Page 1 of 21 TECHNICAL EVALUATION REPORT as of August 12, 2014 PROJECT : NORZAGARAY HEIGHTS RESETTLEMENT PROJECT LOCATION : Brgy. Bitungol, Norzagaray, Bulacan DEVELOPER : Mever Construction 250 HOUSING UNITS Blk. Lot Floor Wall Rfng Door Wdws. C. R. Remarks No. No. Slab CHB Plastering WC Tiles 1 2 2 rough finish (frontage) X 2 2 4 rough finish (frontage) X 3 2 6 rough finish (frontage) X 4 2 8 rough finish (frontage) X 5 2 10 rough finish (frontage) X 6 2 12 X 7 2 14 X 8 2 16 w/ hairline cracks (frontage) X 9 2 18 X 10 2 20 rough finish (frontage) X 11 2 22 rough finish (frontage) X 12 2 24 rough finish (frontage) X 13 2 26 rough finish (frontage) X 14 2 28 X 15 2 30 rough finish (frontage) X 16 2 32 X 17 2 34 rough finish (frontage) X 18 2 36 X 19 2 38 X 20 2 40 X 21 2 42 X 22 2 44 X 23 2 45 X 24 2 46 X 25 2 47 X Ctrl. No. Safety Switch Service Entrance /RSC Elect'l Wire C.R. Jalousi e Wdw n Sink and counte r PVC Vent Catch Basin

Upload: jayson-daigan

Post on 19-Jul-2016

5 views

Category:

Documents


0 download

DESCRIPTION

Technical Evaluation - sample

TRANSCRIPT

Page 1: 250 Housing Units Eval (May 5, 2014)

Page 1 of 21

TECHNICAL EVALUATION REPORT

as of August 12, 2014

PROJECT : NORZAGARAY HEIGHTS RESETTLEMENT PROJECTLOCATION : Brgy. Bitungol, Norzagaray, BulacanDEVELOPER : Mever Construction

250 HOUSING UNITS

Blk. Lot Floor WallRfng Door Wdws.

C. R.Remarks

No. No. Slab CHB Plastering WC Tiles

1 2 2 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

2 2 4 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

3 2 6 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

4 2 8 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

5 2 10 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

6 2 12 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

7 2 14 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

8 2 16 √ √ w/ hairline cracks (frontage) √ √ √ √ √ √ X √ √ √ √ √

9 2 18 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

10 2 20 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

11 2 22 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

12 2 24 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

13 2 26 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

14 2 28 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

15 2 30 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

16 2 32 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

17 2 34 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

18 2 36 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

19 2 38 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

20 2 40 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

21 2 42 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

22 2 44 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

23 2 45 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

24 2 46 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

25 2 47 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

Ctrl. No.

SafetySwitch

Service Entrance

/RSC

Elect'l Wire

C.R. Jalousie Wdw

Kitchen Sink and

counter

PVC Vent

Catch Basin

Page 2: 250 Housing Units Eval (May 5, 2014)

Page 2 of 21

Blk. Lot Floor WallRfng Door Wdws.

C. R.Remarks

No. No. Slab CHB Plastering WC Tiles

Ctrl. No.

SafetySwitch

Service Entrance

/RSC

Elect'l Wire

C.R. Jalousie Wdw

Kitchen Sink and

counter

PVC Vent

Catch Basin

26 2 48 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

27 2 49 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

28 2 50 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

29 2 51 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

30 2 52 √ √ w/ hairline cracks (frontage) √ √ √ √ √ √ X √ √ √ √ √

31 2 53 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

32 2 54 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

33 2 55 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

34 2 56 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

35 2 57 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

36 2 58 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

37 2 59 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

38 2 60 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

39 2 61 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

40 2 62 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

41 2 63 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

42 2 64 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

43 2 65 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

44 2 66 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

45 2 67 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

46 2 68 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

47 2 69 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

48 2 70 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

49 2 71 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

50 2 72 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

51 2 73 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

52 2 74 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

53 3 1 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

54 3 2 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

55 3 3 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

Page 3: 250 Housing Units Eval (May 5, 2014)

Page 3 of 21

Blk. Lot Floor WallRfng Door Wdws.

