8/7/2019 3825--ECIP FINAL ASSIGNMENT http://slidepdf.com/reader/full/3825-ecip-final-assignment 1/25 P a g e | 1 THE ENERGY CRISIS IN PAKISTAN Submitted By GROUP 7 1.  Abdul-Rehman (3702) 2. Rehan Hussain (3777) 3. Ubaid-ur-Rehman (3778) 4. Junaid Ghayoor Hussain (3780) 5. Muhammad Ansaar (3824) 6.  Abdul Sami khan (3825)

Upload: tahira-safdar

Post on 08-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 1/25

P a g e | 1

THE ENERGY CRISIS IN

PAKISTAN

Submitted By

GROUP 7

1. Abdul-Rehman (3702)

2. Rehan Hussain (3777)

3. Ubaid-ur-Rehman (3778)

4. Junaid Ghayoor Hussain (3780)

5. Muhammad Ansaar (3824)

6. Abdul Sami khan (3825)

Page 2: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 2/25

P a g e | 2 

ACKNOWLEDGEMENT

I am heartily thankful to my Lecturer, Mr Adnan Khalil,whose encouragement, guidance and support from theinitial level enabled me to develop an understanding of the subject.

Lastly, I offer my regards and blessings to all of thosewho supported me in any respect during the completion of the project.

Abdur-Rehman,Rehan,Ubaid,Ansaar,Sami,Junaid

Page 3: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 3/25

P a g e | 3 

CONTENT

* ABSTRACT .............................................................................. 4

* INTRODUCTION ..................................................................... 5

* ENERGY CRISIS IN PAKISTAN ............................................ 6

* INFLATION AND ENRGY CRISIS IN PAKISTAN ..............10

* HYDEL ENERGY ...................................................................12

* THERMAL ENERGY ..............................................................16

* LOOMING ENERGY CRISIS IN PAKISTAN ........................18

* ALTERNATE ENERGY SOURCES AND SOLUTIONS .......20

* CONCLUSION ........................................................................22

* RECOMMENDATION ............................................................24

Page 4: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 4/25

P a g e | 4 

ABSTRACT

Energy Crisis in Pakistan is one of the severe challenges the country is facing

today. Electricity,gas,water,fuel is essential part of our daily life and its outage has

severely affected the economy and overall living of ours. Thousands have lost their 

jobs, businesses; our daily life has become miserable. Pakistan is currently facing

upto 18 hours of electricity outage a day, is expected to face more if not dealt with

in time.

The purpose of this study is to analyze the nature of this crisis and to propose some

short-term as well as long-term solutions to this problem.

This study is exploratory in nature. We have done our best to conclude and sketch

up some recommendations in the light of identified hurdles in the way of 

implementing the appropriate solution to our problem.

Our study finds some major wholes in our system if they are covered up we cannot only overcome the deficiency of electricity in our systems but also we can be

able to export it to our neighboring countries.

The basic flaws that our study identified are related to circular debt, and the

inadequate capacity of our electricity production and distribution systems. Also we

emphasized on some prospective alternatives to our electricity production that are

cheaper and they provide more clean electric energy as compared to fossil fuel runenergy plants.

Page 5: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 5/25

P a g e | 5 

INTRODUCTION

y  Background of the study: 

Pakistan has been facing an unprecedented energy crisis since the last few years.The problem becomes more severe during summers. However, this winter was nodifferent. During the peak crisis there was a power outage of 3-4 hours everyday.Those without generators and UPS faced tremendous problems. The prices of bothcontinued to increase due to a sharp increase in their demand.

Almost two years ago the then WAPDA chairman who happens to be a caretaker minister admitted that WAPDA cannot meet the current demand for electricity. Itssurprising that such a senior and experienced person took so long to find this out.

On top of that the government which talked about Pakistan¶s supposedly boomingeconomy failed to understand the gravity of the situation. General Musharraf (R)after becoming Chief Executive used to talk about building dams especiallyKalabagh Dam. This was one of the many promises he failed to keep. Even after that very few power plants have been set up to meet the demand for electricity.

During the second government of Benazir some independent power plants were setup. Had they not been setup then we would have had a much bigger crisis with lifealmost coming to a standstill. I come from the software industry which has been

badly hit by the present power crisis. On an average the generator at my office ison for three hours. Our work is not much affected but overall the company¶soperating expenses have increased.The policy makers of Pakistan have so far failedto understand one thing. They do talk about making dams and setting up nuclear power plants but why do they not understand the importance and benefits of alternate energy sources such as solar, windmill energy etc. They are cheap and

quick methods for producing electricity. Pakistan is a very blessed country becausesolar energy is available in most cities all year round similarly wind energy isreadily available in the coastal areas. These energy sources if tapped can be of great help in reducing the current demand supply gap.

