NHA Executive Board’s Confirmed Minutes
NATIONAL HIGHWAY AUTHORITYSecretariat Section
CONFIRMED MINUTES
Subject: 232nd Meeting of the NHA Executive Board held on Feb
27, 2014 at Islamabad
1. Introduction
1.1. The 232nd meeting of the Executive Board of the National
Highway Authority was held at 1130 hours on Feb 27, 2014 at the
NHA Head Office Auditorium, Islamabad. Mr Shahid Ashraf Tarar,
Chairman NHA presided.
1.2. All Members attended except Dr Shujat Ali, Additional
Secretary (Budget), Finance Division, who was represented by the
Joint Secretary, Finance Division. List of participants is at Annex-A.
1.3. The meeting commenced with recitation of verses from the
Holy Quran and Urdu translation.
-
8/9/2019 232-Executive Board Meeting of NHA
2/56
NHA Executive Board’s Confirmed Minutes
2.4. The Chairman welcomed Mr Sabino Sikandar Jalal, JointSecretary, MoC as a new member of the Executive Board.
2.5. The Chairman briefed the Board about his important
activities since his posting. He narrated that the Prime Minister is
taking keen interest in the development of country & nation, primarily
focusing on highways & communication sector. Lahore - KarachiMotorway and Pak-China Economic Corridor are couple of important
initiatives of the Prime Minister. He assured the Board that NHA will
make hectic efforts to accomplish assigned targets and achieve desired
goals under the valuable guidance & supervision of this august Board
through optimum utilization of NHA’s in-house capabilities.
FORMAL BOARD PROCEEDINGS
3. Agenda Items
3.1. The Secretary NHA stated that 19 x working papers were
circulated in four volumes. Subject-wise distribution is as follows:-
Item No
a. Secretariat /Confirmation of minutes 2
b Planning 8
-
8/9/2019 232-Executive Board Meeting of NHA
3/56
NHA Executive Board’s Confirmed Minutes
4.2. The Additional Secretary (Budget), Finance Division also
made some written observations which were, along with the response
provided by the Finance Wing, presented before the Board for
information, discussion and decision. After deliberations the Board
decided that these observations and their response be made part of
the minutes.
4.3. The Member (Aided Projects) presented response / reply
to the queries made by the Board on Agenda Item 15 titled “Revised
Addendum-15 of M/s EA Consulting (Pvt) Ltd for Construction
Supervision of Lyari Expressway Project.” The Board, however,
decided that the agenda item be presented again.
4.4. Minutes were accepted for confirmation.
Decision
4.5. The Executive Board confirmed minutes of 231st meeting
held on Dec 17, 2013 with the following amendments:-
a. In Agenda Item 6 “Revised PC-I for Construction of
-
8/9/2019 232-Executive Board Meeting of NHA
4/56
NHA Executive Board’s Confirmed Minutes
Read: The Board also accorded approval to handover Pattoki Toll Plaza to Concessionaire,
within forty five (45) days after completion
of proceedings in respect of “Financial
Close,” under the same terms and
conditions ------------
Suggested by Additional Secretary (Budget)
c. In Agenda Item 16 “Construction of Habibabad
Flyover on National Highway (N-5) on Built-Operate-
Transfer Basis” add Para-19.13 under the head
Decision:-
“19.13. The Board further directed that in future
comparison of estimates of BOT/PPP and Public
Sector should be made the part of such proposals for
consideration.”
Suggested by Additional Secretary (Budget)
d. In Agenda Item 18 “Revised Budget Estimates 2012-13 & Budget Estimates 2013-14” add Para 21.3 as
follows:-
-
8/9/2019 232-Executive Board Meeting of NHA
5/56
NHA Executive Board’s Confirmed Minutes
last year budget vs actual expenditure (Annex-J).Further as per Clause 8(e) of NHA Act 1991
(amended 2001) and provisions of NHA Code, it is
the function of the Board to approve projects to be
funded through toll and other receipts from operation
of highways, so there is no need of obtaining
approval of NHC. The Chief (T&C) agreed with the
clarification.”
Suggested by Chief (T&C)
f. In Agenda Item 19 “Annual Maintenance Plan for FY
2013-14” add Para-22.13 under the head Decision:-
“22.13 The Board also decided that proposal for
approval of AMP will always include a one page
summary indicating the status of previous year’s
budget & actual expenditure incurred.”
Suggested by Chief (T&C)
Action By : Secretary NHA
5.
Agenda Item 2
-
8/9/2019 232-Executive Board Meeting of NHA
6/56
NHA Executive Board’s Confirmed Minutes
c. Addendum-4 of M/s Oriental Consultants &Associates for Consultancy Services of NHDSIP:
Construction Supervision of Sukkur - Shikarpur -
Jacobabad Project, Pack-2 (CSP-2) (Agenda Item 14).
5.2. The Executive Board formed following Committee to
investigate and present the facts before the Board for decision:-
a. Mr. Munir Anjum, Chief (T&C) Planning Commission
b. Mr. Asim Amin, General Manager (Design), NHA
c. Mr. Rizwan Baig, General Manager (NESPAK)
d. GM (B&A) was recommended as co-opted member
Proposals
5.3. The General Manager (Design) presented the report
(Annex-B). Proposals recommended by the Committee are as under:-
a. Agenda Item-8. The amendment was required and
was so made. However, the approval of the
amendment rests with the Authority as defined in
the NHA Code, as per financial impact. Same is
-
8/9/2019 232-Executive Board Meeting of NHA
7/56
NHA Executive Board’s Confirmed Minutes
Deliberation
5.4. The Chairman asked about the reasons for increase of
contract cost in the Shershah Bridge. The GM (Design) explained the
reasons as under:-
a. Completion of the Project got delayed because of
various reasons including late and piecemeal issue of
vetted construction drawings.
b. One year EoT was granted to the Contractor ie from
Jun-2009 to May-2010 and the Bridge was finally
opened to traffic in Jun-2010.
c. As per agreement the Consultant's staff (RE, QS and
CO) remained at site another one month for accounts
finalization.
d. Scope of work was increased by assigning another
Bridge of the same Project in the Consultants
Contract, which required immediate attention.
-
8/9/2019 232-Executive Board Meeting of NHA
8/56
NHA Executive Board’s Confirmed Minutes
5.6. The Chairman sought clarification about the chargesmade by the Consultant in respect of ICB-V from signing the
agreement in 2006 until start of work in Feb-2011. The GM (Design)
clarified that nothing was charged by the Consultant during that
period.
Decision
5.7. The Executive Board deliberated and agreed with the
recommendations of the Committee as mentioned in Para-5.3.
Action By : Mem (Construction), Mem (AP) & GM (Design)
6. Agenda Item 3
Procurement Procedure for Hiring of Consultancy
Services in NHA
6.1. The Member (Planning) requested for withdrawal of this
agenda item.