C. R.Remarks

No. No. Slab CHB Plastering WC Tiles

Ctrl. No.

SafetySwitch

Service Entrance

/RSC

Elect'l Wire

C.R. Jalousie Wdw

Kitchen Sink and

counter

PVC Vent

Catch Basin

56 3 4 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

57 3 5 √ √ √ √ √ √ √ √ √ X √ √ √ √ √ provide water stopper (backdoor)

58 3 6 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

59 3 7 √ √ √ √ √ √ √ √ √ X √ √ √ √ √ provide water stopper (backdoor)

60 3 8 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

61 3 9 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

62 3 10 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

63 3 11 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

64 3 12 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

65 3 13 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

66 3 14 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

67 3 15 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

68 3 16 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

69 3 17 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

70 3 18 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

71 3 19 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

72 3 20 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

73 3 21 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

74 3 22 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

75 3 23 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

76 3 24 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

77 3 25 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

78 3 26 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

79 3 27 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

80 3 28 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

81 3 29 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

82 3 30 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

83 3 31 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

84 3 32 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

85 3 33 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

Page 4: 250 Housing Units Eval (May 5, 2014)

Page 4 of 21

Blk. Lot Floor WallRfng Door Wdws.

C. R.Remarks

No. No. Slab CHB Plastering WC Tiles

Ctrl. No.

SafetySwitch

Service Entrance

/RSC

Elect'l Wire

C.R. Jalousie Wdw

Kitchen Sink and

counter

PVC Vent

Catch Basin

86 3 34 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

87 3 35 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

88 3 36 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

89 3 37 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

90 3 38 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

91 3 39 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

92 3 40 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

93 3 41 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

94 3 42 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

95 3 43 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

96 3 44 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

97 3 45 √ √ rough finish (frontage) √ √ √ √ √ √ X √ √ √ √ √

98 3 46 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

99 3 47 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

100 3 48 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

101 3 49 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

102 3 50 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

103 3 51 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

104 3 52 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

105 3 53 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

106 3 54 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

107 3 55 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

108 3 56 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

109 3 57 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

110 3 58 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

111 3 60 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

112 3 61 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

113 4 4 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

114 4 6 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

115 4 8 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

Page 5: 250 Housing Units Eval (May 5, 2014)

Page 5 of 21

Blk. Lot Floor WallRfng Door Wdws.

C. R.Remarks

No. No. Slab CHB Plastering WC Tiles

Ctrl. No.

SafetySwitch

Service Entrance

/RSC

Elect'l Wire

C.R. Jalousie Wdw

Kitchen Sink and

counter

PVC Vent

Catch Basin

116 4 10 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

117 4 12 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

118 4 14 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

119 4 16 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

120 4 18 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

121 7 1 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

122 7 2 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

123 7 3 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

124 7 4 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

125 7 5 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

126 7 6 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

127 7 7 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

128 7 8 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

129 7 9 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

130 7 10 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

131 7 11 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

132 7 12 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

133 8 1 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

134 8 2 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

135 8 3 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

136 8 4 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

137 8 5 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

138 8 6 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

139 8 7 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

140 8 8 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

141 8 9 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

142 8 10 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

143 8 11 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

144 8 12 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

145 8 13 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

Page 6: 250 Housing Units Eval (May 5, 2014)

Page 6 of 21

Blk. Lot Floor WallRfng Door Wdws.

C. R.Remarks

No. No. Slab CHB Plastering WC Tiles

Ctrl. No.

SafetySwitch

Service Entrance

/RSC

Elect'l Wire

C.R. Jalousie Wdw

Kitchen Sink and

counter

PVC Vent

Catch Basin

146 8 14 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

147 8 16 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

148 9 1 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

149 9 2 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

150 9 3 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

151 9 4 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

152 9 5 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

153 9 6 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

154 9 7 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

155 9 8 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

156 9 9 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

157 9 10 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

158 9 11 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

159 9 12 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

160 9 13 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

161 9 14 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

162 9 15 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

163 9 16 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

164 9 17 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

165 9 18 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

166 9 20 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

167 10 4 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

168 10 6 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

169 10 7 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

170 10 8 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

171 10 9 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

172 10 10 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

173 10 11 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

174 10 12 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

175 10 13 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

Page 7: 250 Housing Units Eval (May 5, 2014)

Page 7 of 21

Blk. Lot Floor WallRfng Door Wdws.