Pakistan is facing power shortage, natural crisis and oil crisis. In a report it isclaimed that Pakistan has faced 1000 to 2000 MW shortage of power. And it willlikely face 3000MW next year. Pakistan is facing 80 millions tons of oil shortageaccording to it's need. And is lacking behind the needs of natural gas at about 27million ton of energy in current year and this ratio will rise in upcoming years.

Page 6: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 6/25

P a g e | 6 

Energy Crisis In Pakistan 

An energy crisis is any great shortfall (or price rise) in the supply of energy

resources to an economy. It usually refers to the shortage of oil and additionally toelectricity or other natural resources.The crisis often has effects on the rest of the economy, with many recessions beingcaused by an energy crisis in some form. In particular, the production costs of electricity rise, which raises manufacturing costs.For the consumer, the price of gasoline (petrol) and diesel for cars and other vehicles rises, leading to reduced consumer confidence and spending, higher transportation costs and general price rising. Energy resources have depleted!

Whatever resources are available are simply too expensive to buy or alreadyacquired by countries which had planned and acted long time ago. Delayed effortsin the exploration sector have not been able to find sufficient amounts of energyresources. Nations of the world which have their own reserves are not supplyingenergy resources anymore; only the old contracts made decades ago are active.Airplanes, trains, cars, motorbikes, buses and trucks, all modes of transportationare coming to a stand still. Many industries have closed due to insufficient power supply. Price of oil has gone above the ceiling. At domestic level, alternatemethods like solar, biogas and other methods are being tried for mere survival.The above is a likely scenario of Pakistan and around the globe after 25 years. Apessimistic view, but realistic enough to think about and plan for the future. But

are we doing anything about it? Lets have a look at the current energy situation of Pakistan and the world.

Pakistan¶s economy is performing at a very high note with GDP growing at anexceptional rate, touching 8.35% in 2004-05.In its history of 58 years, there hasbeen only a few golden years where the economy grew above 7%. This year official expectations are that GDP growth rate will be around 6.5 ± 7.0%. For thecoming years, the government is targeting GDP growth rate above 6%. Witheconomy growing at such a pace, the energy requirements are likely to increasewith a similar rate. For 2004-05, Pakistan¶s energy consumption touched 55.5MTOE (Million Tons of Oil Equivalent).The energy consumption is expected to grow at double digit if the overall economysustains the targeted GDP growth rate of 6% by the government. Pakistan¶s energyrequirements are expected to double in the next few years, and our energyrequirements by 2015 is likely to cross 120MTOE. By 2030, the nation¶srequirement will be 7 times the current requirement reaching 361MTOE.

Pakistan¶s energy requirements are fulfilled with more than 80% of energy

Page 7: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 7/25

P a g e | 7

resources through imports.On the other hand, international oil prices have not only broken all records but aretouching new highs, with every news directly or indirectly affecting the black goldindustry. Moreover, speculators all around the world expect oil prices to touch$100 per barrel in medium term. With concerns over Iran¶s nuclear program,terrorist issues in Nigeria and high economic growth in China & India and their ever rising energy requirements, oil prices don¶t see any another way but to shoot

upwards.What is the government doing to ensure a sustainable supply of energy resourcesfor economic growth? What strategic steps are being taken to acquire energyresources in future? Is private sector willing to invest in Pakistan¶s oil industry?What are the incentives being offered to the foreign players to continue working inthe exploration sector? What hurdles are stopping other big players around theworld to enter Pakistan? What is the role of gas distribution companies so far? Are

the citizens of Pakistan being robbed by energy giants with ever rising utility bills?What should be the real price of petroleum, kerosene and other oil products inPakistan? When will the nation have ³load shedding free´ electric supply? Havewe been able to make long term contracts with the countries to provideuninterrupted supply of energy resources? Will the government be able to provideenough sources to the citizens for a sustainable economic growth? Have we lost therace for acquiring maximum energy resources for future survival?

One of the major problems facing the new government, the energy crisis, is

intense, costly and multi-dimensional. The infuriating electricity and gas

disruptions and soaring fuel prices in turn pushing the cost of living have made lifedifficult for people. The even before it took office the new government was greetedwith two jumps in fuel prices, accounting for a 15% rise in two weeks. Meanwhile,crude oil prices have been registering all-time-highs, shooting 40% in the pastyear. The undeniable reality is that that this global spike will somehow have to beaccommodated in energy prices in Pakistan.

There is no quick solution to electricity shortage and the trend of surging prices is

irreversible. There is very little the new government can do on this in theimmediate term. At best, the problem can be prevented from aggravating until a

sustainable solution is struck. Tough decisions will have to be made, and executedwith commitment.