Action By : Member (Planning)
7. Agenda Item 4
Extension of Consultancy Services for Design and
-
8/9/2019 232-Executive Board Meeting of NHA
9/56
NHA Executive Board’s Confirmed Minutes
Deliberation
8.2. The General Manager (P&CA) presented the case.
8.3. The Chief (T&C) observed that this project is shown to be
financed through PSDP allocation, whereas, there is no such funding
arrangement in the PSDP. The GM (P&CA) clarified that the project on
PSDP is shown erroneously in the working paper. Funding for this
purpose is made by the Committee for Reconstruction &
Rehabilitation of Afghanistan (CRRA). The Chief (T&C) stated that, if
the project is neither funded through PSDP nor NHA sources then is it
the power of the Board to approve it? The Member (Planning)
explained that since it is an assignment to NHA and its administrative
control lies with the Board, therefore, approval is requested being the
competent forum for NHA schemes.
8.4. The Chairman suggested that as against required funds of
Rs 90 million CRRA has allocated only Rs 62 million, therefore, supply
of bridges may be ordered as per funds available in first phase and
-
8/9/2019 232-Executive Board Meeting of NHA
10/56
NHA Executive Board’s Confirmed Minutes
9. Agenda Item 6Lyari Expressway Project: VO No 10 (Ex-post facto
approval of Continuation of Technical Assistance &
Supervision by M/s RECO)
Proposal
9.1. The Executive Board is requested to accord in-principle
approval of re-rating so that proceedings of the re-rating committee
may commence and submit its recommendations to the Board for
approval / consideration.
Deliberation
9.2. The Member (AP) made detailed presentation.
9.3. The Chairman after due discussion suggested that a
standing committee headed by the Member (Planning) may be
constituted for framing the policy on the basis of which cases of
Variation Orders, Addendums, escalations and re-rating proposals be
submitted to the competent authority for decision. The Member
(Planning) proposed that cases for policy of revision of PC-Is be also
included in the ToRs of the said committee
-
8/9/2019 232-Executive Board Meeting of NHA
11/56
NHA Executive Board’s Confirmed Minutes
9.6. The Chief (T&C) and VP-NESPAK expressed their dis-satisfaction over the contents of the presentation as the data /
information provided in it was not according to that of working paper.
The Board then directed that the presentation be thoroughly prepared
on standard format & all the relevant data / information be
appropriately covered.
9.7. After detailed deliberations the Board did not clear the
proposal and deferred it with the directions that the working paper be
resubmitted with proper details and presentation.
Decision
9.8. The Executive Board deferred the working paper regarding
Lyari Expressway Project: VO No 10 (ex-post facto approval of
continuation of technical assistance & supervision by M/s RECO) for
resubmission in other meeting.
Action By : Member (Construction)
10. Agenda Item 7
Addendum-2 of M/s Techno Consult for Construction
-
8/9/2019 232-Executive Board Meeting of NHA
12/56
NHA Executive Board’s Confirmed Minutes
10.3. After deliberations the Board has cleared the proposal.However, the Chairman directed that all proposals regarding Variation
Orders / Addendums be provided with proper background, reasons
and justifications so that decisions could be taken smoothly and
effectively.
10.4. The Board directed that quality of briefings to the Board
be improved and presentations be made in a standard format in
respect of all agenda items. It was further instructed that during
presentation the supporting staff of respective Member should be
present outside the meeting place along with complete record and
information relevant to the agenda under consideration for ready
reference as & when required by the Board.
Decision
10.5. The Executive Board approved Addendum-2 of M/s
Techno Consult International (Pvt) Ltd, for Construction Supervision
of road from Hyderabad Badin to Mirwah Sanjar Chang road costing
Rs 14,394,661/= (Rupees fourteen million, three hundred ninety four thousand,
six hundred & sixty one) only (+23.74%) with revised consultancy contract
cost of Rs 75,023,283/= and increase of (+95.3%) entailing EoT from
-
8/9/2019 232-Executive Board Meeting of NHA
13/56
NHA Executive Board’s Confirmed Minutes
Deliberation
11.2. The Member (AP) presented the case.
11.3. The Chief (T&C) stated that the Board has time & again
directed not to consider revision of Factor-C items. The VP-NESPAK
supported the version and opined that Factor-C is being misused,
therefore, working paper need to be scrutinized and earlier decisionsof the Board be annexed for consideration and decision of the item.
The Chairman agreed, in principle, with this point of view. However,
he opined that Factor-C consideration seems justified only because of
increase in scope of work.
11.4. The Member (Planning) clarified that initial project was for
earthworks and cut only, whereas, now this proposal include full
fledged road component, therefore, revision of Factor-C has been
necessitated.
11.5. The VP-NESPAK objected that weightage of fuel equal to
0.24 (as proposed) is very high & will open a Pandora box. After detailed
discussion the Board agreed with the suggestion of VP-NESPAK thatweightage of fuel should not be over 0.17.
-
8/9/2019 232-Executive Board Meeting of NHA
14/56
NHA Executive Board’s Confirmed Minutes
12. Agenda Item 9
Addendum-5 of M/s Associated Consulting Engineers
(ACE) for Construction Supervision of Takhtbhai –
Dargai Section (N-45)
12.1. The subject agenda item could not be discussed due to
paucity of time and was deferred till next meeting.
Action By : Member (Construction)
13. Agenda Item 10
Revised Addendum-1 of M/s ABM Engineers for
Construction Supervision of Kolpur Bypass Project
(N-65)
Proposal
13.1. The Executive Board is requested to approve:-
a. Revised Addendum-1 of M/s ABM Engineers for
-
8/9/2019 232-Executive Board Meeting of NHA
15/56
NHA Executive Board’s Confirmed Minutes
Consultants be prepared and placed before the Board at one timeinstead of piecemeal with complete and full picture / justification. The
Member (Planning) supported the version of the Chief (T&C) and
suggested that concerned Wings should move complete case for
extension of Contractors and Consultants together and not separately
for each.
13.4. The Board deliberated and cleared the proposal.
Decision
13.5. The Executive Board approved revised Addendum-1 of
M/s ABM Engineers for construction supervision of Kolpur Bypass
Project (N-65) of Rs 12.723 million bringing the overall cost to Rs
17.193 million entailing +284.63% variation over the original contract
cost and granted Extension of Time (EoT) from Aug 7, 2011 to Jun 5,
2013 to commensurate with EoT given to the Contractor.
Action By : Member (Construction)
14. Agenda Item 11
Promotion/ Acting Charge Appointment of NHA
-
8/9/2019 232-Executive Board Meeting of NHA
16/56
NHA Executive Board’s Confirmed Minutes
b. Director (Accounts) BS-19
Mr. Muhammad Aslam, DD (Accounts) BS-18 at
serial No.1 in the seniority list for appointment on
acting charge basis against PC-I post of Director
(Accounts) BS-19 wef Jan 10, 2011 ie from the date
of acting charge appointment of Syed Hassan Aamir,
his junior counterpart in compliance of FST
Judgment dated Jan 13, 2012 passed in appeal
No.297 (P) CS/2011.
c. Director (LM & IS) BS-19
Mr. Abdul Ghaffar, Deputy Director (LM & IS) BS-18
(already appointed against PC-I post of Director (LM
& IS, BS-19) ranking at Sr. No.1 in the seniority list
for promotion to the regular single available post of
Director (LM & IS) BS-19 wef Dec 5, 2012 ie the date
of DPC meeting.
