Hong Kong Institute of Vocational Education (Tsing Yi) Higher Diploma in Civil Engineering Construction Contract Administration and Project Management (CON 4371) Topic: Practicing measurement on Column base Lecture No. 3 Module Lecturer : Dr. Joseph Chan Contact Tel.: 3757 9162 Office: IVE(TY)-BU02a Contact email: [email protected] 1

Upload: terwabe-wapagovski

Post on 19-Jul-2016

58 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: 3 Practising measurement.pdf

Hong Kong Institute of Vocational Education (Tsing Yi)

Higher Diploma in Civil EngineeringConstruction Contract Administration and Project Management(CON 4371)Topic: Practicing measurement on Column baseLecture No. 3

Module Lecturer : Dr. Joseph ChanContact Tel.: 3757 9162 Office: IVE(TY)-BU02aContact email: [email protected]

1

Page 2: 3 Practising measurement.pdf

What is column base?

2

Page 3: 3 Practising measurement.pdf

3

What are the ingredients inside the column base

that we need to measure?

Page 4: 3 Practising measurement.pdf

4

Page 5: 3 Practising measurement.pdf

5

Page 6: 3 Practising measurement.pdf

6

Page 7: 3 Practising measurement.pdf

7

RC Column Base foundationDrawing No.: as stated

Taking-off List• Earthwork• Concrete Blinding• Reinforced Concrete• Formwork• Steel Reinforcement

Page 8: 3 Practising measurement.pdf

8

2 types of cap!

Different depths!

Page 9: 3 Practising measurement.pdf

9

Earthwork first!

Page 10: 3 Practising measurement.pdf

10

Size of the excavated hole(no working space would be allowed in Civil Engineering Measurement)

1.50m1.50m

2.00m2.00m

Depth29.50

- 27.302.20

+ 0.052.25

Depth29.50

- 25.903.60

+ 0.053.65

Page 11: 3 Practising measurement.pdf

11

Remember:All excavation are in soil(no rock or AHM)

Page 12: 3 Practising measurement.pdf

12

As referred to CESMM,The excavation is

measured as

Existing ground level

0 – 3m

3 – 6m

6 – 9m

Page 13: 3 Practising measurement.pdf

Remember

13

2.50m

5.50m3.

00m

Exc.; 0-3m dp

Exc.; 3-6m dp

Page 14: 3 Practising measurement.pdf

Remember

14

2.50m

5.50m

3.00

mExc.; 0-3m dp

Exc.; 3-6m dp

Page 15: 3 Practising measurement.pdf

15

Size of the excavated hole(no working space would be allowed in Civil Engineering Measurement)

1.50m1.50m

2.00m2.00m

Depth29.50

- 27.302.20

+ 0.052.25

Depth29.50

- 25.903.60

+ 0.053.65

0-3m 3-6m

3-6m0-3m

0-3m0-3m

Page 16: 3 Practising measurement.pdf

16

RC Column Base foundationDrawing No.: as stated

Taking-off List• Earthwork• Concrete Blinding• Reinforced Concrete• Formwork• Steel Reinforcement

You can write your draft calculation here.(Waste calculation)

Excavation for fdn,Material other than rock or artificial hard material, max. depth n.e. 3.00m

1.501.502.25

4

20.25

Excavation for fdn,Material other than rock or artificial hard material, max. depth 3.00-6.00m

2.002.003.65

29.20

2

20.25

29.20

Page 17: 3 Practising measurement.pdf

17

Sometimes, the excavated would be removed off site and deposited within site for backfilling use.

