________________________________________________________________________________ Page 1 ADDENDUM #1 February 22, 2013 ADDENDUM #1 February 22, 2013 Re: Harrisburg Area Community College Central Administration Building Phase 3 – Interior Fitout Solicitation # RFB13-15 From: Eastern PCM, LLC Construction Manager – HACC 645 N. 12 th Street, Suite 200 Lemoyne, PA 17043 To: All Planholders This Addendum is hereby made part of the Plans dated February 8, 2013 and Project Manual dated February 13, 2013 for the above referenced project. The provisions of this Addendum are intended to supplement the provisions of the Plans and Project Manual and/or supersede them where contradictory thereto. This Addendum contains changes to the requirements of the Plans and Project Manual. Such changes shall be incorporated into the Plans and Project Manual and shall apply to work with the same meaning and force as if they had been included in the original Plans and Project Manual. Where this Addendum modifies a portion of a paragraph or phrase of the Project Manual, the remaining unmodified portion of the paragraph or phrase shall remain in force. The conditions and terms of the Plans and Project Manual shall govern work described in this Addendum. Whenever the conditions of work, or the quality or quantity of materials or workmanship are not fully described in this Addendum, the conditions of work etc. included in the Plans and Project Manual for similar items of work shall apply to the work described in this Addendum. If no similar items of work are included in the Plans and Project Manual, the quality of material and workmanship shall be subject to the written acceptance of the Architect. 1.1 PRE-BID MEETING MINUTES Meeting minutes from the Pre-Bid Meeting held on February 19, 2013 are attached and are a part of this Addendum. In the event of a conflict between the information contained in the Pre-Bid Meeting Notes and the Drawings, Specifications and responses to questions contained in this Addendum, the latter shall take precedence.

Upload: ngokhue

Post on 02-Apr-2019

213 views

Category:

Documents


0 download

TRANSCRIPT

________________________________________________________________________________

Page 1 ADDENDUM #1

February 22, 2013

ADDENDUM #1

February 22, 2013

Re: Harrisburg Area Community College Central Administration Building Phase 3 – Interior Fitout Solicitation # RFB13-15 From: Eastern PCM, LLC Construction Manager – HACC 645 N. 12th Street, Suite 200 Lemoyne, PA 17043 To: All Planholders

This Addendum is hereby made part of the Plans dated February 8, 2013 and Project Manual dated February 13, 2013 for the above referenced project. The provisions of this Addendum are intended to supplement the provisions of the Plans and Project Manual and/or supersede them where contradictory thereto. This Addendum contains changes to the requirements of the Plans and Project Manual. Such changes shall be incorporated into the Plans and Project Manual and shall apply to work with the same meaning and force as if they had been included in the original Plans and Project Manual. Where this Addendum modifies a portion of a paragraph or phrase of the Project Manual, the remaining unmodified portion of the paragraph or phrase shall remain in force. The conditions and terms of the Plans and Project Manual shall govern work described in this Addendum. Whenever the conditions of work, or the quality or quantity of materials or workmanship are not fully described in this Addendum, the conditions of work etc. included in the Plans and Project Manual for similar items of work shall apply to the work described in this Addendum. If no similar items of work are included in the Plans and Project Manual, the quality of material and workmanship shall be subject to the written acceptance of the Architect. 1.1 PRE-BID MEETING MINUTES

Meeting minutes from the Pre-Bid Meeting held on February 19, 2013 are attached and are a part of this Addendum. In the event of a conflict between the information contained in the Pre-Bid Meeting Notes and the Drawings, Specifications and responses to questions contained in this Addendum, the latter shall take precedence.

________________________________________________________________________________

Page 2 ADDENDUM #1

February 22, 2013

1.3 CHANGES TO THE SPECIFICATIONS A. 06410 – Custom Cabinets:

a. ADD the following to paragraph 2.08.N.1:

“e. Manufacturer: Hafele f. Model: 287.42.403”

b. ADD the following to paragraph 2.08:

“O. Z-clips 1. Manufacturer

a. Mockett; www.dougmockett.com b. Monarch; www.monarchmetal.com c. or equal.

2. Material: Aluminum 3. Size: 2” long 4. Quantity: As required for each installation condition.”

B. 09260 – Gypsum Board Assemblies: ADD item 3.07.C.7

“7. Where Level 5 gypsum board finish is indicated sand entire surface of

existing textured paint prior to installing skim coat. Apply a thin, uniform skim coat of joint compound over entire surface. Touch up and sand after last coat as needed to produce a surface free of visual defects, tool marks, and ridges and ready for paint.”

1.4 CHANGES TO THE DRAWINGS

A. Drawing X2.3: REPLACE this sheet in its entirety.

B. Drawing X2.6: REVISE per SKA-1. C. Drawing X2.8: REPLACE this sheet in its entirety. D. Drawing X2.9: REVISE per SKA-2.

E. Drawing A2.3: REPLACE this sheet in its entirety. F. Drawing A2.8: REPLACE this sheet in its entirety.

G. Drawing A2.9: REVISE per SKA-3. H. Drawing A6.1: DELETE New Construction Keynote #21 at all locations. I. Drawing A6.2: DELETE New Construction Keynote #21 at all locations. J. Drawing A6.5: DELETE New Construction Keynote #21 at all locations. K. Drawing A6.6: DELETE New Construction Keynote #21 at all locations.

________________________________________________________________________________

Page 3 ADDENDUM #1

February 22, 2013

L. Drawing A7.3: ADD note at Stair B to read, “See A7.8”. M. Drawing A7.4: REVISE ceiling finish in room 247 to read, “CLG-1”.

N. Drawing A7.6: REVISE per SKA-4.

O. Drawing A7.8: REVISE per SKA-5.

P. Drawing A7.11: REVISE per SKA-6.

Q. Drawing A7.12: REVISE per SKA-7.

R. Drawing A9.1: REVISE this sheet in its entirety.

S. Drawing A9.2: REVISE this sheet in its entirety. T. Drawing A9.3: REVISE this sheet in its entirety. U. Drawing A9.4: REVISE this sheet in its entirety. V. Drawing A9.5: REVISE this sheet in its entirety. W. Drawing A9.6: REVISE this sheet in its entirety. X. Drawing A9.7: REVISE this sheet in its entirety. Y. Drawing A9.8: REVISE this sheet in its entirety. Z. Drawing A9.9: REVISE this sheet in its entirety.

AA. MEP Drawing Set: REPLACE all MEP drawings in their entirety with set dated

February 8, 2013. 1.5 CHANGES TO THE DETAIL REFERENCE MANUAL

A. Index-1 – REPLACE this page in its entirety.

B. N-2 – REPLACE this page in its entirety. C. N-3 – REPLACE this page in its entirety. D. L-2 – REPLACE this page in its entirety. E. L-3 – REPLACE this page in its entirety. F. L-4 – REPLACE this page in its entirety. G. L-5 – REPLACE this page in its entirety. H. CDT-33 – REPLACE this page in its entirety.

________________________________________________________________________________

Page 4 ADDENDUM #1

February 22, 2013

I. CDT-40 – REPLACE this page in its entirety. J. CDT-42 – REPLACE this page in its entirety. K. CDT-49 – REPLACE this page in its entirety. L. CDT-50 – REPLACE this page in its entirety. M. FD-8 – REPLACE this page in its entirety. N. KTF-0 – REPLACE this page in its entirety. O. RD-1 – REPLACE this page in its entirety. P. RD-2 – REPLACE this page in its entirety. Q. RD-3 - ADD this page in its entirety. R. RD-4 – ADD this page in its entirety. S. RD-5 – ADD this page in its entirety. T. RD-6 – ADD this page in its entirety. U. RD-7 – ADD this page in its entirety.

1.6 ATTACHMENTS

A. X2.3 – Roof Plan - Composite - Demolition (revised 2/22/13)

B. SKA-1 – Partial Large Scale Second Floor Demolition Plan - Section A C. X2.8 – Large Scale Roof Demolition Plan - Section A (revised 2/22/13) D. SKA-2 – Partial Large Scale Roof Demolition Plan - Section B E. A2.3 – Roof Plan - Composite - New (revised 2/22/13) F. A2.8 – Large Scale New Roof Plan - Section A (revised 2/22/13) G. SKA-3 – Partial Large Scale New Roof Plan - Section B H. SKA-4 – Partial Large Scale First Floor Paint Plan - Section A I. SKA-5 – Partial Large Scale Second Floor Paint Plan - Section A J. SKA-6 – Partial Large Scale First Floor Pattern Plan - Section B K. SKA-7 – Partial Large Scale Second Floor Pattern Plan - Section A L. A9.1 – First Floor Reflected Ceiling Plan - Composite New (revised 2/22/13)

________________________________________________________________________________

Page 5 ADDENDUM #1

February 22, 2013

M. A9.2 – Second Floor Reflected Ceiling Plan - Composite (revised 2/22/13) N. A9.3 – Large Scale First Floor Reflected Ceiling Plan - Section A (revised 2/22/13) O. A9.4 – Large Scale First Floor Reflected Ceiling Plan - Section B (revised 2/22/13) P. A9.5 – Large Scale Second Floor Reflected Ceiling Plan - Section A (revised 2/22/13) Q. A9.6 – Large Scale Second Floor Reflected Ceiling Plan - Section B (revised 2/22/13) R. A9.7 – Large Scale Reflected Ceiling Plans (revised 2/22/13) S. A9.8 – Large Scale First Floor Reflected Ceiling Plan - Board Room-103 (revised

2/22/13) T. A9.9 – Large Scale Second Floor Reflected Ceiling Plan - Conference Room-257

(revised 2/22/13) U. Index-1 – Detail Reference Manual Index (revised 2/22/13) V. N-2 – Demolition Keynotes (revised 2/22/13) W. N-3 – Demolition Keynotes (revised 2/22/13) X. L-2 – New Construction Keynotes (revised 2/22/13) Y. L-3 – New Construction Keynotes (revised 2/22/13) Z. L-4 – Finishes Legend (revised 2/22/13) AA. L-5 – Ceiling Legend (revised 2/22/13) BB. CDT-55 – Ceiling Detail (revised 2/22/13) CC. CDT-40 – Ceiling Detail (revised 2/22/13) DD. CDT-42 – Ceiling Detail (revised 2/22/13) EE. CDT-49 – Ceiling Detail (revised 2/22/13) FF. CDT-50 – Ceiling Detail (revised 2/22/13) GG. FD-8 – Floor Detail (revised 2/22/13) HH. KTF-0 – Key to Finishes (revised 2/22/13) II. RD-1 – Roof Detail (revised 2/22/13) JJ. RD-2 – Roof Detail (revised 2/22/13) KK. RD-3 – Roof Detail LL. RD-4 – Roof Detail

________________________________________________________________________________

Page 6 ADDENDUM #1

February 22, 2013

MM. RD-5– Roof Detail NN. RD-6 – Roof Detail OO. RD-7 – Roof Detail PP. MEP Drawing Set, revised February 8, 2013. QQ. Formation Thermal Conductivity Test and Data Analysis, Dated 1/11/11: for

reference only.