Deliberation
14.2. The Member (Admn) presented the case.
-
8/9/2019 232-Executive Board Meeting of NHA
17/56
NHA Executive Board’s Confirmed Minutes
The Chief (T&C) supported the said version and added that othervacancies falling under the promotion quota be also worked out and
deserving employees of the Authority be considered for promotions. He
further suggested that the Admn Wing also see that these cases do not
fall under any litigation and there is nothing pending against the
officers recommended for promotion. The Chairman assured the
Board that only deserving personnel having good career record would
be suggested for promotions.
14.6. The Board deliberated and cleared the proposal.
Decision
14.7. The Executive Board approved the promotions of the
recommended officers with the direction that:-
a. Rules position for effective date of promotion be
checked and promotion be ordered accordingly.
b. Admn Wing ensures that no adverse proceedings arepending against the said officers.
-
8/9/2019 232-Executive Board Meeting of NHA
18/56
NHA Executive Board’s Confirmed Minutes
16. Agenda Item 13Construction of Gwadar - Ratodero Road Project:
Addendum-2 of M/s Associated Consultancy Services
(Pvt) Ltd for Khuzdar-Shahdadkot Sec-IV, Package-V
Proposal
16.1. The Executive Board is requested to approve following
variations in the Consultancy Contract of M/s Associated Consultancy
Center (ACC) (Pvt) Ltd of Khuzdar - Shahdadkot Road, Section-IV
Package-V km 125+666 to km 183+251 (M-8):-
a. Addendum 2 with increase of cost Rs 8,110,009/=
and revised cost of the contract Rs 48,625,877/=.
b. Extension of time to the Consultants upto Dec 31,
2013.
Deliberation
16.2. The Member (AP) presented the case.
-
8/9/2019 232-Executive Board Meeting of NHA
19/56
NHA Executive Board’s Confirmed Minutes
17. Agenda Item 14Construction of Gwadar-Ratodero Road Project:
Addendum-4 of M/s Associated Consultancy Services
(Pvt) Ltd for Khuzdar-Shahdadkot Sec-IV, Package-IV
Proposal
17.1. The Executive Board is requested to approve following
variations in the Consultancy Contract of M/s Associated Consultancy
Center (ACC) (Pvt) Ltd of Khuzdar - Shahdadkot Road, Section-IV
Package-IV km 84+500 to km 125+666 (M-8):-
a. Addendum 4 with increase of cost Rs 20,582,086/=
and revised cost of the contract Rs 90,711,360/=.
b. Extension of time to the Consultants upto Apr 30,
2014.
Deliberation
17.2. The Member (AP) presented the case.
-
8/9/2019 232-Executive Board Meeting of NHA
20/56
NHA Executive Board’s Confirmed Minutes
18. Agenda Item 15Construction of Gwadar-Ratodero Road Project:
Addendum-5 of M/s Associated Consultancy Services
(Pvt) Ltd for Khuzdar-Shahdadkot Sec-IV, Package-III
Proposal
18.1. The Executive Board is requested to approve following
variations in the consultancy contract of M/s Associated Consultancy
Centre (Pvt) Ltd of “Khuzdar - Shahdadkot Road, Section-IV, Package-
III (km 35+000 to km 84+500):-
a. Addendum 5 with increase of cost Rs 12,376,929/=
and revised cost of the contract Rs 75,584,680/=.
b. Extension of time to the consultants up to Jun 30,
2014.
Deliberation
18.2. The Member (AP) presented the case.
-
8/9/2019 232-Executive Board Meeting of NHA
21/56
NHA Executive Board’s Confirmed Minutes
19. Agenda Item 16
PC-II for Feasibility Study and Preliminary Design of
Peshawar - Kabul Motorway (265 Km)
Proposal
19.1. The Executive Board is requested to approve the PC-II for
feasibility study and preliminary design of Peshawar - Kabul Motorway
(265 km) at the cost of Rs 82.650 million.
Deliberation
19.2. The Director (Planning) presented the case.
19.3. The Board deliberated and cleared the proposal subject to
completion of required formalities.
Decision
19.4. The Executive Board approved the PC-II for feasibility
-
8/9/2019 232-Executive Board Meeting of NHA
22/56
NHA Executive Board’s Confirmed Minutes
21. Agenda Item 18Variation Order-I of M/s Techno Time Construction
Company for Construction of Bridge Across Vidor
Nullah (N-70, Km 96-97)
21.1. The subject agenda item could not be discussed due to
paucity of time and was deferred till next meeting.
Action By : Member (Operation)
22. Agenda Item 19
Re-Designation of Upgraded Posts of Accounts/Audit
Cadre
Proposal
22.1. The Executive Board is requested to consider the
proposals for re-designation of the following upgraded Account’s cadre
posts to remove anomaly:-
Posts Upgraded
BPS
Proposed re-designation
-
8/9/2019 232-Executive Board Meeting of NHA
23/56
NHA Executive Board’s Confirmed Minutes
22.3. The Joint Secretary, Finance Division remarked that this
proposal needs to be considered by the Finance Division before getting
approval of the Executive Board. The Member (Admn) narrated that
the Executive Board is competent to create, abolish and re-designate
the posts in NHA; hence the proposal is within the competency of the
Executive Board. The Chief (NTRC) was of the view that, since some of
the NHA employees have gone to the courts, the matter may be
decided in the light of orders of the courts.
22.4. The Board after deliberation directed that the case be re-
examined in the light of observations made by the Board Members.
Decision
22.5. The Executive Board considered the proposal and decided
that the case be re-examined and presented before the Board in next
meeting.
Action By : Member (Admn)
23. Additional Agenda Item-I
-
8/9/2019 232-Executive Board Meeting of NHA
24/56
NHA Executive Board’s Confirmed Minutes
Deliberation
23.2. The Member (Planning) presented the case.
23.3. The Board was informed that USAID has specified in the
MOU that the works will be awarded to M/s FWO through a
negotiated contract. The award of works to M/s FWO on single source
basis as per USAID requirement is in line with PPRA Rule-5.
23.4. However, Public Procurement Regulations 2011 require
that whenever an agency shall invoke Rule-5, it shall bring the case to
the ECC which will concur or otherwise for the agency to proceed in
term of Rule-5.