C. R.Remarks

No. No. Slab CHB Plastering WC Tiles

Ctrl. No.

SafetySwitch

Service Entrance

/RSC

Elect'l Wire

C.R. Jalousie Wdw

Kitchen Sink and

counter

PVC Vent

Catch Basin

176 10 14 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

177 10 15 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

178 10 16 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

179 10 17 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

180 10 18 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

181 10 19 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

182 10 20 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

183 10 21 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

184 10 22 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

185 10 23 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

186 10 24 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

187 10 25 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

188 10 26 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

189 10 27 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

190 10 28 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

191 10 29 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

192 10 30 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

193 10 31 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

194 10 32 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

195 10 33 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

196 10 34 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

197 10 35 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

198 10 37 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

199 11 2 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

200 11 3 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

201 11 5 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

202 11 6 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

203 11 13 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

204 11 14 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

205 11 15 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

Page 8: 250 Housing Units Eval (May 5, 2014)

Page 8 of 21

Blk. Lot Floor WallRfng Door Wdws.

C. R.Remarks

No. No. Slab CHB Plastering WC Tiles

Ctrl. No.

SafetySwitch

Service Entrance

/RSC

Elect'l Wire

C.R. Jalousie Wdw

Kitchen Sink and

counter

PVC Vent

Catch Basin

206 11 16 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

207 11 17 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

208 11 18 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

209 11 19 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

210 11 20 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

211 13 1 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

212 13 2 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

213 13 3 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

214 13 4 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

215 13 5 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

216 13 6 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

217 13 7 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

218 13 8 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

219 13 9 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

220 13 10 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

221 13 11 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

222 13 12 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

223 13 13 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

224 13 14 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

225 13 15 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

226 13 16 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

227 13 17 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

228 13 18 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

229 13 19 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

230 13 20 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

231 13 21 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

232 13 22 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

233 13 23 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

234 13 24 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

235 13 25 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

Page 9: 250 Housing Units Eval (May 5, 2014)

Page 9 of 21

Blk. Lot Floor WallRfng Door Wdws.

C. R.Remarks

No. No. Slab CHB Plastering WC Tiles

Ctrl. No.

SafetySwitch

Service Entrance

/RSC

Elect'l Wire

C.R. Jalousie Wdw

Kitchen Sink and

counter

PVC Vent

Catch Basin

236 13 26 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

237 13 27 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

238 13 28 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

239 13 29 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

240 13 30 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

241 13 31 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

242 13 32 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

243 13 33 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

244 13 34 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

245 13 35 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

246 13 36 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

247 13 37 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

248 13 38 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

249 13 39 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

250 13 40 √ √ √ √ √ √ √ √ √ X √ √ √ √ √

RECONMMENDATION: LEGEND:

- Provide slope protection at the back of the housing units in Block 3 √ Completed-The noted defects/damaged portion of housing units shall be covered by Deed of Undertaking and withholding the release of 5% Retention Money X Not Com

Prepared by: Checked by: Noted by:

FORTUNATO JESUS G. DAIGAN CESAR A. JONOS RAMON S. PARAGAS NHA - Senior Engineer Project Engineer District Manager

Region III-A Region III-AMARK CALVIN A. CABULISAN NHA - Senior Engineer

Page 10: 250 Housing Units Eval (May 5, 2014)

TECHNICAL EVALUATION REPORT - LAND DEVELOPMENTas of MAY 2014

PROJECT : NORZAGARAY HEIGHTS RESETTLEMENT PROJECTLOCATION : Brgy. Bitungol, Norzagaray, BulacanDEVELOPER : Mever Construction