The starting point of any remedial efforts should be an acknowledgement of thefact that the crisis is a self-inflicted one. It cannot be denied that something hasbeen wrong down the line that caused this crisis. The country has nearly goneenergy bankrupt while a total disaster appears to be round the corner unless

Page 8: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 8/25

P a g e | 8 

pragmatism is shown. It is also important that lessons be learnt from the pastmistakes on part of relevant circles. The crisis is still addressable as long as there isdue vision and devotion.

The golden age for energy in Pakistan has been 1960s and most of the 1970s, that

is when Tarbela and Mangla dams were put into operation and other dams,including Kalabagh, were actively pursued. In subsequent years, action in the fieldof energy has been utterly recklessness. The prevalent crisis is a consequence of imprudent energy policies over the last three decades.

One of the major limitations that have hindered energy prosperity in the country isshort-sightedness. There has not been a meaningful and coherent energy policy inplace over this period. The approach has been ³project-oriented,´ rather than ³goal-oriented.´ Almost every regime has dealt with energy on an ad hoc basis. Long-term and sustainable planning of energy have been an alien concept. The reason is

fairly simple; energy projects usually require huge investments and commitment,making them undesirable to any regime. The attitude of delaying new projects, asfar as possible, has been the common practice and is in fact the recipe of thepresent crises. In doing so, when things start getting out of control, haphazard andquick-fix measures are sought. A typical example is the Independent Power Producers (IPPs) saga of the 1990s. In an attempt to avert an approaching energycrisis, as a result of negligible capacity addition during the 1980s and the early

1990s, the regime in 1993-94 decided to go for thermal generation through theIPPs. Undoubtedly, the IPPs provided a very healthy contribution at the supply

end, enhancing power generation capacity by more than 5000MW. Nevertheless,this power addition cost the country a fortune ± apart from the controversial tariff structure, the move was against the spirit of energy sustainability and security for the country. The fact that the IPPs were set up at the terms of the investors suggestthat it was a move made in panic.

The last few years provide a perfect example of failure to make a timely responseto the growing energy needs. A threefold increase in energy demand over the lasttwo decades has been responded to with an ill-proportioned increment at thesupply end. Consequently, with the advent of 2008 the gap between demand and

supply grew to 4,500MW indicating a 40% deficit of electricity. The prevalentenergy crisis has not appeared overnight ² the omens were evident for a number of years but the authorities failed to react in time. Senior WAPDA officials claimthat in 2002 the government was officially warned about the approachingelectricity crisis and was asked to take immediate measures to enhance generationcapacity. The timely warning failed to receive any appreciation. The attitude of therelevant authorities has thus indirectly contributed to the growth of the dire crisis.

Page 9: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 9/25

P a g e | 9 

Another example worth quoting here is that of the 969MW Neelam-Jehlumhydroelectric project. It was to be constructed in 2003 at a cost of $1.5 billion. Itgot abandoned until the present power crises intensified towards the end of 2007.The revised estimate is around $2.25 billion. The delay is costing the country afortune ± an extra $750 million in terms of project cost, apart from enormousmonetary dents inflicted by the five-year delay. It is also noteworthy that WAPDAhas traditionally pursued the major projects of national interest but failed to get the

due positive response from the policy- and decision- makers. Interestingly,WAPDA plays the role of a scapegoat, because the common man blames WAPDAfor his sufferings.

It is also important to plant relevant and qualified people at the key policy anddecision making positions. Quite often, these positions are offered to utterlyirrelevant, ill-qualified and incompetent people. The track record suggests that

energy offices are amongst the most coveted ones in any regime, simply becausethey are considered to be the most lucrative ones. There are examples whenundergraduate and utterly irrelevant people have been appointed to run energyoffices. There are also cases when the crucial positions have been used asincentives during political bargaining. The unhealthy attitude towards sensitiveenergy positions is enough to explain how the field of energy has been traditionallytoyed with.

Another aspect of the bankrupt policies is politicisation of projects of nationalinterest. The paramount example is that of Kalabagh Dam. It has been politicised

to such an extent that its orchestration now appears to be next to impossible.Evidences suggest that the issue has been used to serve the vested interest of regimes and certain political and ethnical forces. With the emerging post-lectionsense of national reconciliation on the political arena, it is expected that suchprojects would be looked into with cool heads. It is time to move on. The technicalissues, if there be any, have to be addressed on the drawing board, rather inprocessions. It has to be realised that the delay in project has not only made thecountry suffer but also people that come from all provinces.

In order to tackle the existing crisis and ensure a prosperous energy future, the

backbone of the future energy policies would have to be reliance on domesticresources (hydropower, coal and solar and wind energy) and energy conservation.Decisions on energy projects should revolve around national interest rather thannaïve political and personal gains. Energy offices should be run by qualified,committed and deserving people equipped with due mandate. Relevant ministriesand departments should also be overhauled.