23.5. NHA took up the case with MoC vide its letter dated Aug
23, 2013 and subsequently MoC forwarded the Summary to ECC vide
its letter dated 18 September 2013. The ECC in its meeting held on
Jan 8, 2013 has approved, in principle, the award of works to M/sFWO on single source basis subject to fulfillment of all codal
formalities; and approval of the revised PC-I of the project by
-
8/9/2019 232-Executive Board Meeting of NHA
25/56
NHA Executive Board’s Confirmed Minutes
24. Additional Agenda Item-II
Amended PC-I for Improvement & Widening of Jaglot-
Skardu Road, S-I (163.821 Km)
24.1. The subject agenda item could not be discussed due to
paucity of time and was deferred till next meeting.
Action By : Member (Planning)
25. Additional Agenda Item-III
Award of Periodic Maintenance Works in the Regions
of NHA Under AMP 2012-13 to Lowest Evaluated
Bidders
Proposal
25.1. The Executive Board is requested to accord approval for
the award of Periodic Maintenance Works (FY 2012-13) in the regions
to the lowest evaluated bidders as recommended by the TenderAcceptance Committee mentioned below:-
-
8/9/2019 232-Executive Board Meeting of NHA
26/56
NHA Executive Board’s Confirmed Minutes
b. Balochistan-North
Rs in Million
SrNo
ContractNo
Bidders (M/s) BidAmount
LowestBidder (M/s)
LowestBid
CSR-2011 (%)
CSR-2011+15% (%)
Recommendation
1. PM-2012-
13-BN-01
1. Taimoor Shah
2. N.K and Co
3. Standard
4. Moosa Jan
5. Mir Ahmed Jan
6. Umer Jan
7. NPI Const
8. Ghulam Rasool9. G-S-P
88.209
95.588
75.396
102.032
133.179
124.586
98.810
128.883107.402
Standard
Const Co
75.396 -29.80% -44.80% Recommended
for approval of
Chairman NHA
2. PM-2012-
13-BN-02
1. Mir Ahmed Jan
2. Ghulam Rasool
Lehri
219.538
Non-
responsive
Mir Ahmed Jan
Bangulzai
219.538 29.75% 14.75% Recommended
for approval of
Executive Board
3. PM-2012-
13-BN-03
1. Moosa Jan
2) Mir Ahmed Jan3) Ghulam Rasool
Lehri
63.830
87.178Non-
responsive
M/s Moosa
Jan and Co
63.830 -5.00% -20.00% Recommended
for approval of Chairman NHA
-
8/9/2019 232-Executive Board Meeting of NHA
27/56
NHA Executive Board’s Confirmed Minutes
d. Punjab-North
Rs in Million
Sr
No
Contract
No
Bidders (M/s) Bid
Amount
Lowest
Bidder (M/s)
Lowest
Bid
CSR-
2011 (%)
CSR-2011
+15% (%)
Recommendation
1. PM-2012-
13-PN-01
1. Wajid Iqbal
2. Nauman Const.
132.410
148.567
Wajid Iqbal &
Co,
132.410 4.90% -10.10% Recommended
for approval of
Executive Board
2. PM-2012-
13-PN-02
1. A.M Associates
2. Design & Eng
3. Habib Const
4. Zoraiz
5. Sachal TTC
6. Nauman Const.7. SH Iqbal
389.972
348.417
351.336
378.592
Non-responsive
376.450375.204
Design & Eng.
System
348.417 9.00% -6.00% Recommended
for approval of
Executive Board
3. PM-2012-
13-PN-03
1. Taimoor Shah
2. Design & Eng
3. Jv Sachal TTC
4. Nauman Const
5. Allhadad
83.321
93.320
Non-responsive
89.305
107.428
Taimoor Shah 83.321 6.25% -8.75% Recommended
for approval of
Executive Board
4. PM-2012-
13-PN-04
1. AM Associates
2. Sarwar & Co.
3. Habib const
4. Zoraiz Eng
5. AMCL-Mishal
6 SS Tamirat
Non-responsive
Non-responsive
454.636
444.670
395.473
418 355
AMCL Const &
Mishal Sania
JV
395.473 0.00% -15% Recommended
for approval of
Executive Board
-
8/9/2019 232-Executive Board Meeting of NHA
28/56
NHA Executive Board’s Confirmed Minutes
Sr
No
Contract
No
Bidders (M/s) Bid
Amount
Lowest
Bidder (M/s)
Lowest
Bid
CSR-
2011 (%)
CSR-2011
+15% (%)
Recommendation
7. PM-2012-
13-PN-07
1. Zoraiz Eng
2. BK Const
3. Nouman Const
4. Sh A Razzaq
5. Sarwar & Co
139.172
133.697
138.819
127.578
135.035
Sh Abdul
Razzaq
127.578 4.87% -10.13% Recommended
for approval of
Executive Board
8. PM-2012-
13-PN-08
1. B.K Const.
2. S S Tamiraat
3. Sh Iqbal Akhter4. Nauman Const
5. Sh A Razzaq
6. Sarwar & Co
199.876
204.933
193.391203.792
208.357
209.517
Sh Iqbal
Akhter & Co
193.391 3.38% -11.62% Recommended
for approval of
Executive Board
9. PM-2012-
13-PN-09
1. BK Const
2. Nauman Const
3. Sh Iqbal Akhter
4. Sarwar & Co
5. Sh A Razzaq
128.098
123.440
114.829
132.921
114.924
Sh Iqbal
Akhter & Co
114.829 -2.38% -17.38% Recommended
for approval of
Executive Board
e. Punjab-South
Rs in Million
SrNo
ContractNo
Bidders(M/s)
BidAmount
LowestBidder (M/s)
LowestBid
CSR-2011 (%)
CSR-2011+15% (%)
Recommendation
1. PM-2012-13-PS-01
1. SH Nazar2. Jam Bros3. Chaudry Const.
191.062166.839191.139
Jam Brothers& Co
166.839 8.89% -6.11% Recommendedfor approval of Executive Board
-
8/9/2019 232-Executive Board Meeting of NHA
29/56
NHA Executive Board’s Confirmed Minutes
f. Sindh-North
Rs in Million
SrNo
ContractNo
Bidders (M/s) BidAmount
LowestBidder (M/s)
LowestBid
CSR-2011(%)
CSR-2011+15% (%)
Recommendation
1. PM-2012-13-SN-01
1. NiazMuhammad Khan2. Sachal Engg
196.118
205.321
NiazMuhammadKhan & Bros
196.118 9.75% -5.25% Recommendedfor approval of Executive Board
2. PM-2012-13-SN-02
1. NiazMuhammad Khan2. Umer Jan3. Sachal Engg
206.736
215.798216.931
NiazMuhammadKhan & Bros
206.736 9.50% -5.50% Recommendedfor approval of Executive Board
3. PM-2012-13-SN-03
1.NiazMuhammad Khan2. Sachal Engg3. Umer Jan
309.331
304.529322.749
Sachal Engg.Works
304.529 7.80% -7.20% Recommendedfor approval of Executive Board
g. Sindh-South
Rs in Million
SrNo
ContractNo
Bidders (M/s) BidAmount
LowestBidder (M/s)
LowestBid
CSR-2011 (%)
CSR-2011+15% (%)