END OF ADDENDUM

________________________________________________________________________________

Page 7 ADDENDUM #1

February 22, 2013

Please sign and return this page, via fax, to Eastern PCM, LLC at (717) 233-1666 indicating receipt of this Addendum. HACC Central Administration Building Phase 3 – Interior Fitout Addendum #_____ has been received. Company: Print Company Name Received By: Print Name Signature Date:

Please check one:

We are bidding as a prime contractor

We are not bidding We are a sub-contractor

_______________________________________________________________________________________

HACC, Central Pennsylvania’s Community College Central Administration Building

Phase 3 – Interior Fitout

Pre-Bid Meeting

February 19, 2013 10:00 AM

Meeting Minutes

Attendees

Joe Wojtysiak – HACC Matt Yergo – Premier Construction Group, Inc. Benedict Dubbs – Murray Associates Architects Glenn Foltz – Pagoda Electrical David Hile – Brinjac Engineering Gerald Seymore – Lobar Inc. Steve Schull – Silvertip, Inc. Nick Weikel – Frey-Lutz Jim Hair – Midstate Mechanical and Electrical Jeff Heindel – Hogg Construction John Ziegler – Midstate Mechanical and Electrical Chris Haynes – Sponaugle Construction Services Tom Smith – East Coast Contracting Matt Flickinger – Titan Construction Jim Facciolla – L. R. Costanzo Bill Morgan – Eastern PCM, LLC Dan Carfagno – R. S. Mowry & Sons Dave Chonoski – Eastern PCM, LLC Jim O’Shea – Poole Anderson Construction Sarah Centini – Eastern PCM, LLC (Author)

1.0 Mr. Morgan welcomed all attendees.

1.1 Introduction of Team

a) Owner Harrisburg Area Community College Joseph Wojtysiak Campus Senior Director, Facilities Manager Garry Crider Procurement Services Manager

b) Architect Murray Associates Architects, P.C. Benedict Dubbs Principal

c) MEP Engineer Brinjac Engineering, Inc. Michael Jacobs Senior Engineering Manager d) Construction Eastern PCM, LLC

Manager Bill Morgan Project Executive Justin Kovaleski Project Manager

David Chonoski Construction Manager Sarah Centini Project Engineer

1.2 Mr. Morgan noted that the Bid Form is made up of four pages, all of which must be filled out completely. A Bid Security is required in the amount of 10% of the total bid. A Non-Collusion Affidavit and a MBE/WBE Utilization Form are also required.

HACC, Central Pennsylvania’s Community College Central Administration Building Phase 3 – Interior Fitout Pre-Bid Meeting Minutes February 19, 2013 Page 2

_______________________________________________________________________________________

1.3 Schedule Bid Date Tuesday, March 12, 2013 at Penn Center - Room 223, no later than 2:00 PM. Contract Award April 3, 2013; subject to Board of Trustees Approval Construction Start April 15, 2013; subject to the execution of the contract Substantial Completion December 13, 2013

1.4 All questions are to be directed to the office of the Construction Manager in writing via fax or e-mail (attn: Justin Kovaleski): Fax (717) 233-1666, E-mail: [email protected]. The last day for questions is Wednesday, March 5, 2013 by 12:00 PM.

1.5 Meeting minutes from the pre-bid meeting will be issued with Addendum #1. Additional addenda will be issued as required.

1.6 This is a Prevailing Wage Rate Project. Rates can be found in the Project Manual, Specification 00820.

1.7 It is the intention of the Design Team to acquire LEED Silver Certification. Any LEED documentation shall be sent to EPCM and will then be forwarded to Murray Associates Architects.

1.8 The General Building Permit for Phase 3 will be obtained by and paid for by the Owner. All trade specific permits (i.e. Electrical, Plumbing, etc.) are to be obtained and paid for by applicable contractors in accordance with jurisdictional requirements.

1.9 Project Overview

1. General I. The work will be performed under five (5) Prime Contracts consisting of the interior

improvements to provide approximately 37,000 sf of office space on the first and second floor of Harrisburg Area Community College’s Mumma Hall. The major categories of work include: selective interior demolition, construction of new administration offices and associated mechanical, electrical, plumbing, and voice/data systems to support the improvements. The work also includes the installation of geothermal wells to support a new geothermal heat pump system. The project in its entirety will pursue LEED Silver Certification.

II. Prime Contracts 1. General Trades 2. Electrical 3. Mechanical 4. Fire Protection 5. Testing, Adjusting and Balancing

III. Work includes requirements for recycling, salvaging and reuse of demolition waste and existing materials and equipment as specified. Specification Section 01524 – Construction Waste Management includes specific administrative and procedural requirements for this work.

HACC, Central Pennsylvania’s Community College Central Administration Building Phase 3 – Interior Fitout Pre-Bid Meeting Minutes February 19, 2013 Page 3

_______________________________________________________________________________________

2. Alternates: I. Alternate No. 1: Stainless steel railings in lieu of painted steel

1.10 Mr. Morgan noted that a temporary construction fence has been provided by the Owner. A sketch of the fence layout was provided with the agenda and is attached hereto. Any additional safety measures shall be the responsibility of each respective Contractor. Mr. Morgan noted that an additional safety fence for the well field work will need to be supplied by the Contractor.

1.11 Mr. Morgan noted that the adjacent building, Hall Tech, will be occupied throughout construction. All occupied areas must be left in existing condition. Mr. Morgan warned attendees of high student traffic around the construction area and advised that strict safety precautions be enforced.

1.12 Mr. Morgan noted that contractor parking will be established at the Pre-Construction meeting prior to the start of the project.

1.13 Mr. Dubbs noted long lead items to include: glass floor system, elevator car finishes, window blinds, second floor storefront system, hollow metal frames and ceramic tile. Mr. Dubbs requested that all submittals for these items be submitted as early as possible.

1.14 Mr. Dubbs stated that the well field alternate labeled Alternate No. 1 on plan H0.5 will be further detailed in upcoming Addenda. This Alternate will be re-labeled Alternate No. 2.

1.15 Mr. Dubbs stated that reseeding of the well field will be the responsibility of the contractor installing the wells. There is no site work contract for this project.

1.16 Mr. Morgan stated that the City of Harrisburg is where trade specific permits shall be filed.

1.17 Mr. Dubbs stated that the freight elevator is not in the scope of the fitout but can be utilized during construction.

1.18 Mr. Dubbs stated that sheets A10.1 and A10.2 show furnishings that are outside of the scope of work for Phase 3. The furnishings are shown for coordination purposes.

Respectfully Submitted, Sarah E. Centini, Eastern PCM, LLC The above summations are the interpretation of the author as to the items discussed and the decisions reached. Corrections or additions to these minutes are to be made in writing and sent to the attention of the Author no later than 5 days after receipt; otherwise, these minutes will stand as written. cc: All Attendees Attachment: Central Construction Fence Layout, dated 11.15.12

RD

RD

RD

RD

RD

RDRD

RDRD

RD

RD

RD

RD RD

1

1

SHEET NUMBER:

PROJECT NUMBER:

DATE:

CHECKED BY:DRAWN BY:

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONSAT THE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THISDRAWING, AS AN INSTRUMENT OFSERVICE, IS AND SHALL REMAIN THEPROPERTY OF THE ARCHITECT.

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

PHASE 3

CONSULTANT: STRUCTURAL ENGINEER

WHITNEY, BAILEY, COX &MAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

X2.3X2.3X2.3X2.3

3395339533953395

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

ROOF PLAN -ROOF PLAN -ROOF PLAN -ROOF PLAN -COMPOSITE -COMPOSITE -COMPOSITE -COMPOSITE -DEMOLITIONDEMOLITIONDEMOLITIONDEMOLITION

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICKTED LICKTED LICKTED LICK

ADMINISTRATIONADMINISTRATIONADMINISTRATIONADMINISTRATIONBUILDINGBUILDINGBUILDINGBUILDING

NSCALE: 3/32" = 1'-0"

ROOF PLAN - COMPOSITE - DEMOLITIONROOF PLAN - COMPOSITE - DEMOLITIONROOF PLAN - COMPOSITE - DEMOLITIONROOF PLAN - COMPOSITE - DEMOLITION

NOTES: SEE SHEET N-1 IN D.R.M. FOR GENERAL NOTES - DEMOLITION.

revisions

no. date description

1 2/22/13 ADDENDUM #1

B

C

D

B.5

C.8

9 10 11 13 151412

1

10

10

1

7

9 19

20 21

10

1

1

9 19

20

10

1

7

9 19

20 22

1

39

8

8

1

Murray Associates Architects, P.C.©

CONSULTANT: COSNTRUCTIONMANAGER

EASTERN PCM, LLCEASTERN PCM, LLCEASTERN PCM, LLCEASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONS ATTHE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THIS DRAWING,AS AN INSTRUMENT OF SERVICE, IS ANDSHALL REMAIN THE PROPERTY OF THEARCHITECT.

DRAWING NUMBER:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

DATE:

PHASE 3

CONSULTANT: STRUCTURALENGINEER

WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &MAGNANI, LLCMAGNANI, LLCMAGNANI, LLCMAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

3395

SKA-1

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

PARTIAL LARGE SCALEPARTIAL LARGE SCALEPARTIAL LARGE SCALEPARTIAL LARGE SCALESECOND FLOORSECOND FLOORSECOND FLOORSECOND FLOOR

DEMOLITION PLAN -DEMOLITION PLAN -DEMOLITION PLAN -DEMOLITION PLAN -SECTION ASECTION ASECTION ASECTION A

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICK ADMINISTRATIONTED LICK ADMINISTRATIONTED LICK ADMINISTRATIONTED LICK ADMINISTRATION

BUILDINGBUILDINGBUILDINGBUILDING

RevisionsRevisionsRevisionsRevisions

No.No.No.No. DateDateDateDate DescriptionDescriptionDescriptionDescription

1 2/22/13 ADDENDUM #1

PARTIAL LARGE SCALE SECOND FLOORDEMOLITION PLAN - SECTION ASCALE: 1/8" = 1'-0" (REF. TO DWG. X2.6)

KEY PLAN

SECTION A

SECTION B

RD

RD

RDRD

RD

RD

RD RD

SEE DWG. X2.9

MATCH LINE

SEE DWG. X2.9

MATCH LINE

40

1

41

1

SHEET NUMBER:

PROJECT NUMBER:

DATE:

CHECKED BY:DRAWN BY:

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONSAT THE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THISDRAWING, AS AN INSTRUMENT OFSERVICE, IS AND SHALL REMAIN THEPROPERTY OF THE ARCHITECT.

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

PHASE 3

CONSULTANT: STRUCTURAL ENGINEER

WHITNEY, BAILEY, COX &MAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

X2.8X2.8X2.8X2.8

3395339533953395

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

LARGE SCALE ROOFLARGE SCALE ROOFLARGE SCALE ROOFLARGE SCALE ROOFDEMOLITION PLAN -DEMOLITION PLAN -DEMOLITION PLAN -DEMOLITION PLAN -

SECTION ASECTION ASECTION ASECTION A

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICKTED LICKTED LICKTED LICK

ADMINISTRATIONADMINISTRATIONADMINISTRATIONADMINISTRATIONBUILDINGBUILDINGBUILDINGBUILDING

NSCALE: 1/8" = 1'-0"

LARGE SCALE ROOF DEMOLITION PLAN - SECTION ALARGE SCALE ROOF DEMOLITION PLAN - SECTION ALARGE SCALE ROOF DEMOLITION PLAN - SECTION ALARGE SCALE ROOF DEMOLITION PLAN - SECTION A

NOTES: SEE SHEETS N-1 THRU N-3 IN D.R.M. FOR GENERAL NOTES - DEMOLITION AND DEMOLITION KEYNOTES.

revisions

no. date description

1 2/22/13 ADDENDUM #1

RD

42

1

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLCEASTERN PCM, LLCEASTERN PCM, LLCEASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONS ATTHE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THIS DRAWING,AS AN INSTRUMENT OF SERVICE, IS ANDSHALL REMAIN THE PROPERTY OF THEARCHITECT.

