K-Rend scraped texture, through colour render - colour: Polar White
Splitface blockwork - Natural stone colour
Main EntrancePowder coated aluminium window & doors - RAL 7011
Powder coated louvred doors - RAL 7011
Powder coated fascias, gutters & RWP's - RAL 7011
Covered External AreaLevel Access
Splitface blockwork - Natural stone colour
Powder coated aluminium window & doors - RAL 7011
K-Rend scraped texture, through colour render - colour: Polar White
Powder coated fascias, gutters & RWP's - RAL 7011
Powder coated fascias, gutters & RWP's - RAL 7011
Reception Glazed Windows Level Access Level Access
Corridor roof lightsDecra Stratos metal roof tile - Colour: Slate Grey
Extent of Canopy
Splitface blockwork - Natural stone colour
Classroom roof lights
Velux Roof Lights Velux Roof Lights
Powder coated aluminium window & doors - RAL 7011
Powder coated fascias, gutters & RWP's - RAL 7011
Classroom roof lights Corridor roof lightsResource Area roof lights
Link Corridor Level Access
Powder coated fascias, gutters & RWP's - RAL 7011
Velux Roof Lights Velux Roof Lights Velux Roof Lights
K-Rend scraped texture, through colour render - colour: Polar White
Decra Stratos metal roof tile - Colour: Slate Grey
Powder coated aluminium window & doors - RAL 7011
WC
Cloaks
Reception
Plant
Main Office10 sqm
WC
TW
TW
TW
Resource AreaStoreStore
Store
Cloaks
TW
Cloaks
Clnr
Store
Classroom 257sqm
Classroom 157sqm
Classroom 357sqm
Classroom 457sqm
Head Teacher14.5 sqm
Group Room10 sqm
Cloaks
External Covered Area
ITServer
Office7.7 sqm
MiniKitchen
PLAYING FIELD ELEVATION
ELEVATION FACING THE SCHOOL
MAIN CAR PARK ELEVATION
NURSERY CAR PARK ELEVATION
PROPOSED FLOOR PLAN
KS3 Classroom55.45m2
KS3 Classroom54.72m2
Library 55.45m2
Classroom55.34m2
KS3 Classroom56.72m2Resource Area
41.55m2
RWP RWP
RWP
RWP
RWP
RW
P
RWP
Location of
interactive
whiteboard
Resource Area
Store
Store
Store
Link Corridor
Hygiene Room
Shower
Classroom55.34m2
Resource Area
Store
Store
Store
Link Corridor
Hygiene Room
Shower
WORKS TO THE EXISTING SCHOOL
KEY PLAN
THE SCHOOL GOVERNORS ST LEONARD'S C E PRIMARY SCHOOL, MOOR LANE, PADIHAM, BURNLEY BB12 8HT
BASIC NEED CLASSROOM FACILITY AND ASSOCIATED WORKS
RevRevisionsDate
--- --
NOTES Project
Client 18 Eaton Avenue,Matrix Park,Euxton, Preston, PR7 7NA.Telephone 01772 425360Fax 01772 425369E-mail [email protected]
CHARTERED ARCHITECTSCHARTERED BUILDING SURVEYORS
COWAN & CORev.Drg. No.
CheckedDate
Drawn byScale
-
IHAS SHOWN
SEPT 13
3054/03
-
The Contractor shall comply with the current Building Regulations whether or not specifically stated on these drawings. The Contractor shall check and verify all building and site dimensions, levels and sewer invert levels at connection points before work starts.Do not scale measurements. If in doubt - ask.This drawing is copyright and may not be copied or given to a third party without written authority from Cowan and Co.
CDM Principles - Managing Hazards
Designers do not need to mention every hazard or assumption, as this can obscure significant issues, but they do need to point out significant hazards.
These are not necessarily those that result in the greatest risks but those that are:
A) Not likely to be obvious to a competent contractor or other designer.B) Unusual, orC) Likely to be difficult to manage effectively.
Amendments
Drawing Title
PROPOSED PLANS AND ELEVATIONS