C
ÐGENIVAR
CONSTRUCTION
SITE
MEET¡NG
#2
MEETING
SUMMARY
Construction
Site
Meeting
#2
Anaerobic
Treatment
ol
Septage/Corn
Stover
and Blosollds
to
Produce
Blogas,
Electrlcal Power
and
Treated
Blosollds
Townshlp of
Georglan
Bluffs
and
Townshlp of
Chatsworth
Date:
Thursday,
May27,2010
Tlme
9:15 a.m.
Proiect:
os.03-012-11-os
Locatlon:
Project
Site
Attendeee:
ill
5ifffiy:ii:ri"'Ä:;fi"?$iffi'l',;liio*
Mr.
Eugene
Säuka,
CHFour Biogas
lnc.
Mr.
Justin
Tudor,
CHFour Biogas
lnc.
Mr. Dean Patch,
Bahler
Mr. Max
Bahler, Bahler
Mr.
Marvin
Weppler,
Roads
Superintendent,
Township
of Chatsworth
Mr. Rick
Winìers,
Director
of
Public Works,
Township
of Georgian Bluffs
Mr.
Ross
Slaughter, P. Eng.,
GENIVAR
Consuttants Lp
Mr.
Chrls Wilson, P. Eng., GENIVAR Consultants
Lp
Ms.
Corie
DeGrool,
GENIVAR
Consultants
Lp
DleÌrlbutlon:
Those Present,
Mr.
Benjamin
Strahler,
Maple
Reinders
Prepared By:
Chris Wilson, P.Eng.
The
following
items wEre
discussed
at
ths
Construction
Site
Meeting #2
for the contrart for
the anaerobic
treatmant
ol
septage/com
stovar
and
biosollds
to
produco
biogas, el€ctrical
power
and
tteatod
biosolíds
for
the
Township
of Georgian
Blufls and the
Township
of
Chatswofth:
Actlon
Bv:
1.
The
Minutes
lrom
Construction
Site Meeting
#1
were
reviewed
and
the
following
comments
were
provided
in
reference
to the
iterns
in
the
Minutes.
1.
GENIVAR
has
submitted
a
letter
to
the
Owsn
Sound District
Office of the Ministry
of
Environment
to
receive
consent from
the
District Manager
that the
works
can
receive
wast€
other
than
hauled
sewag€
and waste
agricultural
projects
to
operate the
pasteurizer
or
utilize
othef
waste
feed
into
the
anaerobic
dþestar.
Cunently,
no response
has
been
received
from
the
Dístrict
Manager.
Once a
response
is received,
a
completed
application
will be
submitted to
the
MOE, Toronto
office
as well
as
the
Owen Sound
distric{
otlice.
The
application for
the
Air
and
Noise Approval
was
compteted
by
CHFour
and
has
been
received
by
GENIVAR.
GENIVAR
will
submit
the
apptication to
the MOE.
2,
The
Chief Building
Official for
Georgian
Bluffs
met with
GENIVAR
to
review
the
contract
drawíngs.
No major
concems
were lound
by
the
CBO and the
building
permit
for
the
project
would
be
issued
by
the
Municipality.
GENIVAR
OWEN
SOUND
945 Third Avenue
East, Suile 212,
Owen Sound,
Ontario
N4K
2K8
TEl.:
(519)
97€-7612
Fax
(519)
37ô,8OOB
8/10/2019 35. Construction Meeting #2 May 27, 2010
http://slidepdf.com/reader/full/35-construction-meeting-2-may-27-2010 2/3
L
Construction S¡le Me€ting
fz
Anaercbic T¡eatrnent
ol S€ptage/Biosol¡ds/Com
Stalks
to
Prodtrce
Blogas,
Electrlãl
Powe¡
and
Treated
Biosollds
-
Townshþ
ol
Georgian
Elufls ancl
Iow¡rship
of
Chatsworth Page
2
4.
5.
o.
7.
8.
GENIVAR
is
to
look furthor
into
the
issue
of
providing
fresh
anaerobic sludge for
starl-up.
CHFour
has
provided
GENIVAR
w¡th
a
l¡st
of acceptablo
materials
(i.e.
food wastes,
etc.) for
use
in
lhe anerobic
d¡gester.
GENIVAR
has
provided Maple
with
the
locations
and
pipe
inverts
for
the revised manhole locatlons.
A temporary 150 mm
septic
transfer
line
has been
provided
by
Mapls
to
blpass
lhe Control Building.
Payment
for Payment
Ceñificate #1 has not
been received
yet
by Maple.
Maple is
to
continuo to
provide
an
updated
schedule
(including
CHFour) to GENIVAR.
GENIVAR and Maple aro to
cont¡nue
to keep
track
of
material
quantities
and equipment timo for engineered
fill
and equipment
when
aulhorized by
GENIVAR.
100
mm of gravel cover has been provided
on
lhe
2l
m x
28.5
m
bale
storage
area.
The addilional
storag€ arEa
of
13 m x
30
m
nol
to be completed
has
been
credited to
the
proJect
in
amount of
approximately
$735.00.
It was
agreed that the access road from
the
alt€rnat€ service
road sntrance
shall be constructed
to avoid
the
swamp
to
save
cosls.
Mr.
Doug
Spear
will
be lhe key
contact on-site
representing
Maple
lor
the
time being
until
Kablr Mano
is
back on-síts.
