C ÐGENIVAR CONSTRUCTION SITE MEET¡NG #2 MEETING SUMMARY Construction Site Meeting #2 Anaerobic Treatment ol Septage/Corn Stover and Blosollds to Produce Blogas, Electrlcal Power and Treated Blosollds Townshlp of Georglan Bluffs and Townshlp of Chatsworth Date: Thursday, May27,2010 Tlme 9:15 a.m. Proiect: os.03-012-11-os Locatlon: Project Site Attendeee: ill 5ifffiy:ii:ri"'Ä:;fi"?$iffi'l',;liio* Mr. Eugene Säuka, CHFour Biogas lnc. Mr. Justin Tudor, CHFour Biogas lnc. Mr. Dean Patch, Bahler Mr. Max Bahler, Bahler Mr. Marvin Weppler, Roads Superintendent, Township of Chatsworth Mr. Rick Winìers, Director of Public Works, Township of Georgian Bluffs Mr. Ross Slaughter, P. Eng., GENIVAR Consuttants Lp Mr. Chrls Wilson, P. Eng., GENIVAR Consultants Lp Ms. Corie DeGrool, GENIVAR Consultants Lp DleÌrlbutlon: Those Present, Mr. Benjamin Strahler, Maple Reinders Prepared By: Chris Wilson, P.Eng. The following items wEre discussed at ths Construction Site Meeting #2 for the contrart for the anaerobic treatmant ol septage/com stovar and biosollds produco biogas, el€ctrical power and tteatod biosolíds for the Township of Georgian Blufls and the Township of Chatswofth: Actlon Bv: 1. The Minutes lrom Construction Site Meeting #1 were reviewed and the following comments were provided in reference to the iterns in the Minutes. 1. GENIVAR has submitted a letter to the Owsn Sound District Office of the Ministry of Environment to receive consent from the District Manager that the works can receive wast€ other than hauled sewag€ and waste agricultural projects to operate the pasteurizer or utilize othef waste feed into the anaerobic dþestar. Cunently, no response has been received from the Dístrict Manager. Once a response is received, a completed application will be submitted to the MOE, Toronto office as well as the Owen Sound distric{ otlice. The application for the Air and Noise Approval was compteted by CHFour and has been received by GENIVAR. GENIVAR will submit the apptication to the MOE. 2, The Chief Building Official for Georgian Bluffs met with GENIVAR to review the contract drawíngs. No major concems were lound by the CBO and the building permit for the project would be issued by the Municipality. GENIVAR OWEN SOUND 945 Third Avenue East, Suile 212, Owen Sound, Ontario N4K 2K8 TEl.: (519) 97€-7612 Fax (519) 37ô,8OOB

Upload: massieguy

Post on 02-Jun-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

8/10/2019 35. Construction Meeting #2 May 27, 2010

http://slidepdf.com/reader/full/35-construction-meeting-2-may-27-2010 1/3

C

ÐGENIVAR

CONSTRUCTION

SITE

MEET¡NG

#2

MEETING

SUMMARY

Construction

Site

Meeting

#2

Anaerobic

Treatment

ol

Septage/Corn

Stover

and Blosollds

to

Produce

Blogas,

Electrlcal Power

and

Treated

Blosollds

Townshlp of

Georglan

Bluffs

and

Townshlp of

Chatsworth

Date:

Thursday,

May27,2010

Tlme

9:15 a.m.

Proiect:

os.03-012-11-os

Locatlon:

Project

Site

Attendeee:

ill

5ifffiy:ii:ri"'Ä:;fi"?$iffi'l',;liio*

Mr.

Eugene

Säuka,

CHFour Biogas

lnc.

Mr.

Justin

Tudor,

CHFour Biogas

lnc.

Mr. Dean Patch,

Bahler

Mr. Max

Bahler, Bahler

Mr.

Marvin

Weppler,

Roads

Superintendent,

Township

of Chatsworth

Mr. Rick

Winìers,

Director

of

Public Works,

Township

of Georgian Bluffs

Mr.

Ross

Slaughter, P. Eng.,

GENIVAR

Consuttants Lp

Mr.

Chrls Wilson, P. Eng., GENIVAR Consultants

Lp

Ms.

Corie

DeGrool,

GENIVAR

Consultants

Lp

DleÌrlbutlon:

Those Present,

Mr.

Benjamin

Strahler,

Maple

Reinders

Prepared By:

Chris Wilson, P.Eng.

