    Suite 5, Coldstream Office Park,

    Cnr Hendrik Potgieter & Van Staden

    Little Falls

    +27 11 958 2899+27 11 958 2105

    Directors: NJ Odendaal, D Van Heerden, CJ Muller

    Registration No. 2004/029587/07

    Suite 5, Coldstream Office Park

    2 Coldstream Street

    Little Falls, Roodepoort, South Africa

    Tel: +27 11 958 2899 ! Fax: +27 11 958 2105

    www.minxcon.co.za

    Update of the Stonewall Resources

    as at May 2013,

    Pilgrims Rest area, South Africa

    Short Report

    Effective Date: 25 May 2013

    Issue Date: 25 June 2013

    Minxcon Reference: M2013-030a

    Authors:Paul Obermeyer

    Mineral Resource Manager

    BSc Hons. Geology

  • 8/10/2019 250513 Competent Persons Report

    2/12

    Update of Stonewall Resources as at May 2013 Preliminary Report

    Prepared by Minxcon (Pty) Ltd

    ii

    DISCLAIMER AND RISKS

    This Report was prepared by Minxcon (Pty) Ltd (Minxcon). In the preparation of the Report, Minxcon has

    utilised information relating to operational methods and expectations provided to them by various

    sources. Where possible, Minxcon has verified this information from independent sources after making due

    enquiry of all material issues that are required in order to comply with the requirements of the JORC

    Code. Minxcon and its directors accept no liability for any losses arising from reliance upon the

    information presented in this Report.

    OPERATIONAL RISKS

    The business of mining and mineral exploration, development and production by their nature contain

    significant operational risks. The business depends upon, amongst other things, successful prospecting

    programmes and competent management. Profitability and asset values can be affected by unforeseenchanges in operating circumstances and technical issues.

    POLITICAL AND ECONOMIC RISK

    Factors such as political and industrial disruption, currency fluctuation and interest rates could have an

    impact on future operations, and potential revenue streams can also be affected by these factors. The

    majority of these factors are, and will be, beyond the control of any operating entity.

    COPYRIGHTCopyright in all documents, drawings and records, whether manually or electronically produced, which

    form part of the submission and any subsequent report or project document shall vest in Minxcon. None of

    the documents, drawings or records may be used or applied in any manner, nor may they be reproduced or

    transmitted in any form or by any means whatsoever for or to any other person, without prior written

    consent of Minxcon, other than the filing of the Report with the Alternative Investment Market Securities

    Regulators or an exchange in accordance with London securities laws.

  • 8/10/2019 250513 Competent Persons Report

    3/12

  • 8/10/2019 250513 Competent Persons Report

    4/12

    Update of Stonewall Resources as at May 2013 Preliminary Report

    Prepared by Minxcon (Pty) Ltd

    4

    1. INTRODUCTION

    Minxcon Consulting (Pty) Ltd (Minxcon) was requested by the directors of Stonewall Mining

    (Stonewall) to compile an updated approximation of the status of the Mineral Resources for TGME, as at

    May 2013, with the specific inclusion of the Dukes Hill Mine and Beta Main Rock Dump. The Mineral

    Resource Statement dated October 2011, as reflected in this document, represents the last official

    declared Mineral Resources for Stonewall.

    The Mineral Resource Statement as at May 2013 is an approximation of the current status of the Mineral

    Resources. The May 2013 statement takes into account production figures as reported by the TGME plant,

    in order to reflect Mineral Resource depletion. These figures are thus directly related to the plant

    processed tons as provided by Stonewall. The May 2013 Resource Statement also includes, as requested,

    the additional Mineral Resources for the Dukes Hill Mine and the Beta Main Rock Dump.

    2. PROPERTY LOCATIONS

    Figure 1: General Location of Stonewall Projects and Operations

  • 8/10/2019 250513 Competent Persons Report

    5/12

    Update of Stonewall Resources as at May 2013 Preliminary Report

    Prepared by Minxcon (Pty) Ltd

    5

    3. DECLARED MINERAL RESOURCE STATEMENT AS AT OCTOBER 2011

    All Mineral Resources, as at October 2011, were reported in compliance with the specifications embodied

    in the JORC Code. Mineral Resources have been reported separately, as Measured, Indicated and Inferred.