165 HOUSING UNITS

Blk. No. Lot No.LAY- SEPTIC ROADWAY STORM CONCRETE FINISH

TCT COMPLETEDAREA

OUT TANKDRAINAGE LINE WATER LINE DRAIN PAVEMENTGROUND ELEV (SQ.M)1 2 82 1 93 1 104 1 115 1 126 1 137 1 148 1 159 1 1610 1 1711 1 1812 1 1913 1 2014 1 2115 1 2216 1 2317 1 2418 1 2519 1 2620 1 2721 1 2822 1 2923 1 3024 1 3125 1 3226 1 3327 1 3428 1 3529 1 3630 1 3731 1 3832 1 3933 2 434 2 535 2 636 2 737 2 838 2 939 2 1040 2 1141 2 1242 2 1343 2 1444 2 1545 2 1646 2 1747 2 1848 2 1949 2 2050 2 2151 2 2252 2 2353 2 2454 2 2555 2 2656 2 2757 2 2858 2 2959 2 3060 2 3161 2 3262 2 3363 2 3464 2 3565 2 3666 2 37

Ctrl. No.

Page 11: 250 Housing Units Eval (May 5, 2014)

67 2 3868 2 3969 2 4070 2 4171 2 4272 2 4373 2 4474 2 4575 2 4676 2 4777 2 4878 2 4979 2 5080 2 5181 2 5282 2 5383 2 5484 2 5585 2 5686 2 5787 2 5888 2 5989 2 6090 2 6191 2 6292 2 6393 2 6494 2 6595 2 6696 2 6797 2 6898 2 6999 2 70

100 2 71101 2 72102 2 73103 2 74104 2 75105 3 4106 3 5107 3 6108 3 7109 3 8110 3 9111 3 10112 3 11113 3 12114 3 13115 3 14116 3 15117 3 16118 3 17119 3 18120 3 19121 3 20122 3 21123 3 22124 3 23125 3 24126 3 25127 3 26128 3 27129 3 28130 3 29131 3 30132 3 31133 3 32134 3 33135 3 34136 3 35137 3 36138 3 37139 3 38140 3 39141 3 40142 3 41143 3 42

Page 12: 250 Housing Units Eval (May 5, 2014)

144 3 43145 3 44146 3 45147 3 46148 3 47149 3 48150 3 49151 3 50152 3 51153 3 52154 3 53155 3 54156 3 55157 3 56158 3 57159 3 58160 3 59161 3 60162 3 61163 3 62164 4 3165 4 4166 4 5167 4 6168 4 7169 4 8170 4 9171 4 10172 4 11173 4 12174 4 13175 4 14176 4 15177 4 16178 4 17179 7 1180 7 2181 7 3182 7 4183 7 5184 7 6185 7 7186 7 8187 7 9188 7 10189 7 11190 7 12191 8 1192 8 2193 8 3194 8 4195 8 5196 8 6197 8 7198 8 8199 8 9200 8 10201 8 11202 8 12203 8 13204 8 14205 8 16206 9 1207 9 2208 9 3209 9 4210 9 5211 9 6212 9 7213 9 8214 9 9215 9 10216 9 11217 9 12218 9 13219 9 14220 9 15

Page 13: 250 Housing Units Eval (May 5, 2014)

221 9 16222 9 17223 9 18224 9 20225 10 4226 10 5227 10 6228 10 7229 10 8230 10 9231 10 10232 10 11233 10 12234 10 13235 10 14236 10 15237 10 16238 10 17239 10 18240 10 19241 10 20242 10 21243 10 22244 10 23245 10 24246 10 25247 10 26248 10 27249 10 28250 10 29

Prepared by: Checked by:

LEAN ALEJANDRO J. SERVIDAD CESAR A. JONOS NHA - Senior Engineer Project Engineer

Region III-AFORTUNATO JESUS G. DAIGAN NHA - Senior Engineer

Page 14: 250 Housing Units Eval (May 5, 2014)

Page 14 of 21

TECHNICAL EVALUATION REPORT - LAND DEVELOPMENTas of MAY 8, 2014

PROJECT : NORZAGARAY HEIGHTS RESETTLEMENT PROJECTLOCATION : Brgy. Bitungol, Norzagaray, BulacanDEVELOPER : Mever Construction