DRAWING NUMBER:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

DATE:

PHASE 3

CONSULTANT: STRUCTURALENGINEER

WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &MAGNANI, LLCMAGNANI, LLCMAGNANI, LLCMAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

3395

SKA-2

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

PARTIAL LARGE SCALEPARTIAL LARGE SCALEPARTIAL LARGE SCALEPARTIAL LARGE SCALEROOF DEMOLITION PLAN -ROOF DEMOLITION PLAN -ROOF DEMOLITION PLAN -ROOF DEMOLITION PLAN -

SECTION BSECTION BSECTION BSECTION B

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICK ADMINISTRATIONTED LICK ADMINISTRATIONTED LICK ADMINISTRATIONTED LICK ADMINISTRATION

BUILDINGBUILDINGBUILDINGBUILDING

RevisionsRevisionsRevisionsRevisions

No.No.No.No. DateDateDateDate DescriptionDescriptionDescriptionDescription

1 2/22/13 ADDENDUM #1

PARTIAL LARGE SCALE ROOF DEMOLITIONPLAN - SECTION BSCALE: 1/8" = 1'-0" (REF. TO DWG. X2.9)

RD

RD

RD

RD

RD

RDRD

RDRD

RD

RD

RD

RD RD

SEE LARGE SCALE PLANON DRAWING A2.8

1

1

1

SHEET NUMBER:

PROJECT NUMBER:

DATE:

CHECKED BY:DRAWN BY:

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONSAT THE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THISDRAWING, AS AN INSTRUMENT OFSERVICE, IS AND SHALL REMAIN THEPROPERTY OF THE ARCHITECT.

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

PHASE 3

CONSULTANT: STRUCTURAL ENGINEER

WHITNEY, BAILEY, COX &MAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

A2.3A2.3A2.3A2.3

3395339533953395

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

ROOF PLAN -ROOF PLAN -ROOF PLAN -ROOF PLAN -COMPOSITE - NEWCOMPOSITE - NEWCOMPOSITE - NEWCOMPOSITE - NEW

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICKTED LICKTED LICKTED LICK

ADMINISTRATIONADMINISTRATIONADMINISTRATIONADMINISTRATIONBUILDINGBUILDINGBUILDINGBUILDING

NSCALE: 3/32" = 1'-0"

ROOF PLAN - COMPOSITE - NEWROOF PLAN - COMPOSITE - NEWROOF PLAN - COMPOSITE - NEWROOF PLAN - COMPOSITE - NEW

revisions

no. date description

1 2/22/13 ADDENDUM #1

NOTES: SEE SHEETS N-4 IN D.R.M. FOR GENERAL NOTES - NEW CONSTRUCTION

DN

KEY PLAN

SECTION A

SECTION B

RD

RD

RDRD

RD

RD

RD RD

SEE DWG. A2.9

MATCH LINE

SEE DWG. A2.9

MATCH LINE

C

A4.1

C

A4.1

B

A4.1

B

A4.1

D

A4.2

D

A4.2

E

A4.2

E

A4.2

F

A4.2

F

A4.2

3

A5.1

2

A5.1

1

A5.1

Sim

5

A5.2

EXISTING WALKINGPADS

EXISTING WALKINGPADS

NEW WALKING PADS;SEE DETAIL RD-3 IND.R.M.

NEW CONDENSINGUNITS; SEE MECH. DWGS.SEE RD-4 IN D.R.M. FORROOF SLOPING AROUNDUNITS

SEE DETAIL

IN D.R.M.RD-6

'EF'

1

1

B

A4.1

B

A4.1

D

A4.2

D

A4.2

F

A4.2

F

A4.2

PENTHOUSEPENTHOUSEPENTHOUSEPENTHOUSE

300

STAIR CSTAIR CSTAIR CSTAIR C

SHEET NUMBER:

PROJECT NUMBER:

DATE:

CHECKED BY:DRAWN BY:

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONSAT THE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THISDRAWING, AS AN INSTRUMENT OFSERVICE, IS AND SHALL REMAIN THEPROPERTY OF THE ARCHITECT.

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

PHASE 3

CONSULTANT: STRUCTURAL ENGINEER

WHITNEY, BAILEY, COX &MAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

A2.8A2.8A2.8A2.8

3395339533953395

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

LARGE SCALE NEWLARGE SCALE NEWLARGE SCALE NEWLARGE SCALE NEWROOF PLAN - SECTIONROOF PLAN - SECTIONROOF PLAN - SECTIONROOF PLAN - SECTION

A & PENTHOUSEA & PENTHOUSEA & PENTHOUSEA & PENTHOUSE

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICKTED LICKTED LICKTED LICK

ADMINISTRATIONADMINISTRATIONADMINISTRATIONADMINISTRATIONBUILDINGBUILDINGBUILDINGBUILDING

NSCALE: 1/8" = 1'-0"

LARGE SCALE NEW ROOF PLAN - SECTION ALARGE SCALE NEW ROOF PLAN - SECTION ALARGE SCALE NEW ROOF PLAN - SECTION ALARGE SCALE NEW ROOF PLAN - SECTION A

revisions

no. date description

1 2/22/13 ADDENDUM #1

SCALE:

N

1/8" = 1'-0"

PENTHOUSE PLANPENTHOUSE PLANPENTHOUSE PLANPENTHOUSE PLAN

NOTES: SEE SHEET L-1 IN D.R.M. FOR LEGEND.

NOTES: SEE SHEET L-1 IN D.R.M. FOR LEGEND.

RD

EXISTING WALKINGPADS

NEW WALKING PADS;SEE DETAIL RD-3 IND.R.M.

'EF'

SEE DETAIL

IN D.R.M.RD-7

1

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLCEASTERN PCM, LLCEASTERN PCM, LLCEASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONS ATTHE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THIS DRAWING,AS AN INSTRUMENT OF SERVICE, IS ANDSHALL REMAIN THE PROPERTY OF THEARCHITECT.

DRAWING NUMBER:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

DATE:

PHASE 3

CONSULTANT: STRUCTURALENGINEER

WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &MAGNANI, LLCMAGNANI, LLCMAGNANI, LLCMAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

3395

SKA-3

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

PARTIAL LARGE SCALEPARTIAL LARGE SCALEPARTIAL LARGE SCALEPARTIAL LARGE SCALENEW ROOF PLAN -NEW ROOF PLAN -NEW ROOF PLAN -NEW ROOF PLAN -

SECTION BSECTION BSECTION BSECTION B

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICK ADMINISTRATIONTED LICK ADMINISTRATIONTED LICK ADMINISTRATIONTED LICK ADMINISTRATION

BUILDINGBUILDINGBUILDINGBUILDING

RevisionsRevisionsRevisionsRevisions

No.No.No.No. DateDateDateDate DescriptionDescriptionDescriptionDescription

1 2/22/13 ADDENDUM #1

PARTIAL LARGE SCALE NEWROOF PLAN - SECTION BSCALE: 1/8" = 1'-0" (REF. TO DWG. A2.9)

DN

UP

P-5 P-5

FD-15

P-2

FD-1

SAND THE EXISTINGGYPSUM BOARDSURFACE AND ADDA 'LEVEL 5' SKIM COATBEFORE PAINTING

1

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLCEASTERN PCM, LLCEASTERN PCM, LLCEASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONS ATTHE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THIS DRAWING,AS AN INSTRUMENT OF SERVICE, IS ANDSHALL REMAIN THE PROPERTY OF THEARCHITECT.

DRAWING NUMBER:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

DATE:

PHASE 3

CONSULTANT: STRUCTURALENGINEER

WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &MAGNANI, LLCMAGNANI, LLCMAGNANI, LLCMAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

3395

SKA-4

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

PARTIAL LARGE SCALEPARTIAL LARGE SCALEPARTIAL LARGE SCALEPARTIAL LARGE SCALEFIRST FLOOR PAINT PLANFIRST FLOOR PAINT PLANFIRST FLOOR PAINT PLANFIRST FLOOR PAINT PLAN

- SECTION A- SECTION A- SECTION A- SECTION A

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICK ADMINISTRATIONTED LICK ADMINISTRATIONTED LICK ADMINISTRATIONTED LICK ADMINISTRATION

BUILDINGBUILDINGBUILDINGBUILDING

RevisionsRevisionsRevisionsRevisions

No.No.No.No. DateDateDateDate DescriptionDescriptionDescriptionDescription

1 2/22/13 ADDENDUM #1

PARTIAL LARGE SCALE FIRSTFLOOR PAINT PLAN - SECTION ASCALE: 1/8" = 1'-0" (REF. TO DWG. A7.6)

DN

P-8 P-8P-8

P-4

FD-15

P-2

SAND THE EXISTINGGYPSUM BOARDSURFACE AND ADDA 'LEVEL 5' SKIM COATBEFORE PAINTING

1

FD-9

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLCEASTERN PCM, LLCEASTERN PCM, LLCEASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONS ATTHE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THIS DRAWING,AS AN INSTRUMENT OF SERVICE, IS ANDSHALL REMAIN THE PROPERTY OF THEARCHITECT.

DRAWING NUMBER:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

DATE:

PHASE 3

CONSULTANT: STRUCTURALENGINEER

WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &MAGNANI, LLCMAGNANI, LLCMAGNANI, LLCMAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

3395

SKA-5

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

PARTIAL LARGE SCALEPARTIAL LARGE SCALEPARTIAL LARGE SCALEPARTIAL LARGE SCALESECOND FLOOR PAINTSECOND FLOOR PAINTSECOND FLOOR PAINTSECOND FLOOR PAINT

PLAN - SECTION APLAN - SECTION APLAN - SECTION APLAN - SECTION A

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICK ADMINISTRATIONTED LICK ADMINISTRATIONTED LICK ADMINISTRATIONTED LICK ADMINISTRATION

BUILDINGBUILDINGBUILDINGBUILDING

RevisionsRevisionsRevisionsRevisions

No.No.No.No. DateDateDateDate DescriptionDescriptionDescriptionDescription

1 2/22/13 ADDENDUM #1

PARTIAL LARGE SCALE SECONDFLOOR PAINT PLAN - SECTION ASCALE: 1/8" = 1'-0" (REF. TO DWG. A7.8)

CJ1

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLCEASTERN PCM, LLCEASTERN PCM, LLCEASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONS ATTHE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THIS DRAWING,AS AN INSTRUMENT OF SERVICE, IS ANDSHALL REMAIN THE PROPERTY OF THEARCHITECT.

DRAWING NUMBER:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

DATE:

PHASE 3

CONSULTANT: STRUCTURALENGINEER

WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &MAGNANI, LLCMAGNANI, LLCMAGNANI, LLCMAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

3395

SKA-6

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

PARTIAL LARGE SCALEPARTIAL LARGE SCALEPARTIAL LARGE SCALEPARTIAL LARGE SCALEFIRST FLOOR PATTERNFIRST FLOOR PATTERNFIRST FLOOR PATTERNFIRST FLOOR PATTERN

PLAN - SECTION BPLAN - SECTION BPLAN - SECTION BPLAN - SECTION B

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICK ADMINISTRATIONTED LICK ADMINISTRATIONTED LICK ADMINISTRATIONTED LICK ADMINISTRATION

BUILDINGBUILDINGBUILDINGBUILDING

RevisionsRevisionsRevisionsRevisions

No.No.No.No. DateDateDateDate DescriptionDescriptionDescriptionDescription

1 2/22/13 ADDENDUM #1

PARTIAL LARGE SCALE FIRSTFLOOR PATTERN PLAN - SECTION BSCALE: 1/8" = 1'-0" (REF. TO DWG. A7.11)

CJ

CJ

1

1

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLCEASTERN PCM, LLCEASTERN PCM, LLCEASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONS ATTHE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THIS DRAWING,AS AN INSTRUMENT OF SERVICE, IS ANDSHALL REMAIN THE PROPERTY OF THEARCHITECT.