The

following

items wEre

discussed

at

ths

Construction

Site

Meeting #2

for the contrart for

the anaerobic

treatmant

ol

septage/com

stovar

and

biosollds

to

produco

biogas, el€ctrical

power

and

tteatod

biosolíds

for

the

Township

of Georgian

Blufls and the

Township

of

Chatswofth:

Actlon

Bv:

1.

The

Minutes

lrom

Construction

Site Meeting

#1

were

reviewed

and

the

following

comments

were

provided

in

reference

to the

iterns

in

the

Minutes.

1.

GENIVAR

has

submitted

a

letter

to

the

Owsn

Sound District

Office of the Ministry

of

Environment

to

receive

consent from

the

District Manager

that the

works

can

receive

wast€

other

than

hauled

sewag€

and waste

agricultural

projects

to

operate the

pasteurizer

or

utilize

othef

waste

feed

into

the

anaerobic

dþestar.

Cunently,

no response

has

been

received

from

the

Dístrict

Manager.

Once a

response

is received,

a

completed

application

will be

submitted to

the

MOE, Toronto

office

as well

as

the

Owen Sound

distric{

otlice.

The

application for

the

Air

and

Noise Approval

was

compteted

by

CHFour

and

has

been

received

by

GENIVAR.

GENIVAR

will

submit

the

apptication to

the MOE.

2,

The

Chief Building

Official for

Georgian

Bluffs

met with

GENIVAR

to

review

the

contract

drawíngs.

No major

concems

were lound

by

the

CBO and the

building

permit

for

the

project

would

be

issued

by

the

Municipality.

GENIVAR

OWEN

SOUND

945 Third Avenue

East, Suile 212,

Owen Sound,

Ontario

N4K

2K8

TEl.:

(519)

97€-7612

Fax

(519)

37ô,8OOB

8/10/2019 35. Construction Meeting #2 May 27, 2010

http://slidepdf.com/reader/full/35-construction-meeting-2-may-27-2010 2/3

L

Construction S¡le Me€ting

fz

Anaercbic T¡eatrnent

ol S€ptage/Biosol¡ds/Com

Stalks

to

Prodtrce

Blogas,

Electrlãl

Powe¡

and

Treated

Biosollds

-

Townshþ

ol

Georgian

Elufls ancl

Iow¡rship

of

Chatsworth Page

2

4.

5.

o.

7.

8.

GENIVAR

is

to

look furthor

into

the

issue

of

providing

fresh

anaerobic sludge for

starl-up.

CHFour

has

provided

GENIVAR

w¡th

a

l¡st

of acceptablo

materials

(i.e.

food wastes,

etc.) for

use

in

lhe anerobic

d¡gester.

GENIVAR

has

provided Maple

with

the

locations

and

pipe

inverts

for

the revised manhole locatlons.

A temporary 150 mm

septic

transfer

line

has been

provided

by

Mapls

to

blpass

lhe Control Building.

Payment

for Payment

Ceñificate #1 has not

been received

yet

by Maple.

Maple is

to

continuo to

provide

an

updated

schedule

(including

CHFour) to GENIVAR.

GENIVAR and Maple aro to

cont¡nue

to keep

track

of

material

quantities

and equipment timo for engineered

fill

and equipment

when

aulhorized by

GENIVAR.

100

mm of gravel cover has been provided

on

lhe

2l

m x

28.5

m

bale

storage

area.

The addilional

storag€ arEa

of

13 m x

30

m

nol

to be completed

has

been

credited to

the

proJect

in

amount of

approximately

$735.00.

It was

agreed that the access road from

the

alt€rnat€ service

road sntrance

shall be constructed

to avoid

the

swamp

to

save

cosls.

Mr.

Doug

Spear

will

be lhe key

contact on-site

representing

Maple

lor

the

time being

until

Kablr Mano

is

back on-síts.

The

project

sign

board layout

has

been

approved

by the

Municipality

lor construction. An

updated control

philosophy

for

thg drum screen, mixer

and

polymer

system

has

been

provided

to Maplo.

CHFour

is

to give

Maplenotice

prior

to

the gsnerator arriving on-

site. ll

is

preferred

that

a one

(1)

month's

notíce be

provided.

There was

discussion

wíth regards

to

providing

bollards

ât

tho

FOG

tank.

GENIVAR

¡s

to

look

into

the

number

of bollards

that

would

be

required and

a

Change Order will be issued

to

Maple,

GENIVAR has

contactsd Hydro

One

conceming

a

slte

inspection

to

sort

out

the details for

supplying and installing

the

util¡ty

transformer

and

other

issues

on-site

(i.e.

new hydro

pole,

additional

hydro

poles,

etc.).