    Table 1: The Combined Mineral Resources for Stonewall as at 31 October 2011

    Tonnage Gold Grade Gold ContentResource

    Category

    Type of

    Operation Mt g/t Kg '000 oz.UG 0.170 4.77 811 26.1

    Surface 0.151 1.59 240 7.7Measured

    Tailings 2.294 0.77 1,770 56.9

    Total Measured 2.615 1.08 2,821 90.7

    UG 2.755 5.87 16,184 520.2

    Surface 3.173 0.88 2,811 90.4Indicated

    Tailings 0.012 0.58 7 0.2

    Total Indicated 5.940 3.20 19,002 610.8

    UG 14.535 3.91 56,832 1,827.3

    Surface 0.801 0.80 642 20.7

    Tailings 2.451 3.07 7,516 241.6

    Rock Dump 0.121 1.59 192 6.2

    Inferred

    Plant Floats 0.041 0.54 22 0.7Total Inferred 17.949 3.63 65,204 2,096.5

    Grand Total 26.504 3.28 87,027 2,798.0Notes:

    1. The tonnages and grades in Table 1 are quoted as in situtonnes.2. Mineral Resources declared are for the entire project and have not been divided into attributable portions.3. The cut-offs and densities are applied to the attributable portions in the tables that follow.

    Table 2: Mineral Resources for the Stonewall Underground Operations as at 31 October 2011

    Density TonnageGold

    GradeGold Content

    Cut-OffGrade

    MineralResource

    Category

    UG Mine Reef

    t/m3 Mt g/t Kg '000 oz. cm.g/t

    Measured Frankfort Bevetts 3.60 0.170 4.77 811 26.1 133

    Total Measured 3.60 0.170 4.77 811 26.1 133Frankfort Bevetts 3.60 0.282 5.04 1,421 45.7 133

    DH/Clewer Rho 3.30 0.696 3.39 2,359 75.8 133

    Beta Beta 3.60 0.443 4.86 2,153 69.2 133

    Rietfontein Rietfontein 3.00 1.244 7.92 9,852 316.7 133

    Indicated

    Olifantsgeraamte Olifantsgeraamte 3.60 0.090 4.43 399 12.8 133

    Total Indicated 3.25 2.755 5.87 16,184 520.2 133

    Total Measured and Indicated 3.27 2.925 5.81 16,995 546.3 133

    Density TonnageGold

    GradeGold Content

    Cut-OffGrade

    MineralResourceCategory

    UG Mine Reef

    t/m3 Mt g/t Kg '000 oz. Mt

    Frankfort Bevetts 3.60 0.468 5.30 2,480 79.7 133

    DH/Clewer Rho 3.30 0.046 2.09 96 3.1 133

    Beta Beta 3.60 4.624 3.11 14,381 462.4 133Theta Theta lower 3.80 0.104 9.78 1,017 32.7 133

    Morgenzon Top Rho 3.80 0.053 5.51 292 9.4 133

    Vaalhoek Vaalhoek 3.80 1.346 5.74 7,726 248.4 133

    Ponieskrantz Portuguese 3.80 0.549 2.77 1,521 48.9 133

    Rietfontein Rietfontein 3.00 0.657 7.23 4,750 152.7 133

    Olifantsgeraamte Olifantsgeraamte 3.60 0.421 4.59 1,932 62.1 133

    Glynns Compound Hill 3.80 3.840 3.84 14,746 474.1 133

    Malieveld Glynns 3.80 1.709 3.51 5,999 192.9 133

    Nestor Sandstone 3.80 0.443 2.37 1,050 33.8 133

    Inferred

    Frankfort Theta 3.60 0.275 3.06 842 27.1 133

    Total Inferred 3.68 14.535 3.91 56,832 1,827.3 133

    Table 3: Mineral Resources for the Stonewall Open Pit Operations as at 31 October 2011

