ILC DR Workshop - KEK Results of TiN conditioning in PEP-II e+ beam line SEY of Tin-samples measured before and after 2-months conditioning in the beam line. 2 samples inserted respectively in the synchrotron radiation fan plane (0 o position) and out of this plane (45 o ). ILC tests, M. Pivi et al. – SLAC Before installation in beam line After beam conditioning e- dose > 40mC/mm**2 Similar low SEY recently measured in situ in KEKB beam line S. Kato, Y. Suetsugu et al.TRANSCRIPT
![Page 1: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/1.jpg)
3rd INSTALLATION: chicane magnetic field tests
PEP-II e+ ring
1st and 2nd
Feb 2008
Electron cloud installation studies at SLAC
ILC tests - SLACCherrill Spencer
![Page 2: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/2.jpg)
ILC DR Workshop - KEK
““Ecloud1” SEY test station in PEP-II SLACEcloud1” SEY test station in PEP-II SLAC
Transfer system at 0o
PEP-II LER e+
Transfer system at 45o
2 samples facing beam pipe are irradiated by SR
Isolation valves
ILC tests, M. Pivi et al. – SLAC
![Page 3: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/3.jpg)
ILC DR Workshop - KEK
Results of TiN conditioning in PEP-II e+ beam line
SEY of Tin-samples measured before and after 2-months conditioning in the beam line. 2 samples inserted respectively in the synchrotron radiation fan plane (0o position) and out of this plane (45o).
ILC tests, M. Pivi et al. – SLAC
Before installation in beam line
After beam conditioning
e- dose > 40mC/mm**2
Similar low SEY recently measured in situ in KEKB beam line S. Kato, Y. Suetsugu et al.
![Page 4: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/4.jpg)
LER#1
XPS Before installation XPS After exposure in PEP-II LER for 2 months (e dose 40mC/mm^2)
Carbon content is strongly reduced after exposition to PEP-II LER synchrotron radiation + electron + ion conditioning. This is a different result if compared to electron (only) conditioning in laboratory set-up where carbon crystals growth has been observed by many laboratories.
Surface analysis: Carbon content decrease
TiN samples: X-ray Photon Spectroscopy.
ILC tests, M. Pivi et al. – SLAC
![Page 5: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/5.jpg)
Results of NEG conditioning in PEP-II e+ beam line
ILC tests – SLAC
NEG as received
After beam conditioning
March 2008
After NEG heating
![Page 6: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/6.jpg)
![Page 7: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/7.jpg)
KEK, Feb 2008
![Page 8: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/8.jpg)
Clearing electrodes in KEKB magnetic free region
Y. Suetsugu, KEK
![Page 9: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/9.jpg)
Y. Suetsugu, KEK
![Page 10: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/10.jpg)
11 March, 2008 SPS meeting. Mauro Pivi SLAC
Gianluigi Arduini, Elena Chapochnikova, Paolo Chiggiato, Miguel Jimenez, Mauro Taborelli (CERN) Mauro Pivi, Lanfa Wang, Frank Cooper, Munro Morrison (SLAC)Marco Venturini, Miguel Furman (LBNL)
SPS Groove Chamber Tests Collaborators
![Page 11: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/11.jpg)
Secondary electron yield (SEY) estimate: SPS Groove
0 100 200 300 400 500 600 7000
0.2
0.4
0.6
0.8
1
1.2
1.4
Energy (eV)
SEY
0=1.20,B=2 Tesla,Rtip=0.13mm,H=2mm
Grooved SurfaceFlat Surface
0 200 400 600 8000
0.2
0.4
0.6
0.8
1
1.2
1.4
Energy (eV)
SEY
Grooved SurfaceFlat Surface
0=1.20,B=2 Tesla,Rtip=0.13mm,H=1mm
Height=2mm Height=1mm
In this simulation the groove height is taken to be the effective total height from top to valley
Lanfa Wang, SLAC
![Page 12: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/12.jpg)
Marco Venturini, LBNL
electron cloud build-up as a function of time for 1mm deep grooves with angle alpha =80 deg, for various choices of the groove tip radius. Groove on bottom and top sides. In these simulations hg=1mm is the height of the groove triangle.