Page 10: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 10/25

P a g e | 10

INFLATION AND ENERGY CRISIS IN PAKISTAN 

Pakistan is facing a number of constraints in the path of social economic andpolitical development. One of them is the ever-increasing inflationary pressure onthe general public. This inflationary pressure created a social instability andmisconception among the messes towards the Government. General publicconsiders the government responsible for this inflation. Government gave the blunt

gift of inflation, unemployment, terrorism and energy crisis to the public. Thegovernment offended the masses. Some economists argue that such type of increase in prices was never seen before the regime of Musharaf. The prices of essential domestic commodities have touched the psychological boundaries. Thefixed income employees and creditors are affected by this inflation.

During five years the prices of red chilli increased by 62.7%, flour 66.2%vegetable oil 120% sugar 30.9% rice 69.9% and other essential domesticcommodities like vegetables, chicken etc also showed increasing trend of prices.According to official reports the inflation rate is 7.2% and according to non-officialreports like UN 8.6% World Bank 8.9% and Asian Development Bank 9.1%. Thisinflationary pressure has psychologically affected the employees and employers.Some renounced economists argue that the reason of this increasing inflation rateis the standard year 2001 according to which inflation rate is measured. In 2001 the

foreign aid was given to Pakistan therefore low standards were made to measurethe inflation rate. Although the increasing trend in the prices of fuel and other things in the international market is another factor but the standard year is also afactor.Not only these factors caused hyperinflation but also energy crisis played a vitalrole in this hyper change in the prices of daily use domestic and capitalcommodities.There are three main resources used to fulfil the energy requirements Electricity,Fuel and Gas. Despite having the treasure of natural energy resources, Pakistan¶senergy production plants are not fulfilling the country¶s requirements effectively.The present energy crisis is affecting the economy entirely. Industrial and daily life

has paralysed by this energy crisis. WAPDA is just fulfilling the country¶s energyneed near to 46% the remaining is fulfilled by the alternative expensive resources.

The energy crisis created cost pull inflation in the country, as electricity is the keymaterial for any production plant. There is a general observation of 5-10 hours of load shedding, but some times it hits the level of 18 hours. Even the industrialcapital of Pakistan (Karachi) is suffering from the same situation.Why in the era of energy reservation Pakistan is not utilizing its energy resources?

Page 11: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 11/25

P a g e | 11

Pakistan is just relaying on the electricity production by Dams. But Pakistan hasnot enough dams or water to generate electricity. Although WAPADA is enjoyingthe monopoly but government has to pay 2 rupee/unit as incentive. Our neighbouring country India has built a number of Dams to overcome the energycrisis but Pakistan government has paid no heed on this issue. Many projects aredelayed due to provincialism the glaring example is of Kala Bagh Dam. The costlymachinery amounted US $9 million is now functionless due to (rust) delay in the

construction of Kala Bagh Dam, Some scientists predicted that in next 10year world has to face the water shortage also.If the government fails to construct dams for the generation of electricity due toProvincialism government should have to adopt alternative options to accomplishthe energy needs of the country. As Iran has large treasure of natural energyresources like natural gas and fuel, despite this Iran is engaged in the attainment of nuclear power generation plant. Pakistan, despite being an atomic power does not

think about the nuclear electric generation plant. International community isimposing sanctions on Iran due to uranium enrichment but Iran pays no heed tothem. Then why is the Pakistani government reluctant to use its nuclear plants totackle energy crisis?Secondly, Pakistan¶s western area especially Thar is enriched by natural coal,which is the fifth largest treasure of the world. Pakistan has signed a contract with

China to generate 300 Mega watts by coal deposits in 2003, but due to somereasons it has not been completed till now.Industrialists due to high prices of electricity use alternative resources (petrol) inelectric generators to fulfil their energy needs but, the fuel (petrol) prices ininternational market cross the psychological limits of US $110/beryl recently. Thehigh prices of fuel and electricity created a long-term cost pull inflation (increasein the prices of raw material of one commodity cause high prices of other commodities).There are a lot of expectations with the new government as Nawaz Sharif pledgedthat if he came in rule he will fix the prices of domestic commodities likevegetables oil, floor, sugar and rice for two years. Now the new government shouldtake basic steps to eradicate inflation. I think energy crisis is the real cause of thisinflationary pressure. We are hopeful that new government will take some positive

steps to fulfil its promises and public expectations.

Page 12: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 12/25

P a g e | 12 

HYDEL ENERGY

Water flowing in the rivers has kinetic energy. One the they are used to drive the

turbine and produce electricity the power generated as hydel energy.

Power produced by the turbine depends on quantity of water flowing/minute and

the head of water available.

