3 finalised ground & first floor plans ready plot-first floor plan.pdf

2
 GROUND FLOOR PLAN 02-03-2015 1 : 100 STARTING DATE DATE SCALE DRA WN BY CHECKED BY MEASURED BY DRAWINGNO. SHEET NO. PROJECT TITLE 19-01-2015 KOH JING HAO & SANJEH KUMAR RAMAN PENANG GROUP PENANG GROUP DRAWING TITLE LHCO. 003 3 40 LEGENDS : 1 PAVEMENT 2 FIVE FOOT WALKWAY 3 HALL 1 4 AIR WELL 1 5 HALL 2 6 AIR WELL 2 7 TOILET 1 8 HALL 3 9 HALL 4 10 AIR WELL 3 11 INACCESSIBLE STAIRCASE 12 UT I LI TI ES ROOM 13 STOREROOM 14 TOILET 2 15 INACCE SSIBLEROOM  ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG LIAN HUAT COMPANY  A1 1 1 FFL : 0.000 SPACE NO. FINISH FLOOR LEVEL TIMBER DRAWING SHEET NO. DRAWING NAME TILES FINISHING TD1 40

Upload: weiyingsabrina

Post on 06-Oct-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

  • GROUND FLOOR PLAN02-03-2015

    1 : 100

    STARTING DATE

    DATE

    SCALE

    DRAWN BY

    CHECKED BY

    MEASURED BY

    DRAWING NO. SHEET NO.PROJECT TITLE

    19-01-2015

    KOH JING HAO & SANJEH KUMAR RAMAN

    PENANG GROUP

    PENANG GROUP

    DRAWING TITLE

    LHCO. 0033

    40

    LEGENDS :

    1 PAVEMENT

    2 FIVE FOOT WALKWAY

    3 HALL 1

    4 AIR WELL 1

    5 HALL 2

    6 AIR WELL 2

    7 TOILET 1

    8 HALL 3

    9 HALL 4

    10 AIR WELL 3

    11 INACCESSIBLE STAIRCASE

    12 UTILITIES ROOM

    13 STOREROOM

    14 TOILET 2

    15 INACCESSIBLE ROOM

    ARC1215METHODS OF DOCUMENTATION ANDMEASURED DRAWINGSLIAN HUAT COMPANY, 140 LEBUHCARNARVON, GEORGETOWNPENANG

    LIAN HUAT COMPANY

    A11

    1

    FFL : 0.000

    SPACE NO.

    FINISH FLOOR LEVEL

    TIMBER

    DRAWING SHEET NO.DRAWING NAME

    TILES FINISHING

    TD140