Excavation & deposition Backfilling above structure

Page 18: 3 Practising measurement.pdf

18

Excavated volume(m³)

Disposal off site(m³)

Deposition first(m³)

Backfill for Compaction(m³)

Page 19: 3 Practising measurement.pdf

19

Excavation for fdn,Material other than rock or artificial hard material, max. depth n.e. 3.00m

1.501.502.25

4

20.25

Excavation for fdn,Material other than rock or artificial hard material, max. depth 3.00-6.00m

2.002.003.65

29.20

2

and

Deposition general fill material, above fdn

and

Compaction general fill material, above fdn

and

Deposition general fill material, above fdn

and

Compaction general fill material, above fdn

m³m³

20.25 29.20

Page 20: 3 Practising measurement.pdf

20

Excavated material (m³)

Disposal (m³) Deposition & Compaction (m³)

Page 21: 3 Practising measurement.pdf

21

In-situ concrete grade 10/20S, OPC to BS12;Blinding concrete

1.501.500.05

0.45

and

4

2.002.000.05

0.40

2

0.85

Ddt – Deposition a.b.d.

andDdt – Compaction a.b.d.

andDisposal of material other than rock or AHM in tips provided by the Employer

a.b.d.: as before described.

Page 22: 3 Practising measurement.pdf

22

Excavated material (m³)

Disposal (m³) Deposition & Compaction (m³)

Page 23: 3 Practising measurement.pdf

23

In-situ reinforced concrete grade 30/20D, OPC to BS12

1.501.500.50

4.50

and

4

0.500.501.70

1.70

4Ddt – Deposition a.b.d.

andDdt – Compaction a.b.d.

andDisposal of material other than rock or AHM in tips provided by the Employer

2.002.000.75

6.00

2

0.500.502.85

1.43

2

13.63

Page 24: 3 Practising measurement.pdf

24

Excavated material (m³)

Disposal (m³) Deposition & Compaction (m³)

Page 25: 3 Practising measurement.pdf

25

Fwk Class F1; ex 300mm at any inclination; 85-90°1.50

0.50 12.00

4

0.501.70 13.60

4

2.000.75 12.00

4

0.502.85 11.40

4

49.00

4

4

2

2

Page 26: 3 Practising measurement.pdf

Steel Reinforcement

26

Page 27: 3 Practising measurement.pdf

27

Bar reinf., MS 10mmØ;n.e. 12m length to BS 44490.74

40.70

55

40.70m x 0.666 kg/m= 25.071 kg= 0.025 tonne

Bar reinf., HY 12mmØ;n.e. 12m length to BS 44491.59

50.88

32

50.88m x 0.888 kg/m= 45.181 kg= 0.045 tonne

Bar reinf., HY 16mmØ;n.e. 12m length to BS 44492.07

53.96

28

53.96m x 1.579 kg/m= 91.579 kg= 0.092 tonne

Bar reinf., HY 20mmØ;n.e. 12m length to BS 44491.00

30.00

30

30.00m x 2.466 kg/m= 73.98 kg= 0.074 tonne

m

m

m

m

Page 28: 3 Practising measurement.pdf

28

Page 29: 3 Practising measurement.pdf

29

Page 30: 3 Practising measurement.pdf

30

Page 31: 3 Practising measurement.pdf

Measurement techniquein

Civil Engineering Work

31

Page 32: 3 Practising measurement.pdf

Section 7 - Earthwork

Unit in (m³)

32

General / Structure / Foundation

Soil / Rock / Artificial Hard Mat’l

0-3m / 3-6m / 6-9m / ….

No depth range for general excavation

Page 33: 3 Practising measurement.pdf

Section 7 - Earthwork

33

Excavation volume

Disposal

Dep

ositi

on &

Bac

kfill

Dep

ositi

on &

Bac

kfill

Page 34: 3 Practising measurement.pdf

Section 10 - Formwork

Unit in (m²)

34F1 / F2 / F3 / F4 / F5

Check exceed 300mm or notIf n.e. 300mm If >300mmAny inclination 0-5°

5-85°85-90°

If curved, please stated

Page 35: 3 Practising measurement.pdf

Section 11 - Reinforcement

Unit in (tonne)

35

Bar reinforcement

Mild steel / High yield steel

Diameter and BS4449

Bar n.e. 12m in length

Page 36: 3 Practising measurement.pdf

Section 12 - Concrete

Unit in (m³)

36

What grade?Grade 10/20; Grade 30/20Any type of cement/PFAIf BS stated; state it. BS12

Blinding & no-fine MUST be stated if applicable

Page 37: 3 Practising measurement.pdf