    Mineral

    Resource

    Surface

    Operation

    Operation

    TypeDensity Tonnage

    Gold

    GradeGold Content

    Cut-Off

    Grade

  • 8/10/2019 250513 Competent Persons Report

    6/12

    Update of Stonewall Resources as at May 2013 Preliminary Report

    Prepared by Minxcon (Pty) Ltd

    6

    Category t/m3 Mt g/t Kg '000 oz. g/t

    Measured Hermansburg Open Pit 2.30 0.151 1.59 240 7.7 0.20

    Total Measured 2.30 0.151 1.59 240 7.7 0.20

    Hermansburg 2.30 0.752 1.20 902 29.0 0.20

    DG1 2.30 0.389 1.72 669 21.5 0.20Indicated

    DG2

    Open Pit

    2.30 2.032 0.61 1 240 39.9 0.20

    Total Indicated 2.30 3.173 0.88 2 811 90.4 0.20

    Total Measured and Indicated 2.30 3.324 0.92 3 051 98.1 0.20

    Density TonnageGold

    GradeGold Content

    Cut-OffGrade

    MineralResource

    Category

    SurfaceOperation

    OperationType

    t/m3 Mt g/t Kg '000 oz. g/t

    Hermansburg 2.30 0.244 0.41 100 3.2 0.20

    DG1 2.30 0.286 1.42 406 13.1 0.20Inferred

    DG5

    Open Pit

    2.30 0.271 0.50 136 4.4 0.20

    Total Inferred 2.30 0.801 0.80 642 20.7 0.20

    Table 4: Mineral Resources for the Stonewall Tailings Dams as at 31 October 2011

    Density TonnageGold

    GradeGold Content

    Cut-OffGrade

    MineralResourceCategory

    SurfaceOperation

    Reef

    t/m3 Mt g/t Kg '000 oz. g/t

    Glynns Lydenburg Tailings 1.40 1.212 0.80 970 31.2 0.00Blyde 1 Tailings 1.40 0.447 0.72 322 10.4 0.00

    Blyde 2 Tailings 1.40 0.220 0.61 134 4.3 0.00

    Blyde 3 Tailings 1.40 0.274 0.88 241 7.7 0.00

    Measured

    Blyde 4 Tailings 1.40 0.141 0.73 103 3.3 0.00

    Total Measured 1.40 2.294 0.77 1,770 56.9 0.00

    Indicated Blyde 5 Tailings 1.40 0.012 0.58 7 0.2 0.00

    Total Indicated 1.40 0.012 0.58 7 0.2 0.00

    Total Measured and Indicated 1.40 2.306 0.77 1,777 57.1 0.00

    Density TonnageGold

    GradeGold Content

    Cut-OffGrade

    MineralResourceCategory

    SurfaceOperation

    Reef

    t/m3 Mt g/t Kg '000 oz. g/t

    Blyde 3a Tailings 1.40 0.023 0.57 13 0.4 0.00Inferred TGME Plant Tailings 1.40 2.428 3.09 7,503 241.2 0.00

    Total Inferred 1.40 2.451 3.07 7,516 241.6 0.00

    Table 5: Mineral Resources for the Stonewall Rock Dumps as at 31 October 2011

    Density TonnageGold

    GradeGold Content

    Cut-OffGrade

    MineralResourceCategory

    SurfaceOperation

    Reef

    t/m3 Mt g/t Kg '000 oz. g/t

    Inferred Vaalhoek Rock Dump 1.70 0.121 1.59 192 6.2 0.20

    Total Inferred 1.70 0.121 1.59 192 6.2 0.20

    Density TonnageGold

    GradeGold Content

    Cut-OffGrade

    MineralResourceCategory

    SurfaceOperation

    Reef

    t/m3 Mt g/t Kg '000 oz. g/t

    Inferred Plant FloatsProcessedMaterial

    1.60 0.041 0.54 22 0.7 0.00

    Total Inferred 1.60 0.041 0.54 22 0.7 0.00Notes:

    1. Mineral Resources are inclusive of the Ore Reserves.2. The Mineral Resources are declared at cut-offs shown in the tables above.3. Conversion: 1kg = 32.15076 oz.4. Beta Mine calculated over 90 cm stoping width.5. Frankfort Mine calculated over minimum achievable stoping width of 90 cm.6. A 5% factor was applied to the Vaalhoek tonnes to account for the sorting operation.7. A 70% mass pull is expected at TGME Plant Floats prior to treatment with XRT.