DRAWING NUMBER:

PROJECT NUMBER:

DRAWN BY: CHECKED BY:

DATE:

PHASE 3

CONSULTANT: STRUCTURALENGINEER

WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &WHITNEY, BAILEY, COX &MAGNANI, LLCMAGNANI, LLCMAGNANI, LLCMAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

3395

SKA-7

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

PARTIAL LARGE SCALEPARTIAL LARGE SCALEPARTIAL LARGE SCALEPARTIAL LARGE SCALESECOND FLOOR PATTERNSECOND FLOOR PATTERNSECOND FLOOR PATTERNSECOND FLOOR PATTERN

PLAN - SECTION APLAN - SECTION APLAN - SECTION APLAN - SECTION A

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICK ADMINISTRATIONTED LICK ADMINISTRATIONTED LICK ADMINISTRATIONTED LICK ADMINISTRATION

BUILDINGBUILDINGBUILDINGBUILDING

RevisionsRevisionsRevisionsRevisions

No.No.No.No. DateDateDateDate DescriptionDescriptionDescriptionDescription

1 2/22/13 ADDENDUM #1

PARTIAL LARGE SCALE SECONDFLOOR PATTERN PLAN - SECTION ASCALE: 1/8" = 1'-0" (REF. TO DWG. A7.12)

SHEET NUMBER:

PROJECT NUMBER:

DATE:

CHECKED BY:DRAWN BY:

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONSAT THE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THISDRAWING, AS AN INSTRUMENT OFSERVICE, IS AND SHALL REMAIN THEPROPERTY OF THE ARCHITECT.

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

PHASE 3

CONSULTANT: STRUCTURAL ENGINEER

WHITNEY, BAILEY, COX &MAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

A9.1A9.1A9.1A9.1

3395339533953395

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

FIRST FLOORFIRST FLOORFIRST FLOORFIRST FLOORREFLECTED CEILINGREFLECTED CEILINGREFLECTED CEILINGREFLECTED CEILINGPLAN - COMPOSITEPLAN - COMPOSITEPLAN - COMPOSITEPLAN - COMPOSITE

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICKTED LICKTED LICKTED LICK

ADMINISTRATIONADMINISTRATIONADMINISTRATIONADMINISTRATIONBUILDINGBUILDINGBUILDINGBUILDING

NSCALE: 3/32" = 1'-0"

FIRST FLOOR REFLECTED CEILING PLAN - COMPOSITE - NEWFIRST FLOOR REFLECTED CEILING PLAN - COMPOSITE - NEWFIRST FLOOR REFLECTED CEILING PLAN - COMPOSITE - NEWFIRST FLOOR REFLECTED CEILING PLAN - COMPOSITE - NEW

revisions

no. date description

1 2/22/13 ADDENDUM #1

SKY LIGHT(ABOVE)

SKY LIGHT(ABOVE)

SKY LIGHT(ABOVE)

SKY LIGHT(ABOVE)

SHEET NUMBER:

PROJECT NUMBER:

DATE:

CHECKED BY:DRAWN BY:

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONSAT THE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THISDRAWING, AS AN INSTRUMENT OFSERVICE, IS AND SHALL REMAIN THEPROPERTY OF THE ARCHITECT.

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

PHASE 3

CONSULTANT: STRUCTURAL ENGINEER

WHITNEY, BAILEY, COX &MAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

A9.2A9.2A9.2A9.2

3395339533953395

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

SECOND FLOORSECOND FLOORSECOND FLOORSECOND FLOORREFLECTED CEILINGREFLECTED CEILINGREFLECTED CEILINGREFLECTED CEILINGPLAN - COMPOSITEPLAN - COMPOSITEPLAN - COMPOSITEPLAN - COMPOSITE

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICKTED LICKTED LICKTED LICK

ADMINISTRATIONADMINISTRATIONADMINISTRATIONADMINISTRATIONBUILDINGBUILDINGBUILDINGBUILDING

NSCALE: 3/32" = 1'-0"

SECOND FLOOR REFLECTED CEILING PLAN - COMPOSITESECOND FLOOR REFLECTED CEILING PLAN - COMPOSITESECOND FLOOR REFLECTED CEILING PLAN - COMPOSITESECOND FLOOR REFLECTED CEILING PLAN - COMPOSITE

revisions

no. date description

1 2/22/13 ADDENDUM #1

SEE DWG. A9.4

MATCH LINE

SEE DWG. A9.4

MATCH LINE

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 9' - 0"9' - 0"9' - 0"9' - 0"+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"

+ 11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"+ 9' - 0"9' - 0"9' - 0"9' - 0"+ 9' - 0"9' - 0"9' - 0"9' - 0"+ 9' - 0"9' - 0"9' - 0"9' - 0"+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 9' - 6"9' - 6"9' - 6"9' - 6"+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 9' - 0"9' - 0"9' - 0"9' - 0"+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"

+ 8' - 10"8' - 10"8' - 10"8' - 10"

+ 11' - 0"11' - 0"11' - 0"11' - 0"+ 8' - 6"8' - 6"8' - 6"8' - 6"

+8' -

6"

8' -

6"

8' -

6"

8' -

6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 10"8' - 10"8' - 10"8' - 10"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

1' - 3 3/4"

3' - 6 1/2"

3' - 2"

+ 11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"

+ 11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"

OPEN

ETR

CD

T-3ETR

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"

CDT-7

CDT-7

CDT-14

CD

T-1

6

CDT-17

CD

T-1

7

CD

T-1

8

ETR

ETR

ETR

ETR

ETR

ETROPEN

OPEN

ETR

1' - 8"

CDT-7

OPEN

+ 8' - 6"8' - 6"8' - 6"8' - 6"

CD

T-1

7

CDT-53

CD

T-5

4

CD

T-5

7

+ 9' - 0"9' - 0"9' - 0"9' - 0"

KEY PLAN

SECTION A

SECTION B

SHEET NUMBER:

PROJECT NUMBER:

DATE:

CHECKED BY:DRAWN BY:

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONSAT THE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THISDRAWING, AS AN INSTRUMENT OFSERVICE, IS AND SHALL REMAIN THEPROPERTY OF THE ARCHITECT.

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

PHASE 3

CONSULTANT: STRUCTURAL ENGINEER

WHITNEY, BAILEY, COX &MAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

A9.3A9.3A9.3A9.3

3395339533953395

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

LARGE SCALE FIRSTLARGE SCALE FIRSTLARGE SCALE FIRSTLARGE SCALE FIRSTFLOOR CEILING PLAN -FLOOR CEILING PLAN -FLOOR CEILING PLAN -FLOOR CEILING PLAN -

SECTION ASECTION ASECTION ASECTION A

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICKTED LICKTED LICKTED LICK

ADMINISTRATIONADMINISTRATIONADMINISTRATIONADMINISTRATIONBUILDINGBUILDINGBUILDINGBUILDING

NSCALE: 1/8" = 1'-0"

LARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - SECTION ALARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - SECTION ALARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - SECTION ALARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - SECTION A

revisions

no. date description

1 2/22/13 ADDENDUM #1

NOTE: SEE SHEET L-1 AND L-5 IN D.R.M. FOR LEGEND AND CEILING LEGEND.

SEE DWG. A9.3

MATCH LINE

SEE DWG. A9.3

MATCH LINE

+ 9' - 0"9' - 0"9' - 0"9' - 0" + 9' - 0"9' - 0"9' - 0"9' - 0" + 9' - 0"9' - 0"9' - 0"9' - 0" + 9' - 0"9' - 0"9' - 0"9' - 0" + 9' - 0"9' - 0"9' - 0"9' - 0"

+ 11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"

+ 11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"

+ 8' - 0"8' - 0"8' - 0"8' - 0"+ 8' - 0"8' - 0"8' - 0"8' - 0"

+8' -

6"

8' -

6"

8' -

6"

8' -

6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 11' - 0"11' - 0"11' - 0"11' - 0"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"

+ 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 9' - 0"9' - 0"9' - 0"9' - 0"+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"

+ 11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"+ 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 11' - 4"11' - 4"11' - 4"11' - 4"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+8' -

6"

8' -

6"

8' -

6"

8' -

6"

+ 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+11

' -

4"

11' -

4"

11' -

4"

11' -

4"

+ 11' - 0"11' - 0"11' - 0"11' - 0"

+ 11' - 0"11' - 0"11' - 0"11' - 0"

+ 11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"

+ 8' - 10"8' - 10"8' - 10"8' - 10"

+ 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 11' - 4"11' - 4"11' - 4"11' - 4"

+ 11' - 4"11' - 4"11' - 4"11' - 4"

+ 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"

+ 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+11

' -

6 3

/4"

11' -

6 3

/4"

11' -

6 3

/4"

11' -

6 3

/4"

+ 10' - 4"10' - 4"10' - 4"10' - 4"

+ 7' - 2"7' - 2"7' - 2"7' - 2"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 0"8' - 0"8' - 0"8' - 0"+ 8' - 0"8' - 0"8' - 0"8' - 0"

OPEN

SEE LARGE SCALE PLANON DRAWING A9.7

CDT-6

3' - 0 1/4"

4' -

2"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 10' - 6"10' - 6"10' - 6"10' - 6"

SEE LARGE SCALE PLANON DRAWING A9.8

CDT-8

CDT-9

CDT-10

CDT-11

3' -

4 3

/8"

CD

T-5

CDT-12

CD

T-1

3

CD

T-1

1

CD

T-4

CDT-2

OPEN

+ 9' - 6 1/2"9' - 6 1/2"9' - 6 1/2"9' - 6 1/2"

+8' -

0"

8' -

0"

8' -

0"

8' -

0"

CDT-1

+ 8' - 6"8' - 6"8' - 6"8' - 6" + 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

GLASSFLOORSYSTEMABOVE

+ 11' - 0"11' - 0"11' - 0"11' - 0"

+ 11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"

CD

T-6

CD

T-8

CD

T-9

CD

T-1

0

CDT-14

CD

T-1

4

CDT-15

CD

T-1

5

CD

T-1

5

CD

T-1

6

CDT-20

CD

T-2

0

+ 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"

+ 10' - 10"10' - 10"10' - 10"10' - 10"

+ 10' - 10"10' - 10"10' - 10"10' - 10"

+ 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"

+ 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"

OPEN

+ 10' - 10"10' - 10"10' - 10"10' - 10"

CDT-47

CD

T-4

7

CD

T-5

7

CD

T-6

0

CD

T-6

1

+ 9' - 0"9' - 0"9' - 0"9' - 0"

KEY PLAN

SECTION A

SECTION BSHEET NUMBER:

PROJECT NUMBER:

DATE:

CHECKED BY:DRAWN BY:

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONSAT THE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THISDRAWING, AS AN INSTRUMENT OFSERVICE, IS AND SHALL REMAIN THEPROPERTY OF THE ARCHITECT.

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

PHASE 3

CONSULTANT: STRUCTURAL ENGINEER

WHITNEY, BAILEY, COX &MAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

A9.4A9.4A9.4A9.4

3395339533953395

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

LARGE SCALE FIRSTLARGE SCALE FIRSTLARGE SCALE FIRSTLARGE SCALE FIRSTFLOOR CEILING PLAN -FLOOR CEILING PLAN -FLOOR CEILING PLAN -FLOOR CEILING PLAN -

SECTION BSECTION BSECTION BSECTION B

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICKTED LICKTED LICKTED LICK

ADMINISTRATIONADMINISTRATIONADMINISTRATIONADMINISTRATIONBUILDINGBUILDINGBUILDINGBUILDING

NSCALE: 1/8" = 1'-0"

LARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - SECTION BLARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - SECTION BLARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - SECTION BLARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - SECTION B

revisions

no. date description

1 2/22/13 ADDENDUM #1

NOTE: SEE SHEET L-1 AND L-5 IN D.R.M. FOR LEGEND AND CEILING LEGEND.

