3- precedence network
TRANSCRIPT
8/10/2019 3- Precedence Network
http://slidepdf.com/reader/full/3-precedence-network 1/11
Tutorial # 3Precedence Network
King Saud University
College of Engineering
GE 404 Engineering Management
8/10/2019 3- Precedence Network
http://slidepdf.com/reader/full/3-precedence-network 2/11
Important extension to the original activity-on-nodeIncludes precedence relationships among the activities
specify a “lead/lag time” associated with any of the precedence relationships
one activity will overlap another in some fashion.Lag time can be designated on a dependency line witha positive, negative, or zero value.
Limitations and Disadvantages of Lag:Lag would complicate the scheduling process.Lags are not extensively used except where the timeeffects are substantial for special project type.
Precedence Diagramming
8/10/2019 3- Precedence Network
http://slidepdf.com/reader/full/3-precedence-network 3/11
8/10/2019 3- Precedence Network
http://slidepdf.com/reader/full/3-precedence-network 4/11
10
A
40
B
20
C
20
D
15
E
SS 5
SF 10
FF 10
SF 5FS 6
ES D EF
Act FF
LS TF LF
Example1Given a precedence network for small project. Find:
All times
Project duration Critical path
8/10/2019 3- Precedence Network
http://slidepdf.com/reader/full/3-precedence-network 5/11
0 10 10
A
5 40 45
B
16 20 36
C
35 20 55
D
30 15 45
E
SS 5
SF 10
FF 10
SF 5FS 6ES D EF
Ac t FF
j j j
jiji
jiji
iji
iji
i j
D ES EF DSF ES
D FF EF SS ES
FS EF
all Max ES
]2[
TimeInitial
)(]1[
Forward Pass ComputationsActivity A
10100
0TimeInitial
A D A ES A EF A ES
Activity B
45405
550
0TimeInitial)(
B B B
AB A B
D ES EF
SS ES A Max ES
Activity C
362016
16610
0TimeInitial)(
C DC ES C EF AC FS A EF A Max ES C
Activity D
552035
120516,
352010450TimeInitial
),(
D D D ES D EF D DCDSF C ES OR D
D BD
FF B
EF C B Max D ES
Activity E
45153030151035
0TimeInitial)(
E E E
E DE D E
D ES EF DSF ES
D Max ES
Notice: Terminal Time = 55Project duration =55
8/10/2019 3- Precedence Network
http://slidepdf.com/reader/full/3-precedence-network 6/11
0 10 10
A
0 0 10
5 40 45
B
5 0 45
16 20 36
C
35 19 55
35 20 55
D
35 0 55
30 15 45
E
40 10 55
SS 5
SF 10
FF 10
SF 5FS 6ES D EF
Ac t FF
Activity E
401555
55TimeTerminal
E D E LF E LS E LF
Activity D
352055
65201055
55TimeTerminal)(
D D D
D DE E D
D LF LS
DSF LF E Min LF
Activity A
01010
101055,
2963555TimeTerminal
),(
A D A LF A LS A D ABSS B LS OR AC
FS C
LS C B Min A LF
Backward Pass Computations
i i i
i ij j
i ij j
ij j
ij j
j i
D LF LS
D SF LF
D SS LS
F F LF
F S LS
e
al l M in LF
]4[
TimTerminal
)(]3[
Notice: Critical Path (A, B, D)Project duration =55
Activity C
352055
7020555
55TimeTerminal)(
D D D
C CD DC
D LF LS
DSF LF D Min LF
Activity B
54045451055
55TimeTerminal)(
B B B
BD D B
D LF LS FF LF
D Min LF
8/10/2019 3- Precedence Network
http://slidepdf.com/reader/full/3-precedence-network 7/11
0 10 10
A
0 0 10
5 40 45
B
5 0 45
16 20 36
C
35 19 55
35 20 55
D
35 0 55
30 15 45
E
40 10 55
SS 5
SF 10
FF 10
SF 5FS 6
ES D EF
Act FF
LS TF LF
Notice: Critical Path (A, B, D)Project duration =55
Final solution
8/10/2019 3- Precedence Network
http://slidepdf.com/reader/full/3-precedence-network 8/11
10
A
20
C
12
E
14
F
2
H
8
B
6
D
3
G
FS 4
SS 10
FF 2
SS 3
SF 5
FF 5
ZZ2,5
SS 3
ES D EF
Act FF
LS TF LF
Example2Given a precedence network for small project. Find:
All times
Project duration Critical path
8/10/2019 3- Precedence Network
http://slidepdf.com/reader/full/3-precedence-network 9/11
0 10 10
A
0 20 20
C
10 12 22
E
13 14 27
F
25 2 27
H
3 8 11
B
2 6 8
D
22 3 25
G
FS 4
SS 10
FF 2
SS 3
SF 5
FF 5
ZZ2,5 SS 3
ES D EF
Act FF
LS TF LF
j j j
jiji
jiji
iji
iji
i j
D ES EF
DSF ES
D FF EF
SS ES
FS EF
all Max ES
]2[
TimeInitial
)(]1[
Forward PassComputations
8/10/2019 3- Precedence Network
http://slidepdf.com/reader/full/3-precedence-network 10/11
0 10 10
A
0 10
0 20 20
C
7 27
10 12 22
E
10 22
13 14 27
F
13 27
25 2 27
H
25 27
3 8 11
B
8 16
2 6 8
D
7 13
22 3 25
G
22 25
FS 4
SS 10
FF 2
SS 3
SF 5
FF 5
ZZ2,5 SS 3
ES D EF
Ac t
FF
LS TF LF
Backward PassComputations
iii
iij j
iij j
ij j
ij j
ji
D LF LS DSF LF
DSS LS
FF LF
FS LS
e
all Min LF
]4[
TimTerminal
)(]3[
8/10/2019 3- Precedence Network
http://slidepdf.com/reader/full/3-precedence-network 11/11
0 10 10
A
0 0 10
0 20 20
C
7 7 27
10 12 22
E
10 0 22
13 14 27
F
13 0 27
25 2 27
H
25 0 27
3 8 11
B
8 5 16
2 6 8
D
7 5 13
22 3 25
G
22 0 25
FS 4
SS 10
FF 2
SS 3
SF 5
FF 5
ZZ2,5
SS 3
ES D EF
Act FF
LS TF LF
Total Float Computations
Notice:Project duration =27Critical Paths (A, E, F, H; A, E, G, H)