    The Inferred Mineral Resources have a large degree of uncertainty as to their existence and whether they

    can be mined economically. It cannot be assumed that all or any part of the Inferred Resource will be

    upgraded to a higher confidence category. The current Mineral Resource model is based on availablesampling data collected over the history of the Project area. The Mineral Resource estimation was carried

    out by Mr C Muller of Minxcon and Ms L Mavengere (formerly of Minxcon) who are both JORC Competent

  • 8/10/2019 250513 Competent Persons Report

    7/12

    Update of Stonewall Resources as at May 2013 Preliminary Report

    Prepared by Minxcon (Pty) Ltd

    7

    Persons with professional registration with SACNASP (SA). The grade models were verified by visual and

    statistical methods and are deemed to be globally unbiased. The blocks were classified into Measured,

    Indicated and Inferred Mineral Resource categories using the following and not limited thereto: sampling

    QAQC, geological confidence, distance to sample (variogram range) and kriging efficiency. Only the

    Mineral Resources lying within the legal boundaries are reported.

    The business of mining and mineral exploration, development and production by their nature contain

    significant operational risks. The business depends upon, amongst other things, successful prospecting

    programmes and competent management. Profitability and asset values can be affected by unforeseen

    changes in operating circumstances and technical issues. Factors such as political and industrial

    disruption, currency fluctuation and interest rates could have an impact on future operations, and

    potential revenue streams can also be affected by these factors. The majority of these factors are, and

    will be, beyond the control of any operating entity.

  • 8/10/2019 250513 Competent Persons Report

    8/12

    Update of Stonewall Resources as at May 2013 Preliminary Report

    Prepared by Minxcon (Pty) Ltd

    8

    4. DECLARED MINERAL RESOURCE STATEMENT AS AT MAY 2013

    All Mineral Resources, as at May 2013, were reported in compliance with the specifications embodied in

    the JORC Code. Mineral Resources have been reported separately, as Measured, Indicated and Inferred.

    The May 2013 statement takes into account production figures as reported by the TGME plant, in order to

    reflect Mineral Resource depletion. These figures are thus directly related to the plant-processed tonnesas provided by Stonewall. The Mineral Resource Statement as at May 2013, includes additional Mineral

    Resources for the Dukes Hill Mine and the Beta Main Rock Dump. Table 6 summarises the Mineral

    Resources for Stonewall as at May 2013 and also includes the reconciliation to the Mineral Resources as at

    31 October 2011.

    Table 6: The Combined Mineral Resources for Stonewall as at May 2013

    Tonnage Gold Grade Gold ContentChange in

    Tonnage

    Change in

    GoldContent

    (Moz)

    Mineral

    ResourceCategory

    Type of

    Operation

    Mt g/t Kg '000 oz. % %

    UG 0.170 4.77 811 26.1 0 0Surface 0.151 1.59 240 7.7 0 0Measured

    Tailings 2.294 0.77 1,770 56.9 0 0

    Total Measured1. 2.615

    1.08 2,821 90.7 0 0

    UG 2.755 5.87 16,184 520.2 0 0

    Surface 3.173 0.88 2,811 90.4 0 0Indicated

    Tailings 0.012 0.58 7 0.2 0 0

    Total Indicated 5.940 3.20 19,002 610.8 0 0

    UG 14.652 3.99 58,478 1,880.2 0.8 2.9

    Surface 0.801 0.8 642 20.7 0 0

    Tailings 2.128 3.06 6,517 209.5 -13.2 -13.2

    Rock Dump 0.121 1.59 192 6.2 0 0

    Plant Floats 0.041 0.54 22 0.7 0 0

    Inferred

    Beta Main 0.154 0.81 124 4.0 100 100

    Total Inferred 17.897 3.69 65,975 2,121.3 -0.3 1.2

    Grand Total 26.452 3.32 87,798 2,822.8 0.2 0.9Notes:

    1. The tonnages and grades in Table 6 are quoted as in situtonnes.2. Mineral Resources declared are for the entire project and have not been divided into attributable portions.3. The cut-offs are applied to the attributable portions in the tables that follow.

    Table 7: Mineral Resources for the Stonewall Underground Operations as at May 2013

    Density TonnageGold

    GradeGold Content

    Cut-Off

    GradeMineral

    ResourceCategory

    UG Mine Reef

    t/m3 Mt g/t Kg '000 oz. cm.g/t

    Measured Frankfort Bevetts 3.6 0.170 4.77 811 26.1 133

    Total Measured 3.6 0.170 4.77 811 26.1 133

    Frankfort Bevetts 3.6 0.282 5.04 1,421 45.7 133

    DH/Clewer Rho 3.3 0.696 3.39 2,359 75.8 133

    Beta Beta 3.6 0.443 4.86 2,153 69.2 133

    Rietfontein Rietfontein 3.0 1.244 7.92 9,852 316.7 133

    Indicated

    Olifantsgeraamte Olifantsgeraamte 3.6 0.090 4.43 399 12.8 133

    Total Indicated 3.3 2.755 5.87 16,184 520.2 133

    Total Measured and Indicated 3.3 2.925 5.81 16,995 546.3 133

    Density TonnageGold

    GradeGold Content

    Cut-OffGrade

    MineralResourceCategory

    UG Mine Reef

    t/m3 Mt g/t Kg '000 oz. cm.g/t

    Frankfort Bevetts 3.6 0.468 5.3 2,480 79.7 133

    DH/Clewer Rho 3.3 0.046 2.09 96 3.1 133

    Beta Beta 3.6 4.624 3.11 14,381 462.4 133

    Theta Theta lower 3.8 0.104 9.78 1,017 32.7 133

    Morgenzon Top Rho 3.8 0.053 5.51 292 9.4 133

    Vaalhoek Vaalhoek 3.8 1.346 5.74 7,726 248.4 133

    Inferred

    Ponieskrantz Portuguese 3.8 0.549 2.77 1,521 48.9 133

  • 8/10/2019 250513 Competent Persons Report

    9/12

    Update of Stonewall Resources as at May 2013 Preliminary Report

    Prepared by Minxcon (Pty) Ltd

    9

    Rietfontein Rietfontein 3.0 0.657 7.23 4,750 152.7 133

    Olifantsgeraamte Olifantsgeraamte 3.6 0.421 4.59 1,932 62.1 133

    Glynns Compound Hill 3.8 3.84 3.84 14,746 474.1 133

    Malieveld Glynns 3.8 1.709 3.51 5,999 192.9 133

    Nestor Sandstone 3.8 0.443 2.37 1,050 33.8 133

    Frankfort Theta 3.6 0.268 3.06 820 26.4 133

    Dukes Hill Theta 3.0 0.124 13.45 1,668 53.6 133

    Total Inferred 3.7 14.652 3.99 58,478 1,880.2 133

    Table 8: Mineral Resources for the Stonewall Open Pit Operations as at May 2013

    Density TonnageGold

    GradeGold Content

    Cut-Off

    Grade

    MineralResourceCategory

    Surface Operation Operation Type

    t/m3 Mt g/t Kg '000 oz. g/t

    Measured Hermansburg Open Pit 2.3 0.151 1.59 240 7.7 0.2

    Total Measured 2.3 0.151 1.59 240 7.7 0.2

    Hermansburg 2.3 0.752 1.20 902 29.0 0.2

    DG1 2.3 0.389 1.72 669 21.5 0.2Indicated

    DG2

    Open Pit

    2.3 2.032 0.61 1,240 39.9 0.2

    Total Indicated 2.3 3.173 0.88 2,811 90.4 0.2

    Total Measured and Indicated 2.3 3.324 0.92 3,051 98.1 0.2

