22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery by establishing scalable multilink network architectures

Upload: clifton-jason-short

Post on 28-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

22 September 2011

Final review

1

MARCH final reviewFornebu, Norway, 22 September 2011

Significantly lower the cost of converged broadband service delivery by establishing scalable multilink network architectures

Page 2: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Agenda

09:00-10:00 Presentation of summarised results, Focus on second half of the project, i.e., Deliverables D3.3, D3.4, D3.5, D4.2/D5.1, D5.2, and D7.6

10:00-10:45 DemonstrationsDeliverable D6.1

10:45-11:00 Coffee break

11:00-12:00 Questions and answers

12:00-13:00 Reviewer internal discussion

13:00-14:00 Lunch

22 September 2011

Final review

2

Page 3: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Response to emails 20 SeptemberBeyond SoA at start of MARCH

• Scenarios business analyses, future broadband access market development, and forecasted consumer spending

• Methods for scheduling of application IP packets on multiple links for real time video applications using dynamic error correction, adaptive bit rate, and adaptive scalable video coding

• Radio resource management applicable for multilink

• Investigating and proposing multilink network architecture solutions for multipath gateway, multilink middleware, multilink connection manager, enhanced Wi-Fi offload with multilink, and roaming and multi-actor assured services

• Developed and demonstrated multilink network technical solutions, multilink-aware content provider application, and using IPTV applications handling multilink streams

Partner contributions

Largely as describe din the PD, with more details at the meeting

European dimension

Different skills needed. Mixed industry collaboration. Standardisation effort

New and enhanced products will be specified in more detail during the review

22 September 2011

Final review

3

Page 4: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

The economical scenarios analyses have evolved through collaboration between all partners and all WPs

WP 2 WP 4 WP 5 WP 7WP 6

Scenarios and actorsTechnology components

Feasible architectures

Cost elementsProved deployability

Feedback from workshops and presentations

Input from industry partnersCAPEX and OPEXWillingness to pay

Input from industry in different marketsMarket and service specific CAPEX and

OPEX and willingness to pay

Page 5: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Quantitative analyses of four scenarios derived from developed business models

Promoting multilink for continuous access to Campus 3D educational learning environment in Spain

Promoting multilink for security fleets communication management

Promoting the combination of WiMAX and satellite broadcast networks for bandwidth and N-play to rural areas of Spain

Broadband services combining mobile 3G and Wi-Fi

Deliverable D3.322 September 2011

5

Final review

Page 6: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Example of a mediator providing broadband 3G and WiFI access

Business case assumptions

Provides gateway and terminal software only

Targets advanced private customers

Population of 5 000 000 and a mobile terminal penetration of 90%.

20% of the terminals can support more than one network interface in Year 0, with an increase of

5-20% the first years.

We attract 0.5% of the multilink terminals as customers.

ARPU is 3€ with an annual decrease

The net present value (NPV) is estimated to be 1 026 084.

This business case shows a positive cash flow already after 1 year.

Deliverable D3.322 September 2011

6

Final review

Page 7: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Example of an operator providing broadband 3G and WiFI access

Business case assumptions

Customers with multilink terminals use multilink transparently controlled by the

operator

Increased revenue due to more customers (2-5%)

Invests in gateway and terminal software

Population of 5 000 000 and a mobile terminal penetration of 90%.

20% of the terminals can support more than one network interface in Year 0, with an

increase of 5-20% the first years.

This business case shows a positive cash flow already in year 1.

Deliverable D3.322 September 2011

7

Final review

Page 8: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Fixed broadband Western European residential market

22 September 2011

Final review

8

Penetration forecasts Busy hour traffic forecasts

Deliverable D3.4

Several high quality sources for traffic dataOwn developed forecast methods

Page 9: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Mobile broadband consumer and business market Western Europe

22 September 2011

Final review

9

Penetration, large screen

Deliverable D3.4

Page 10: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Mobile data busy hour traffic Western Europe

22 September 2011

Final review

10Deliverable D3.4

Page 11: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Market development summary

• Busy hour total traffic forecasts during the busy hour; key information for planning and dimensioning of the networks

• Short-term and long-term traffic forecasts are crucial for long term network planning

• Long-term traffic forecasts for both fixed and mobile broadband data in the busy hour show an explosive growth.

o Mobile data traffic in 2015 increases 36 times the 2008 level and 16 times the 2009 level

o Fixed broadband traffic is estimated to be 19 times larger than the mobile broadband in 2009, while the proportion is reduced to 6 times larger in 2015

• However, it is important to underline that there are uncertainties in these forecasts

22 September 2011

Final review

11Deliverable D3.4

Page 12: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Growth in provisioning and consumption of digital content on Internet

High digital share:

• Music: large CD decrease, revenue catastrophe, hope: subscription models

• Games: smooth transformation to online, healthy online business

Low digital share – so far:

• Film: DVD decrease, some online streaming successes

• TV: linear still going strong, online is catch-up

Challenge: Sustainable business model for digital contentIn the long run: transformation to sustainable digital models

22 September 2011

12

Final review

Deliverable 3.5

Page 13: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Challenge for content industry – challenge for broadband networksBroadband network: How to position in mediator role between

end-user and content provider?

