22 august 2013 working with energy in china 1 working with energy in china mogens heering, senior...
TRANSCRIPT
WORKING WITH ENERGY IN CHINA1 22 AUGUST 2013
Working with energy in China
Mogens Heering, Senior VP, COWI CMCZhang Penghao, Market Director, COWI China
WORKING WITH ENERGY IN CHINA2
Agenda
22 AUGUST 2013
COWI in China
China's 12th Five Year Plan and the Danish fairy tale
Understanding of the political and personal agenda of the leaders
Opportunities given and understood by COWI;› Targeting different political levels with different goals.
Understanding the agenda for each level.
› Tangible, applicable solutions with integration of Danish resources
› Nanjing High Tech Zone rebranding need
From contact to contract –the importance of Government to Government relations
Matching the levels
The consultant as a forerunner for other Danish industries
WORKING WITH ENERGY IN CHINA3 22 AUGUST 2013
COWI in China
› COWI's first project in China was in 1980s, a district energy donor project
› We established our permanent office in 2005
› Our current services include: › District energy and Energy planning
› Energy in buildings
› Carbon development
› Water management and environmental due diligence
› Sustainable urban development
WORKING WITH ENERGY IN CHINA4 22 AUGUST 2013
China's 12th Five Year plans 2011-2015› China's main goals until 2015 are:
› GDP to grow by 7 percent annually on average
› More than 45 million jobs to be created in urban areas
› Energy consumption per unit of GDP to be cut by 16 percent;
› Carbon dioxide emission per unit of GDP to be cut by 17 percent;
WORKING WITH ENERGY IN CHINA5 22 AUGUST 2013
The Danish fairy Tale and it’s perfect timing in China in 2013
Economic Growth by 78% with Energy and GHG emission decreasing due to
1. Renewable Energy
2. CHP/DH
3. Energy Efficiency
19901991199219931994199519961997199819992000200120022003200420052006200720082009708090
100110120130140150
GDP, fixed prices CO2-emissions, adjusted
Financial Crisis
Source: Danish Energy Agency
WORKING WITH ENERGY IN CHINA6
Central Government
Provincial Party Secretary
Provincial Governor
Municipal Party Secretary
Mayor
Implementation Official
Understanding of the political and personal agenda of the leaders
22 AUGUST 2013
WORKING WITH ENERGY IN CHINA7
› Understanding of the political and personal agenda of the leaders
Opportunities given and understood by COWI:Targeting different political levels with different goals.
22 AUGUST 2013
• Control total energy consumption• Optimize energy structure
Central Government
• GDP growth vs. Energy consumption control• Conventional investment vs. Renewable energy
Local Government
• Government requirement vs. Personal career• Right project to achieve reputation
Local Leader Personal Interest
• Driving force or Barrier • Approaching the right people
Implementation Official Interest
WORKING WITH ENERGY IN CHINA8
Opportunities given and understood by COWI:Tangible, applicable solutions with integration of Danish resources
22 AUGUST 2013
CHP1
CHP2
Geo-thermal plant
SS
SS
SS
SS
SS
SS
SS
SS
SS
Anshan Steel Plant
Pilot 1
Pilot 2
Pilot 3
Anshan Master plan 2015› The Master Plan outlines the
frame for the future District Heating system
Core tasks
›To improve city functions ›To form city features›To structure eco city›To promote industrial development
Utilize upgrading zone to lead regional development
› 19.2km2 area is the built-up area of High-tech zone, it is also the core area. Take this area as a sample which can be the engine and demonstration.
Interaction between industry and cityGreen, eco and smart high tech town
› Interaction between industry and city, coordination development
› Intelligent technology and applicable industry
› Perfect functional eco city
› Green, eco and smart high tech demonstration zone
Planning vision and core tasks
京沪铁路
宁六路
沿山大道
天润路
Nanjing High Tech Zone Sustainable Planning
Industry development
Achieve one package service on planning, construction, overall investment attraction, enterprise settlement and follow-up management in industrial park
Eco city
Compared to China and other regions of China, there should be a significant reduction on resource consumption
Urban function
A place suitable for living and work, and thus promote social communication and innovation
Sino-Danish Eco Life Science Park
Urban Planning Exhibition Centre, "Nanjing Light House"
Architects: Archiland Architectural Design Co.
At least 30 % open suspended ceiling to allow for cooling from TABS
TABS in all decks for heating and cooling
Two mech. ventilation systems (including dehumidification):- One for closed rooms with high heat loads- One for open rooms(only during Summer)
Natural ventilation for open spaces during winter(single offices also possible)
Heat pump/cooling compr.
Dual mode heat pump/cooling compressor
Solar thermal on roof
Optimized façade design
Ventilation/dehumidifi
cation
Air tight facade
Borehole storage
WORKING WITH ENERGY IN CHINA12
From contact to contract –the importance of Government to Government relations
22 AUGUST 2013
Public-Public
Public-Private
WORKING WITH ENERGY IN CHINA13
Matching the levels
22 AUGUST 2013
WORKING WITH ENERGY IN CHINA14
The importance of Government to Government relations
22 AUGUST 2013
WORKING WITH ENERGY IN CHINA15
The consultant as a forerunner for other Danish industries
22 AUGUST 2013
WORKING WITH ENERGY IN CHINA16
THANK YOU.QUESTIONS?
22 AUGUST 2013