250 DEVELOPED LOTS

Blk. No. Lot No.LAY- SEPTIC ROADWAY STORM CONCRETE FINISH

TCT COMPLETEDOUT TANK DRAINAGE LINE WATER LINE DRAIN PAVEMENTGROUND ELEV

1 2 2 √ √ √ √ √ √ √ X X2 2 4 √ √ √ √ √ √ √ X X3 2 6 √ √ √ √ √ √ √ X X4 2 8 √ √ √ √ √ √ √ X X5 2 10 √ √ √ √ √ √ √ X X6 2 12 √ √ √ √ √ √ √ X X7 2 14 √ √ √ √ √ √ √ X X8 2 16 √ √ √ √ √ √ √ X X9 2 18 √ √ √ √ √ √ √ X X

10 2 20 √ √ √ √ √ √ √ X X11 2 22 √ √ √ √ √ √ √ X X12 2 24 √ √ √ √ √ √ √ X X13 2 26 √ √ √ √ √ √ √ X X14 2 28 √ √ √ √ √ √ √ X X15 2 30 √ √ √ √ √ √ √ X X16 2 32 √ √ √ √ √ √ √ X X17 2 34 √ √ √ √ √ √ √ X X18 2 36 √ √ √ √ √ √ √ X X19 2 38 √ √ √ √ √ √ √ X X20 2 40 √ √ √ √ √ √ √ X X21 2 42 √ √ √ √ √ √ √ X X22 2 44 √ √ √ √ √ √ √ X X23 2 45 √ √ √ √ √ √ √ X X24 2 46 √ √ √ √ √ √ √ X X25 2 47 √ √ √ √ √ √ √ X X26 2 48 √ √ √ √ √ √ √ X X27 2 49 √ √ √ √ √ √ √ X X28 2 50 √ √ √ √ √ √ √ X X29 2 51 √ √ √ √ √ √ √ X X30 2 52 √ √ √ √ √ √ √ X X31 2 53 √ √ √ √ √ √ √ X X32 2 54 √ √ √ √ √ √ √ X X33 2 55 √ √ √ √ √ √ √ X X34 2 56 √ √ √ √ √ √ √ X X35 2 57 √ √ √ √ √ √ √ X X36 2 58 √ √ √ √ √ √ √ X X37 2 59 √ √ √ √ √ √ √ X X38 2 60 √ √ √ √ √ √ √ X X39 2 61 √ √ √ √ √ √ √ X X40 2 62 √ √ √ √ √ √ √ X X41 2 63 √ √ √ √ √ √ √ X X42 2 64 √ √ √ √ √ √ √ X X43 2 65 √ √ √ √ √ √ √ X X44 2 66 √ √ √ √ √ √ √ X X45 2 67 √ √ √ √ √ √ √ X X46 2 68 √ √ √ √ √ √ √ X X47 2 69 √ √ √ √ √ √ √ X X48 2 70 √ √ √ √ √ √ √ X X49 2 71 √ √ √ √ √ √ √ X X50 2 72 √ √ √ √ √ √ √ X X51 2 73 √ √ √ √ √ √ √ X X52 2 74 √ √ √ √ √ √ √ X X53 3 1 √ √ √ √ √ √ √ X X54 3 2 √ √ √ √ √ √ √ X X55 3 3 √ √ √ √ √ √ √ X X56 3 4 √ √ √ √ √ √ √ X X57 3 5 √ √ √ √ √ √ √ X X58 3 6 √ √ √ √ √ √ √ X X59 3 7 √ √ √ √ √ √ √ X X60 3 8 √ √ √ √ √ √ √ X X61 3 9 √ √ √ √ √ √ √ X X62 3 10 √ √ √ √ √ √ √ X X63 3 11 √ √ √ √ √ √ √ X X64 3 12 √ √ √ √ √ √ √ X X65 3 13 √ √ √ √ √ √ √ X X

Ctrl. No.

