21-07-0335-00-0000-wgsession22_opening_notes.ppt september 2007 vivek gupta, chair, 802.21slide 1...

26
September 2007 Vivek Gupta, Chair, 802.21 Slide 1 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary Vivek Gupta [email protected]

Upload: merilyn-powers

Post on 06-Jan-2018

217 views

Category:

Documents


3 download

DESCRIPTION

WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, Slide 3 IEEE Meeting Server Details External website: Local: Meeting website: Meeting website: During meetings post documents at local server Get DCNs from Chair:

TRANSCRIPT

Page 1: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 1

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

IEEE 802.21Session #22Big Island, HawaiiOpening Plenary

Vivek [email protected]

Page 2: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 2

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

WG OfficersOffice OfficerChair Vivek GuptaVice Chair Michael WilliamsSecretary Xiaoyu LiuEditor Qiaobing Xie802.11 Liaison David Hunter802.16 Liaison Peretz FederIETF Liaison Yoshihiro Ohba

• The WG has 69 voting members as of this meeting

Page 3: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 3

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

IEEE 802.21Meeting Server Details

External website: http://www.ieee802.org/21

Local: Meeting website: http://802server/21 Meeting website: http://10.128.0.11/21

During meetings post documents at local serverGet DCNs from Chair:

Page 4: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 4

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Session Time and Location

Monday Tuesday Wednesday Thursday

AM-1 Joint Opening Plenary

MRPM SG 802.21 WG (Joint TGu)

MRPM SG

AM-2 802.21 WG 802.21 WG 802.21 WG

PM-1 802.21 WG 802.21 WG Security SG 802.21 WG

PM-2 Security SG 802.21 WG Security SG 802.21 WG

Eve - IMT-Advanced Social -

Location: Hilton Waikola – Kohala-3

Page 5: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 5

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Attendance• Electronic Attendance ONLY• Electronic Attendance

– http://ieee802.facetoface-events.com/groups/802.21/attendance.php– http://newton.events.ieee.org/– Enter your personal information and profile– Mark attendance during every session

• Total number of 802.21 WG sessions: 14 • 11 sessions for 75% attendance to be counted towards WG voting

membership• Room reserved for evening sessions:

– 7:30 – 9:30 pm or later in case we need to use it• All attendance records on the 802.21 website

– Please check the attendance records for any manual errors

Page 6: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 6

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Voting Membership• 802.21 Voting Membership described in

– DCN#: 21-06-0075-02-0000• Maintenance of Voting Membership

– Two Plenary sessions out of four consecutive Plenary sessions on a moving window basis

– One out of the two Plenary session requirement could be substituted by an Interim session

Page 7: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 7

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Voting Membership• Reciprocal Voting Rights• Attendance credit policy with other 802 WG

– 802.16 - only during Joint LMSC Plenary sessions– 802.20 - both during Interim and Joint LMSC Plenary

sessions – To get credit for attendance in the above WG meetings

send email to the Chair with a copy to Secretary

Page 8: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 8

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Miscellaneous Meeting Logistics• Breaks

– 802.21 WG would break as follows:• AM Coffee break: 10:00-10:30 am• Lunch:12.00 noon until 1.00 pm• PM Coffee break: 3:00 – 3:30 pm

• Wednesday Evening Social– 6.30 pm - 9.00 pm

http://ieee802.face2face-events.com/wireless/attendee.htmlComplimentary drinks: 6:30 – 7:30 PM

Page 9: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 9

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Registration and Media Recording• Each Attendee must provide contact information and

pay conference fee• Conference fee has to be paid through the

registration desk at the hotel or through sponsor• Failure to pay conference fee results in loss of credit

for voting rights• Photography not permitted unless approved by WG

Chair• Audio taping of IEEE 802.21 meetings is NOT

allowed• Media – Press and Analyst briefings

– Only the 802.21 WG Chair and WG Vice-Chair are allowed to give verbal statements/interviews to the media on behalf of the IEEE 802.21 working group

Page 10: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 10

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Membership & Anti-Trust• Individual membership

– In all IEEE standards meetings, membership is by individual, hence you do not represent a company or organization.

• Anti-Trust laws– The Anti-Trust laws forbid the discussion of

prices within our meetings.

Page 11: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 11

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

The IEEE-SA strongly recommends that at each WG meeting the Chair or a designee:

– Show slides #1 through #5 of this presentation– Advise the WG attendees that:

• The IEEE’s patent policy is consistent with the ANSI patent policy and is described in Clause 6 of the IEEE-SA Standards Board Bylaws;

• Early identification of patent claims which may be essential for the use of standards under development is encouraged;

• There may be Essential Patent Claims of which the IEEE is not aware. Additionally, neither the IEEE, the WG, nor the WG chair can ensure the accuracy or completeness of any assurance or whether any such assurance is, in fact, of a Patent Claim that is essential for the use of the standard under development.