SEE DWG. A9.6

MATCH LINE

SEE DWG. A9.6

MATCH LINE

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6" + 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 9' - 6"9' - 6"9' - 6"9' - 6"+ 9' - 6"9' - 6"9' - 6"9' - 6"+ 9' - 6"9' - 6"9' - 6"9' - 6"+ 9' - 6"9' - 6"9' - 6"9' - 6"+ 9' - 6"9' - 6"9' - 6"9' - 6"+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 9' - 6"9' - 6"9' - 6"9' - 6"+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 9' - 6"9' - 6"9' - 6"9' - 6" + 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

OPEN ETR

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+8' -

0"

8' -

0"

8' -

0"

8' -

0"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 4"8' - 4"8' - 4"8' - 4"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

SEE LARGE SCALE PLANON DRAWING A9.9

ETR

ETR

OPEN

OPEN

OPENOPEN

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

3' - 5 1/4"

CDT-29

6' - 3"

CDT-29

CDT-30

CD

T-3

4

CDT-35

4' - 0"

3' - 5 5/8"

CDT-35

CDT-35

CD

T-3

8

CD

T-4

2

CDT-52

SIM.

CD

T-5

5

CD

T-5

8

CDT-59

EQ

.EQ

.

4

3'-10

"

3' - 11"3

3'-6"

KEY PLAN

SECTION A

SECTION B

ETR

+ 8' - 0"8' - 0"8' - 0"8' - 0"

SHEET NUMBER:

PROJECT NUMBER:

DATE:

CHECKED BY:DRAWN BY:

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONSAT THE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THISDRAWING, AS AN INSTRUMENT OFSERVICE, IS AND SHALL REMAIN THEPROPERTY OF THE ARCHITECT.

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

PHASE 3

CONSULTANT: STRUCTURAL ENGINEER

WHITNEY, BAILEY, COX &MAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

A9.5A9.5A9.5A9.5

3395339533953395

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

LARGE SCALE SECONDLARGE SCALE SECONDLARGE SCALE SECONDLARGE SCALE SECONDFL. CLG. PLAN - SECT.FL. CLG. PLAN - SECT.FL. CLG. PLAN - SECT.FL. CLG. PLAN - SECT.

A & PENTHOUSEA & PENTHOUSEA & PENTHOUSEA & PENTHOUSE

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICKTED LICKTED LICKTED LICK

ADMINISTRATIONADMINISTRATIONADMINISTRATIONADMINISTRATIONBUILDINGBUILDINGBUILDINGBUILDING

NSCALE: 1/8" = 1'-0"

LARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - SECTION ALARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - SECTION ALARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - SECTION ALARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - SECTION A

NSCALE: 1/8" = 1'-0"

LARGE SCALE PENTHOUSE REFLECTED CEILING PLANLARGE SCALE PENTHOUSE REFLECTED CEILING PLANLARGE SCALE PENTHOUSE REFLECTED CEILING PLANLARGE SCALE PENTHOUSE REFLECTED CEILING PLAN

revisions

no. date description

1 2/22/13 ADDENDUM #1

NOTE: SEE SHEET L-1 AND L-5 IN D.R.M. FOR LEGEND AND CEILING LEGEND.

NOTE: SEE SHEET L-1 AND L-5 IN D.R.M. FOR LEGEND AND CEILING LEGEND.

SEE DWG. A9.5

MATCH LINE

SEE DWG. A9.5

MATCH LINE

+ 9' - 6"9' - 6"9' - 6"9' - 6"+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"+ 9' - 6"9' - 6"9' - 6"9' - 6"+ 9' - 6"9' - 6"9' - 6"9' - 6"+ 9' - 6"9' - 6"9' - 6"9' - 6"+ 9' - 6"9' - 6"9' - 6"9' - 6"+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6" + 9' - 0"9' - 0"9' - 0"9' - 0"+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 0"8' - 0"8' - 0"8' - 0"+ 8' - 0"8' - 0"8' - 0"8' - 0"

+8' -

2"

8' -

2"

8' -

2"

8' -

2"

+ 9' - 6"9' - 6"9' - 6"9' - 6" + 9' - 6"9' - 6"9' - 6"9' - 6" + 9' - 6"9' - 6"9' - 6"9' - 6"

+8' -

0"

8' -

0"

8' -

0"

8' -

0"

+ 8' - 6"8' - 6"8' - 6"8' - 6"+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 7' - 2"7' - 2"7' - 2"7' - 2"

SKY LIGHT(ABOVE)

SKY LIGHT(ABOVE)

SKY LIGHT(ABOVE)

SKY LIGHT(ABOVE)

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+8' -

0"

8' -

0"

8' -

0"

8' -

0"

ETR

SEE LARGE SCALE PLANON DRAWING A9.7

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+8' -

10"

8' -

10"

8' -

10"

8' -

10"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 0"8' - 0"8' - 0"8' - 0"+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 10"8' - 10"8' - 10"8' - 10"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

5' -

0 1

/2"

CD

T-2

9

3' - 2"

CDT-29

CDT-30

CDT-30

CD

T-3

1

CDT-32

CDT-32

CD

T-3

3

CD

T-4

2

CDT-40

CD

T-4

0

SEE DETAILCDT-48 IND.R.M.

SEE DETAILCDT-48 SIM.IN D.R.M.

CDT-49

OPEN

OPEN

CD

T-4

9

CDT-50

CD

T-5

0

CDT-52

CDT-56

CD

T-5

6

CD

T-5

8

CDT-59

CD

T-5

2

SIM

.

CD

T-6

2

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 2"8' - 2"8' - 2"8' - 2"

KEY PLAN

SECTION A

SECTION B SHEET NUMBER:

PROJECT NUMBER:

DATE:

CHECKED BY:DRAWN BY:

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONSAT THE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THISDRAWING, AS AN INSTRUMENT OFSERVICE, IS AND SHALL REMAIN THEPROPERTY OF THE ARCHITECT.

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

PHASE 3

CONSULTANT: STRUCTURAL ENGINEER

WHITNEY, BAILEY, COX &MAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

A9.6A9.6A9.6A9.6

3395339533953395

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

LARGE SCALE SECONDLARGE SCALE SECONDLARGE SCALE SECONDLARGE SCALE SECONDFLOOR CEILING PLAN -FLOOR CEILING PLAN -FLOOR CEILING PLAN -FLOOR CEILING PLAN -

SECTION BSECTION BSECTION BSECTION B

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICKTED LICKTED LICKTED LICK

ADMINISTRATIONADMINISTRATIONADMINISTRATIONADMINISTRATIONBUILDINGBUILDINGBUILDINGBUILDING

NSCALE: 1/8" = 1'-0"

LARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - SECTION BLARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - SECTION BLARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - SECTION BLARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - SECTION B

revisions

no. date description

1 2/22/13 ADDENDUM #1

NOTE: SEE SHEET L-1 AND L-5 IN D.R.M. FOR LEGEND AND CEILING LEGEND.

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 11' - 4"11' - 4"11' - 4"11' - 4" + 11' - 4"11' - 4"11' - 4"11' - 4"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 11' - 4"11' - 4"11' - 4"11' - 4"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 11' - 4"11' - 4"11' - 4"11' - 4"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

CD

T-6

+ 11' - 0"11' - 0"11' - 0"11' - 0"+ 9' - 0"9' - 0"9' - 0"9' - 0" CD

T-1

4

CONTINUEWALL TILE 9"PAST CEILINGHEIGHT

CONTINUEWALL TILE 9"PAST CEILINGHEIGHT

CD

T-2

1

11' -

2 3

/4"

1' -

9 1

/8"

1' - 8 1/8" 5' - 3" 3' - 10 1/8"

1' - 8 1/8"

2' - 1"

5' - 3"

2' - 1"

CD

T-2

1

CDT-22CDT-22

CDT-22

CONTINUEWALL TILE 9"PAST CEILINGHEIGHT

CONTINUEWALL TILE 9"PAST CEILINGHEIGHT

CD

T-2

3

CD

T-2

3

CDT-24

CDT-25

CDT-24

CDT-25

6' - 0 1/2" 6' - 0 1/2"

EQ. EQ.

13

32CL

23

33

1 CL

EQ. EQ.

CL

CL

CL

CL

CL

CL

CL

1' -

6"

2' -

11"

3' -

0"

2' -

11"

1' -

6"

1' -

6"

1' -

6"

2' -

9"

2' -

9"

EQUAL EQUAL

3

CL

CL

2' -

7"

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 2"8' - 2"8' - 2"8' - 2"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

CONTINUEWALL TILE 9"PAST CEILINGHEIGHT

CONTINUEWALL TILE 9"PAST CEILINGHEIGHT

+ 8' - 2"8' - 2"8' - 2"8' - 2"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

4' -

11"

1' - 9 1/8"

2' - 2"

5' - 3" 4' - 0" 1' - 9"

2' - 1 7/8"

5' - 3"

CD

T-2

6

CD

T-2

6

CDT-27

CDT-27

CDT-27

CDT-28

CDT-28

CD

T-2

9

+ 9' - 6"9' - 6"9' - 6"9' - 6"

13

32

EQ. EQ.

CL

CL

CL

CL

1' -

6"

1' -

6"

2' -

9"

2' -

9"

EQ. EQ.

23

31

1' -

6"

1' -

6"

2' -

9"

2' -

9"

CL

CL

CL

CL

EQ

UAL

EQ

UAL

EQUAL EQUAL

6

CL

CL

CL

6' - 0"

SHEET NUMBER:

PROJECT NUMBER:

DATE:

CHECKED BY:DRAWN BY:

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONSAT THE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THISDRAWING, AS AN INSTRUMENT OFSERVICE, IS AND SHALL REMAIN THEPROPERTY OF THE ARCHITECT.

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

PHASE 3

CONSULTANT: STRUCTURAL ENGINEER

WHITNEY, BAILEY, COX &MAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

A9.7A9.7A9.7A9.7

3395339533953395

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

LARGE SCALELARGE SCALELARGE SCALELARGE SCALEREFLECTED CEILINGREFLECTED CEILINGREFLECTED CEILINGREFLECTED CEILING

PLANSPLANSPLANSPLANS

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICKTED LICKTED LICKTED LICK

ADMINISTRATIONADMINISTRATIONADMINISTRATIONADMINISTRATIONBUILDINGBUILDINGBUILDINGBUILDING

NSCALE: 3/8" = 1'-0"

LARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - RESTROOMSLARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - RESTROOMSLARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - RESTROOMSLARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - RESTROOMSN

SCALE: 3/8" = 1'-0"

LARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - RESTROOMSLARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - RESTROOMSLARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - RESTROOMSLARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - RESTROOMS

revisions

no. date description

1 2/22/13 ADDENDUM #1

NOTE: SEE SHEET L-1 AND L-5 IN D.R.M. FOR LEGEND AND CEILING LEGEND. NOTE: SEE SHEET L-1 AND L-5 IN D.R.M. FOR LEGEND AND CEILING LEGEND.

