAYTON ST MONROE ST FOREST ST 38TH &

INTRODUCTION|Public Process Problem

Definition Identification of

Alternatives Analysis &Feasibility

Preferred Alternative

Summer Fall Winter 2015 2015 2015/16

Basis of Design

Spring2016

Final Design &Construction

Fall 2016

Begin Mid2018

WHERE WE’VE BEEN: 368 subscribers to project email blasts

515+ email blast recipients

11 design workgroup meetings

25+ small group and one-on-one meetings

360+ individuals met with

86 community surveys completed

5 open houses/community workshops

Presented to Great Outdoors Colorado Coalition Registered Neighborhood Organizations, and other community groups

Who is in the Design Work Group?

Leadership from Registered Neighborhood Organizations

Civic groups & business organizations

Residents reflecting broad and diverse representation

17-062 07/18/201817 062 07/18/2018

39th Ave Greenway connecting & enhancing neighborhoods

Page 4: 39th Ave WELCOME - Denver · WELCOME Open House . to the 39th Avenue Greenway and Open Channel . July 24, 2018 . ... Existing Pipe. 40TH AVE CLAYTON ST MONROE ST FOREST ST 38TH &

INTRODUCTION|Project Facts 12-acre recreational greenway along 39th Avenue between Franklin and Steele Streets.

Community amenities such as multi-use trails and an outdoor amphitheater.

Needed conveyance of water to reduce flood risk to nearby homes and businesses.

INNOVATIVE FIRSTS Programmable decorative LED lighting incorporated under bridges Progressive “Shared Street” design integrating all modes oftransportation within the street Enhanced lighting along the multi-use trail Multi-functional designs that create public space around technicalstructures

5,000 sq ft2 pedestrian bridges

over the Greenway for 2 community gardens

20,000 sq ftfor 3 plaza areas 2

new vehicular bridges

86 pedestrian

lights alongmulti-use

trail*5

4 natural paths for accessshade structures across the channel *estimated quantities

1.1 miles multi-use trails

2.44 miles sidewalks

2.77 miles improvedroadways

10,000 linear feet of new stormwater pipe