Page 15: 250 Housing Units Eval (May 5, 2014)

Page 15 of 21

Blk. No. Lot No.LAY- SEPTIC ROADWAY STORM CONCRETE FINISH

TCT COMPLETEDOUT TANK DRAINAGE LINE WATER LINE DRAIN PAVEMENTGROUND ELEV

Ctrl. No.66 3 14 √ √ √ √ √ √ √ X X67 3 15 √ √ √ √ √ √ √ X X68 3 16 √ √ √ √ √ √ √ X X69 3 17 √ √ √ √ √ √ √ X X70 3 18 √ √ √ √ √ √ √ X X71 3 19 √ √ √ √ √ √ √ X X72 3 20 √ √ √ √ √ √ √ X X73 3 21 √ √ √ √ √ √ √ X X74 3 22 √ √ √ √ √ √ √ X X75 3 23 √ √ √ √ √ √ √ X X76 3 24 √ √ √ √ √ √ √ X X77 3 25 √ √ √ √ √ √ √ X X78 3 26 √ √ √ √ √ √ √ X X79 3 27 √ √ √ √ √ √ √ X X80 3 28 √ √ √ √ √ √ √ X X81 3 29 √ √ √ √ √ √ √ X X82 3 30 √ √ √ √ √ √ √ X X83 3 31 √ √ √ √ √ √ √ X X84 3 32 √ √ √ √ √ √ √ X X85 3 33 √ √ √ √ √ √ √ X X86 3 34 √ √ √ √ √ √ √ X X87 3 35 √ √ √ √ √ √ √ X X88 3 36 √ √ √ √ √ √ √ X X89 3 37 √ √ √ √ √ √ √ X X90 3 38 √ √ √ √ √ √ √ X X91 3 39 √ √ √ √ √ √ √ X X92 3 40 √ √ √ √ √ √ √ X X93 3 41 √ √ √ √ √ √ √ X X94 3 42 √ √ √ √ √ √ √ X X95 3 43 √ √ √ √ √ √ √ X X96 3 44 √ √ √ √ √ √ √ X X97 3 45 √ √ √ √ √ √ √ X X98 3 46 √ √ √ √ √ √ √ X X99 3 47 √ √ √ √ √ √ √ X X100 3 48 √ √ √ √ √ √ √ X X101 3 49 √ √ √ √ √ √ √ X X102 3 50 √ √ √ √ √ √ √ X X103 3 51 √ √ √ √ √ √ √ X X104 3 52 √ √ √ √ √ √ √ X X105 3 53 √ √ √ √ √ √ √ X X106 3 54 √ √ √ √ √ √ √ X X107 3 55 √ √ √ √ √ √ √ X X108 3 56 √ √ √ √ √ √ √ X X109 3 57 √ √ √ √ √ √ √ X X110 3 58 √ √ √ √ √ √ √ X X111 3 60 √ √ √ √ √ √ √ X X112 3 61 √ √ √ √ √ √ √ X X113 4 4 √ √ √ √ √ √ √ X X114 4 6 √ √ √ √ √ √ √ X X115 4 8 √ √ √ √ √ √ √ X X116 4 10 √ √ √ √ √ √ √ X X117 4 12 √ √ √ √ √ √ √ X X118 4 14 √ √ √ √ √ √ √ X X119 4 16 √ √ √ √ √ √ √ X X120 4 18 √ √ √ √ √ √ √ X X121 7 1 √ √ √ √ √ √ √ X X122 7 2 √ √ √ √ √ √ √ X X123 7 3 √ √ √ √ √ √ √ X X124 7 4 √ √ √ √ √ √ √ X X125 7 5 √ √ √ √ √ √ √ X X126 7 6 √ √ √ √ √ √ √ X X127 7 7 √ √ √ √ √ √ √ X X128 7 8 √ √ √ √ √ √ √ X X129 7 9 √ √ √ √ √ √ √ X X130 7 10 √ √ √ √ √ √ √ X X131 7 11 √ √ √ √ √ √ √ X X132 7 12 √ √ √ √ √ √ √ X X133 8 1 √ √ √ √ √ √ √ X X134 8 2 √ √ √ √ √ √ √ X X135 8 3 √ √ √ √ √ √ √ X X136 8 4 √ √ √ √ √ √ √ X X137 8 5 √ √ √ √ √ √ √ X X138 8 6 √ √ √ √ √ √ √ X X139 8 7 √ √ √ √ √ √ √ X X140 8 8 √ √ √ √ √ √ √ X X

Page 16: 250 Housing Units Eval (May 5, 2014)