Recommendation
1. PM-2012-
13-SS-01
1. Niaz M Khan
2.Fazal & Bros3.Sh Iqbal Akhtar
401.961
440.872416.204
Niaz
MuhammadKhan & Bros
401.961 9.50%
-5.50%
Recommended
for approval of Executive Board
2 PM 2012 1 Ni M Kh 184 431 M/ Ni 184 431 9 00% 6 00% R d d
-
8/9/2019 232-Executive Board Meeting of NHA
30/56
NHA Executive Board’s Confirmed Minutes
Deliberation
25.2. The Member (Operation) presented the case.
25.3. The Board deliberated and cleared the proposal.
Decision
25.4. The Executive Board approved award of Periodic
Maintenance Works (FY 2012-13) in the following regions to the lowest
evaluated bidders as recommended by the Tender Acceptance
Committee:-
a. Khyber Pakhtunkhwa
Package NoName of Lowest
Evaluated Bidder
Quoted
Bid Price
Variation
CSR-2011
Variation
(CSR-2011+15%)
PM-2012-13-KP-01M/s Taimoor Shah
Construction Co
206,146,997 +4.66% -10.34%
PM-2012-13-KP-02M/s Taimoor Shah
Construction Co131,969,092 +7.86% -7.14 %
PM 2012 13 KP 03M/s Akhunzada Fazal
142 788 386 +14 00% 1 00 %
-
8/9/2019 232-Executive Board Meeting of NHA
31/56
NHA Executive Board’s Confirmed Minutes
d. Punjab-North
Package NoName of Lowest
Evaluated Bidder
Quoted
Bid Price
Variation
CSR-2011
Variation
(CSR-2011+15%)
PM-2012-13-PN-01 M/s Wajid Iqbal & Co. 132,410,166.62 +4.90% -10.10 %
PM-2012-13-PN-02M/s Design &
Engineering System348,417,291.19 +9.00% -6.00 %
PM-2012-13-PN-03M/s Taimoor Shah
Construction Co.83,321,441.25 +6.25 % -8.75 %
PM-2012-13-PN-04 M/s AMCL - MishalSania JV
395,473,158.00 +0.00 % -15.00 %
PM-2012-13-PN-05M/s AMCL - Mishal
Sania JV243,631,984.00 +0.00 % -15.00 %
PM-2012-13-PN-06M/s AMCL - Mishal
Sania JV295,508,279.00 +0.00 % -15.00 %
PM-2012-13-PN-07M/s Sh. Abdur Razzaq
& Co127,577,977.21 +4.87 % -10.13 %
PM-2012-13-PN-08M/s Sh. Iqbal Akhtar &
Co
193,391,260.23 +3.38 % -11.62%
PM-2012-13-PN-09M/s Sh. Iqbal Akhtar &
Co114,829,446.40 -2.38% -17.38 %
e. Punjab-South
Package NoName of Lowest
Evaluated Bidder
Quoted
Bid Price
Variation
CSR-2011
Variation
(CSR-2011+15%)
PM-2012-13-PS-01 M/s Jam Brothers 196,117,964.44 +9.75% -5.25%PM-2012-13-PS-03 M/s Usmani Associates 206,735,693.40 +9.50% -5.50%
PM-2012-13-PS-04M/s Supercon
Engineers304,528,541.70 +7.80% -7.20%
-
8/9/2019 232-Executive Board Meeting of NHA
32/56
NHA Executive Board’s Confirmed Minutes
h. Northern Areas
Package NoName of Lowest
Evaluated Bidder
Quoted
Bid Price
Variation
CSR-2011
Variation
(CSR-2011+15%)
PM-2012-13-NA-01M/s Attaullah Khan
Tarand & Co132,215,772.40 -3.00% -18.00 %
PM-2012-13-NA-02M/s Attaullah Khan
Tarand & Co103,944,665.12 -11.50% -26.50%
Action By : Member (Operation)
26. Conclusion
26.1. The Chairman wrapped up the meeting by thanking the
Board Members for their active participation and useful input.
-----------------------
-
8/9/2019 232-Executive Board Meeting of NHA
33/56
NHA Executive Board’s Confirmed Minutes
EXTRACTS
DRAFT MINUTES OF THE
232ND EXECUTIVE BOARD MEETING
FEBRUARY 27 AT ISLAMABAD
-
8/9/2019 232-Executive Board Meeting of NHA
34/56
NHA Executive Board’s Confirmed Minutes
26. Additional Agenda Item-4
Award of Periodic Maintenance Works of Punjab-
North Region (Wazirabad Section) under AMP 2012-
13 to Lowest Evaluated Bidder
Proposal
26.1.
Deliberation
26.2. The Member (Planning) presented the case.
Decision
Action By : Member (Operation)
27. Additional Agenda Item-5
Award of Periodic Maintenance Works of Punjab
-
8/9/2019 232-Executive Board Meeting of NHA
35/56
NHA Executive Board’s Confirmed Minutes
28. Additional Agenda Item-6
Award of Periodic Maintenance Works of Sindh-North
Region under AMP 2012-13 to Lowest Evaluated
Bidder
Proposal
28.1.
Deliberation
28.2. The Member (Planning) presented the case.
Decision
Action By : Member (Operation)
29. Additional Agenda Item-7
Award of Periodic Maintenance Works of Balochistan
-
8/9/2019 232-Executive Board Meeting of NHA
36/56
NHA Executive Board’s Confirmed Minutes
30. Additional Agenda Item-8
Award of Periodic Maintenance Works of Balochistan-
South Region under AMP 2012-13 to Lowest
Evaluated Bidder
Proposal
30.1.
Deliberation
30.2. The Member (Operation) presented the case.
Decision
Action By : Member (Operation)
31. Additional Agenda Item-9
Award of Periodic Maintenance Works of Khyber
-
8/9/2019 232-Executive Board Meeting of NHA
37/56
NHA Executive Board’s Confirmed Minutes
32. Additional Agenda Item-10
Award of Periodic Maintenance Works of Sindh-North
Region under AMP 2012-13 to Lowest Evaluated
Bidder
Proposal
32.1.