The
project
sign
board layout
has
been
approved
by the
Municipality
lor construction. An
updated control
philosophy
for
thg drum screen, mixer
and
polymer
system
has
been
provided
to Maplo.
CHFour
is
to give
Maplenotice
prior
to
the gsnerator arriving on-
site. ll
is
preferred
that
a one
(1)
month's
notíce be
provided.
There was
discussion
wíth regards
to
providing
bollards
ât
tho
FOG
tank.
GENIVAR
¡s
to
look
into
the
number
of bollards
that
would
be
required and
a
Change Order will be issued
to
Maple,
GENIVAR has
contactsd Hydro
One
conceming
a
slte
inspection
to
sort
out
the details for
supplying and installing
the
util¡ty
transformer
and
other
issues
on-site
(i.e.
new hydro
pole,
additional
hydro
poles,
etc.).
Hydro
One has not
responded
yet
to wh6n a meeting
will
be set up.
GENIVAR
is to
follow
up
with additional calls.
The FIT application
was
completed
and submitted on
April
30,2010
by GENIVAF,
Build Canada
will be
províding
a
profile
ol
the
project
on
their
website.
The
profile
has not
been
sst up
currently.
Maple
would
like
to be
notified
when the
project
profile
appaars on tho
Build
Canada website.
Maple noted that lhey
are
on
schedule for
completion
of the
project
and there
were
no
significant
delays
during
the
construction
period
from
the
previous
construction meoting
on
April29,2010.
GEN]VAF
Maple/CHFour
GENIVAR/Maple
CHFour
GENIVAR
GENIVAR
GENIVAR
10.
11.
12.
13.
14.
17.
18.
19.
20.
21,
8/10/2019 35. Construction Meeting #2 May 27, 2010
http://slidepdf.com/reader/full/35-construction-meeting-2-may-27-2010 3/3
Constnrctlon
Sito
f\,b€ting
f2
Anåerþblc
Tr€aùn€nt
ot
Sêptag€/tsiosollds/Com
Stalks to
Prodræe
Biogae,
Ëlectrical
powsr
and
Tre4led
Eiosolids
-
Tow¡ship
of
Georgian
Blufls
and Township
of
Chais,¡rorth
Paoe
3
23. The
CHFour webcam has
not
been
installed
on-site
yet.
25.
CHFour
and
Maplo
ar6
to
continue to
look
¡nto
the
issue
of
CHFour
the
del¡very
date for
tho
CHFour MCC.
lt was
noted
that
the
electrical and
mechanical
sub-contractors
for
CHFour
had
not
b€€n select€d
to date.
Mapte/CHFour
2.
There
was
discussion
that
May
2Sh would
be the
cut
off
date for
the
submittal for
Payment
Cert¡ficate
#2.
3. As
per
the
schedule
updates normatly
submitted
by
Mapte
to
GENIvAR,
Maple
the Township
of
Georgian
Bluffs
and the Township
of
Chatsworth woutd
like
to be cc'd
by e-mail on these
schedule
updat€s,
4.
"a,ry _rains
had
occurred
previous
to
th6
construction
meeting.
Mr.
Ross
Slaughter of GENIVAR
noted
that
temporary
drainage
-ot
ttre
building foundations
should
be
provided
on site
as required
by the
conlract
documents.
lt
was
noted
that
GENIVAR
takes no
responsibility
for
any
damage to
the
loundations
due
to
insufficient
temporary
drainagó
melhods.
5.
The
digeslate storag€ tank invert localion is to be provided by GENIVAR
to
Maple.
GENIVAR
6. lt
was noted
that the
updated
Control Phitosophy
submitted
byGEN|VAR
to
Maple
is
to
be
included
under
Change
Directive
#9.
7.
lt
was
noted
that no Permit
To Take
WatEr woufd
be
completed
for
lhe Maple/GENIVAR
well
on-site.
The
maximum
watsr
taking
per
day
is
10,000
lGAUmin.
(approx,
7.0
IGPM).
This ftow
rate
must
b6 restricted
by
the
contractor
for
use in filling
up
the
digester.
8. lt
wag noted
that
through
lurther
conversation
with Hydro
Onê,
the
incoming
power
to
the site
is
4,800
kV
as opposed
to
2,400
kV
as
originally noted
in
the contract documents.
9.
lt was
noted
by
GENIVAR that
there will
be
a
site
meeting on
Jun6
14,
2010
at 8:30 a.m. with
the Project
Team
(municipatities).
10.
lt was
noted
that
TssA
would
provide
a
review
of
allgas
related
aspects
on-site, including
inspecting
the
cooling
bed
prior
to being buried.
11.
There was
discussion
conceming
backfilling
of
th6
tanks
earlíer
if
the
GENIVAR/Keilar
concrete breaks
meet
the strength
requirements.
This
is
to
be
discussed
by
GENIVAR
and Kellar
Engineering.
12.
There
was
dlscussion
that
the nexil
meet¡ng
would
be on
June 29,
2010
at
9:00 a.m. at the construclion
s¡te.
13. The
meeting
adjourned
at 10:30
a.m.
lf
there
are any
errors
or
omissions
in
the
above minutes,
please
contacl
the undersigned.
Prepared
by:
GENIVAR
Consultants LP
%%
risS.
Wílson, P.
Eng.
Environmental
Engineer
CSW/lem