Suggestion 1 – MEDIATOR ROLE:

Two-sided market – sender party paysthe broadband network:

Pros Cons

•Sending party cares more about other side•End-user demand variety

• Empirically few examples of shifts

PlatformBroadband network

End-userContent and

service provider

22 September 2011

13

Final review

Deliverable 3.5

Page 14: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Challenge for content industry – challenge for broadband networks

Suggestion 2 – MEDIATOR ROLE:

The hypothesis is: Part of the spending categories, which the household now pay for, will in the future be partially substituted by use of services in the mobile and fixed broadband networks

22 September 2011

14

Final review

Deliverable 3.5

Page 15: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Household spending for content and telecommunication increase

We see the spending over time change between categories, but for some of the countries there is also a significant growth in total spending.

Example: Cultural services and entertainment , Norway

The table shows that all three categories for the Norwegian market have a very significant growth both from 2000 – 2005 and from 2005 to 2009. Probably there will be a similar in the period 2005 – 2009 in the Western European market.

22 September 2011

15

Final review

Deliverable 3.5

Page 16: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Substitution can happen, also in rural areasLower content spending in rural areas

Communication spending almost on urban level

CommunicationEntertainment

22 September 2011

16

Final review

Deliverable 3.5

Page 17: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Summary and further work

22 September 2011

17

Final review

Deliverable D3.5

Page 18: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Investigated multilink techniques

• Content adaption

• Bandwidth aggregation

• Service constraints optimisation

• Forward error correction over multiple connections

• Reliability and robustness/Reliability and security

• Inter-system network load balancing with QoS awareness

• Radio Resource Management (RRM)

• Multiple antenna techniques

Deliverable D4.2/D5.1 22 September 2011

18

Final review

Page 19: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Network layer main multilink techniques

• Adaptive video coding

o Layered video on different links

o Frame types on different links

• Adaptive scheduling

o Consider latency, loss rate, link bandwidth

o Streaming and control traffic, priority handling

• Forward / Backward error checking and correction

o Considers different link loss rate

• Monitoring

o Passive and active end-to-end for each link

Deliverable D4.2/D5.1 22 September 2011

19

Final review

Page 20: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Network layer techniques key benefits

• Increased throughput by sending independent information on several concurrent streams

• Increased reliability, e.g., by sending duplicate information on several concurrent streams

• Increased service continuity by dynamic and flexible access to different radio access networks

• Increased network utilisation by sharing the network load

o Supported by simulations and analytical modelling

Deliverable D4.2/D5.1 22 September 2011

20

Final review

Page 21: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Radio access network layer main techniques and benefits

• Service capacity

o Selection an optimal link for each user

o Use multiple input multiple output (MIMO) technology

• Service reliability by using redundant links

o MIMO technology

• Increased quality of service (QoS)

o Load balancing including user QoS parameters

Deliverable D4.2/D5.1 22 September 2011

21

Final review

Page 22: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Multilink network architecture• Identified deployment possibilities of MARCH

ML techniques into holistic architectural settings Considering ongoing standardisation Considering various multilink connectivity modes Proposing specific value propositions Investigating evolution paths

• More specifically, investigating and proposing solutions Multipath gateway Multilink middleware Multilink connection manager Enhanced Wi-Fi offload with multilink Roaming and multi-actor assured services

22 September 2011

22Deliverable D5.2Final review

Page 23: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

2009-10-27

HLø

23

Multilink connectivity modesConcurrent use of multiple links

App App

ML User Equipment

MLA MPG

MPG(Multipath Gateway)

Service FlowSplitting / Merging

Service flow split/merge

MLA

App

App

App

App

App

Multi TCP connections

Deliverable D5.2

Page 24: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

MLA

2009-10-27

HLø

24

Multilink connectivity modes Concurrent use of multiple links

App

Non-3GPP access

3GPP access

App

App

App

App

IP flow mobility (3GPP Rel. 10)

App PDN-GW(MLG)

App

3GPP MNOCore

• Seamless WLAN offload

• IP flow mobility between 3GPP and WLAN (DSMIPv6)

• Interactions with the Policy Control and ANDSF frameworks

Deliverable D5.2

Page 25: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

ML User Equipment

ML Adaptor (MLA)