Page 16 of 21

Blk. No. Lot No.LAY- SEPTIC ROADWAY STORM CONCRETE FINISH

TCT COMPLETEDOUT TANK DRAINAGE LINE WATER LINE DRAIN PAVEMENTGROUND ELEV

Ctrl. No.141 8 9 √ √ √ √ √ √ √ X X142 8 10 √ √ √ √ √ √ √ X X143 8 11 √ √ √ √ √ √ √ X X144 8 12 √ √ √ √ √ √ √ X X145 8 13 √ √ √ √ √ √ √ X X146 8 14 √ √ √ √ √ √ √ X X147 8 16 √ √ √ √ √ √ √ X X148 9 1 √ √ √ √ √ √ √ X X149 9 2 √ √ √ √ √ √ √ X X150 9 3 √ √ √ √ √ √ √ X X151 9 4 √ √ √ √ √ √ √ X X152 9 5 √ √ √ √ √ √ √ X X153 9 6 √ √ √ √ √ √ √ X X154 9 7 √ √ √ √ √ √ √ X X155 9 8 √ √ √ √ √ √ √ X X156 9 9 √ √ √ √ √ √ √ X X157 9 10 √ √ √ √ √ √ √ X X158 9 11 √ √ √ √ √ √ √ X X159 9 12 √ √ √ √ √ √ √ X X160 9 13 √ √ √ √ √ √ √ X X161 9 14 √ √ √ √ √ √ √ X X162 9 15 √ √ √ √ √ √ √ X X163 9 16 √ √ √ √ √ √ √ X X164 9 17 √ √ √ √ √ √ √ X X165 9 18 √ √ √ √ √ √ √ X X166 9 20 √ √ √ √ √ √ √ X X167 10 4 √ √ √ √ √ √ √ X X168 10 6 √ √ √ √ √ √ √ X X169 10 7 √ √ √ √ √ √ √ X X170 10 8 √ √ √ √ √ √ √ X X171 10 9 √ √ √ √ √ √ √ X X172 10 10 √ √ √ √ √ √ √ X X173 10 11 √ √ √ √ √ √ √ X X174 10 12 √ √ √ √ √ √ √ X X175 10 13 √ √ √ √ √ √ √ X X176 10 14 √ √ √ √ √ √ √ X X177 10 15 √ √ √ √ √ √ √ X X178 10 16 √ √ √ √ √ √ √ X X179 10 17 √ √ √ √ √ √ √ X X180 10 18 √ √ √ √ √ √ √ X X181 10 19 √ √ √ √ √ √ √ X X182 10 20 √ √ √ √ √ √ √ X X183 10 21 √ √ √ √ √ √ √ X X184 10 22 √ √ √ √ √ √ √ X X185 10 23 √ √ √ √ √ √ √ X X186 10 24 √ √ √ √ √ √ √ X X187 10 25 √ √ √ √ √ √ √ X X188 10 26 √ √ √ √ √ √ √ X X189 10 27 √ √ √ √ √ √ √ X X190 10 28 √ √ √ √ √ √ √ X X191 10 29 √ √ √ √ √ √ √ X X192 10 30 √ √ √ √ √ √ √ X X193 10 31 √ √ √ √ √ √ √ X X194 10 32 √ √ √ √ √ √ √ X X195 10 33 √ √ √ √ √ √ √ X X196 10 34 √ √ √ √ √ √ √ X X197 10 35 √ √ √ √ √ √ √ X X198 10 37 √ √ √ √ √ √ √ X X199 11 2 √ √ √ √ √ √ √ X X200 11 3 √ √ √ √ √ √ √ X X201 11 5 √ √ √ √ √ √ √ X X202 11 6 √ √ √ √ √ √ √ X X203 11 13 √ √ √ √ √ √ √ X X204 11 14 √ √ √ √ √ √ √ X X205 11 15 √ √ √ √ √ √ √ X X206 11 16 √ √ √ √ √ √ √ X X207 11 17 √ √ √ √ √ √ √ X X208 11 18 √ √ √ √ √ √ √ X X209 11 19 √ √ √ √ √ √ √ X X210 11 20 √ √ √ √ √ √ √ X X211 13 1 √ √ √ √ √ √ √ X X212 13 2 √ √ √ √ √ √ √ X X213 13 3 √ √ √ √ √ √ √ X X214 13 4 √ √ √ √ √ √ √ X X215 13 5 √ √ √ √ √ √ √ X X