Simulation of electron cloud build up
![Page 13: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/13.jpg)
•Max. e-cloud linear density vs. groove tip radius (SEY=1.3)•For flat surfaces the max. linear density is ~ 1.5 nC/m). •In the SPS tests, grooves on top and bottom side. •In these simulations hg=1mm is the height of the groove triangle.
Marco Venturini, LBNL
Simulation of electron cloud build up
![Page 14: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/14.jpg)
• Roundness of tips and valley is important• Manufacture Tolerances on roundness are
rather tight for 1mm grooves
• Few more work on simulations:– In the SPS, would it be more realistic to assume
initial SEY=1.5 (?!), since no photon scrubbing. – Define tolerance roundness to obtain SEY<1– For small 1mm groove important to consider the
effective groove height (after roundness)
![Page 15: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/15.jpg)
munro 16
TRIANGULAR GROOVE CHAMBER MFG
January , 2008
![Page 16: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/16.jpg)
RequirementsTriangular Grooves
Groove Width 0.35 mm Groove Depth 1 mmOverall Depth 2 mmGroove Length 0.5 M
Taper Angle 20 degreesRadius at Top & Bottom 0
![Page 17: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/17.jpg)
Basic Problems• Very small grooves are difficult to fab• Sharp radii at base & top of grooves
unattainable by normal mfg methods • Mfg options are to either have grooves as
part of vac chamber, or fab grooves as separate item & then attach to vac chamber.
![Page 18: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/18.jpg)
Mfg Options• Extrusion: Very small radii at top & bottom of
grooves are difficult to mfg• Machining: Mill multiple slots in solid material• Metal Folding: Form multiple folds• EDM: Small radii are beyond normal tolerances • Brazed-up Assembly: Use individual razor type
foil blades• Isostatic Pressing or Metal Injection Molding:
Uses powdered metal & binders which would probably would not be suitable for vacuum usage. Also have difficulty in forming small radii
![Page 19: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/19.jpg)
Groove Options Manufactured
Series of aluminum extrusions fabricated• Grooves all around chamber (2 different
groove profiles)• Grooves at top & bottom of chamber• Separate linear extrusion for insertion into
existing stainless vacuum chamber
![Page 20: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/20.jpg)
Cost Considerations
• Assuming long sections required, the extrusion approach is by far the least expensive.
• Limited to aluminum material • Copper may be possible, but could not find
vender
![Page 21: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/21.jpg)
Aluminum triangular grooves by ALMAG.Original design for the SPS: 2mm depth, limited by the groove sharpness.SLAC 2008
![Page 22: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/22.jpg)
Aluminum triangular groove:
depth 1.9mm, angle 20deg, radius top 0.095mm, radius valley 0.140mm
![Page 23: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/23.jpg)
With final geometryThe real geometry:
radius of tip=0.095mm
radius of valley =0.14mm
0 100 200 300 400 500 600 7000.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
Energy (eV)
SEY
0=1.50,Height=1.9mm, =200
Flat surfacer=0.14mm,B=2 Teslar=0.14mm,B=0.2Teslar=0.09mm,B=2 Teslar=0.09mm,B=0.2Teslaaverage,B=2 Tesla
Lanfa Wang, SLAC
![Page 24: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/24.jpg)
Manufacturing Options depth 1mm: Metal Folding
Metal Folding: Form multiple folds. [EMEGA Company, USA]
![Page 25: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/25.jpg)
Manufacturing Options depth 1mm: Razor Blades
![Page 26: 3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill](https://reader036.vdocuments.mx/reader036/viewer/2022062401/5a4d1b287f8b9ab059997ee1/html5/thumbnails/26.jpg)
Brazed-up Assembly: Use individual razor type foil blades
Manufacturing Options depth 1mm: Razor Blades