OS IP stack

Application

Link/Phy

MARCH Middleware

Multipath GW Content Server

MPG Function

Mapping the e2e IP stream onto

the IP tunnels OS IP stack

Link/Phy

Application

OS Socket API with link specific nw address

Virtual Socket API

NICNICNIC

Multipath Gateway ArchitectureIP – in – IP tunnels

Deliverable D5.2

Page 26: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

Architecture – Enhanced Wi-Fi offload with multilink

21 September 2011

26

User Equipment

OS IPStack

Application

Link/Phy

Wi-Fi3GPP

ApplicationApplication

NIAL

Conn Mgr

MPG

MPCF

IMS Client IMS Core

AppSrv

HSS/SPR

eANDSF

PDN-GW(MLGF)

MLPDP(ePCRF)

PEF

Policy Client

NIAL – Network Interface Abstraction LayerNI – Network Interface (Card)

MLPDP – ML Policy Decision PointPEF – Policy Enforcement FunctionHSS – Home Subscriber ServerSPR – Subscriber Profile Repository

Multilink Middleware

MPG

Holistic evolution of the user terminal is key!

Deliverable D5.2

Page 27: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

AppSrv

AG

MLUE

CG (F)

CSMPGF

MLA

APAPAP(M)

MLPDP(ePCRF)

PEF

APAPAP(F)

PEFInternet

eANDSF

Partner HotSpot domain

CG

PCRF

PEF

Competing MNO domain

MNO partnering with HotSpot Network Operator

Inter-actor operation, potentially based onGSMA OneAPI

Deliverable D5.2

Page 28: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

OnlineContent

Provider(Home area)

VisitedMNO(Core)Visited MNO(Access)

CG(M)

MLUE

MLA

APAPAP(M)

LRM

MLPDP(ePCRF)

PEF

AP(F)

LRM

VisitedeANDSF

HotspotPartner

domain / Premises

Transit (Hub) Internet NSP

HomeMNO

(Core)

CS

HSS

MPGF

MLCF

Point of Interconnect supporting

Assured service quality traffic terminationCf. EU project ETICS

Roaming multilink user

(3)

(1)

Service/Session Handler

Service/Session Handler

Service/Session Handler

(2)

(4)

(5)

(6)

(7)

Roaming with multilink and Wi-Fi based local breakout

22 September 2011

28

Final review

Deliverable D5.2

Page 29: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

MARCH - Technical Exploitation beyond SoA

• Development of the scalable and modular multilink architecture

• Telvent - First multilink-aware content provider

• IPTV application to display multilink streams by Gravity

• Transparent multilink solution and mediator service are under development by Simula

• Multi access network solutions to be developed into future product lines by Lividi

• Video conference solution that exploits multiple networks simultaneously by Lividi

• New product: RMM server by RuggedCom

• Multilink techniques such as dynamic FEC, bandwidth aggregation, adaptive bit rate control and AVC codec by LiveU

Deliverable D7.6 22 September 2011

30

Final review

Page 30: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

MARCH Economical Exploitation

• New N-play business models

• Business evaluations for different cases

• New market strategies and partner strategies

• IPTV live event application

• Developed products hopefully will generate significant impact on live broadcast market

• Standardisation of the developed results

o Contributions to 3GPP, IPSphere and TMForum on multilink combination of mobile and wireless local area network

Deliverable D7.6 22 September 2011

31

Final review

Page 31: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

22 September 2011

32

Final review

MARCH Dissemination• MARCH publications

o Papers in journals: 8

o Papers in conference proceedings: 17

o Presentations at workshops and conferences: 10

• MARCH events and demonstrations

o MARCH workshop in Norway - Fornebu, Norway, 27th of October, 2009

o First MARCH international workshop - Ramat-Gan, Tel Aviv, Israel, 3rd of MARCH, 2010.

o MARCH live demonstration at Svalbard, Norway - MARCH multilink technology used to provide live video coverage from an excavation site of Predator X at Svalbard, 3 - 17 August 2010

Deliverable D7.6

Page 32: 22 September 2011 Final review 1 MARCH final review Fornebu, Norway, 22 September 2011 Significantly lower the cost of converged broadband service delivery

MARCH Dissemination

• MARCH events and demonstrations

o Celtic-Plus Event 2011 - The MARCH consortium demonstrated the project's results on the Celtic-Plus Event 2011. Live coverage of this CELTIC Event was powered by LiveU - member of the MARCH Consortium - using the multilink technology

o Workshop on Broadband mobile access over heterogeneous networks for improved capacity, coverage, and quality of experiences

• Universities disseminated the results through their education activity

o PhD theses, MsC/BsC theses, etc.

• Website of the project was launched where all the public material is accessible

Deliverable D7.6 22 September 2011