Page 17: 250 Housing Units Eval (May 5, 2014)

Page 17 of 21

Blk. No. Lot No.LAY- SEPTIC ROADWAY STORM CONCRETE FINISH

TCT COMPLETEDOUT TANK DRAINAGE LINE WATER LINE DRAIN PAVEMENTGROUND ELEV

Ctrl. No.216 13 6 √ √ √ √ √ √ √ X X217 13 7 √ √ √ √ √ √ √ X X218 13 8 √ √ √ √ √ √ √ X X219 13 9 √ √ √ √ √ √ √ X X220 13 10 √ √ √ √ √ √ √ X X221 13 11 √ √ √ √ √ √ √ X X222 13 12 √ √ √ √ √ √ √ X X223 13 13 √ √ √ √ √ √ √ X X224 13 14 √ √ √ √ √ √ √ X X225 13 15 √ √ √ √ √ √ √ X X226 13 16 √ √ √ √ √ √ √ X X227 13 17 √ √ √ √ √ √ √ X X228 13 18 √ √ √ √ √ √ √ X X229 13 19 √ √ √ √ √ √ √ X X230 13 20 √ √ √ √ √ √ √ X X231 13 21 √ √ √ √ √ √ √ X X232 13 22 √ √ √ √ √ √ √ X X233 13 23 √ √ √ √ √ √ √ X X234 13 24 √ √ √ √ √ √ √ X X235 13 25 √ √ √ √ √ √ √ X X236 13 26 √ √ √ √ √ √ √ X X237 13 27 √ √ √ √ √ √ √ X X238 13 28 √ √ √ √ √ √ √ X X239 13 29 √ √ √ √ √ √ √ X X240 13 30 √ √ √ √ √ √ √ X X241 13 31 √ √ √ √ √ √ √ X X242 13 32 √ √ √ √ √ √ √ X X243 13 33 √ √ √ √ √ √ √ X X244 13 34 √ √ √ √ √ √ √ X X245 13 35 √ √ √ √ √ √ √ X X246 13 36 √ √ √ √ √ √ √ X X247 13 37 √ √ √ √ √ √ √ X X248 13 38 √ √ √ √ √ √ √ X X249 13 39 √ √ √ √ √ √ √ X X250 13 40 √ √ √ √ √ √ √ X X

Recommendation: Legend:

- Provide slope protection at the back of the housing units in Block 3 √ Completed- The noted defects/damaged portion of Land Development shall be covered by X Not Completed Deed of Undertaking and withholding the release of 10% Retention Money.

Prepared by: Checked by: Noted by:

FORTUNATO JESUS G. DAIGAN CESAR A. JONOS RAMON S. PARAGAS NHA - Senior Engineer Project Engineer District Manager

Region III-A Region III-A

MARK CALVIN A. CABULISAN NHA - Senior Engineer

Page 18: 250 Housing Units Eval (May 5, 2014)

Page 18 of 21

TECHNICAL EVALUATION REPORT - LAND DEVELOPMENTas of MAY 8, 2014

250 DEVELOPED LOTSAREA(SQ.M)

6340404040404040404040404040404040404040404040404040404040404040404040404040404040404040404040404242404073674040404040404040404040

Page 19: 250 Housing Units Eval (May 5, 2014)

Page 19 of 21

AREA(SQ.M)

404040404040404040404040404040404040404040404040404040404040404040404040404040404040404040405440404040404040404040404040404040404040404040404040404040

Page 20: 250 Housing Units Eval (May 5, 2014)

Page 20 of 21

AREA(SQ.M)

4040404040404040404040404040404040404040404040404040404040404040404040404040404040404040404040404040404040404040404040404040404040404040404048

5340

40

40

Page 21: 250 Housing Units Eval (May 5, 2014)

Page 21 of 21

AREA(SQ.M)

40

4040

40

4040

40

40

4040

40

40

4040

41

4142

41

40

4140

43

40

5053

40

4043

40

40

4040

40

40

40

CompletedNot Completed

RAMON S. PARAGASDistrict Manager