K-Rend scraped texture, through colour render - colour: Polar White Splitface blockwork - Natural stone colour Main Entrance Powder coated aluminium window & doors - RAL 7011 Powder coated louvred doors - RAL 7011 Powder coated fascias, gutters & RWP's - RAL 7011 Covered External Area Level Access Splitface blockwork - Natural stone colour Powder coated aluminium window & doors - RAL 7011 K-Rend scraped texture, through colour render - colour: Polar White Powder coated fascias, gutters & RWP's - RAL 7011 Powder coated fascias, gutters & RWP's - RAL 7011 Reception Glazed Windows Level Access Level Access Corridor roof lights Decra Stratos metal roof tile - Colour: Slate Grey Extent of Canopy Splitface blockwork - Natural stone colour Classroom roof lights Velux Roof Lights Velux Roof Lights Powder coated aluminium window & doors - RAL 7011 Powd & RW Classroom roof lights Corridor roof lights Resource Area roof lights Link Corridor Level Access gutters Velux Roof Lights Velux Roof Lights Velux Roof Lights K-Rend scraped texture, through colour render - colour: Polar White Decra Stratos metal roof tile - Colour: Slate Grey Powder coated aluminium window & doors - RAL 7011 WC Cloaks Reception Plant Main Office 10 sqm WC TW TW TW Resource Area Store Store Store Cloaks TW Cloaks Clnr Store Classroom 2 57sqm Classroom 1 57sqm Classroom 3 57sqm Classroom 4 57sqm Head Teacher 14.5 sqm Group Room 10 sqm Cloaks External Covered Area IT Server Office 7.7 sqm Mini Kitchen PLAYING FIELD ELEVATION ELEVATION FACING THE SCHOOL MAIN CAR PARK ELEVATION NURSERY CAR PARK ELEVATION PROPOSED FLOOR PLAN KS3 Classroom 55.45m2 KS3 Classroom 54.72m2 Library 55.45m2 Classroom 55.34m2 KS3 Classroom 56.72m2 ResourceArea 41.55m2 Resource Area Store Store Store Link Corridor HygieneRoom Shower Classroom 55.34m2 Resource Area Store Store Store Link Corridor Hygiene Room Shower WORKS TO THE EXISTING SCHOOL KEY PLAN THE SCHOOL GOVERNORS ST LEONARD'S C E PRIMARY SCHOOL, MOOR LANE, PADIHAM, BURNLEY BB12 8HT BASIC NEED CLASSROOM FACILITY AND ASSOCIATED WORKS Rev Revisions Date - -- -- NOTES Project Client 18 Eaton Avenue, Matrix Park, Euxton, Preston, PR7 7NA. Telephone 01772 425360 Fax 01772 425369 E-mail admin@cowanandco.com CHARTERED ARCHITECTS CHARTERED BUILDING SURVEYORS COWAN & CO Rev. Drg. No. Checked Date Drawn by Scale - IH AS SHOWN SEPT 13 3054/03 - The Contractor shall comply with the current Building Regulations whether or not specifically stated on these drawings. The Contractor shall check and verify all building and site dimensions, levels and sewer invert levels at connection points before work starts. Do not scale measurements. If in doubt - ask. This drawing is copyright and may not be copied or given to a third party without written authority from Cowan and Co. CDM Principles - Managing Hazards Designers do not need to mention every hazard or assumption, as this can obscure significant issues, but they do need to point out significant hazards. These are not necessarily those that result in the greatest risks but those that are: A) Not likely to be obvious to a competent contractor or other designer. B) Unusual, or C) Likely to be difficult to manage effectively. Amendments Drawing Title PROPOSED PLANS AND ELEVATIONS

Upload: others

Post on 02-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 3054 03 Proposed Plan & Elevs - Borough of Burnley 0435 Drawing … · Decra Stratos metal roof Corridor roof lights tile - Colour: Slate Grey Extent of Canopy Splitface blockwork