Mostly river flows by melting glaciers on High Mountain. One the water starts

flowing in the valley its changes its head very rapidly. This energy can be

converted into electrical energy.

Two methods are normally used:

1.  Dams2.  Run of the river projects.

In case of Dams the water flow is restricted by the making a huge storage device

and the head of water is incresaesd, the water then is allows to flow by means of 

gates and pass through the turbine, the head of reservoir level is maintained to

provide uniform power and the water stored in the season additionally is used for 

irrigation purpose in the dry season.

In the run of river project the water is diverted through the tunnel and once it

gain the head allowed to fall and pass through the turbine and back too river. The

water in these projects is continuously flowing and not being stored.

Geographical situation is paramount importance in choosing the suitable site for 

the hydel project and it evolves a very serious time and money consuming study.

Once a site is located further detailed feasibility study is required before preceding

any serious effort to start the work.

Page 13: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 13/25

P a g e | 13 

The feasibility study should include following field work.

1: Detailed Mapping of the area.

2: Topographic study of the area.

3: seismic refraction study.

4: River flow data.

5: Weather data contain Temperature,Pressures,Rain Humidity.

6: Water sampling and testing.

7: Environmental study.

8: Social impact.

9: Identification of stake holders of the area.

PAKISTAN MAJOR DAMS

1: Warsak Dam

2: Mangla Dam

3:Tarbela Dam

1: Warsak Dam: 

The gigantic multi-purpose Warsak Dam is situated 30 kms

Page 14: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 14/25

P a g e | 14 

north-west of Peshawar in the heart of tribal territory. It has a total generating

capacity of 240,000 kw and will eventually serve to irrigate 110,000 acres of land.

2:

Mangla Dam:

 World's third largest earth-filled dam is only 115 km south-eastof Rawalpindi. One has to turn left from Dina Town and the dam on river Jhelumis about 14 km to the east. The dam is 3,353 meters long and 116 meters highabove the river bed. It is designed to store 5.88 MAF water and also used for power generation. In the centre of the dam there is a Gakkhar Fort from where onecan have a panoramic view of the lake. For permit to visit the dam, please contact

PRO, WAPDA, Mangla. A NOC from the Ministry of Interior is required for foreigners only.

3: Tarbela Dam: The world's largest earth-filled dam on one of the world's most important

rivers - the Indus - is 103 km from Rawalpindi. The dam was completed in 1976 ata cost of Rs.18.5 billion. Over 15,000 Pakistani and 800 foreign workers andengineers worked during its construction. It is the biggest hydel power station inPakistan having a capacity of generating 3,478 MW of electricity. Its reservoir is97 km long with a depth of 137 meters while total area of the lake is 260 sq.km.

Permits are required for visiting the Dam. Please contact Public Relations Officer (PRO), Water and Power Development Authority (WAPDA), Tarbela (Tel: 051-568941-2). A No-Objection Certificate (NOC) from the Ministry of Interior (Shaheed-e-Millat Sectt.), Islamabad is also required for foreign visitors.

HYDEL ENEGRY AND ITS CRISIS IN PAKISTAN

The energy crisis starts from 1990 and still Pakistan is in the crisis of these all as

before. The latest and perhaps the most troublesome crisis faced by the Pakistanination these days is the shortage in supply of electricity. The country is facing ahuge electric power crisis these days. Though it has been more than a year sincewhen the country is facing this crisis, but till now no proper solution has been

made to this problem neither any proper planning has come into existence since thesymptoms and begging of this short supply of electricity. While rolling blackoutsor load shedding as it is locally known has always been a staple of daily life inPakistan, the problem has become acute in the last couple of years.

This crisis appears insurmountable in the near or even long-term future, unless

proper understanding and correct implementation is undertaken on priority basis.

Page 15: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 15/25

P a g e | 15 

At present total power production capacity in the country is about 19,500 MW, outof which Hydel Power is only 6,500 MW, balance of 13,000 MW is thermal either using Natural Gas or Furnace Oil. Small capacity of 450 MW is Nuclear and only150 MW is through coal.

It is very important to understand the consequence of the prevailing situation.

Current price of furnace oil is about Rs.49,000 per ton, which amounts up toRs.49/- per kg. On an average one kg of furnace oil produces 3.8 kWh of electricity. Thus, the cost of furnace oil for generating one unit of electricity isabout Rs.13. On top of this the fixed cost of a thermal plant works out to be aboutRs.3 per unit. Therefore, one unit (kWh) of the electricity produced by all thermalplants using furnace oil is Rs.16 per unit. According to WAPDA/IPP agreement,the private power producers will charge WAPDA the actual fuel cost for whichthey have a direct contract with PSO. As we all know that WAPDA tariff charged

from the consumers is about Rs.5 per unit (kWh).

