22/05/2015 sedmi okvirni program fp7 cooperation - ict call 5 fp7-ict-2009-5 ebonita Ćurković fp7...

16
25/03/22 www.hit.hr 1 Sedmi okvirni program FP7 Cooperation - ICT Call 5 FP7-ICT-2009-5 Ebonita Ćurković FP7 NCP ICT [email protected]

Upload: francis-norris

Post on 18-Dec-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

18/04/23 www.hit.hr 1

Sedmi okvirni program FP7Cooperation - ICT

Call 5 FP7-ICT-2009-5

Ebonita ĆurkovićFP7 NCP ICT [email protected]

18/04/23 www.hit.hr 2

Call 5 – Osnovni podaci

Otvara se: 31. srpnja 09.Prijave do: 3. studenog 09. 17.00 h

Proračun: 732 milijuna €Očekivana primjena na tržištu: 2015-2020

Instrumenti financiranja: NoE, CP, CSA

Teme i ciljevi:

Challenge 1 1.1, 1.2, 1.3 , 1.4, 1.6 Challenge 3 3.1, 3.5, 3.7 Challenge 4 4.2, 4.3 Challenge 8 8.4, 8.5, 8.6, 8.9 Challenge 9 9.2, 9.5

18/04/23 www.hit.hr 3

Tri nova cilja koja potpomažu European Economic Recovery Plan 2010-2013 Public-Private Partnerships(PPP):

Objective ICT-2009-10.1: Smart Factories: ICT for agile and environmentally friendly manufacturing

Objective ICT-2009-10.2: ICT for energy-efficient buildings and spaces of public use

Objective ICT-2009-10.3: ICT for the Fully Electric Vehicle

Te novi cilj: ICT-2009.9.5: Supplements to Strengthen Cooperation in ICT R&D in an Enlarged Europe

Call 5 – novosti

18/04/23 www.hit.hr 4

Call 5 – Glavni EU ICT ciljevi / izazovi

Jačanje ICT EU industrije i TP na tri polja:

- Future internet - Cognitive systems and robotics- Low consumption electronic components

Socijalno ekonomski aspekt ICT-aDigitalne knjižnice, e learning; Upotreba IT alata za bolju zdravstvenu zaštitu i jeftiniji zdravstveni sustav;Efikasno korištenje energije i očuvanje okoliša;Upotreba ICT-a za dobrobit gradjana (državna uprava, digitalno opismenjavanje, pomoć

invalidima i nemoćnim osobama); Sinergija nacionalnih ICT programa i platformi (ENIAC, ARTEMIS , AAL) Što vi š e SME-a u consorciumu Podržavanje inovativnost , posebno kod SME-a Podstiče upotrebu IPv6 protokola odnosno financira u FP7 samo one projekte koji

koriste IPv6 mrežni protokol Standardzaciju ICT-a u EU i svijetu kako bi se mogla dalje razvijati globalna suradnja Dovodjenje korisnika u istraživački ciklus (Living labs projekt)

18/04/23 www.hit.hr 5

FP7 ICT povezanost sa drugim ICT programima

CIP (Competitive and Innovation Programme) Capacities Programme (eInfrasturcture, Research

Infrastructures) ICT i Energy Theme – nova rješenja za Smart Electricity

Distribution Networks

18/04/23 www.hit.hr 6

Objective ICT-2009.1.4: Trustworthy ICT[1]

Pregled financiranja Challenge 1

WP 09-10Mil Euros

Call 5Mil Euros

Instruments of Funding

1. Pervasive and Trustworthy Network and Service Infrastructure

557

1.1 The Network of the Future

190 80 IP, STREP, CSA, NoE

1.2 Internet of Services, Software & virtualisation

110 110IP, STREP, CSA

1.3 Internet of Things and enterprise environments

37 37IP, STREP, CSA

1.4. Trustworthy ICT 90 90 IP, STREP, CSA, NoE

1.6 Future Internet Experimental Facility & Experimentally-driven Research

50 50IP, STREP, CSA

18/04/23 www.hit.hr 7

Objective ICT-2009.1.4: Trustworthy ICT[1]