K-Rend scraped texture, through colour render - colour: Polar White

Splitface blockwork - Natural stone colour

Main EntrancePowder coated aluminium window & doors - RAL 7011

Powder coated louvred doors - RAL 7011

Powder coated fascias, gutters & RWP's - RAL 7011

Covered External AreaLevel Access

Splitface blockwork - Natural stone colour

Powder coated aluminium window & doors - RAL 7011

K-Rend scraped texture, through colour render - colour: Polar White

Powder coated fascias, gutters & RWP's - RAL 7011

Powder coated fascias, gutters & RWP's - RAL 7011

Reception Glazed Windows Level Access Level Access

Corridor roof lightsDecra Stratos metal roof tile - Colour: Slate Grey

Extent of Canopy

Splitface blockwork - Natural stone colour

Classroom roof lights

Velux Roof Lights Velux Roof Lights

Powder coated aluminium window & doors - RAL 7011

Powder coated fascias, gutters & RWP's - RAL 7011

Classroom roof lights Corridor roof lightsResource Area roof lights

Link Corridor Level Access

Powder coated fascias, gutters & RWP's - RAL 7011

Velux Roof Lights Velux Roof Lights Velux Roof Lights

K-Rend scraped texture, through colour render - colour: Polar White

Decra Stratos metal roof tile - Colour: Slate Grey

Powder coated aluminium window & doors - RAL 7011

WC

Cloaks

Reception

Plant

Main Office10 sqm

WC

TW

TW

TW

Resource AreaStoreStore

Store

Cloaks

TW

Cloaks

Clnr

Store

Classroom 257sqm

Classroom 157sqm

Classroom 357sqm

Classroom 457sqm

Head Teacher14.5 sqm

Group Room10 sqm

Cloaks

External Covered Area

ITServer

Office7.7 sqm

MiniKitchen

PLAYING FIELD ELEVATION

ELEVATION FACING THE SCHOOL

MAIN CAR PARK ELEVATION

NURSERY CAR PARK ELEVATION

PROPOSED FLOOR PLAN

KS3 Classroom55.45m2

KS3 Classroom54.72m2

Library 55.45m2

Classroom55.34m2

KS3 Classroom56.72m2Resource Area

41.55m2

RWP RWP

RWP

RWP

RWP

RW

P

RWP

Location of

interactive

whiteboard

Resource Area

Store

Store

Store

Link Corridor

Hygiene Room

Shower

Classroom55.34m2

Resource Area

Store

Store

Store

Link Corridor

Hygiene Room

Shower

WORKS TO THE EXISTING SCHOOL

KEY PLAN

THE SCHOOL GOVERNORS ST LEONARD'S C E PRIMARY SCHOOL, MOOR LANE, PADIHAM, BURNLEY BB12 8HT

BASIC NEED CLASSROOM FACILITY AND ASSOCIATED WORKS

RevRevisionsDate

--- --

NOTES Project

Client 18 Eaton Avenue,Matrix Park,Euxton, Preston, PR7 7NA.Telephone 01772 425360Fax 01772 425369E-mail [email protected]

CHARTERED ARCHITECTSCHARTERED BUILDING SURVEYORS

COWAN & CORev.Drg. No.

CheckedDate

Drawn byScale

-

IHAS SHOWN

SEPT 13

3054/03

-

The Contractor shall comply with the current Building Regulations whether or not specifically stated on these drawings. The Contractor shall check and verify all building and site dimensions, levels and sewer invert levels at connection points before work starts.Do not scale measurements. If in doubt - ask.This drawing is copyright and may not be copied or given to a third party without written authority from Cowan and Co.

CDM Principles - Managing Hazards

Designers do not need to mention every hazard or assumption, as this can obscure significant issues, but they do need to point out significant hazards.

These are not necessarily those that result in the greatest risks but those that are:

A) Not likely to be obvious to a competent contractor or other designer.B) Unusual, orC) Likely to be difficult to manage effectively.

Amendments

Drawing Title

PROPOSED PLANS AND ELEVATIONS