Deliberation
32.2. The Member (Operation) presented the case.
Decision
Action By : Member (Operation)
33. Additional Agenda Item-11
Award of Periodic Maintenance Works of Northern
-
8/9/2019 232-Executive Board Meeting of NHA
38/56
NHA Executive Board’s Confirmed Minutes
-
8/9/2019 232-Executive Board Meeting of NHA
39/56
NHA Executive Board’s Confirmed Minutes
NATIONAL HIGHWAY AUTHORITY
CONFIRMED MINUTES
232nd Executive Board MeetingIslamabad, February 27, 2014
INDEX
PARA AGENDA ITEM PAGE ACTION BY
1. Introduction 1 ---
2. Opening Remarks (Chairman NHA) 1 ---
3. Formal Proceedings (Agenda Items) 2 ---
4. Agenda Item 1Confirmation of Minutes - 231st Meeting of theExecutive Board Held on Dec 17, 2013
2 Secy NHA
5. Agenda Item 2Report by Technical Committee Constituted by theExecutive Board for Review of Agenda Items 8, 10 & 14
5 Mem (C),Mem (AP) &
-
8/9/2019 232-Executive Board Meeting of NHA
40/56
NHA Executive Board’s Confirmed Minutes
PARA AGENDA ITEM PAGE ACTION BY
11. Agenda Item 8Cost Escalation Due to Increase in Prices of Construction Material: Rationalization of Factor-C forSpecified Materials (Khuzdar-Shahdadkot Road, Sec-IV,Pack-IV, Wangu Hills)
12 Mem (C) & Mem (C)
12. Agenda Item 9Addendum-5 of M/s Associated Consulting Engineers
(ACE) for Construction Supervision of Takhtbhai – Dargai Section (N-45)
14 Mem (C)
13. Agenda Item 10Revised Addendum-1 of M/s ABM Engineers forConstruction Supervision of Kolpur Bypass Project (N-65)
14 Mem (C)
14. Agenda Item 11
Promotion/ Acting Charge Appointment of NHA OfficersEngineering/ Finance/ Admin/ LM&IS Cadre AgainstRegular/PC-I Posts in BS-18 & 19
15 Mem (A)
15. Agenda Item 12Elevation of NHA Employees Working in BS-1 to 16:Report by the Executive Board’s Sub-CommitteeConstituted for Review of Board’s Decision taken in its223rd Meeting of Nov 7, 2012
17 Mem (A)
16. Agenda Item 13Construction of Gwadar - Ratodero Road Project:
dd d 2 f / i d C l S i18 Mem (C)
-
8/9/2019 232-Executive Board Meeting of NHA
41/56
NHA Executive Board’s Confirmed Minutes
PARA AGENDA ITEM PAGE ACTION BY
22. Agenda Item 19Re-Designation of Upgraded Posts of Accounts/AuditCadre
22 Mem (A)
23. Additional Agenda Item-IConstruction of NHA Roads Providing Connectivity toAfghanistan Through USAID’s Financial Assistance:Award of Balance/Leftover Works of Kalat – Quetta -
Chaman (N-25) Section-II (ICB-II &IV) to FWO on SingleSource Basis
23 Mem (P)
24. Additional Agenda Item-IIAmended PC-I for Improvement & Widening of Jaglot-Skardu Road, S-I (163.821 Km)
25 Mem (P)
25 Additional Agenda Item-IIIAward of Periodic Maintenance Works in the Regions of NHA Under AMP 2012-13 to Lowest Evaluated Bidders
25 Mem (O)
26. Conclusion 32 ---
------------------
-
8/9/2019 232-Executive Board Meeting of NHA
42/56
NHA Executive Board’s Confirmed Minutes
Annex-A
NATIONAL HIGHWAY AUTHORITY
LIST OF PARTICIPANTS
232ND EXECUTIVE BOARD MEETINGFEBRUARY 27, 2014 AT ISLAMABAD
IN CHAIR
1. Mr Shahid Ashraf Tarar Chairman
MEMBERS
2. Mr Zulfiqar Ahmad Cheema Inspector General, NationalHighways & Motorway Police
3. Mr Sabino Sikandar Jalal Joint Secretary Ministry of Communications
4. Mr Qazi Iftikhar Ahmed Vice President NESPAK
5. Mr Muhammad ShamsuddinQ hi
Chief NTRC
-
8/9/2019 232-Executive Board Meeting of NHA
43/56
NHA Executive Board’s Confirmed Minutes
-2-
10. Mr Waqar Ahmed Joint Secretary, Finance DivisionRepresented Additional Secretary (Finance)
NHA OFFICERS ITEM
11. Mr Pervaiz Gul Member (AP)6 to 10
13, 14, 15 & 17
12. Mr Usman Akhtar Bajwa Member (Admn) 11, 12 & 19
13. Mr Arshad Mahmood Ch Member (Ops) 18 & A-III
14. Mr Pervez Iqbal Sulehri GM (P&CA) 5
15. Mr Jehanzaib Niazi Dir (Planning) 16
-
8/9/2019 232-Executive Board Meeting of NHA
44/56
232ND Meeting, February 27, 2014, Islamabad
NHA Executive Board’s Confirmed Minutes
-
8/9/2019 232-Executive Board Meeting of NHA
45/56
Khyber Pakhtunkhwa Region
Sr.
No.Contract No.
Financial Bids
BiddersBid Amount
(Rs.)
Lowest
Bidder
Lowest Bid
Amount
(Rs.)
CSR-
2011 (%)
CSR-2011
+ 15%
(%)
Recommen
dation
1PM-2012-13-
KP-01
1. M/s Taimoor Shah
Construction
2. M/s Karcon
3. M/s D-E-S4. M/s Wa id I bal
206,146,997
216,271,166
246,169,882
206,714,204
M/s
Taimoor
Shah
206,146,997 4.66% -10.34%Recommended
for approval of
NHA EB
2PM-2012-13-
KP-02
1) M/s Taimoor Shah
2) M/s Karcon
131,969,092
146,210,889
M/s
Taimoor
Shah
131,969,092 7.86% -7.14%Recommended
for approval of
NHA EB
3 PM-2012-13-KP-03
1) M/s Karcon2) M/s Akhunzada
Fazal Jamil and Co
149,677,300142,788,386
M/s
AkhunzadaFazal
Jamil and
Co
142,788,386 14.00% -1.00% Recommendedfor approval of NHA EB
4PM-2012-13-
KP-041) M/s Karcon 307,353,497
M/s
Karcon307,353,497 19.50% 4.50%
Recommended
for
re-tendering
-
8/9/2019 232-Executive Board Meeting of NHA
46/56
Sr.
No.
Contract
No.
Financial Bid
Recommen-
dationBiddersBid Amount
(Rs.)
Lowest
Bidder
Lowest Bid
Amount
(Rs.)
CSR-
2011
(%)
CSR-2011
+ 15%
(%)
1PM-2012-
13-BN-01
1) M/s Taimoor Shah and Co
2) M/s N.K and Company
3) Standard Const. Co.
4) M/s Moosa Jan and Co.
5) M/s Mir Ahmid Jan Bangulzai6) M/s Umer Jan & Co.
88,209,351
95,587,876
75,396,279
102,032,002
133,178,614124,586,445
M/s
Standard
Const. 75,396,279-29.80% -44.80%
Recommended
for approval of Chairman NHA
Balochistan North Region
7) M/s NPI Construction
8) M/s Ghulam Rasool Lehri
9) M/s G-S-P
98,809,939
128,882,529
107,402,108
o.
