Mangoola Coal Mod 6 EA Final for Public Exhibition 15 3 Current operations 3.1 Approval history PA 06_0014 was originally granted under Part 3A of the EP&A Act in 2007 and includes approval to extract up to 10.5 Mtpa ROM coal for up to 21 years. Five modifications to PA 06_0014 have been approved to date, namely: Modification 1 – Early works modification; Modification 2 – Hunter River pipeline modification; Modification 3 – Relocation of mining infrastructure area; Modification 4 – Relocation of 500 kilovolt (kV) electricity transmission line (ETL) and mine modifications; and Modification 5 – Nighttime rail works. Modifications 1, 2, and 3 were identified prior to the commencement of construction following review of the plans and designs and were largely related to construction activities and the location and construction of infrastructure on the site. Modification 5 was identified after commencement of construction and related to requirements to undertake limited nighttime works during the construction phase. The works associated with each of these modifications were largely complete, or underway, as of February 2013. The modifications approved under Modification 4 were identified in order to address a key constraint of the mine plan approved under the original project, being the existing 500 kV ETL which bisects the resource to be extracted. The presence of the ETL meant that the mine plan had to be designed around this infrastructure, which resulted in two pits operating for life of the mine, either side of the ETL corridor in the initial stages of the mine life. This resulted in environmental constraints to mining operations such as disjointed rehabilitated final landform either side of the ETL corridor. Safety setback limits to the ETL were also required, which further constrained operations around the ETL resulting in the sterilisation of coal, and presented potential safety risks to personnel onsite. To overcome these constraints and improve the efficiency and optimise the resource recovery, Xstrata Mangoola proposed to relocate the ETL to the western perimeter of the approved project disturbance boundary. In conjunction with relocation of the ETL, a revised mine plan was proposed which largely comprises two operational pits, the Northern Pit and Southern Pit, together with improvements in mining methods to increase efficiencies of operation. Minor additional disturbance areas identified outside the approved project disturbance boundary were also proposed for resource recovery, operation of water management infrastructure, and alterations to drainage design surrounding the rail loop. Modification 4 of PA 06_0014 was approved on 22 June 2012 by the PAC under delegation from the Minister for Planning and Infrastructure. The associated Project Approval 10_0002 for the ETL relocation was granted to the proponent, TransGrid (NSW), on 16 July 2012.

Upload: others

Post on 28-Dec-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 3 Current operations - Major Projects

   

  Mangoola Coal Mod 6 EA Final for Public Exhibition  15 

3 Current operations 

3.1 Approval history 

PA 06_0014 was originally granted under Part 3A of the EP&A Act in 2007 and includes approval to extract up to 10.5 Mtpa ROM coal for up to 21 years.  

Five modifications to PA 06_0014 have been approved to date, namely: 

• Modification 1 – Early works modification; 

• Modification 2 – Hunter River pipeline modification; 

• Modification 3 – Relocation of mining infrastructure area; 

• Modification  4  –  Relocation  of  500  kilovolt  (kV)  electricity  transmission  line  (ETL)  and  mine modifications; and 

• Modification 5 – Night‐time rail works. 

Modifications 1, 2, and 3 were identified prior to the commencement of construction following review of the plans and designs and were largely related to construction activities and the location and construction of  infrastructure  on  the  site. Modification  5 was  identified  after  commencement  of  construction  and related to requirements to undertake limited night‐time works during the construction phase. The works associated with each of these modifications were largely complete, or underway, as of February 2013.  

The modifications approved under Modification 4 were identified in order to address a key constraint of the mine  plan  approved  under  the  original  project,  being  the  existing  500  kV  ETL which  bisects  the resource to be extracted. The presence of the ETL meant that the mine plan had to be designed around this infrastructure, which resulted in two pits operating for life of the mine, either side of the ETL corridor in the initial stages of the mine life. This resulted in environmental constraints to mining operations such as disjointed rehabilitated final  landform either side of the ETL corridor. Safety setback  limits to the ETL were also required, which further constrained operations around the ETL resulting  in the sterilisation of coal, and presented potential safety risks to personnel on‐site.   