The production cost of furnace oil electricity is Rs.16 per unit, add to it the

transmission, distribution cost (including loses), ³the total cost of such electricityworks out to approximately Rs.22 per kWh. The difference between WAPDA tariff and the furnace oil electricity is Rs.17 per kWh.´ It is estimated that the countryconsumes at least 25 billion units of electricity produced annually through furnaceoil, which amounts to the total deficit of Rs.425 Billion. If WAPDA has to balanceits books it would require a subsidy of Rs.425 Billion. This deficit is somewhatreduced due to cheap power produced through hydel energy and natural gas, but

the deficit cannot change substantially, unless bulk of electricity is producedthrough hydel energy. Obviously, a deficit of Rs.300-350 Billion cannot be

sustained, the government does not have resources to pay such a huge subsidy, andit is also not feasible to increase the power tariff very much. Therefore the power crisis is far greater than what is being perceived. In the absence of extremely heavysubsidy, WAPDA is delaying payments to IPPs and also to the oil companies. Theresult is that IPPs are now producing much less electricity than their capacity.

Page 16: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 16/25

P a g e | 16 

Thermal energy

Thermal energy is the thermal type of energy. With all known history available, wood

always used for heating and cooking. In 2nd world war fossils fuels entered in the form of 

coal to get energy. Until liquid fuels were discovered and because of their convinces of 

transportation they took over as major of energy source.

Once the steam engines were invented then the coal or liquid fuels was burnt in the in

boilers and heat producers steam which is used to drive an electrical generators, or any

other mechanical devices.

Rudolph diesel invention of diesel engine revolution the energy concept and today

we see sine the majority of machine moving on diesel engines.

The choice of gensets strictly depends on the requirement of client, before ordering a

power plant following points to be considered

y  Expected demand of the power 

y  Type of fuel requiredy  Space available for the power plant

y  Availability of gun sets

y  Availability of local service back up and stock of parts

y  Price is paramount importance and hidden expenses should be locked carefully.

The major manufactures and suppliers of gensets based on internal combustion

engines are given below

y  Man

y  Wartsilay  Caterpillar 

y  Jen bacher 

y  Waukesha

y  Mitsubishi

y  Detroit diesel

y  Rolls Royce

Page 17: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 17/25

P a g e | 17

Internal combustion engines can obtain 30_50% thermal efficiency. its means

that around 50%energy is wasted in the form of exhaust gases, cooling system

and radiations. therefore for larger plants heat recovery system are utilized.

CRISIS OF THERMAL ENERGY

The oil crisis facing the world, is not about supply or about the increase in demand. It is aboutthe speculators who are pumping huge amounts of money into forecasting a serious shortageahead. Not now but in the future. And that the prices will escalate enough for them to make akilling. If one looks at the real picture, there is no shortage of oil, there has been no shutdown of any major producer, nor has there been a sudden jump in the import from any large consumer.The Chinese import for their industrialisation is not more than 10 percent annually. This is

certainly not enough for the huge jump in the world crude rates. This jump is matched by thephenomenal profits of the oil companies and of course the oil producing countries. The thirst for profits of the oil traders has benefited the oil producers - Iran being a major beneficiary.The US government must be wondering at the irony of this windfall benefiting a prime enemy of American and Israeli interests at the cost of millions of innocent citizens of the US and Europe,engineered by the greasy gnomes of the oil trade. There is no threat of an oil embargo, nor of awar, it is just pure speculation, funded by the huge mountains of American and European cash atthe disposal of the Soroses of the Oil trade. They stand to make a killing at the expense of hapless citizens of the world. As I had written in an earlier piece as far back as 2005, when anattack on Iran was imminent, that the rise in oil at 100 $ a barrel would impact on the food priceshas proved prophetic with the current sky high prices of bread in Europe and America.

In the meantime we poor Pakistanis are suffering with 50 percent living below the poverty line,and many more being pushed under thanks to the current oil crisis which has managed to createtsunami that is a threat worldwide. With no remedy in sight. Electricity riots are already acommon sight but the frequency of breadlines breaking into riots is increasing daily, not just inSomalia but in parts of the third world where we thought wheat was never in critical shortage.The riots in Pakistan are for two reasons. Firstly, the price - a worldwide phenomenon, andsecond, a physical shortage due mainly to incompetence in the many layers of our government.