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

+ 11' - 0"11' - 0"11' - 0"11' - 0" + 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4" + 11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"11' - 6 3/4"

+ 9' - 6 1/2"9' - 6 1/2"9' - 6 1/2"9' - 6 1/2"

+ 11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"

+8' -

0"

8' -

0"

8' -

0"

8' -

0"

+ 11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"11' - 1 3/8"

CL

1 3/8"

6' -

2"

2"

6' -

0"

1 3/8"

2"

EQ

UAL

3' -

0 7

/8"

EQ

UAL

CL

1 3/8" 14' - 0" 14' - 0" 1 3/8"

3' - 0 1/2" EQUAL EQUAL

3' - 2 1/2"

CDT-6

+11

' -

0"

11' -

0"

11' -

0"

11' -

0"

+ 9' - 0"9' - 0"9' - 0"9' - 0"

CDT-43

CDT-43

CD

T-4

3

CD

T-4

3

CDT-44

1' - 10 3/4"

CDT-45

CDT-46

CDT-46

LINE OF LIGHTCOVE WALL ABOVE

CD

T-4

5

1' -

3"

2' -

2"

5' -

8 3

/4"

2' -

2"

1' -

3"

PROJECTOR LIFTLOCATION -KEEP14" CLEAR ABOVECEILING PLANE

2' -

7 7

/8"

1' - 4 5/8"

135°

EQ

UAL

EQ

UAL

EQ

UAL

EQ

UAL

CL

CL

7 3/8" 4' - 9" 4' - 9" 4' - 0" 4' - 0" 4' - 9" 4' - 9" 7 3/8"

CL CL CLCLCLCL

3' - 1" 3' - 0" 3' - 0"CL CL CL

CL

9 7

/8"

7 3/8" 4' - 9" 4' - 9" 4' - 0" 4' - 0" 4' - 9" 4' - 9" 1' - 10"

CLCL CL CLCLCLCL CL

EQ. EQ.

EQ

UAL

EQ

UAL

CL

CL

SHEET NUMBER:

PROJECT NUMBER:

DATE:

CHECKED BY:DRAWN BY:

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONSAT THE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THISDRAWING, AS AN INSTRUMENT OFSERVICE, IS AND SHALL REMAIN THEPROPERTY OF THE ARCHITECT.

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

PHASE 3

CONSULTANT: STRUCTURAL ENGINEER

WHITNEY, BAILEY, COX &MAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

A9.8A9.8A9.8A9.8

3395339533953395

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

LARGE SCALE FIRST FL.LARGE SCALE FIRST FL.LARGE SCALE FIRST FL.LARGE SCALE FIRST FL.REFLECTED CEILINGREFLECTED CEILINGREFLECTED CEILINGREFLECTED CEILING

PLAN - BOARD RM.-103PLAN - BOARD RM.-103PLAN - BOARD RM.-103PLAN - BOARD RM.-103

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICKTED LICKTED LICKTED LICK

ADMINISTRATIONADMINISTRATIONADMINISTRATIONADMINISTRATIONBUILDINGBUILDINGBUILDINGBUILDING

NSCALE: 3/8" = 1'-0"

LARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - BOARD ROOM-103LARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - BOARD ROOM-103LARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - BOARD ROOM-103LARGE SCALE FIRST FLOOR REFLECTED CEILING PLAN - BOARD ROOM-103

revisions

no. date description

1 2/22/13 ADDENDUM #1

NOTE: SEE SHEET L-1 AND L-5 IN D.R.M. FOR LEGEND AND CEILING LEGEND.

+ 9' - 6"9' - 6"9' - 6"9' - 6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 4"8' - 4"8' - 4"8' - 4"

+ 8' - 6"8' - 6"8' - 6"8' - 6"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

+ 8' - 0"8' - 0"8' - 0"8' - 0"

EQUAL EQUAL

CL

5' - 0" 5' - 0"

CL

11' -

0"

11' -

0"

8"

ETR

+ 8' - 6"8' - 6"8' - 6"8' - 6"

3' - 8 5/8"

+8' -

6"

8' -

6"

8' -

6"

8' -

6"

OPEN

CDT-35

CDT-36 CDT-36

CD

T-3

6

CD

T-3

6

CDT-37

1' - 0" 4' - 0" 4' - 0" 1' - 0"

CL

CL CL

2' -

0"

CL

CL

CL

CL

CL

EQ. EQ.

EQ

.EQ

.

EQ. EQ.

CLCL

4' - 0"

4' -

10"

4' -

10"

EQ

.EQ

.

CL

4' - 0"

1' - 0" 4' - 0" 4' - 0" 1' - 0 1/8"

CL CL CL

2' -

0"

CL

CL

EQ. EQ.

SHEET NUMBER:

PROJECT NUMBER:

DATE:

CHECKED BY:DRAWN BY:

THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND EXISTING CONDITIONSAT THE SITE BEFORE PROCEEDING WITHEACH PHASE OF HIS WORK. THISDRAWING, AS AN INSTRUMENT OFSERVICE, IS AND SHALL REMAIN THEPROPERTY OF THE ARCHITECT.

Murray Associates Architects, P.C.©

CONSULTANT: CONSTRUCTIONMANAGER

EASTERN PCM, LLC

645 N. 12TH STREETSUITE 200LEMOYNE, PA 17043717-233-3816

PHASE 3

CONSULTANT: STRUCTURAL ENGINEER

WHITNEY, BAILEY, COX &MAGNANI, LLC

ONE STERLING PLACE100 STERLING PARKWAYSUITE 108MECHANICSBURG, PA 17050717-691-4708

HARRISBURG, PAHARRISBURG, PAHARRISBURG, PAHARRISBURG, PA

A9.9A9.9A9.9A9.9

3395339533953395

FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013FEBRUARY 8, 2013

TABTABTABTAB BHDBHDBHDBHD

CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONDOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS

LARGE SCALE SECONDLARGE SCALE SECONDLARGE SCALE SECONDLARGE SCALE SECONDFL. REFLECTED CEILINGFL. REFLECTED CEILINGFL. REFLECTED CEILINGFL. REFLECTED CEILINGPLAN - CONF. RM.-257PLAN - CONF. RM.-257PLAN - CONF. RM.-257PLAN - CONF. RM.-257

ALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCALTERATIONS TO HACCTED LICKTED LICKTED LICKTED LICK

ADMINISTRATIONADMINISTRATIONADMINISTRATIONADMINISTRATIONBUILDINGBUILDINGBUILDINGBUILDING

NSCALE: 3/8" = 1'-0"

LARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - CONFERENCE ROOM-257LARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - CONFERENCE ROOM-257LARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - CONFERENCE ROOM-257LARGE SCALE SECOND FLOOR REFLECTED CEILING PLAN - CONFERENCE ROOM-257

revisions

no. date description

1 2/22/13 ADDENDUM #1

NOTE: SEE SHEET L-1 AND L-5 IN D.R.M. FOR LEGEND AND CEILING LEGEND.

DETAIL REFERENCE

MANUAL INDEX

NOTES: N-0 THRU N-4

LEGENDS: L-0 THRU L-5

MISCELLANEOUS DETAILS: MDT-0 THRU MDT-9

STAIR DETAILS: STD-0 THRU STD-18

COLUMN ENCLOSURE DETAILS: CE-0 THRU CE-71

CEILING DETAILS: CDT-0 THRU CDT-62

DOOR SCHEDULE: DS-0 THRU DS-4

DOOR ELEVATIONS: DE-0 THRU DE-2

DOOR DETAILS: DD-0 THRU DD-43

FLOOR DETAILS: FD-0 THRU FD-20

KEY TO FINISHES: KTF-0 THRU KTF-3

MILLWORK DETAILS: MWD-0 THRU MWD-55

PARTITION TYPES: PT-0 THRU PT-63

ELEVATOR DETAILS: EL-0 THRU EL-4

ROOF DETAILS: RD-0 THRU RD-7

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 - CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

INDEX-1

ADDENDUM #1 - FEBRUARY 22, 2013

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

N-2

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

DEMOLITION KEYNOTES

NUMBER DESCRIPTION

1 REMOVE EXISTING PARTITION IN ITS ENTIRETY.

2 REMOVE EXISTING DOOR, FRAME AND HARDWARE.

3 REMOVE PROTION OF EXISTING WALL TO UNDERSIDE OF DECK OR

SLAB FOR NEW DOOR OPENING OR OPENING.

4 REMOVE EXISTING LINEAR METAL CEILING.

5 REMOVE EXISTING ALUMINUM DOOR, FRAME AND HARDWARE. STORE

FOR RE-INSTALLATION.

6 REMOVE EXISTING ALUMINUM SLIDING DOOR, FRAME AND HARDWARE.

STORE FOR RE-INSTALLATION; REFER TO ELECTRICAL DRAWINGS FOR

CONNECTIONS.

7 REMOVE EXISTING FLOORING.

8 REMOVE EXISTING CEILING SYSTEM.

9 REMOVE EXISITNG BASE.

10 REMOVE EXISTING FRAME.

11 REMOVE EXISING BRICK.

12 REMOVE EXISTING ALUMINUM SYSTEM, DOOR, FRAME, HARDWARE AND

THRESHOLD.

13 REMOVE EXISTING PARTITION ABOVE DOOR IN ITS ENTIRETY.

14 REMOVE EXISTING DOOR.

15 REMOVE EXISTING STEEL COLUMN, STEEL BEAM AND DRYWALL

ENCLOSURE.

16 REMOVE EXISTING ILLUMINATED RAILING AND BRACKETS; SEE

ELECTRICAL DRAWINGS.

17 REMOVE EXISTING CONCRETE SLAB.

18 REMOVE EXISTING FLAGPOLE AND FLASHING COLLAR.

19 REMOVE EXISTING WOOD PANELING.

20 REMOVE EXISTING WOOD MOLDING.

21 REMOVE EXISTING COATRACK.

22 REMOVE EXISTING CASEWORK.

23 NOT USED.

24 REMOVE EXISTING RAILING.

25 REMOVE EXISTING CONCRETE BENCHES.

26 REMOVE EXISTING FLAGPOLE LIGHTS; REFER TO ELECTRICAL

DRAWINGS.

27 REMOVE EXISTING BOX HYDRENT; SEE PLUMBING DRAWINGS.

28 REMOVE EXISTING FIRE EXTINGUISHER CABINET AND FIRE EXTINGUISHER.

TURN OVER TO OWNER.

29 REMOVE EXISTING HARDWOOD TRIM.

ADDENDUM #1 - FEBRUARY 22, 2013

1

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

N-3

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

DEMOLITION KEYNOTES

NUMBER DESCRIPTION

30 REMOVE EXISTING HARDWOOD STRIP PANELING.

31 REMOVE EXISTING WOOD PANELING.

32 REMOVE EXISTING RAILING AND BRACKETS.

33 REMOVE EXISTING GLASS SMOKE CURTAIN. STORE FOR LATER

RE-INSTALLATION.

34 REMOVE EXISTING WOOD PANELING FROM FACE OF GYPSUM BOARD

SOFFIT.

35 REMOVE EXISTING GYPSUM BOARD SOFFIT.

36 REMOVE ONE LAYER OF PLYWOOD FROM EXISTING 2 LAYERS ON

RADIUS WALL AROUND STAIR.

37 FOR ALL SAW CUTTING OF SLABS FOR NEW ELECTRICAL

/PLUMBING/DATA LINES REFER TO ELECTRICAL, PLUMBING AND POWER

DRAWINGS.

38 REMOVE EXISTING SLAB AS REQUIRED FOR NEW SHOWER. SEE

MECHANICAL, ELECTRIC AND PLUMBING DRAWINGS FOR ADDITIONAL

SAW CUTTING AND FLOOR PENETRATIONS.