To overcome  these constraints and  improve  the efficiency and optimise  the  resource  recovery, Xstrata Mangoola proposed  to  relocate  the ETL  to  the western perimeter of  the approved project disturbance boundary.  In  conjunction with  relocation  of  the  ETL,  a  revised mine  plan was  proposed which  largely comprises two operational pits, the Northern Pit and Southern Pit, together with improvements in mining methods to  increase efficiencies of operation. Minor additional disturbance areas  identified outside the approved project disturbance boundary were also proposed  for  resource  recovery, operation of water management  infrastructure, and alterations to drainage design surrounding the rail  loop. Modification 4 of PA 06_0014 was approved on 22 June 2012 by the PAC under delegation from the Minister for Planning and  Infrastructure. The associated Project Approval 10_0002  for  the ETL  relocation was granted  to  the proponent, TransGrid (NSW), on 16 July 2012. 

   

Page 2: 3 Current operations - Major Projects

   

  Mangoola Coal Mod 6 EA Final for Public Exhibition  16 

3.2 Approvals and tenements 

Table 3.1 outlines the relevant approvals, mining authorities, leases and licences which apply to Mangoola Coal. 

Table 3.1  Relevant approvals, mining authorities,  leases and  licences which apply  to Mangoola Coal 

Regulatory authority  Approval number  Title  Anniversary/expiration date 

Mining Authorities 

Department of Primary Industries (DPI) (now part of the Department of Trade and Investment, Regional Infrastructure and Services (DTIRIS)) 

ML 1626  Mining lease (ML) 1626  20 November 2029 

EL 5552  Exploration lease 5552  7 November 2014 

AL 9  Assessment lease 9  7 November 2014 

Mangoola Coal MOP   Mining Operations Plan (MOP) 

December 2013 

Environment protection licence 

Environment Protection Authority (EPA) 

EPL No. 12894  Environment protection licence (EPL) No. 12894 

Anniversary date 7 July 

Project approvals 

DP&I  Project approval 06_0014  Project approval  20 November 2029 

06_0014 MOD 1  Minor modification to project approval – early works 

20 November 2029 

06_0014 MOD 2  Modification to project approval – pipeline modification 

20 November 2029 

06_0014 MOD 3  Modification to project approval – mining infrastructure and CHPP 

20 November 2029 

06_0014 MOD 4  Modification to project approval – relocation of 500 kV and mine plan modifications  

20 November 2029   

06_0014 MOD 5  Modification to project approval – night time works 

20 November 2029 

Other licences 

EPA  RL 42108  Radiation licence 42108  28 April 2013 

NSW Office of Water (NOW)  Various groundwater licences 

A summary of groundwater licences is provided in the SWMP available on Xstrata Mangoola’s website. 

Various groundwater licences 

Various surface water access licences 

A summary of surface water access licences is provided in the Site Water Management Plan (SWMP) available on Xstrata Mangoola’s website. 

Various surface water access licences 

Page 3: 3 Current operations - Major Projects

   

  Mangoola Coal Mod 6 EA Final for Public Exhibition  17 

3.3 Key features of the current operations 

Key  features  of Mangoola  Coal’s  current  operations  are  summarised  in  Table  3.2.  The  location  of  the approved project disturbance boundary and mine infrastructure is shown on Figure 3.1. 

Table 3.2  Current operations 

Aspect  Current operations (as modified most recently under Modification 4) 

Extraction limit  Maximum extraction of 10.5 Mtpa of ROM coal. 

Project approval term  21 years to November 2029. 

Operating hours  Operation of the mine 24 hours per day, seven days per week. 

Number of employees   Operational workforce of up to 300 employees. 

Mining methods  Open‐cut truck and shovel operations to handle overburden and remove coal. 

Mining areas  Within approved project disturbance boundary as determined under Modification 4 (refer to Figure 3.1). 