– Instruct the WG Secretary to record in the minutes of the relevant WG meeting: • That the foregoing information was provided and the five slides were shown; • That the chair or designee provided an opportunity for participants to identify patent

claim(s)/patent application claim(s) and/or the holder of patent claim(s)/patent application claim(s) that the participant believes may be essential for the use of that standard;

• Any responses that were given, specifically the patent claim(s)/patent application claim(s) and/or the holder of the patent claim(s)/patent application claim(s) that were identified (if any) and by whom.

• It is recommended that the WG chair review the guidance in the Standards Companion on inclusion of potential Essential Patent Claims by normative reference.

Note: WG includes Working Groups, Task Groups, and other standards-developing committees.

Page 12: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 12

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Highlights of the IEEE-SA Standards Board Bylaws on Patents in Standards

– Participants have a duty to tell the IEEE if they know (based on personal awareness) of potentially Essential Patent Claims they or their employer own

– Participants are encouraged to tell the IEEE if they know of potentially Essential Patent Claims owned by others• This encouragement is particularly strong as the third party may not be a participant in the standards process

– Working Group required to request assurance– Early assurance is encouraged– Terms of assurance shall be either:

• Reasonable and nondiscriminatory, with or without monetary compensation; or,• A statement of non-assertion of patent rights

– Assurances• Shall be provided on the IEEE-SA Standards Board approved LOA form• May optionally include not-to-exceed rates, terms, and conditions• Shall not be circumvented through sale or transfer of patents• Shall be brought to the attention of any future assignees or transferees• Shall apply to Affiliates unless explicitly excluded• Are irrevocable once submitted and accepted• Shall be supplemented if Submitter becomes aware of other potential Essential Patent Claims

– A “Blanket Letter of Assurance” may be provided at the option of the patent holder– A patent holder has no duty to perform a patent search– Full policy available at http://standards.ieee.org/guides/bylaws/sect6-7.html#6

Slide #1

Page 13: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 13

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

6.2 Policy

IEEE standards may be drafted in terms that include the use of Essential Patent Claims. If the IEEE receives notice that a [Proposed] IEEE Standard may require the use of a potential Essential Patent Claim, the IEEE shall request licensing assurance, on the IEEE Standards Board approved Letter of Assurance form, from the patent holder or patent applicant. The IEEE shall request this assurance without coercion.

The Submitter of the Letter of Assurance may, after Reasonable and Good Faith Inquiry, indicate it is not aware of any Patent Claims that the Submitter may own, control, or have the ability to license that might be or become Essential Patent Claims. If the patent holder or patent applicant provides an assurance, it should do so as soon as reasonably feasible in the standards development process. This assurance shall be provided prior to the Standards Board’s approval of the standard. This assurance shall be provided prior to a reaffirmation if the IEEE receives notice of a potential Essential Patent Claim after the standard’s approval or a prior reaffirmation. An asserted potential Essential Patent Claim for which an assurance cannot be obtained (e.g., a Letter of Assurance is not provided or the Letter of Assurance indicates that assurance is not being provided) shall be referred to the Patent Committee.

A Letter of Assurance shall be either:

a) A general disclaimer to the effect that the Submitter without conditions will not enforce any present or future Essential Patent Claims against any person or entity making, using, selling, offering to sell, importing, distributing, or implementing a compliant implementation of the standard; or

b) A statement that a license for a compliant implementation of the standard will be made available to an unrestricted number of applicants on a worldwide basis without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination. At its sole option, the Submitter may provide with its assurance any of the following: (i) a not-to-exceed license fee or rate commitment, (ii) a sample license agreement, or (iii) one or more material licensing terms.

IEEE-SA Standards Board Bylaws on Patents in Standards

Slide #2

Page 14: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 14

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Copies of an Accepted LOA may be provided to the working group, but shall not be discussed, at any standards working group meeting.

The Submitter and all Affiliates (other than those Affiliates excluded in a Letter of Assurance) shall not assign or otherwise transfer any rights in any Essential Patent Claims that are the subject of such Letter of Assurance that they hold, control, or have the ability to license with the intent of circumventing or negating any of the representations and commitments made in such Letter of Assurance.

The Submitter of a Letter of Assurance shall agree (a) to provide notice of a Letter of Assurance either through a Statement of Encumbrance or by binding any assignee or transferee to the terms of such Letter of Assurance; and (b) to require its assignee or transferee to (i) agree to similarly provide such notice and (ii) to bind its assignees or transferees to agree to provide such notice as described in (a) and (b).

This assurance shall apply to the Submitter and its Affiliates except those Affiliates the Submitter specifically excludes on the relevant Letter of Assurance.

If, after providing a Letter of Assurance to the IEEE, the Submitter becomes aware of additional Patent Claim(s) not already covered by an existing Letter of Assurance that are owned, controlled, or licensable by the Submitter that may be or become Essential Patent Claim(s) for the same IEEE Standard but are not the subject of an existing Letter of Assurance, then such Submitter shall submit a Letter of Assurance stating its position regarding enforcement or licensing of such Patent Claims. For the purposes of this commitment, the Submitter is deemed to be aware if any of the following individuals who are from, employed by, or otherwise represent the Submitter have personal knowledge of additional potential Essential Patent Claims, owned or controlled by the Submitter, related to a [Proposed] IEEE Standard and not already the subject of a previously submitted Letter of Assurance: (a) past or present participants in the development of the [Proposed] IEEE Standard, or (b) the individual executing the previously submitted Letter of Assurance.