    Density TonnageGold

    GradeGold Content

    Cut-Off

    Grade

    MineralResourceCategory

    Surface Operation Operation Type

    t/m3 Mt g/t Kg '000 oz. g/t

    Hermansburg 2.3 0.244 0.41 100 3.2 0.2

    DG1 2.3 0.286 1.42 406 13.1 0.2Inferred

    DG5

    Open Pit

    2.3 0.271 0.50 136 4.4 0.2

    Total Inferred 2.3 0.801 0.80 642 20.7 0.2

    Table 9: Mineral Resources for the Stonewall Tailings Dams as at May 2013

    Density TonnageGold

    GradeGold Content

    Cut-Off

    Grade

    MineralResourceCategory

    Surface Operation Reef

    t/m3 Mt g/t Kg '000 oz. g/t

    Glynns Lydenburg Tailings 1.4 1.212 0.80 970 31.2 0Blyde 1 Tailings 1.4 0.447 0.72 322 10.4 0

    Blyde 2 Tailings 1.4 0.220 0.61 134 4.3 0

    Blyde 3 Tailings 1.4 0.274 0.88 241 7.7 0

    Measured

    Blyde 4 Tailings 1.4 0.141 0.73 103 3.3 0

    Total Measured 1.4 2.294 0.77 1,770 56.9 0

    Indicated Blyde 5 Tailings 1.4 0.012 0.58 7 0.2 0

    Total Indicated 1.4 0.012 0.58 7 0.2 0

    Total Measured and Indicated 1.4 2.306 0.77 1,777 57.1 0

    Density TonnageGold

    GradeGold Content

    Cut-Off

    Grade

    MineralResourceCategory

    Surface Operation Reef

    t/m3 Mt g/t Kg '000 oz. g/t

    Blyde 3a Tailings 1.4 0.023 0.57 13 0.4 0Inferred

    TGME Plant Tailings 1.4 2.105 3.09 6,504 209.1 0Total Inferred 1.4 2.128 3.06 6,517 209.5 0

    Table 10: Mineral Resources for the Stonewall Rock Dumps as at May 2013

    Density TonnageGold

    GradeGold Content

    Cut-OffGrade

    MineralResourceCategory

    Surface Operation Reef

    t/m3 Mt g/t Kg '000 oz. g/t

    Inferred Vaalhoek Rock Dump 1.7 0.121 1.59 192 6.2 0.2

    Total Inferred 1.7 0.121 1.59 192 6.2 0.2

    Density TonnageGold

    GradeGold Content

    Cut-OffGrade

    MineralResourceCategory

    Surface Operation Reef

    t/m3 Mt g/t Kg '000 oz. g/t

    Inferred Plant Floats Processed Material 1.6 0.041 0.54 22 0.7 0

    Total Inferred 1.6 0.041 0.54 22 0.7 0

    Mineral Surface Operation Reef Density TonnageGold

    GradeGold Content

    Cut-OffGrade

  • 8/10/2019 250513 Competent Persons Report

    10/12

    Update of Stonewall Resources as at May 2013 Preliminary Report

    Prepared by Minxcon (Pty) Ltd

    10

    ResourceCategory

    t/m3 Mt g/t Kg '000 oz. g/t

    Inferred Beta MainRock Dump

  • 8/10/2019 250513 Competent Persons Report

    11/12

    Update of Stonewall Resources as at May 2013 Preliminary Report

    Prepared by Minxcon (Pty) Ltd

    11

    5. CONCLUSIONS

    Due to the May 2013 depletions applied to the existing Stonewall Operations, as well as the

    inclusion of additional Resources, the Mineral Resources of Stonewall have decreased by 0.2% in

    tonnage and increased by 0.9% in gold content.