Page 18: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 18/25

P a g e | 18 

The looming energy crisis in Pakistan

Energy costs, from where they stand now, could rise by more than 50 percent inthe next few years. The cost of power on this scale would be difficult to manage bymost emerging economies All oil-consuming countries, particularly the third worldhave suffered due to the consistently rising demand-driven cost of energy

From 2004 onwards, the price of oil started soaring in the international market, andfor the first time in October 2004, oil prices crossed the benchmark of US$ 50 per barrel. It continued to fluctuate but kept moving up each year and in 2007 brieflycrossed US$ 100 per barrel. For the past few days it has been hovering at US$ 103

plus per barrel. The oil industry has been plagued by two main deficiencies whichis a drop in exploration activity following the economic slowdown of the mid-1990s. Coupled with that, the global refining capacity did not keep pace with therise in demand by developing countries, especially in China, India and the Far East

beginning 2000. Yet, both OPEC and the vertically integrated oil industry havedisplayed no interest in increasing the output, which needs additional investment inexploration and at last 4 to 5 years to build additional refining capacity.All oil-consuming countries, particularly the third world countries have suffereddue to the consistently rising demand-driven cost of energy. Pakistan is one of the

countries worst hit by the rise in price of energy. The domestic energy generationsources are restricted to hydropower, limited production of oil and gas, andnegligible use of coal as the input for power generation. Even the conversion of cement industry to use coal did not help much as the required quantity was beingimported from Indonesia and some other countries. This brings us to the shortagebeing faced in supply of electricity for domestic and industrial purposes (In figuresI and II below the position of domestic demand and supply for electrical energy ishighlighted).

According to the PPIB website, during 2008 Pakistan would be short of electricitysupply to the tune of 1,457 mwh. Given this supply shortfall, and few choices for 

plugging this gap with indigenous energy resources; the planned and projectedgrowth in GDP appears highly unlikely. If Pakistan chooses to rely on fossil fuel togenerate electricity it would be a constant burden on the country¶s foreignexchange reserves, and due to continuously increasing price of oil, our exportablesurplus would become progressively more uncompetitive and goods for localconsumption would become costlier. This may result in closure/ bankruptcy of 

Page 19: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 19/25

P a g e | 19 

some industries and the country could face some economic weaknesses. It istherefore imperative that Pakistan finds workable remedies to the looming energycrises and remedies are found with practical solutions to facing up to the problemsarising out of growing population and the growing energy needs to supportreasonable GDP growth.For the last 10 years Pakistan has been importing crude oil and refined petroleumproducts to generate electricity, besides meeting the increasing demands of its

expanding transport sector.

Page 20: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 20/25

P a g e | 20

ALTERNATE ENERGY RESOURCES AND THEIR SOLUTION

1. Nuclear energy: KANUPP was established with the help of the Canadian

Government in the 1960¶s and nearing end of its lifecycle. The ³Chashrna Nuclear Power Plant´ has been designed and built in collaboration with People¶s Republicof China, and is being operated and maintained by Pakistani scientists andengineers, delivering full power of 300 mw to the national grid. With the KarachiNuclear Power Plant also operational since 1971, Pakistan is the only country inthe Muslim World operating nuclear power plants. Nuclear power is safe,

economical and environment-friendly.

2. Natural gas exploration: Pakistan still has huge untapped gas reserves. If 

we allocate more resources to their exploration there is a possibility that in the near future part of the energy resource gap may be met from new reserves.The current

gas prices and the limits they place on increasing the profitability of this sector would not attract any reasonable amount of investment, whether local or foreign,since the cost of exploration has gone up substantially and current well head pricesdo not justify further investment at the current rate of return. The other factor discouraging exploration of new gas reserves, which would continue to haunt us, isthe law and order situation in most of the areas where gas finds can be apossibility.

3. Natural gas import: The IPI (Iran-Pakistan-India) gas pipeline project is

also a long story (global political situation is not being discussed for obviousreasons) but the current plan to lay the 54 inch pipeline through the coastal area hasa major flaw. Even if Pakistan starts building the pipeline on priority basis, it may

take 5 years to complete the project (i.e. by 2013), and it may plug the energy gaponly thereafter.

4. Solar energy: At present, except for low-ampere domestic use, solar 

energy is a distant possibility, although in a country like Pakistan where clouds are

Page 21: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 21/25

P a g e | 21

a rarity for most part of the year it could be a workable option. There is a simpleway of harnessing this energy for the industry, which is dependent on steamgeneration through oil or gas-fired boilers. Water can be pre-heated by convergingsun rays on tanks made of metals/alloys that can easily absorb the heat. This pre-heating can reduce the cost of producing steam and reduce the energy resource gapto an extent, though negligible.

5. Coal: Pakistan has enormous coal reserves (probably the third largest in the

world) that remain untapped and even the industries that have converted from gasto coal as their energy source have to import coal mostly from Indonesia, which isagain a drain on Pakistan¶s scarce foreign exchange reserves.