Coal processing  Operation of the CHPP which includes a Coal Preparation Plant (CPP). A bypass system has been implemented which allows crushed coal to bypass the CPP and be transported directly by enclosed conveyor from the surge bin straight to the product coal stockpile area for transportation off‐site by the existing rail load‐out facilities. Placement of coarse rejects predominantly within mined areas. Tailings are managed through a series of in‐pit tailings dams, with ongoing management of overburden emplacement within mined areas.  

Infrastructure  Infrastructure comprises: 

• CHPP and associated infrastructure; 

• Northern Access Road and Wybong Road intersection; 

• rail infrastructure; 

• administration and employee facilities; 

• electrical power reticulation; 

• telecommunication cables; 

• water supply and sewage systems; 

• tailings and water management infrastructure including the Hunter River Pump Station and Hunter River Pipeline; 

• workshop and refuelling facilities; 

• lighting; and 

• explosives storage. 

External coal transport  Loading of product coal onto trains and transport to market via the Mangoola Coal rail loop and spur connected to the Muswellbrook‐Ulan railway. Up to 10 trains per day. 

3.4 Status of mine development 

Open‐cut mining commenced at Mangoola Coal  in September 2010. Extraction then commenced  in the Tailings  Pit  (refer  to  Figure  3.1),  progressing  in  a  north‐easterly  direction.  Water  management infrastructure  constructed  includes  the Raw Water Dam  (RWD), Pit Water Dam  (PWD), other  required sediment and erosion control  features and dams, and  the Hunter River Pump Station and Hunter River Pipeline (refer to Figure 3.1).  

   

Page 4: 3 Current operations - Major Projects

   

  Mangoola Coal Mod 6 EA Final for Public Exhibition  18 

Mangoola Coal operates within a SWMP and the requirements of relevant water sharing plans (refer to Section 5.4.6). Mangoola Coal has unit  shares of  the Hunter Regulated River Water  Source  and water access  licences  (WAL)  to  take water  from  the Hunter River,  via Mangoola Coal’s Hunter River Pipeline (refer Figure 3.1), to supplement on‐site water requirements. Mangoola Coal also holds salinity credits for the discharge of saline water to the Hunter River under the HRSTS; however, approval for discharge has not  previously  been  sought,  therefore,  saline  discharges  to  the  Hunter  River  are  not  part  of  current operations.  

Under  the  current approved mine plan, mining has  commenced  in  the Northern Pit  to  the east of  the existing  500 kV  ETL,  progressing  in  a  south‐easterly  direction.  A  separate  project  approval  has  been granted to TransGrid for the removal of the existing 9 km section of ETL which bisects the coal resource, and  construction of an 11.1 km  section of 500 kV ETL along  the western  side of  the approved project disturbance boundary (refer Figure 3.1). Of the 11.1 km, approximately 5.8 km is within Mangoola Coal’s approved project disturbance boundary. The ETL was a key constraint of the original mine plan. Once the relocation of the ETL has occurred and the existing ETL decommissioned and removed, the Northern Pit will progress largely as a single pit in a south‐westerly direction towards Anvil Hill.  

The Southern Pit  is expected  to  commence operation  in Year 5 of  the mine under  current operations, progressing  in a westerly to north‐westerly direction. The Southern Pit  joins up with the Northern Pit to form the Main Pit in approximately Year 8, which will then generally progress in a westerly direction. The Main Pit progresses around either side of Anvil Hill until completion of mining  in Year 15,  leaving a final void along the western perimeter of the approved project disturbance boundary. 

3.5 Environmental framework 

3.5.1 Environmental management strategy 

Mangoola Coal operates in accordance with a comprehensive Environmental Management Strategy (EMS) which provides the strategic context and is the overarching document for environmental management of current operations. The EMS has been prepared  in accordance with  the XCN Sustainable Development Management Framework and the requirements of PA 06_0014.  

