21 sept 2009 markus friedl electronics 1 electronics 2 machine shop hephy scientific advisory board...
TRANSCRIPT
21 Sept 2009
Markus FriedlElectronics 1Electronics 2Machine Shop
HEPHY Scientific Advisory Board Meeting
2Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Mission Statement
• Development & maintenance of high-tech electronics & precision mechanics for HEP experiments– Electronics: In-house circuit design, assembly, firmware
development and testing– Mechanics: Precision machining of prototypes and small series
• Support for CMS-Trigger, CMS-Tracker, Belle, ILC and Outreach projects
3Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
List of Members
• Electronics 1– Staff: 8 persons, 7.1 FTE– Head: A.Taurok– Members: B.Arnold, H.Bergauer,
M.Eichberger, K.Kastner, B.Neuherz, M.Padrta, T.Schreiner
• Machine Shop– Staff: 2 persons, 2.0 FTE– Head: A.Taurok– Members: M.Oderits, R.Stark
• Electronics 2– Staff: 7 persons, 4.85 FTE– Head: M.Friedl– Members: I.Gfall, C.Irmler, M.Pernicka,
J.Pirker, S.Schmid, H.Steininger
4Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Skills
Schematics design, PCB layout
Assembly
FPGA programming& simulation
Beam tests
Testing
Machining
Softwaredevelopment
5Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Equipment
…and many others:• Software for
Schematics/PCB and FPGA programming
• Pattern generators, oscillators, scopes
• Plate cutting & bending machines, drills, saws, …
Vapor phase soldering machine
BGA soldering machine
8 GHz real time oscilloscope
CNC milling machine
6Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Completed Projects
• DELPHI– FCA & VFT subdetectors– LTD electronics boards
• NA48– Clock distribution– Calorimeter trigger– 960 MHz-ADC system
• Outreach– LHC2008 exhibition
• CMS– Drift Tube Trigger– Global Muon Trigger– Global Trigger– Central Trigger Control– Analog Optohybrid– Pixel-FED
• Belle– FADCs for Silicon Tracker
(SVD2)
7Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Present Activities
• CMS– Trigger & Pixel: fine-tuning, adaptations, maintenance – R&D for CMS upgrade
• Belle II– Silicon Tracker for Belle II:
R&D for Detector Module, Repeater, Data Acquisition, Control
• ILC Experiment– Mixed SiLC/CMS upgrade/Belle II beam test
• Outreach– Animated LHC wall poster
8Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Present Activities – CMS TriggerGlobal Trigger upgradeTrigger definition using MATLAB SimulinkXilinx SystemGenerator makes VHDL code
DSP inside
CONDITION CHIP
ALGO + FinOR (FDL)
12
4
2
8
FPGA CTRLFPGA 4
4
FPGA CTRLFPGA 4
4
3.2 Gbps Optical Links
Mentor/ISE software implements chip design
PSB_opt(Pipelined
Synchronising Buffer)3.2Gb/s optical links
instead of cable
Central Trigger ControlAdvanced version
9Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Present Activities – CMS Tracker
Pixel-FED upgrade
Digital optical link instead of analogPartly re-using existing components
Firmware development for heavy ion mode
10Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Present Activities – Belle II R&D Origami Chip-on-Sensor Concept
• Thinned readout chips (APV25) on sensor
• Strips of bottom side are connected by flex fanouts wrapped around the edge
• All readout chips are aligned single cooling pipe
• Shortest possible connections
high signal-to-noise ratio
side view
~60cm
Ladder configuration
top view
APV25(th inned to 100µm)
zylon ribcooling pipe
DSSDRohacellKapton
zylon rib
APV25 cooling pipe
3-layer kapton hybrid
integrated fanout(or: second metal)
DSSD
single-layer flex wrapped to p-side
11Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Present Activities – Belle II R&D
Full readout chain to DAQ• To be designed and built by HEPHY• Prototypes exist for all stages
Origami module
Repeater box
FADC+PROC VME
Tim e [ns]
Sig
nal [
e]
AP V25 shaper output
6 sam p led data
used fo r h it tim e reconstruction
0 50 100 150 200 250 300
0
5000
10000
15000
20000
25000
30000
tpeak
S peak
Data processing and hit time finding (~3ns RMS)
in FPGA firmware
12Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Present Activities – Outreach
• Animated LHC model + light queue = animated LHC wall poster
• Will be ready for the “Lange Nacht der Forschung” (Long night of research) outreach event, 7 November 2009
+ =
13Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Timeline of Papers, Talks and Posters
0
2
4
6
8
10
12
14
16
2003 2004 2005 2006 2007 2008 2009
Other Papers
Belle Talks+Posters
Belle Papers
CMS Talks+Posters
CMS Papers
14Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Future Plans• Belle II
– Production of full silicon tracker (together with semiconductor group) and its complete readout chain
• CMS– Trigger: Development of Global Trigger for CMS upgrade
– Tracker: Upgrade of Pixel-FED, stacked modules for L1 track trigger
• Outreach– New, improved spark chamber for our exhibitions
• Generic (motivated by Belle II and CMS)– Fast serial links
– FPGA design & simulation, embedded programming
15Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Some Objects Made by Us
CMS – Analog Optohybrid
CMS – Pixel-FED
Belle II – Origami Module
Outreach – Spark ChamberCMS – Global Trigger
Belle II – Repeater
16Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Backup Slides
17Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Completed Projects – LHC2008 Exhibition
LED-animated3D-LHC
model
GR
ID g
lob
e (
live
dat
a)
CMSOptohybrid
mobile
Light queue(data transfer from
CMS to GRID)
18Markus Friedl21 Sept 2009
Electronics 1Electronics 2Machine Shop
Present Activities – Belle II R&D
Origami chip-on-sensor module