6. Wind energy: The government is following a policy to encourage

investment in wind energy. Two corridors have been identified in Sindh, and landhas been allocated to various wind energy projects. The issues confronting thewind power sector are as under:(a) Scarcity of equipment: wind power equipment is in short supply, the world

over. Propelled by GDP growth needs, demand for energy has been growingglobally, and as cost of energy derived from fossil fuels has increased two-foldduring the last three years, the demand of wind power equipment has also grownmanifold.(b) Due to growth in demand and increase in the cost of metals, especially steel

and its products, the price of equipment required for wind power has also increasedmanifold.(e) Although the cost of equipment and know how is high, the advantages of windpower are quantifiable, and after a number of years, electricity generated by thistechnology would become the cheapest compared to alternate sources of energy atthat point of time.To install this initially expensive but eventually very economical technology, in thefirst instance Pakistan may start importing and installing the equipment to generate

electricity but in the long run it must encourage domestic production of theequipment. If Pakistan can replicate the sophisticated machinery and equipment for 

uranium enrichment and also can produce or cause to be produced very high RPMcentrifuges, machinery, electric circuits, vacuum valves and allied equipment then,probably, then it also has the capacity to produce equipment for wind power. Inthis regard, Pakistan can also enter into technology transfer agreements withforeign manufacturers.The considerations that place wind energy on top of the list

Page 22: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 22/25

P a g e | 22 

is mainly due to the fact that generating energy using this technology requires nofuel, and the energy production process does not pollute the environment.

CONCLUSION

* Conclusion 

After all the literature that we reviewed we can sketch up some rough hurdles that are there that

won¶t let implement our identified solutions. These hurdles are explained in short below;

* Hurdles Implementing the Solutions to this Crisis: 

** a Circular Debt: 

We identified that the Government is not serious in paying the IPP¶s circular Debt. Once this

debt is paid off, the IPP¶s can pay off their petroleum import expenses and start producing at

optimum levels. As long as the debt is left un-paid, we may continue to have such crisis forever.

** b Line Losses: 

We identified that WAPDA is facing huge line losses due to electricity theft or illegal usage of 

electricity. The burden is beard by the Government so in order to cover up such losses and to

ensure adequate and clean facility of electricity; we must ensure that no body breaks into the

transmission system.

** c Inadequate Power Generation Capacity: 

We identified that most of the systems here run on either Gas or Coal i-e they are thermal

systems. Both Gas and Coal are considered as scarce and expensive commodities for electricity

Page 23: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 23/25

P a g e | 23 

producers. We must not rely mostly on such production systems. We must ensure usage of 

efficient Thermal plants instead of in-efficient ones to conserve the scarce resources.

** d Lack of Capacity of Transmission of Electricity: 

We identified that most electricity transmission lines here in Pakistan are incapable of 

transmitting electric voltages of more than two phases. This makes them in-compatible to carry

higher voltages, so even if we produce 3 phase electricity, it would be of no use in this case. We

need to upgrade our transmission lines.

** e Lack of Capacity of Distribution of Electricity:

We identified that we lack high quality lower end grids that are used to carry electricity from

power houses to the ultimate consumers via grid stations. The infrastructure is old and

deteriorated. The system is unable to sustain extreme weather conditions hence most of the grids

shut down at extreme temperature or either completely stops working.

** f Privatization of K.E.S.C: 

After the privatization of K.E.S.C is enhanced its production capacity but the Government for a

certain reasons did not provide it with adequate distribution network. As production alone is not

sufficient, the Government must provide a clean transmission system for IPP¶s especially to

K.E.S.C as it is responsible to provide electricity to two of our provinces Sindh and

Balouchistan.

**g Government¶s dependence on IPP¶s: 

The IPP¶s at current are responsible to provide electricity to half of our country. As the Govt. did

not pay their debt so now they are charging or demanding higher per unit prices from the

consumers. This hike in electricity prices is affecting not only our local industries and homes but

Page 24: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 24/25

P a g e | 24 

is also affecting our exports of manufacturing goods. The govt. must intervene and pay out the

circular debt. Or provide subsidy on electricity.

Recommendations

y  Govt. must pay circular debt.

y  Govt. must invest to cover up line losses.

y  Industries that consume 32% of our electricity, must apply Energy Conservation Systems

and Management measures.

y  They can start producing their own energy with their own investment without depending

upon the grid.

y  Industrialists and new investors must consider the Energy Sector as good an investment

as any other. Needs image building.

y  Govt. must convert from inefficient gas plants to efficient ones in order to conserve

electric energy.

y  Govt. must consider investing in Solar Energy plants to produce Electricity as they

provide free energy, and are less mechanical than Wind Energy Plants. 

Page 25: 3825--ECIP FINAL ASSIGNMENT

8/7/2019 3825--ECIP FINAL ASSIGNMENT

http://slidepdf.com/reader/full/3825-ecip-final-assignment 25/25

P a g e | 25