    All changes have taken place in the Inferred Mineral Resource Category.

    The underground Inferred Mineral Resources have increased by a net 0.8% in tonnage, coincidentwith a 2.9% net gain in gold content. This was due to only 6545 tonnes being mined at Frankfort at a

    relatively low grade, as well as the addition of the high grade Dukes Hill Inferred Mineral Resources

    to the underground Mineral Resource.

    No changes took place in the open pit operation.

    The tailings Inferred Mineral Resource decreased by 13.2% in tonnage and 13.2% in gold content due

    to the significant tonnages mined at the TGME Plant Tailings facility.

    The Inferred Mineral Resources attributable to rock dumps has increased by a net 95.1% in tonnage

    and a net 58% increase in gold content due to the inclusion of the Beta Main Rock Dump into the

    Inferred Mineral Resources.

    The Inferred Mineral Resources for Stonewall has experienced a net 0.3% decrease in tonnage,

    accompanied by a net 1.2% increase in gold content.

  • 8/10/2019 250513 Competent Persons Report

    12/12

    Update of Stonewall Resources as at May 2013 Preliminary Report

    Prepared by Minxcon (Pty) Ltd

    12

    CJ MULLER

    BSc (Hons.) (Geol.), Pr. Sci. Nat., MGSSA

    DIRECTOR

    Appendix 1: Certificate of Competent Person

    CERTIFICATE of COMPETENT PERSON - CJ Muller

    I, Charles Muller, do hereby certify that:

    1. I am a Director of Minxcon Consulting (Pty) LtdSuite 5 Coldstream Office Park,

    2 Coldstream Street,

    Little Falls, Roodepoort, South Africa

    2. I graduated with a BSc. (Geol.) degree from the Rand Afrikaans University in 1988. In addition, I have obtained a

    BSc. Hons. (Geol.) from the Rand Afrikaans University in 1994 and attended courses in geostatistics and advanced

    Datamine modelling and geostatistical evaluation through the University of the Witwatersrand.

    3. I have worked as a Geoscientist for more than 25 years. As the former Chief Geologist for Goldfields South Africa,

    my specialisation lies within Mineral Resource modelling and management. I have completed a number of Mineral

    Resource estimates and reports pertaining to gold, using approaches described by the Australasian Code for

    Reporting of Exploration Results, Minerals Resources and Ore Reserves (JORC).

    4. I am affiliated with the following professional associations:

    Class Professional SocietyYear of

    Registration

    Member Geostatistical Association of Southern Africa 2008

    MemberSouth African Council for Natural Scientific Professions (Pr. Sci. Nat. Reg. No.

    400201/04)2004

    5. I am responsible for the preparation of this Technical Report with the effective date, 25 May 2013.

    6. I have read the definition of Competent Person set out the Australasian Code for Reporting of Exploration

    Results, Minerals Resources and Ore Reserves (JORC), and certify that by reason of my education, affiliation with

    professional associations and past relevant work experience, I fulfil the requirements to be a Competent Person

    for the purposes of this Competent Persons Report.

    7. I have read the JORC Code and this Report has been prepared in compliance with it.

    8. As of the effective date, to the best of my knowledge, information and belief, the Report contains all scientificand technical information required to be disclosed to make the Report not misleading.

    9. The facts presented in the Report are, to the best of my knowledge, correct.

    10.The analyses and conclusions presented in the Report are limited only by the reported forecasts and conditions.

    11.I have no present or prospective interest in the subject property or asset and have no bias with respect to the

    assets that are the subject of the Report, or to the parties involved with the assignment.

    12.I have read this technical Report and NI43-101 Standards of Disclosure for Mineral Projects and this Report has

    been prepared in compliance with NI43-101.

    13.My compensation, employment or contractual relationship with the Commissioning Entity is not contingent on any

    aspect of the Report.

    14.I did not make a personal inspection of the property, as it was done on my behalf.

    15.I have had no prior involvement with the property that is the subject of this Report.

    Yours faithfully,