Xstrata Mangoola implements an Environmental Monitoring Program for current operations. The program includes  the monitoring of noise and  vibration, air quality,  surface water, groundwater, ecological and meteorological  monitoring.  The  data  is  used  in  measuring  ongoing  environmental  performance  of operations against  regulatory  requirements. This  includes  requirements under PA 06_0014 and EPL No. 12894. The existing monitoring network, as of April 2013, is shown in Figure 3.2 and includes:  

• two weather stations on Wybong Road (WS1) (used for compliance purposes) and Coolabah Road (WS2); 

• 21 dust deposition gauges; 

• seven high volume air samplers (HVAS); 

• four tapered element oscillating microbalance (TEOMs) instruments; 

• five  continuous  unattended  noise monitoring  locations,  and  five  attended monitoring  locations which are monitored on a quarterly basis; 

• four vibration monitoring locations; 

Page 5: 3 Current operations - Major Projects

   

  Mangoola Coal Mod 6 EA Final for Public Exhibition  19 

• 50 groundwater monitoring locations; and 

• 17 surface water monitoring locations.  

Xstrata Mangoola also employs two Beta Attenuation Monitors (BAM) and an E‐sampler to measure PM2.5 and  PM10,  respectively,  which  do  not  have  permanent  monitoring  locations  and  are  used  as supplementary monitoring. 

Monitoring data is reported annually in accordance with Mangoola Coal’s relevant approvals.  

A  suite  of  management  plans  and  monitoring  programs  have  been  implemented  for  operations  in accordance with PA 06_0014. A  summary of  the current  status of Mangoola Coal’s management plans and monitoring programs  required under PA 06_0014  is presented  in Table 3.3. Relevant management plans will be updated, where required, to include the proposed modification.   

Table 3.3  Summary  of  current  status  of Mangoola  Coal’s management  plans  and monitoring programs 

PA 06_0014 condition  Requirement  Status  Comment 

Schedule 3, Condition 11  Noise Management Plan (NMP) 

Submitted 31/10/2012  Awaiting approval (Mod 4 Amended) 

Schedule 3, Condition 19  Road Closure Plan   Approved 17/05/2011  Revision will be submitted in April 2013 to MSC and DRE. 

Schedule 3, Condition 23  Blast Monitoring Program  Re‐submitted 21/12/2010  DP&I feedback incorporated Will be reviewed in 2013 

Schedule 3, Condition 27  Air Quality Management Plan (AQMP) 

Submitted 31/10/2012  Awaiting approval (Mod 4 Amended) 

Schedule 3, Condition 31  SWMP (and its components)  Re‐submitted 10/12/2012  DP&I feedback incorporated Will be reviewed in 2013 

Schedule 3, Condition 32  Site Water Balance  Re‐submitted 10/12/2012  As above 

Schedule 3, Condition 33  Erosion and Sediment Control Plan 

Re‐submitted 10/12/2012  As above 

Schedule 3, Condition 34  Surface Water Monitoring Plan 

Re‐submitted 10/12/2012  As above 

Schedule 3 Condition 35  Groundwater Monitoring Program 

Re‐submitted 10/12/2012  As above 

Schedule 3, Condition 36  Surface and Groundwater Response Plan 

Approved  19/12/2012  As above 

Schedule 3, Condition 40A  Translocation Plan  Approved  19/02/2013  Modification 4 addition 

Schedule 3, Condition 41  Landscape Management Plan (and its components) 

Re‐submitted 21/12/2010  DP&I feedback incorporated Will be reviewed in 2013 

Schedule 3, Condition 42  Rehabilitation and Offset Management Plan 

Re‐submitted 21/12/2010  DP&I feedback incorporated Will be reviewed in 2013 

Schedule 3, Condition 43  Final Void Management Plan  Re‐submitted 21/12/2010  DP&I feedback incorporated 

Schedule 3, Condition 44  Mine Closure Plan  Re‐submitted 21/12/2010  DP&I feedback incorporated 

Schedule 3, Condition 46  Aboriginal Cultural Heritage Management Plan 

Submitted 25/08/08  Approved 5/1/2009 

Schedule 3, Condition 48  Conservation Management Strategy 

Submitted 4/08/2010  Under review ‐ submission planned for April 2013 

Page 6: 3 Current operations - Major Projects

   