39 REMOVE PORTION OF EXISTING WALL FOR NEW DOOR OPENING.

40 REMOVE PORTION OF EXISTING METAL DECK, SUBSTRATE BOARD,

INSULATION , COVER BOARD AND MEMBRANE ROOFING FOR

INSTALLATION OF NEW MECHANICAL UNIT.

41 REMOVE PORTION OF EXISTING METAL DECK, SUBSTRATE BOARD,

INSULATION , COVER BOARD AND MEMBRANE ROOFING FOR

INSTALLATION OF NEW REFREGERANT LINES.

42 REMOVE PORTION OF EXISTING TEMPORARY SEALED MECHANICAL

CURB FOR NEW MECHANICAL UNIT.

ADDENDUM #1 - FEBRUARY 22, 2013

1

1

1

1

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

L-2

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

NEW CONSTRUCTION KEYNOTES

NUMBER DESCRIPTION

1 WALL HUNG WATER CLOSET MOUNTED RIM HT. 1'-3" A.F.F., WITH FLUSH

VALVE

2 WALL HUNG WATER CLOSET (ACCESSIBLE) RIM HT. 1'-6" A.F.F., WITH

FLUSH VALVE

3 WALL HUNG URINAL MOUNTED RIM HT. 1'-8" A.F.F.

4 WALL HUNG URINAL (ACCESSIBLE RIM HT. 1'-5" A.F.F.)

5 PHENOLIC TOILET PARTITION - CEILING HUNG (SEE DETAIL CDT-X)

6 URINAL PRIVACY SCREEN - WALL MOUNTED (PHENOLIC PARTITION 18"

DEEP)

7 DOUBLE ROLL TOILET PAPER DISPENSER - TOP MOUNTED 2'-6" A.F.F.

8 SANITARY NAPKIN DISPOSAL - MOUNT OPENING 2'-1" A.F.F. BY OWNER,

INSTALLED BY CONTRACTOR.

9 INSULATE ALL EXPOSED PIPING BELOW LAVATORY

10 18" VERTICAL GRAB BAR 1 1/4" DIA. MOUNTED 39" A.F.F.

11 36" GRAB BAR 1 1/4" DIA. MOUNTED 36" A.F.F. TO THE TOP

12 42" GRAB BAR 1 1/4" DIA. MOUNTED 36" A.F.F. TO THE TOP

13 SEMI-RECESSED WASTE RECEPTICLE. MOUNT AS PER ELEVATIONS, BY

OWNER, INSTALLED BY CONTRACTOR.

14 WALL MOUNTED DOOR STOP; PROVIDE BLOCKING & CENTER STOP ON

WALL TILE

15 PURSE/BAG HOOK. MOUNT CENTERED BETWEEN LAVATORIES TO

UNDERSIDE OF COUNTER TOP ON APRON

16 3'-0" WIDE X 3'-6" HIGH FRAMED MIRROR - MOUNTED 3'-4" A.F.F. TO

BOTTOM OF GLASS

17 FULL HEIGHT MIRROR 3'-0" WIDE X 5'-0" HIGH FRAMED MIRROR. MOUNT

ALIGNED WITH TOILET PARTITION HEIGHTS

18 DYSON ELECTRIC HAND DRYER. MOUNT 3'-6" A.F.F. AT HAND

PLACEMENT

19 DYSON ELECTRIC HAND DRYER (ACCESSIBLE). MOUNT 2'-10" A.F.F. AT

HAND PLACEMENT

20 RECESSED MODULAR LOCKING HOSE BIBB ASSEMBLY - SEE PLUMBING

DRAWINGS

21 NOT USED

22 FOLDING SHELF - T.O. SHELF MOUNTED 32" A.F.F.

23 2" X 2" X 1/4" GALVANIZED STEEL TUBE MOUNTED INSIDE WALL.

24 3'-0" WIDE X 4'-0" HEIGHT FRAMED MIRROR. MOUNT BOTTOM OF GLASS

NO HIGHER THAN 3'-4" A.F.F.

25 1'-0" WIDE SOLID SURFACE SHELF ON 3/4" SUBRATE. MOUNT 34" A.F.F.

26 MOP/ BROOM RACK MOUNTED 5'-6" A.F.F.

27 2'-0" WIDE X 2'-0" DEEP MOP SINK

ADDENDUM #1 - FEBRUARY 22, 2013

1

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

L-3

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

NEW CONSTRUCTION KEYNOTES

NUMBER DESCRIPTION

28 UNDER COUNTER MOUNTED LAVATORY (ACCESSIBLE 34" MAX. RIM HT.

A.F.F.)

30 2'-0" WIDE TOWEL BAR BY OWNER.

31 FOLD-UP ACCESSIBLE SHOWER SEAT MOUNTED 1'-6" A.F.F.

32 WATER RESISTANT 1 1/4" DIA. CORNER GRAB BAR MOUNTED 36" A.F.F.

33 HAND-HELD SHOWER HEAD, MOUNTED ON SLIDER BAR. MOUNT BOTTOM

OF BAR 3'-2" A.F.F. MAX.

34 36" WIDE MIN. FROSTED GLASS SHOWER DOOR. WITH THREE HINGES.

SEE DOOR SCHEDULE.

35 ROBE HOOK BY OWNER.

36 3'-6" WIDE X 3'-6" HIGH FRAMELESS MIRROR WITH STANDOFFS AND LED

LIGHT STRIP MOUNTED BEHIND MIRROR. SEE MWD-39/40 & ELECTRICAL

DRAWINGS.

37 WALL MOUNTED ADA COMPLIANT LAVATORY FAUCET. SEE PLUMBING

DWGS.

38 MANUAL ROOM DARKENING SHADE - SEE RB-1 IN KEY TO FINISHES.

39 ELECTRICAL ROOM DARKENING SHADE - SEE RB-2 IN KEY TO FINISHES.

40 DECORATIVE 18" VERTICAL GRAB BAR MOUNTED 39" A.F.F.

41 DECORATIVE 36" GRAB BAR MOUNTED 36" A.F.F. TO THE TOP

42 DECORATIVE 42" GRAB BAR MOUNTED 36" A.F.F. TO THE TOP

43 SINGLE ROLL TOILET PAPER DISPENSER - TOP MOUNTED19" A.F.F. TO

CENTER

44 NOT USED

45 COUNTER MOUNTED ADA COMPLIANT LAVATORY FAUCET. SEE

PLUMBING DRAWINGS.

46 COUNTER MOUNTED ADA COMPLIANT GOOSENECK KITCHEN FAUCET. SEE

PLUMBING DWGS.

47 18" WATER RESISTANT VERTICAL GRAB BAR 1 1/4" DIA. MOUNTED 39"

A.F.F.

48 UNDERMOUNT SINGLE BOWL STAINLESS STEEL SQUARED KITCHEN SINK.

14" X 16". SEE PLUMBING DWGS.

49 NOT USED

50 NOT USED

51 NOT USED

52 REFRIGERATOR, BY CONTRACTOR.

53 PAPER TOWEL DISPENSER BY OWNER, INSTALLED BY CONTRACTOR.

PROVIDE BLOCKING AS REQUIRED.

54 FRAMELESS SHOWER DOOR STOP -MOUNT AT TOP OF GLASS SHOWER

DOOR

ADDENDUM #1 - FEBRUARY 22, 2013

FINISHES LEGEND

ROOM NUMBERROOM NUMBERROOM NUMBERROOM NUMBER

CEILINGCEILINGCEILINGCEILING

WALLWALLWALLWALL

FLOORFLOORFLOORFLOOR

BASEBASEBASEBASE

HORIZ.HORIZ.HORIZ.HORIZ. VERT.VERT.VERT.VERT.

CONSTRUCTION NOTES:

ALL TRANSITION STRIPS TO TERMINATE UNDER DOOR.

USE P-1 ON ALL EXPOSED GYPSUM BOARD WALLS AND

SOFFITS AS PRIMER COAT PRIOR TO FINAL PAINT COAT

TOIL. PARTITIONSTOIL. PARTITIONSTOIL. PARTITIONSTOIL. PARTITIONSONLY APPLICABLEONLY APPLICABLEONLY APPLICABLEONLY APPLICABLE

IN ROOMS 110, 111,IN ROOMS 110, 111,IN ROOMS 110, 111,IN ROOMS 110, 111,

203, 204203, 204203, 204203, 204

SEE SHEETS A7.14 AND A7.15 FOR TILE PATTERN

ELEVATIONS

FACE OF SOFFITS TO BE PAINTED THE COLOR

OF COORDINATING WALL AROUND IT - SEE

DWGS. A7.6, A7.7, A7.8, AND A7.9

SEE DETAIL MDT-3 IN DRM FOR TILE BASE DETAIL

"CJ" REFERS TO CONTROL JOINT (SEE DETAIL FD-8 IN

DRM AND A7.10, A7.11, A7.12 & A7.13 FOR LOCATIONS.

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 - CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

L-4

ADDENDUM #1 - FEBRUARY 22, 2013

CEILING LEGEND

2' X 2' ACOUSTICAL PANEL CEILING

GYPSUM BOARD CEILING/SOFFIT

LINEAR METAL CEILING

2' X 2' FLUORESCENT INDIRECT CEILING

FIXTURE (SEE ELECTRICAL DRAWINGS)

2' X 4' FLUORESCENT INDIRECT CEILING

FIXTURE (SEE ELECTRICAL DRAWINGS)

RECESSED DOWN LIGHT (SEE ELECTRICAL DRAWINGS)

PENDANT LIGHT FIXTURE (SEE ELECTRICAL DRAWINGS)

TRACK LIGHTING (SEE ELECTRICAL DRAWINGS)

CEILING DIFFUSER SUPPLY (SEE MECHANICAL DRAWINGS FOR SIZE)

RADIANT HEAT (SEE MECHANICAL DRAWINGS FOR SIZE)

CEILING DIFFUSER RETURN OR EXHAUST (SEE MECH. DWGS FOR SIZE)

STRIP LIGHT FIXTURE (SEE ELECTRICAL DRAWINGS)

+9-6" INDICATES CEILING HEIGHT

ETR INDICATES EXISTING TO REMAIN

EXIT SIGN (SEE ELECTRICAL DRAWINGS)

PENDANT LIGHT FIXTURE (SEE ELECTRICAL DRAWINGS)

PENDANT LIGHT FIXTURE (SEE ELECTRICAL DRAWINGS)

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 - CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

L-5

ADDENDUM #1 - FEBRUARY 22, 2013

6"

9' -

6"

CEIL

ING

HEIG

HT

8'-10

"

EXIS

TIN

G

10'-10

"

EXIS

TIN

GEXISTING BULKHEAD

TO REMAIN

NEW 1/2" GYPSUM

BOARD - PAINTED

SUSPENDED

ACOUSTICAL

CEIULING PANEL

SYSTEM

EXISTING CEILING

TO REMAIN

NOTE: ALL EXPOSED EXISTING GYPSUM BOARD TO BE PAINTED.

SAND THE EXISTING GYPSUM BOARD SURFACE AND ADD

A 'LEVEL 5' - SKIM COAT BEFORE PAINTING.

SCALE:

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

1 1/2" = 1'-0"

CEILING DETAIL

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

CDT-33

ADDENDUM #1 - FEBRUARY 22, 2013

EXISTING GYPSUM

BOARD TO REMAIN

EXISTING METAL

STUDS TO REMAIN

NEW 1/2" GYPSUM

BOARD - PAINTED

9' -

6"

CEIL

ING

HEIG

HT

NEW 5/8" GYPSUM

BOARD - PAINTED

1' -

0"

9' - 0

"

SO

FFIT

HEIG

HT

NEW 3 5/8"

METAL STUDS

@ 16" O.C. BRACE

TO STRUCTURE

ABOVE

LINE OF WALL BEYOND

VARIES

SUSPENDED

ACOUSTICAL

CEILING PANEL

SYSTEM

NOTE: ALL EXPOSED EXISTING GYPSUM BOARD TO BE PAINTED.