2
PM-2012-
13-BN-02
1) M/s Mir Ahmid Jan Bangulzai
2) M/s Ghulam Rasool Lehri
219,537,805Non-responsive
M/s Mir
Ahmid
JanBangulzai 219,537,805 29.75% 14.75%
Recommended
for approval of
NHA EB
3PM-2012-
13-BN-03
1) M/s Moosa Jan and Co.
2) Mir Ahmed Jan
3) Ghulam Rasool Lehri
63,829,853
87,178,141Non-responsive
M/s
Moosa
Jan and
Co.
63,829,853 -5.00% -20.00%Recommended
for approval of
Chairman NHA
Total (Balochistan North) 358,763,937 4.35% -10.65%
-
8/9/2019 232-Executive Board Meeting of NHA
47/56
Balochistan South Region
Sr.
No.
Contract
No.
Financial Bid
Recommen-
dationBiddersBid Amount
(Rs.)
Lowest
Bidder
Lowest Bid
Amount (Rs.)
CSR-
2011 (%)
CSR-
2011 +
15%
(%)
1PM-2012-
13-BS-01
1) M/s Mir Ahmed Jan
2) M/s N.K & Co.
Non-responsive
178,472,954
M/s N.K
& Co.178,472,954 19.00% 4.00%
Recommended
for approval of
NHA EB
3PM-2012-
13-BS-031) M/s N.K & Company 84,970,154
M/s N.K
& Co. 84,970,15419.50% 4.50%
Recommended
for approval of
NHA EB
-
8/9/2019 232-Executive Board Meeting of NHA
48/56
Punjab - North Region
Sr.
No.
Cont.
No.Bidders
Bid Amount
(Rs.)
Financial Bid
Recommen-
dationLowest
Bidder
Lowest Bid
Amount
(Rs.)
CSR-
2011
(%)
CSR-
2011 +
15%
(%)
1
PM-
2012-
13-PN-
01
1 M/s Wajid Iqbal & Co,
2) M/s Nauman Const. & co.
132,410,166
148,566,983
M/s Wajid
Iqbal &
Co,
132,410,166 4.90% -10.10%Recommended
for approval of
NHA EB
2
PM-
2012-
13-PN-
02
1) M/s A.M Associates
2) M/s Design & Eng. System
3) M/s Habib Construction
4) Zoraiz (cons) Pvt Ltd.
5) M/s Sachal TTC
6) M/s Nauman Const. Co.
7. M/s SH Iqbal Akhtar & Co.
389,971,647
348,417,291
351,335,685
378,592,146Non-responsive
376,450,498
375,203,868
M/s
Design &
Eng.
System
348,417,291 9.00% -6.00%
Recommended
for approval of
NHA EB
3
PM-
2012-
13-PN-
03
1) M/s Taimoor Shah
2) M/s Design & Eng. System
3) Jv Sachal TTC
4) Nouman Const Co.
5) M/s Allhadad
83,321,441
93,320,014
Non-
responsive
89,304,900
107,427,804
M/s
Taimoor
Shah83,321,441 6.25% -8.75%
Recommended
for approval of
NHA EB
Cont
d. on next slide
-
8/9/2019 232-Executive Board Meeting of NHA
49/56
Punjab - North Region
Sr.
No
Contra
ct No. Bidders Bid Amount (Rs.)
Financial Bid
Recommen-
dationLowestBidder
Lowest Bid
Amount
(Rs.)
CSR-
2011
(%)
CSR-
2011 +15%
(%)
4
PM-
2012-
13-PN-
1) M/s AM Associates
2) M/s Sarwar & Co.
3) M/s Habib construction
4) M/s Zoraiz Eng (Pvt) Ltd.
5) M/s AMCL- Mishal Sania JV
Non-responsive
Non-responsive
454,635,942
444,670,018
395,473,158
M/s
AMCL
Const &Mishal
395,473,158 0.00% -15%
Recommended
for approval of NHA EB
7) M/s ZKB
8) M/s SARCO
, ,
500,273,544
434,625,000
Sania JV
5
PM-
2012-
13-PN-
05
1) M/s Sarwar & Co.
2) M/s Habib Construction
3) M/s Zoraiz Eng (PVT)4) M/s SS Tamirat
5) M/s AMCL - Mishal Sania JV
6) M/s Jam Brothers & Co.
7) M/s Sachal Engg Works
8) M/s Progressive Intl
9) M/s Z.K.B
10) M/s SARCO
287,485,741
276,278,669
262,830,184257,728,530
243,631,984
277,472,466
289,922,060
288,703,901
308,803,539
277,375,013
M/s JV
AMCL -
Mishal
Sania
243,631,9840.00% -15%
Recommended
for approval of
NHA EB
Cont
d. on next slide
-
8/9/2019 232-Executive Board Meeting of NHA
50/56
Punjab - North Region
Sr.
No.
Cont.
No.Bidders
Financial Bids
Recommen-
dationBid Amount
(Rs.)
Lowest
Bidder
Lowest
Bid
Amount
(Rs.)
CSR-
2011
(%)
CSR-
2011
+ 15%
(%)
PM-
1) M/s Sarwar & Co.
2) M/s A.M Associates
3) M/s Habib Construction4) M/s B.K Construction Co.
344,267,145
360,520,100
323,433,811313,209,224
M/s JVRecommended
6-
13-PN-
06
5) M/s Zoraiz Eng (PVT) LTD
6) M/s S.S Tamiraat
7) M/s AMCL- Mishal Sania JV
8) M/s Sachal Eng Works
9) M/s Progressive Int
315,809,697
310,283,692
295,508,279
361,849,887
350,177,310
-
Mishal
Sania
295,508,279 0.00% -15% for approval of NHA EB
-
8/9/2019 232-Executive Board Meeting of NHA
51/56
Punjab - North Region
Sr.
No.
Contract
No.Bidders
Financial Bids
Recommen-
dationBid Amount
(Rs.)
Lowest
Bidder
Lowest Bid
Amount (Rs.)
CSR-
2011
(%)
CSR-2011
+ 15%
(%)
7
PM-
2012-13-
PN-07
1) M/s Zoraiz Eng (Pvt) Ltd
2) M/s BK Construction
3) M/s Nouman Construction Co.
4) M/s Sh. Abdul Razzaq5 M/s Sarwar & Com an Pvt Ltd
139,171,551
133,697,145
138,818,756
127,577,977135 035 333
M/s Sh.
Abdul
Razzaq127,577,977
4.87% -10.13%Recommended
for approval of
NHA EB
8
PM-
2012-13-
PN-08
1) M/s B.K Const.
2) M/s S S Tamiraat
3) M/s Sh Iqbal Akhter & Co.
4) M/s Nauman Construction Co.
5) M/s Sh Abdur Razzaq & Co
6) M/s Sarwar & Company (Pvt) Ltd
199,876,066
204,933,377
193,391,260
203,792,260
208,356,728
209,516,552
M/s Sh
Iqbal
Akhter &
Co.
