24 th street improvements project

19
24 th Street Improvements Project CEQA Public Hearing for Certification of Final Environmental Impact Report January 16, 2014

Upload: morgan

Post on 10-Jan-2016

35 views

Category:

Documents


0 download

DESCRIPTION

24 th Street Improvements Project. CEQA Public Hearing for Certification of Final Environmental Impact Report January 16, 2014. What’s Happened So Far:. Notice of Preparation Circulated April 11, 2008 to May 12, 2008 Public Scoping Meeting held April 30, 2008 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 24 th  Street Improvements Project

24th Street Improvements Project

CEQA Public Hearing for Certification of Final

Environmental Impact Report

January 16, 2014

Page 2: 24 th  Street Improvements Project

• Notice of Preparation Circulated April 11, 2008 to May 12, 2008

• Public Scoping Meeting held April 30, 2008 • Draft Environmental Document Circulated

from May 23, 2012 to July 16, 2012• Caltrans Public Hearing (NEPA) held June

26, 2012• Planning Commission Public Hearing

(CEQA) held July 5, 2012.

What’s Happened So Far:

Page 3: 24 th  Street Improvements Project

24th Street ImprovementsProposed Cul-de-sacs – Not a part of this Project CC Resolution 128-12 approved November 2012Allowed with Conditions

Page 4: 24 th  Street Improvements Project

Notification/Mailing Area

Page 5: 24 th  Street Improvements Project

24th Street Improvements Project

State Freeway System in Metropolitan Bakersfield

Page 6: 24 th  Street Improvements Project

24th Street Improvements Project

Projects to improve the SR 58/SR 178 Corridor

SR-178 (WIDEN)

ROSEDALE HIGHWAY

SR-178 AT FAIRFAX RD

SR-178 at Morning Drive

Page 7: 24 th  Street Improvements Project

24th Street Improvements Project

TRIP projects on SR 58/SR 178 Corridor

SR-178 (WIDEN)

ROSEDALE HIGHWAY

SR-178 AT FAIRFAX RD

24TH STREET IMPROVEMENT PROJECT

SR-178 at Morning Drive

Page 8: 24 th  Street Improvements Project

From 1971 Caltrans Study of Freeway Alignments

Page 9: 24 th  Street Improvements Project

ROUTE 178 CORRIDOR STUDY

Prepared For:KERN COG, CALTRANS, CITY OF BAKERSFIELD

Prepared By:Barton-Aschman Associates, Inc.

December 1986

Additional Studies:

Page 10: 24 th  Street Improvements Project

10

Page 11: 24 th  Street Improvements Project

11

Page 12: 24 th  Street Improvements Project

• Enhanced Landscaping for Median and Parkway Areas• Eliminated B Street access to 24th , install cul-de-sac• Installed raised/striped median for NB Oak Right-Turn• Eliminated two proposed bus turnouts between Cedar

and A Streets• Eliminated WB Left-turns at Beech, Spruce and Cedar

Streets• Eliminated EB Left-turns at Spruce and Cedar Streets• Shifted Elm Street cul-de-sac north

24th Street Improvements ProjectChanges from Draft Environmental Document:

Page 13: 24 th  Street Improvements Project

Based on:• Public Comments and Concerns Received (over 1700)• Results of Engineering and Environmental Technical Studies• Superior Engineering Design (Less Driveways)

• More efficient Traffic Movement

• Smaller relative impact to Potential Historic Districts• Fewer Full Parcel Acquisitions from the two Districts• Larger District to North, so less percentage impact to District

• Smaller lots on north result in smaller residual property remainders after project

• Cost is slightly less

24th Street Improvements ProjectAlternative No. 1 – Widen to the NorthSelected as Preferred Alternative

Page 14: 24 th  Street Improvements Project

24th Street Improvements ProjectAlternative No. 1 – Widen to the NorthSelected as Preferred Alternative

Page 15: 24 th  Street Improvements Project

24th Street Improvements ProjectAlternative No. 1 – Widen to the NorthSelected as Preferred Alternative

Page 16: 24 th  Street Improvements Project

24th Street Improvements ProjectAlternative No. 1 – Widen to the NorthSelected as Preferred Alternative

Page 17: 24 th  Street Improvements Project

24th Street Improvements ProjectAlternative No. 1 – Widen to the NorthSelected as Preferred Alternative

Page 18: 24 th  Street Improvements Project

24th Street Improvements ProjectTwo Potential Historic DistrictsFor This Project Only

Page 19: 24 th  Street Improvements Project

Thank You

Landscaping ConceptRoland Genick