  Mangoola Coal Mod 6 EA Final for Public Exhibition  20 

Table 3.3  Summary  of  current  status  of Mangoola  Coal’s management  plans  and monitoring programs 

PA 06_0014 condition  Requirement  Status  Comment 

Schedule 3, Condition 51 and 51A 

Construction Traffic Management Plan 

Submitted 19/02/2010  Approved  

Schedule 3, Condition 53  Visual Assessment Report  Submitted 6/5/2008  Approved 27/05/2008 

Schedule 3, Condition 58  Energy Savings Action Plan  Re‐submitted 13/01/2011  DP&I feedback incorporated 

Schedule 5, Condition 1  Environmental Management Strategy 

Re‐Submitted 2/12/2010  DP&I feedback incorporated 

Schedule 5, Condition 2  Environmental Monitoring Program 

Submitted 10/01/2011  Updated to reflect changes to referenced plans. 

Statement of Commitments  Spontaneous Combustion Management Plan 

Complete  Latest Version (4): 02/01/2012 

3.5.2 Best endeavours to acquire 

Schedule 3, Condition 2 of PA 06_0014 requires Xstrata Mangoola to demonstrate its best endeavours to either acquire all of the land where landowners are entitled to acquisition rights, as identified in the table in Appendix 5 of PA 06_0014 (being properties adversely affected by noise, blasting and/or air quality), or enter into a negotiated agreement with these landowners. In accordance with Schedule, 3 Condition 2 of PA  06_0014,  a  report  was  submitted  to  DP&I  prior  to  the  commencement  of mining  operations  to demonstrate  its best endeavours  to acquire  the  land specified  in Appendix 5. The properties  remaining from the table in Appendix 5 of PA 06_0014, in May 2013, are presented in Table 3.4.  

Table 3.4  Landowners with acquisition rights 

Residential receptor ID 

Owner  Lot  DP  Significant noise impact 

Significant Air Impact 

Significant Blast Impact ‐ Vibration 

Significant Blast Impact ‐ Overpressure 

Residences 

56   Buddin KW & Bezzina S   23   240086   Yes   Yes   Yes   Yes  

34   Cole G R   186   750924   Yes   ‐  ‐  ‐ 

121  Fairweather JA   2   593485   Yes   ‐  ‐  ‐ 

132   Horden RJ & AM   180   750924   Yes   ‐  ‐  ‐ 

81   Phelps JR & CM   12   240086   Yes   ‐  ‐  ‐ 

83   Ray MD & JT   9   750968   ‐  Yes   Yes   Yes  

25   Withers KL, LA, RIC & PJ RAY   168   750968   Yes   ‐  Yes   Yes  

Additional Properties >25% Affected 

‐  Googe FN & WL   1/1   75029/ 414239   Yes   ‐  ‐  ‐ 

‐  Fairweather CR, ALJ, JMA & WS1  

68‐71,  76, 77  750924  Yes   ‐  ‐  ‐ 

66   LeBreton   122  585122  Yes   ‐  ‐  ‐ 

164   Valantine, MG   88  818690  Yes   ‐  ‐  ‐ Notes:  1. The Lot and DP for this property are incorrectly stated in Appendix 5 of PA 06_0014 as Lot 71 DP 9011088. 

Page 7: 3 Current operations - Major Projects

Figure 3.1

!

!

!