193,391,2603.38% -11.62%
Recommended
for approval of
NHA EB
9
PM-
2012-13-
PN-09
1) M/s BK Const
2) M/s Nauman Construction Co
3) M/s Sh Iqbal Akhter & Co
4) M/s Sarwar & Co (Pvt) Ltd
5) Sh Abdul Razzaq & Co
128,097,999
123,439,890
114,829,446
132,920,789
114,923,549
M/s Sh
Iqbal
Akhter &
Co
114,829,446-2.38% -17.38%
Recommended
for approval of
NHA EB
-
8/9/2019 232-Executive Board Meeting of NHA
52/56
Punjab South Region
Sr
No.
Contract
No.Bidders
Bid Amount
(Rs.)
Lowest
Bidder
Lowest Bid
Amount (Rs.)
CSR-
2011 (%)
CSR-
2011 +
15%
(%)
Recommen-
dation
1PM-2012-
13-PS-01
1) M/s SH. Nazar & Co
2) M/s Jam Brothers & Co
3) M/s Chaudry Const.
191,062,408
166,838,698
191,139,017
M/s Jam
Brothers
& Co166,838,698
8.89% -6.11%Recommended
for approval of
NHA EB
2PM-2012-
13-PS-02
1) M/s SH Nazar & Co
2) M/s Design & Eng Systems
3) M/s Supercon Engineers
4) M/s Choudhry Const. Co5) M/s SARCO
176,700,685
178,718,474
177,277,196
181,312,774179,078,793
M/s SH
Nazar &
Co
176,700,68522.60% 7.60%
Cancelled due to
high variance
Cont
d. on next slide
-
8/9/2019 232-Executive Board Meeting of NHA
53/56
Punjab South Region
Sr.No.
Cont.No.
Bidders Bid Amount (Rs.) LowestBidder
Lowest BidAmount (Rs.)
CSR-
2011
(%)
CSR-2011
+ 15%
(%)
Recommen-dation
3
PM-
2012-13-
PS-03
1) M/s Zoraiz Engrs (PVT) Ltd
2) M/s B.K Construction Co
3) M/s Sachal Engr Work
4) M/s Hidayatullah Khan & Co.
5) M/s ZKB Brothers
613,549,170
570,994,463
Non-responsive
547,057,441
647,968,418
M/s Usmani
Associates 495,428,569-5.00% -20.00%
Recommended
for approval of
NHA EB
s sman ssoc a es
7) M/s SARCO
, ,
573,132,628
4 PM-2012-13-
PS-04
1) M/s Supercon Engineers
2) M/s SARCO3) M/s Chaudhry Const Co
4) M/s Zarghoon Enterprises
5) M/s Allahdad
168,473,938
171,843,417192,434,676
202,168,726
178,207,988
M/sSupercon
Engineers168,473,938
12.50% -2.50%Recommendedfor approval of
NHA EB
-
8/9/2019 232-Executive Board Meeting of NHA
54/56
Sindh - North Region
Sr.
No.
Contract
No.Bidders
Financial Bid
Recommen-
dationBid Amount
(Rs.)
Lowest
Bidder
Lowest Bid
Amount (Rs.)
CSR-
2011
(%)
CSR-
2011 +
15%
(%)
1
PM-
2012-13-
SN-01
1) M/s Niaz Muhammad Khan & Bros
2) M/s Sachal Engg. Works
196,117,964
205,320,766
M/s Niaz
Muhammad
Khan & Bros
196,117,964 9.75% -5.25%Recommended
for approval of
NHA EB
2
PM-
2012-13-
SN-02
1) M/s Niaz Muhammad Khan & Bros
2) M/s Umer Jan & Co.
3) M/s Sachal Engg. Works
206,735,693
215,798,079
216,930,878
M/s Niaz
Muhammad
Khan & Bros
206,735,693 9.50% -5.50%Recommended
for approval of
NHA EB
3
PM-
2012-13-
SN-03
1) M/s Niaz Mohammad Khan & Bros
2) M/s Sachal Engg. Works
3) M/s Umer Jan & Co.
309,330,939
304,528,541
322,749,405
M/s Sachal
Engg. Works304,528,541 7.80% -7.20%
Recommended
for approval of
NHA EB
-
8/9/2019 232-Executive Board Meeting of NHA
55/56
Sindh - South Region
Sr.
No.
Cont.
No.Bidders
Financial Bids
Recommen-
dationBid Amount
(Rs.)
Lowest
Bidder
Lowest Bid
Amount (Rs.)
CSR-
2011 (%)
CSR-
2011 +
15%
(%)
1
PM-
2012-13-SS-01
1) M/s Niaz Muhammad Khan & Bros.
2) M/s Fazal & Bros.3 M/s Shaikh I bal Akhtar
401,960,776
440,872,048416 203 770
M/s Niaz
MuhammadKhan & Bros
401,960,776 9.50% -5.50%
Recommended
for approval of NHA EB
2
PM-
2012-13-
SS-02
1) M/s Niaz Muhammad Khan & Bros.
2) M/s Fazal & Bros.
3) M/s Shaikh Iqbal Akhtar
184,430,744
202,856,898
198,609,915
M/s Niaz
Muhammad
Khan &
Bros.
184,430,744 9.00% -6.00%
Recommended
for approval of
NHA EB
3
PM-
2012-13-
SS-03
1) M/s Niaz Muhammad Khan & Bros.
2) M/s Fazal & Bros.
180,864,062
203,327,544
M/s Niaz
Muhammad
Khan &
Bros.
180,864,062 9.50% -5.50%
Recommended
for approval of
NHA EB
-
8/9/2019 232-Executive Board Meeting of NHA
56/56
Northern Areas Region
Sr.
No.
Cont.
No.Bidders
Financial Bid
Recommen-
dationBid Amount
(Rs.)
Lowest
Bidder
Lowest Bid
Amount (Rs.)
CSR-
2011
(%)
CSR-2011
+ 15%
(%)
1
PM-
2012-13-
1) M/s Nauman Const. Co.
2) M/s Muhammad Haroon & Sons
3) M/s Attaullah Khan Trand 4) M/s
155,319,456
144,483,215
132,215,772
M/s
Attaullah
Khan
132,215,772 -3.00% -18.00% Recommendedfor approval of -
arcon vt t
5) M/s Wajid Iqbal & Co.
, ,
145,709,959
ran
Bros.
2
PM-
2012-13-
NA-02
1) M/s Nauman Const. Co.
2) M/s Muhammad Haroon & Sons
3) M/s Attaullah Khan Trand
140,824,467
124,498,694
103,944,665
M/s
Attaullah
Khan
Trand &
Bros.
103,944,665 -11.50% -26.50%Recommended
for approval of
NHA EB
3
PM-
2012-13-
NA-03
1) M/s Attaullah Khan Trand 2) M/s
Muhammad Haroon & Sons
3) M/s Badiuz Zaman
24,363,313
24,701,331
29,901,612
M/s
Attaullah
Khan
Trand &
Bros.
24,363,313 -6.30% -21.30%Recommended
for approval