21st century schools bond advisory...

27
NOVEMBER 29, 2016 MEETING 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEE

Upload: others

Post on 18-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

N O V E M B E R 2 9 , 2 0 1 6 M E E T I N G

21ST CENTURY SCHOOLS BOND ADVISORY

COMMITTEE

Page 2: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

2

PROJECT UPDATE YEARS 1 - 4 AND ACCELERATED

SCOPE

Page 3: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

GOB PROJECT UPDATE

3

Year 1 (68 Projects, including 1 advanced)

66

Substantially completed, including

6-12 Grade Addition at MAST on

Virginia Key and Miami Norland

Senior High School

2 In construction

Page 4: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

GOB PROJECT UPDATE

4

Year 2 (79 Projects)

54

Under $1M (SBE/MBE):

• 44 substantially completed

• 7 in construction

• 2 in bidding

• 1 in design

9 With values between $1M and $2M:

• 8 substantially completed

• 1 in construction

16

Over $2M:

• 1 substantially completed

• 13 in construction

• 2 in bidding or design

Page 5: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

GOB PROJECT UPDATE

5

Year 3 (54 Projects)

17

Under $2M (includes MBE and SBE projects):

• 2 substantially completed

• 13 in construction

• 2 in bidding/design

37

Over $2M:

• 10 in construction

• 6 in bidding

• 15 in design

• Balance in A/E and CM commissioning

Page 6: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

GOB PROJECT UPDATE

6

Year 4 (50 Projects and Accelerated Scope)

11 With values between $1M and $2M:

• All have been assigned to teams of architects and

contractors and are in final scope validation or design

39 Over $2M:

• To be advertised in bundled solicitations

• 4 already in design

238 Smaller accelerated projects (playgrounds, portable

removal, roofing, air conditioning)

• 172 completed

• 23 in construction

• Balance in design or bidding

Page 7: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

GOB PROJECT DELIVERY UPDATE

7

PROJECT

TYPE OF PROJECT (1-NEW; 2- RENOVATIONS;

3-RENOVATIONS/PARTIAL REPLACEMENT)

CLEAR SITE (1-Y; 2-N)

PHASING REQUIRED

(1-N; 2-Y)

UNKNOWN CONDITIONS

(1-N; 2-Y)

COMPETITIVE MARKET

(1-Y; 2-N)

PROTOTYPE USED

(1-Y; 2-N)

SCORE CONSTRUCTION DELIVERY

METHOD

Ben Sheppard ES Addition 1 1 1 1 1.5 2 7.5 HARD BID

Air Base K-8 Addition 1 1 1 1 1.5 2 7.5 HARD BID

Ethel K. Beckham ES Addition 1 1 1 1 1.5 2 7.5 HARD BID

State School M1 (reuse) – S.W. 167 Ave/95 St 1 1 1 1 1.5 1 6.5 HARD BID

NOTES:

1. MAXIMUM SCORE IS 13; MINIMUM SCORE IS 6

2. A HIGHER SCORE REVEALS GREATER COMPLEXITY AND IS MORE SUITABLE FOR A CM AT-RISK DELIVERY METHOD; A LOW SCORE REVEALS A LESS COMPLEX PROJECT MORE SUITABLE FOR HARD BID

SCORE:

< 9 HARD BID; 10 or > CM at Risk

Note: The projects highlighted above were previously presented to the Committee at the March 3, 2015 meeting

and recommended to be delivered as CMR. Since then, scope and schedule have been refined and reevaluated

for possible delivery method cost efficiencies, and are now recommended as Hard Bid projects. The other project,

a prototype reuse, is recommended for Hard Bid, the same delivery method used for the prototype itself and a

subsequent reuse project in the Doral area, currently in construction. RECOMMENDED ACTION: THAT THE COMMITTEE ACKNOWLEDGE AND ENDORSE THE PROPOSED PROJECT DELIVERY METHOD IDENTIFIED ABOVE.