Hydro

One has not

responded

yet

to wh6n a meeting

will

be set up.

GENIVAR

is to

follow

up

with additional calls.

The FIT application

was

completed

and submitted on

April

30,2010

by GENIVAF,

Build Canada

will be

províding

a

profile

ol

the

project

on

their

website.

The

profile

has not

been

sst up

currently.

Maple

would

like

to be

notified

when the

project

profile

appaars on tho

Build

Canada website.

Maple noted that lhey

are

on

schedule for

completion

of the

project

and there

were

no

significant

delays

during

the

construction

period

from

the

previous

construction meoting

on

April29,2010.

GEN]VAF

Maple/CHFour

GENIVAR/Maple

CHFour

GENIVAR

GENIVAR

GENIVAR

10.

11.

12.

13.

14.

17.

18.

19.

20.

21,

8/10/2019 35. Construction Meeting #2 May 27, 2010

http://slidepdf.com/reader/full/35-construction-meeting-2-may-27-2010 3/3

Constnrctlon

Sito

f\,b€ting

f2

Anåerþblc

Tr€aùn€nt

ot

Sêptag€/tsiosollds/Com

Stalks to

Prodræe

Biogae,

Ëlectrical

powsr

and

Tre4led

Eiosolids

-

Tow¡ship

of

Georgian

Blufls

and Township

of

Chais,¡rorth

Paoe

3

23. The

CHFour webcam has

not

been

installed

on-site

yet.

25.

CHFour

and

Maplo

ar6

to

continue to

look

¡nto

the

issue

of

CHFour

the

del¡very

date for

tho

CHFour MCC.

lt was

noted

that

the

electrical and

mechanical

sub-contractors

for

CHFour

had

not

b€€n select€d

to date.

Mapte/CHFour

2.

There

was

discussion

that

May

2Sh would

be the

cut

off

date for

the

submittal for

Payment

Cert¡ficate

#2.

3. As

per

the

schedule

updates normatly

submitted

by

Mapte

to

GENIvAR,

Maple

the Township

of

Georgian

Bluffs

and the Township

of

Chatsworth woutd

like

to be cc'd

by e-mail on these

schedule

updat€s,

4.

"a,ry _rains

had

occurred

previous

to

th6

construction

meeting.

Mr.

Ross

Slaughter of GENIVAR

noted

that

temporary

drainage

-ot

ttre

building foundations

should

be

provided

on site

as required

by the

conlract

documents.

lt

was

noted

that

GENIVAR

takes no

responsibility

for

any

damage to

the

loundations

due

to

insufficient

temporary

drainagó

melhods.

5.

The

digeslate storag€ tank invert localion is to be provided by GENIVAR

to

Maple.

GENIVAR

6. lt

was noted

that the

updated

Control Phitosophy

submitted

byGEN|VAR

to

Maple

is

to

be

included

under

Change

Directive

#9.

7.

lt

was

noted

that no Permit

To Take

WatEr woufd

be

completed

for

lhe Maple/GENIVAR

well

on-site.

The

maximum

watsr

taking

per

day

is

10,000

lGAUmin.

(approx,

7.0

IGPM).

This ftow

rate

must

b6 restricted

by

the

contractor

for

use in filling

up

the

digester.

8. lt

wag noted

that

through

lurther

conversation

with Hydro

Onê,

the

incoming

power

to

the site

is

4,800

kV

as opposed

to

2,400

kV

as

originally noted

in

the contract documents.

9.

lt was

noted

by

GENIVAR that

there will

be

a

site

meeting on

Jun6

14,

2010

at 8:30 a.m. with

the Project

Team

(municipatities).

10.

lt was

noted

that

TssA

would

provide

a

review

of

allgas

related

aspects

on-site, including

inspecting

the

cooling

bed

prior

to being buried.

11.

There was

discussion

conceming

backfilling

of

th6

tanks

earlíer

if

the

GENIVAR/Keilar

concrete breaks

meet

the strength

requirements.

This

is

to

be

discussed

by

GENIVAR

and Kellar

Engineering.

12.

There

was

dlscussion

that

the nexil

meet¡ng

would

be on

June 29,

2010

at

9:00 a.m. at the construclion

s¡te.

13. The

meeting

adjourned

at 10:30

a.m.

lf

there

are any

errors

or

omissions

in

the

above minutes,

please

contacl

the undersigned.

Prepared

by:

GENIVAR

Consultants LP

%%

risS.

Wílson, P.

Eng.

Environmental

Engineer

CSW/lem