LIMB OF ADDY HILL

WALLABY ROCKS

ANVILHILL

MANG

OOLA

ROAD

MUSWELLBROOK - ULAN RAILWAY

HUNT

ER RIVER

RIDGELANDS ROAD

WYBONG ROAD

MANGOOLA ROAD

DENMAN ROAD

Mining infrastructure area

Product stockpile

Hunter River pipelineRail loop

Northern Access Road

Permanent ROM stockpiles

Site accessWYBONG POST OFFICE ROAD

CHPPGOLDEN HIGHWAY

Temporary ROM stockpiles

CAST

LERO

CKRO

AD

BIG FLAT CREEK

ANVI L CREEK

SANDY CREE

K

WYBONG

MANGOOLA

CASTLEROCK

N

0 0.5 1 1.5 2 km

Current operationsMangoola Coal Modification 6 Environmental Assessment

PitWaterDam

TailingsDam

RawWaterDam

Project disturbance boundary

Existing 500kV transmission line

KEY

Exploration LeaseMining LeaseAssessment Lease

INTEGRATED DESIGN SOLUTIONS

Prepar

ed by

www.i

ntegra

teddes

ignsol

ution

s.com

.au ©

2013

| 0305

64 Ma

ngoola

EA - R

ev E -

22 M

ay 20

13

Native vegetation areas

Railway linesRoads

Waterways

Approved 500kV transmission lineeasement

Inactive overburden emplacement area

Active pitActive overburden emplacement area

Approved ROM stockpiles

RehabilitationTailings dam

Page 8: 3 Current operations - Major Projects

Figure 3.2

GF

GF

GF

GF

GF

XY

XY

"

"

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

"

"

"

"

"

S

S

S

S

SJ

J

Ç

Ç

Ç

Ç

Ç

Ç

Ç

Ç

Ç

Ç

Ç

Ç

Ç

Ç

Ç

Ç

Ç

Ç

Ç

Ç

(

(

(

(

(

((

(

(

(

(

(

(

(

(

(

(

(

(

(

$+

$+

$+

$+

$+

$+

$+

$+

$+

$+

$+

$+

$+

$+

$+

$+

$+

'4

'4

'4

'4

'4'4

'4

'4

'4

!>

!>!>

!>

!>

!?

!?

!?

!?

!?

!?

#I#I

#I

#I#I

#I

#I#I

#I#I

#I

#I

#I

#I

#I#I#I

#I

#I

#I

#I

#I#I

#I

#I

#I

#I#I

#I

#I

#I

#I

#I

#I

#I

#I#I

#I

#I

#I

#I

#I

#I

#I#I

#I

#I

#I

#I

#I

#I

#I

#I

#I

#I

#I

#I#I#I#I

#I

#I#I

#I

%2

%2%2

%2

%2

%2

%2

%2

%2

!

!

!

!

!

!

!

!

!

!

LIMB OF ADDY HILL

WALLABY ROCKS

ANVILHILL

MANG

OOLA

ROAD

MUSWELLBROOK - ULAN RAILWAY

HUNTE

R RIVE

R

RIDGELANDS ROAD

WYBONG ROAD

MANGOOLA ROAD

ROXBURGH ROAD

DENMAN ROAD

Mining infrastructure area

Product stockpile

Hunter River pipelineRail loop

Northern Access Road

Permanent ROM stockpiles

Site accessWYBONG POST OFFICE ROAD

CHPPTemporary ROM stockpiles

ROSE

MOUNT ROAD

GOLDEN HIGHWAY

WYBONG CREE

K

YARRAMANROAD CA

STLE

ROCK

ROAD

ANVI L CREEK

REEDY CREEK

SPRING CREEK

SANDY CREEK

WYBONG

DENMAN

MYAMBAT

ROXBURGHMANGOOLA

HOLLYDEEN

CASTLEROCK

N

Existing environmental monitoring networkMangoola Coal Modification 6 Environmental Assessment

PitWaterDam

TailingsDam 1

RawWaterDam

Prepar

ed by

www.i

ntegra

teddes

ignsol

ution

s.com

.au ©

2013

| 0305

64 Ma

ngoola

EA - R

ev E -

22 M

ay 20

13

Project disturbance boundaryExisting 500kV transmission lineApproved ROM stockpiles

Monitoring sites

Railway linesMajor roads

WaterwaysNative vegetation areas

!P

!P

INTEGRATED DESIGN SOLUTIONS

0 1 2 3 km

HVAS TSPNoise monitoring location - attendedNoise monitoring location - continuousPM25 monitorStream health monitoring locationsSurface water monitoring locationsTEOMWeather stations

HVAS PM10

Blast monitoring locationsDust deposition gaugesGroundwater monitoring locations

!P

$+'4

"J

"S

GFXY

%2

#I!Ç(

!>!?

KEY