SAND THE EXISTING GYPSUM BOARD SURFACE AND ADD

A 'LEVEL 5' - SKIM COAT BEFORE PAINTING.

SCALE:

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

1 1/2" = 1'-0"

CEILING DETAIL

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

CDT-40

ADDENDUM #1 - FEBRUARY 22, 2013

SEE FLOOR PLAN

FOR PARTITION TYPE

EXISTING METAL

STUDS TO REMAIN

EXISTING ONE LAYER

OF PLYWOOD OR GYPSUM

BOARD TO REMAIN

EXISTING GYPSUM

BOARD TO REMAIN

NEW 2 LAYERS OF 1/4"

ABUSE RESISTANT GYPSUM

BOARD. OFFSET JOINTS -

PAINTED

NEW 1/2" GYPSUM BOARD -

PAINTED

NEW 3 5/8"

METAL STUDS

@ 16" O.C.

9' - 0

"

SO

FFIT

HEIG

HT

NOTE: ALL EXPOSED EXISTING GYPSUM BOARD TO BE PAINTED.

SAND THE EXISTING GYPSUM BOARD SURFACE AND ADD

A 'LEVEL 5' - SKIM COAT BEFORE PAINTING.

SCALE:

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

1 1/2" = 1'-0"

CEILING DETAIL

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

CDT-42

ADDENDUM #1 - FEBRUARY 22, 2013

PATCH AND REPAIR

EXISTING GYPSUM

BOARD

EXISTING METAL STUDS

AND GYPSUM BOARD

TO REMAIN

NEW 1/2" GYPSUM

BOARD - PAINTED

EXISTING METAL

STUDS TO REMAIN

PATCH AND REPAIR

EXISTING GYPSUM

BOARD

EXISTING STRUCTURE

TO REMAIN

EXISTING STEEL

CHANNEL AND

STEEL PLATE

TO REMAIN

8'-10

" SO

FFIT

HEIG

HT

NOTE: ALL EXPOSED EXISTING GYPSUM BOARD TO BE PAINTED.

SAND THE EXISTING GYPSUM BOARD SURFACE AND ADD

A 'LEVEL 5' - SKIM COAT BEFORE PAINTING.

SCALE:

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

1" = 1'-0"

CEILING DETAIL

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

CDT-49

ADDENDUM #1 - FEBRUARY 22, 2013

NEW 3 5/8" METAL STUDS

@ 16" O.C. BRACE TO

STRUCTURE ABOVE

NEW 5/8" GYPSUM

BOARD - PAINTED

NEW 1/2" GYPSUM

BOARD - PAINTED

SUSPENDED

ACOUSTICAL CEILING

PANEL SYSTEM

EXISTING METAL

STUDS AND GYPSUM

BOARD TO REMAIN

PATCH AND REPAIR

EXISTING GYPSUM

BOARD8'-10

" SO

FFIT

HEIG

HT

9'-6" CEIL

ING

HEIG

HT

1' -

0"

NOTE: ALL EXPOSED EXISTING GYPSUM BOARD TO BE PAINTED.

SAND THE EXISTING GYPSUM BOARD SURFACE AND ADD

A 'LEVEL 5' - SKIM COAT BEFORE PAINTING.

SCALE:

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

1 1/2" = 1'-0"

CEILING DETAIL

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

CDT-50

ADDENDUM #1 - FEBRUARY 22, 2013

EXISTING CONCRETE

SLAB TO REMAIN

3/8"

THIN SET

PORCELAIN TILE

1/8" SOFT CONTROL

JOINT

THIN SET

PORCELAIN TILE

SCALE:

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

3" = 1'-0"

FLOOR DETAIL

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

FD-8

ADDENDUM #1 - FEBRUARY 22, 2013

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 - CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

KTF-0

KEY TO

FINISHESLEGEND

VCT - VINYL COMPOSITION TILE

VCB - VINYL COVE BASE

PT - PORCELAIN TILE

PTB - PORCELAIN TILE BASE

P - PAINT

CLG - CEILING

FRP - FIBERGLASS REINFORCED PANEL

SS - SOLID SURFACE

PLAM - PLASTIC LAMINATE

TP - TOILET PARTITION

PTG - PORCELAIN TILE GROUT

CPT - CARPET

QTZ - QUARTZ

PLG - PATTERNED GLASS

EMF - ENTRANCE FLOOR MAT

RB - ROLLING BLINDS

GF - GLASS FLOOR

ST - STAIR TREADS

SR - STAIR RISERS

SL - STAIR LANDINGS

EPC - EPOXY PAINTED CONCRETE

RP - RESIN PANEL

FAB - FABRIC

STN - WOOD STAIN

GLF - GLASS FILM

NOTES: ALL WINDOW STOOLS TO RECIEVE SS-5 FINISH.

ADDENDUM #1 - FEBRUARY 22, 2013

ALL UNDERSIDES OF SOFFITS TO BE PAINTED P-2, EXCEPT IN

ROOM 103, SEE DETAILS ON ELEVATION 25.

EXISTING ROOFING

SYSTEM TO REMAIN

EXISTING METAL ROOF DECK

EXISTING STRUCTURE TO REMAIN

TOP OF STEEL PLATE

ELEV. 354'-11 7/8"

NEW J-MOLDING

TERMINATION AT TOP OF

GYPSUM BOARD

NEW 1/2" GYPSUM

BOARD - PAINTED

NEW 1/2" GYPSUM BOARD

REVEAL

EXISTING WALL CONSTRUCTION

TO REMAIN

EXISTING SKYLIGHT

ROOF CURB TO REMAIN

EXISTING ALUMINUM

FRAME SKYLIGHT

SYSTEM TO REMAIN

4"

1/2"

EXISTING STEEL

PLATE TO REMAIN

NOTE: ALL EXPOSED EXISTING GYPSUM BOARD TO BE PAINTED.

SAND THE EXISTING GYPSUM BOARD SURFACE AND ADD

A 'LEVEL 5' - SKIM COAT BEFORE PAINTING.

SCALE:

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

1 1/2" = 1'-0"

ROOF DETAIL

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

RD-1

ADDENDUM #1 - FEBRUARY 22, 2013

EXISTING

ROOFING SYSTEM

EXISTING METAL

ROOF DECK

EXISTING STRUCTURE

TO REMAIN

TOP OF STEEL PLATE

ELEV. 354'-1 3/8"

NEW CONTINUOUS BREAK

METAL TO COVER BLOCKING

AND GYPSUM BOARD

NEW 1/2" GYPSUM

BOARD - PAINTED

EXISTING STEEL

PLATE TO REMAIN

NEW 1/2" GYPSUM

BOARD REVEAL

EXISTING WALL

CONSTRUCTION TO REMAIN

EXISTING ROOF CURB

TO REMAIN

EXISTING 3 5/8" METAL

STUD ROOF CURB

ASSEMBLY

EXISTING ACRYLIC SKYLIGHT

1/2"

4"

NOTE: ALL EXPOSED EXISTING GYPSUM BOARD TO BE PAINTED.

SAND THE EXISTING GYPSUM BOARD SURFACE AND ADD

A 'LEVEL 5' - SKIM COAT BEFORE PAINTING.

SCALE:

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

1 1/2" = 1'-0"

ROOF DETAIL

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

RD-2

ADDENDUM #1 - FEBRUARY 22, 2013

LAP SEALANT

ROOF WALKWAY PAD

LAP SEALANT

EXISTING ROOFING

SYSTEM TO REMAIN

EXISTING METAL

DECK TO REMAIN

2' - 0"

SCALE:

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

1 1/2" = 1'-0"

ROOF DETAIL

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

RD-3

ADDENDUM #1 - FEBRUARY 22, 2013

SLO

PE

SLO

PE

CRICKETS @

1/4" PER FT.

CRICKET @

1/4" PER FT.

NEW PIPE CURB

ASSEMBLY; SEE

MECH. DWGS.

NEW CONDENSING UNIT;

SEE MECH. DWGS.

NOTE: SEE RD-5 IN D.R.M. FOR FLASHING OF PIPE CURB ASSEMBLY AND EQUIPMENT SUPPORT.

TYPICAL FOR ALL 6 UNITS; SEE MECHANICAL DRAWINGS.

INSTALLER MUST MAINTAIN ALL ROOF WARRANTIES.

NEW EQUIPMENT

SUPPORT CURB;

SEE MECH. DWGS.

SCALE:

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

1" = 1'-0"

ROOF DETAIL

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

RD-4

ADDENDUM #1 - FEBRUARY 22, 2013

CONDENSING UNIT;

SEE MECH. DWGS.

METAL COUNTER FLASHING

EQUIPMENT SUPPORT CURB;

SEE MECH. DWGS.

ROOF FLASHING

EXISTING ROOFING SYSTEM

TO REMAINEXISTING METAL DECK

TO REMAIN

PRESSURE TREATED WOOD

BLOCKING

EXISTING ROOFING

SYSTEM TO REMAIN

PRESSURE TREATED

WOOD BLOCKING

METAL COUNTER FLASHING

PIPE CURB ASSEMBLY;

SEE MECH. DWGS.

ROOF FLASHING

PIPING; SEE MECH.

DWGS.

NOTE: TYPICAL FOR ALL 6 UNITS; SEE MECHANICAL DRAWINGS.

INSTALLER MUST MAINTAIN ALL ROOF WARRANTIES.

LAP SEALANT

CONT. SEALANT

CONT. SEALANT

LAP SEALANT

1' -

0"

SCALE:

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

1" = 1'-0"

ROOF DETAIL

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

RD-5

ADDENDUM #1 - FEBRUARY 22, 2013

ROOF TOP UNIT; SEE MECH. DWGS.

EXISTING ROOFING

SYSTEM TO REMAIN

LAP SEALANT

ROOF FLASHING

METAL COUNTER

FLASHING

PREFABRICATED METAL ROOF

CURB; SEE MECH. DWGS.

PRESSURE TREATED

WOOD BLOCKING

EXISTING METAL

DECK TO REMAIN

ROOF FRAMING AS

REQUIRED FOR NEW

OPENING

1' -

0"

NOTE: INSTALLER MUST MAINTAIN ALL ROOF WARRANTIES.

SCALE:

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

1 1/2" = 1'-0"

ROOF DETAIL

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

RD-6

ADDENDUM #1 - FEBRUARY 22, 2013

ROOF TOP UNIT; SEE MECH. DWGS.

EXISTING ROOFING

SYSTEM TO REMAIN

LAP SEALANT

ROOF FLASHING

METAL COUNTER

FLASHING

EXISTING PREFABRICATED

METAL ROOF CURB; SEE MECH.

DWGS.

EXISTING PRESSURE

TREATED WOOD

BLOCKING

EXISTING METAL

DECK TO REMAIN

EXISTING ROOF

FRAMING

1' -

0"

NOTE: INSTALLER MUST MAINTAIN ALL ROOF WARRANTIES.

SCALE:

MURRAY ASSOCIATES ARCHITECTS, P.C.

PHASE 3 -

1 1/2" = 1'-0"

ROOF DETAIL

CONSTRUCTION DOCUMENTS

3395/ ALTERATIONS TO HACC TED LICK

ADMINISTRATION BUILDING/ FEBRUARY 8, 2013

RD-7

ADDENDUM #1 - FEBRUARY 22, 2013