Page 8: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

GOB PROJECT EXPENDITURES

8

Transaction Category

March ‘14

June ’14

Sept. ‘14

Dec. ‘14

March ‘15

June ‘15

Sept.

‘15

Dec.

‘15

March

‘16

June

‘16

Sept.

‘16

Oct.

‘16

Facilities

Exp. (Millions ) $8 $23 $38 $58 $85 $122 $158 $185 $212 $254 $295 $323

Technology

Exp. (Millions) $16 $28 $35 $38 $43 $45 $47 $54 $65 $69 72 $77

$0

$50

$100

$150

$200

$250

$300

$350

Expenditures thru 10/31/16

Facilities Exp. (in Millions $)

Technology Exp. (in Millions $)

Page 9: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

GOB EXPENDITURES AND CONTRACTED

9

Transaction Category

March ‘14

June ’14

Sept. ‘14

Dec. ‘14

March ‘15

June '15

Sept.

‘15

Dec.

‘15

March

‘16

June

‘16

Sept.

‘16

Oct.

‘16

Expenditures (Millions ) $24 $51 $73 $96 $128 $167 $205 $239 $277 $323 $367 $400

Contracted (Millions ) $29 $50 $58 $72 $100 $46 $97 $110 $117 $123 $105 $97

$0

$50

$100

$150

$200

$250

$300

$350

$400

$450

Expenditures and Contracted Amounts thru 10/31/16

Expenditures (in Millions$)

Contracted (in Millions $)

Page 10: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

SCHOOL ADOPTION PROGRAM (29 SCHOOLS VISITED TO DATE)

• SHENANDOAH ES - Rev. Guillermo

Revuelta

• KENWOOD K-8 - Mr. Roberto Martinez

• PHYLLIS RUTH MILLER ES – Mr. Anthony

Dawsey

• BUNCHE PARK ES – Mr. Cecil T. Daniels

• SHENANDOAH MS – Mr. Joseph Gebara

• OJUS ES – Dr. Jaap Donath

• PALMETTO ES - Ms. Cindy Lerner

• HIALEAH-MIAMI LAKES SHS – Ms. Carol

Graham Wyllie

• HUBERT O. SIBLEY K-8 - Dr. Sean Foreman

• RUTH K. BROAD / BAY HARBOR K-8- Mr. Alan Rubin

• CUTLER BAY ACADEMY- Mr. Paul Wallace

• HIALEAH SHS – Sen. Rene Garcia

• EDISON PARK K-8- Mr. Anthony Dawsey

• iTech @ EDISON MS- Mr. Anthony Dawsey

• CHARLES DREW K-8- Mr. Anthony Dawsey

• NATURAL BRIDGE ES- Ms. Julie Williamson

• FULFORD ES- Ms. Marlen Martell

• OLYMPIA HEIGHTS ES- Mr. Frank Silva

• MIAMI NORLAND SHS- Mr. Cecil Daniels

• AMERICAN SHS- Ms. Carol Graham Wyllie

• COCONUT GROVE ES- Mr. Jack Lowell

• PONCE DE LEON MS- Mr. Joseph Gebara

• RIVERSIDE ES- Mr. Joseph Gebara

• Dr. EDWARD L. WHIGHAM- Mr. Paul Wallace

• KENSINGTON ES - Rev. Guillermo Revuelta

• MORNINGSIDE ES – Ms. Gepsie Mettellus

• D.A. DORSEY EDU. CTR. – Mr. T. Willard Fair

• LIBERTY CITY ES – Mr. T. Willard Fair

• GLADES MS – Mr. Alfred Billings

10

Page 11: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

APPROVAL OF THIRD ANNUAL REPORT

11

Page 12: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

REPORT CONTENT

• The Third Annual Report is meant to provide a high level

summary of the main activities undertaken by the District

in its continued implementation of the GO Bond program

through March 31, 2016. The Report includes the

following:

• Committee governance and membership

• Executive Summary describing:

• Project related activities, including number of projects in play

and status

• SMBE related activities, including number of SMBE firms working

on the program, outreach efforts and changes to Board policy

and District processes aimed at promoting and increasing

SMBE participation both at the prime and sub-consulting levels

• Financial activity, in terms of expenditures and encumbrances

12

Page 13: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

REPORT CONTENT

• A GO Bond program update section containing more

detailed information on program adjustments, project

activity and lessons learned

• A listing of projects by location, with budget,

expenditures, scope and status information

• A summary of the outreach, mentoring and networking

efforts undertaken by the Office of Economic

Opportunity

• Bond financing information related to the reporting

period, including strategy used to achieve cost

efficiencies and the best outcome for the taxpayers

13

Page 14: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

PROGRAM INSIGHTS

• The District is currently at mid-point in the level of effort

with the GOB program implementation which is

evidenced by both expenditures and number of

projects

• While there were some large projects in years 1 and 2

of the Bond program, most large projects were

planned starting with year 3 and running through year 5

• These larger projects present both challenges and

opportunities not necessarily applicable or present with

the implementation of Year 1 and 2 projects

14

Page 15: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

PROGRAM INSIGHTS

• The most pressing challenge facing the District is the

continuing rise in construction costs due to the

competitive nature of the local market and

accommodating that in the District’s continued

commitment to fidelity in program implementation

• Some of the strategies the District is employing to

address this particular challenge include:

• bundling similar projects (value and complexity) which saves selection and commissioning time and simplifies the submittal

process for interested firms

• using different delivery methods to capitalize on economies of

scale (e.g. grouping like projects for hard bidding)

• using prototypical designs when possible to achieve time and cost efficiencies

15

Page 16: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

PROGRAM INSIGHTS

16

• Another area of continued focus in the Bond

implementation program is the District’s commitment to

economic development opportunities for Small and

Micro Business Enterprise (SMBE) firms, as well as

increased diversity in sub-consulting/sub-contracting

teams

• Specifically for larger projects, there is a standard

process through which participation goals are

established as part of the selection and commissioning

process for both design professionals and contractors

• To date, that process has yielded noteworthy results,

with the majority of the firms not just meeting, but well

exceeding the pre-established participation goals

Page 17: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

PROGRAM INSIGHTS

17

• This success is due in large part to a pilot program

aimed at incentivizing SMBE participation and greater

team diversity in large Bond projects through strategic

assignment of points during screening and selection of

firms

• Team diversity has increased more substantially among

contractors than design professionals as a result of

greater and more diverse sub-contractor availability

• In addition, the Board successfully graduated the first

MBE firm to SBE status as a result of their successful

performance. That firm will now be able to participate

in larger projects

Page 18: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

18

PROGRAM INSIGHTS

Page 19: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

19

PROGRAM INSIGHTS

Page 20: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

20

PROGRAM INSIGHTS

Page 21: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

PROGRAM INSIGHTS

21

Page 22: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

22

PROGRAM INSIGHTS

Page 23: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

23

PROGRAM INSIGHTS

Page 24: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

24

PROGRAM INSIGHTS

Page 25: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

25

PROGRAM INSIGHTS

Page 26: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

REPORT REVIEW AND INPUT PROCESS

• District provided link to the Third Annual Report Draft to

Committee members on August 26, 2016

• Committee members were asked to provide input and

comments to District staff by September 13, 2016

• As no comments or requests for change were received

as of November 28, 2016, it is recommended that the

Third Annual Report be approved by the Committee for

transmittal to the Board once the Chair’s letter is inserted

in the document

26

Page 27: 21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEEbondsforschools.dadeschools.net/pdfs_2016/Presentation... · 2016-11-30 · Senior High School 2 In construction . GOB PROJECT UPDATE 4

27

NEXT MEETING: DECEMBER 6, 2016

(TOUR OF M.A.S.T. @ VIRGINIA KEY)