30 ° march 2012

22
www.bicy.it 30 ° March 2012 Methodology for definition of the bike mobility policies developed in the BICY Project and applied in the Municipalities of Cervia and Ravenna Joerg Schweizer University of Bologna [email protected]

Upload: nam

Post on 10-Jan-2016

17 views

Category:

Documents


0 download

DESCRIPTION

Methodology for definition of the bike mobility policies developed in the BICY Project and applied in the Municipalities of Cervia and Ravenna. Joerg Schweizer University of Bologna [email protected]. 30 ° March 2012. Bicycling for Everyone. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 30 °  March 2012

www.bicy.it

30° March 2012

Methodology for definition of the bike mobility policies developed in the BICY

Project and applied in the Municipalities of Cervia and Ravenna

Joerg Schweizer University of Bologna

[email protected]

Page 2: 30 °  March 2012

www.bicy.it

Bicycling for Everyone

Page 3: 30 °  March 2012

www.bicy.it

Example: Numero medio biciclette in transito al giorno

• Via ROMEA SUD

• Direzione: ROT. BRETAGNA

• Indagine: 14-20/09/2011

Dati ci aiutano Ad aiutare I ciclisti

Page 4: 30 °  March 2012

www.bicy.it

Common Indicator analyses framework

Page 5: 30 °  March 2012

www.bicy.it

L’esperienza del ciclista a Ravenna?

Sicurezza?Tempo?Furti?Piste ciclabili?

Page 6: 30 °  March 2012

www.bicy.it

Erfurt, March 12, 2012

Page 7: 30 °  March 2012

www.bicy.it

Ciclisti Italiani si sentono meno rispettati

Page 8: 30 °  March 2012

www.bicy.it

Erfurt, March 12, 2012

Page 9: 30 °  March 2012

www.bicy.it

Troviamo parcheggi?

Page 10: 30 °  March 2012

www.bicy.it

Erfurt, March 12, 2012

Page 11: 30 °  March 2012

www.bicy.it

Page 12: 30 °  March 2012

www.bicy.it

Erfurt, March 12, 2012

Page 13: 30 °  March 2012

www.bicy.it

Erfurt, March 12, 2012

Page 14: 30 °  March 2012

www.bicy.it

Carbon reductions, three scenarios

Erfurt, March 12, 2012

Page 15: 30 °  March 2012

www.bicy.it

Analisi costi benefici(HEAT http://www.thepep.org)

Erfurt, March 12, 2012

Page 16: 30 °  March 2012

www.bicy.it

RAVENNA!

Page 17: 30 °  March 2012

www.bicy.it

Da 15% a 30% bisogna raddopiare la lunghezzadelle ciclabili

Page 18: 30 °  March 2012

www.bicy.it

• Finanziamento di piste ciclabili (per radoppiare)» Costo /km corsia ciclabile 22.000€.  » Costo/km pista ciclabile (nuova) 250.000€.

• Finanziamento per parcheggi sicuri» Costo per 10 postazioni ca. 750€.» Incentivi per case e negozi di installare parcheggi.

• Unico coordinatore per le attività bici» Bicycle office

Actions!

Page 19: 30 °  March 2012

www.bicy.it

Lavorare su tutti i fronti:• Coordinamento multimodale• Educazione / Scuole• Affari/promozione/turismo• Misure complementare (meno parchecci,

restrizione di accessi, limiti di velocità)• Protezione legale, applicare la legge!• Innovazioni! (E-bikes, Bikesharing+GPS, etc.)

Page 20: 30 °  March 2012

www.bicy.it

Monitoring• BYPAD audit ogni 2-3 years

• Registrare tutti I cambiamenti (parcheggi, piste ciclabili)

• Misurazione flussi

• Mobility survey ogni 5 anni

• Registrare dati geo-referenziati su feriti, decessi e collisioni

• Pubblicazione dati su Internet

• Public Involvement

Page 21: 30 °  March 2012

www.bicy.it

CERVIA!

Page 22: 30 °  March 2012

www.bicy.it

Da 25% a 50%, raddopiare lePiste ciclabile