Pregled financiranja Challenge 3

WP 09-10Mil Euros

Call 5Mil Euros

Instruments of Funding

3.Components, systems, engineering

375

3.1 Nanoelectronics

Technology 35 35 IP, STREP, CSA, NoE

3.5 Engineering of Networked Monitoring

and Control Systems

32 32IP, STREP, CSA, , NoE

3.7 Photonics 60 50IP, STREP, CSA, ERA-NET Plus

3.9 Microsystems and Smart Miniaturised Systems

80 80 IP, STREP, CSA, NoE

18/04/23 www.hit.hr 8

Objective ICT-2009.1.4: Trustworthy ICT[1]

Pregled financiranja Challenge 4

WP 09-10Mil Euros

Call 5Mil Euros

Instruments of Funding

4.Digital Libraries and Content

188

4.2 Technology-Enhanced

Learning 49 49 IP, STREP, CSA, NoE

4.3 Intelligent information

management 70 70

IP, STREP, CSA, , NoE

18/04/23 www.hit.hr 9

Pregled financiranja Challenge 8 (sveukupno)

WP 09-10Mil Euros

Call 5Mil Euros

Instruments of Funding

8. Future and Emerging

Technologies 171

FET-Open (otvoren do 31.12.2010)

61 CP, CSA samo

FET-Proactive 110 39

18/04/23 www.hit.hr 10

Pregled financiranja Challenge 8 (ciljevi)

WP 09-10Mil Euros

Call 5Mil Euros

Instruments of Funding

8 Future emergine technologies FET

8.4 FET proactive 4: Human-Computer Confluence

15 IP

8.5 FET proactive 5: Self-Awareness in Autonomic Systems

15 IP, STREP ali minimum 50%

za IP 8.6 FET Proactive 6: Towards Zero-Power ICT

7 STREP

8.9 Coordinating Communities, Plans and Actions in FET Proactive Initiatives

1.5 CSA

18/04/23 www.hit.hr 11

Objective ICT-2009.1.4: Trustworthy ICT[1]

Pregled financiranja Challenge 9

WP 09-10Mil Euros

Call 5Mil Euros

Instruments of Funding

9. Horizontal Actions 22.3

9.2 Supplements to Support International Cooperation between Ongoing Projects

0.3 IP, STREP

9.5 Supplements to Strengthen Cooperation in ICT R&D in an Enlarged

Europe

10 IP, STREP

18/04/23 www.hit.hr 12

Pregled financiranja Challenge 10

WP 09-10Mil Euros

Call 5Mil Euros

Instruments of Funding

Contribution of the ICT Theme to Public-Private Partnerships for R&D in the European Economic Recovery Plan

70

10.1 Smart Factories: ICT for agile and environmentally friendly

manufacturing

35 35 PPP

10.2 ICT for energy-efficient buildings and spaces

of public use

15 15IP, STREP, CSA, , NoE

10.3 ICT for the Fully Electric Vehicle

20 20IP, STREP, CSA, ERA-NET Plus

18/04/23 www.hit.hr 13

Pravila za instrumente financiranja (CP, CSA, NoE)

Funding scheme Minimum conditions:

Collaborative project (CP) IP+STREP At least 3 independent legal entities, each of which is established in a MS or AC,

and no two of which are established in the same MS or AC. Collaborative project for specific cooperation actions dedicated to international cooperation partner countries (SICAs)At least 4 independent legal entities. Of these, 2 must be established in different MS or AC. The other two must be established in different international cooperation partner countries

Network of excellence (NoE) At least 3 independent legal entities, each of which is established in a MS or AC,

and no two of which are established in the same MS or AC. Co-ordination action (CA), Co-oridnate support action (CSA)

At least 3 independent legal entities, each of which is established in a MS or AC, and no two of which are established in the same MS or AC.Support action At least 1 independent legal entity

MS = Member States of the EU; AC = Associated Country. Where the minimum conditions for an indirect action are satisfied by a number of legal entities, which together form one legal entity, the latter may be the sole participant, provided that it is established in a Member State or Associated country

18/04/23 www.hit.hr 14

Kontakt

Ebonita ĆurkovićICT NCP

[email protected] 099 310 6604

18/04/23 www.hit.hr 15

Internet stranice

http://cordis.europa.eu/fp7/ict/ http://cordis.europa.eu/fp7/ict/

programme/home_en.html

18/04/23 www.hit.hr 16

Puno uspjeha u prijavama projekata!