IEEE-SA Standards Board Bylaws on Patents in Standards

Slide #3

Page 15: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 15

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

The assurance is irrevocable once submitted and accepted and shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal.

The IEEE is not responsible for identifying Essential Patent Claims for which a license may be required, for conducting inquiries into the legal validity or scope of those Patent Claims, or for determining whether any licensing terms or conditions are reasonable or non-discriminatory.

Nothing in this policy shall be interpreted as giving rise to a duty to conduct a patent search. No license is implied by the submission of a Letter of Assurance.

In order for IEEE’s patent policy to function efficiently, individuals participating in the standards development process: (a) shall inform the IEEE (or cause the IEEE to be informed) of the holder of any potential Essential Patent Claims of which they are personally aware and that are not already the subject of an existing Letter of Assurance, owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents; and (b) should inform the IEEE (or cause the IEEE to be informed) of any other holders of such potential Essential Patent Claims that are not already the subject of an existing Letter of Assurance.

IEEE-SA Standards Board Bylaws on Patents in Standards

Slide #4

Page 16: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 16

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Other Guidelines for IEEE WG Meetings

• All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws.

• Don’t discuss the interpretation, validity, or essentiality of patents/patent claims.

• Don’t discuss specific license rates, terms, or conditions.– Relative costs, including licensing costs of essential patent claims, of different technical approaches may be

discussed in standards development meetings.

• Technical considerations remain primary focus

• Don’t discuss fixing product prices, allocation of customers, or dividing sales markets.

• Don’t discuss the status or substance of ongoing or threatened litigation.

• Don’t be silent if inappropriate topics are discussed… do formally object.---------------------------------------------------------------

If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at [email protected] or visit http://standards.ieee.org/board/pat/index.html

See IEEE-SA Standards Board Operations Manual, clause 5.3.10 and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details.

This slide set is available at http://standards.ieee.org/board/pat/pat-slideset.ppt

Slide #5

Page 17: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 17

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Copyright• Under the current US copyright law — the

author of information is deemed to own the copyright from the moment of creation

• The IEEE Bylaws require copyright of all material to be held by the IEEE– Must consult with IEEE for re-use of copyright

material• The IEEE Standards accomplishes transfer

of copyright ownership through the Project Authorization Request (PAR) process

Page 18: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 18

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

IEEE SA News• Changes to the IEEE Standards Association

Operations Manual and Standards Board Bylaws– http://standards.ieee.org/board/pro/2006changes.pdf

• Changes to the IEEE-SA Standards Board Bylaws and IEEE-SA Standards Board Operations Manual (July - December 2006) including affiliation declarations– http://standards.ieee.org/resources/index.html#guides

Page 19: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 19

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

New Members• New Member Count =

Page 20: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 20

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Summary of Completed Work• Draft Specification (P802-21-D01) confirmed in May 2005• WG Letter Ballot Completed in July 2007• Initiated Sponsor Ballot in Aug 2007

– ~ 60% Approval, 650 Comments

• Requirements submitted to ITU through 802.18 for IMT-Advanced

• Interaction with other 802 groups and other SDOs– 802.16: MIH solution incorporated in 802.16g in Nov 2005– 802.11: MIH solution incorporated in 802.11u in Sep 2006– 3GPP: Requirements for IS Accepted at SA2#52 in May-2006, Concept of

Information Service accepted at SA2# 58 in Orlando

• Two New Study Groups– Security– Multi-Radio Power Conservation Management

Page 21: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 21

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Objectives for the September Meeting• Complete SB Comment Resolution

– Technical Comment Resolution– Discuss submitted contributions

• Study Group Activities– Security Signaling during Handovers– Multi-radio Power Conservation Management

• Interaction with other 802 groups and external SDOs– Joint session with 802.11u on Wed at 8:00 AM– 3GPP next steps discussion

• Next Steps on IMT-Advanced

Page 22: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 22

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Revised 802.21 Timeline (Jan 2007)

• IEEE 802.21 ECSG formed – March 2003• IEEE 802.21 WG formed – March 2004• Requirements development – September 2004• Call for Proposals – October 2004• Harmonized Single Proposal Confirmed by the WG – May 2005• Ongoing WG Comment Resolution started – July 2005• WG Comment Resolution completed – January 2006• Start of WG Letter Ballot – March 2006• Start of IEEE 802 Sponsor Ballot –July-07• IEEE 802 Draft Standard submitted to RevCom – March 2008• Ongoing Interaction with Other Standards Organization (3GPP,

3GPP2, IETF, 802.11, 802.16, 802.3) - adoption of it depends on the timeline of work items within these groups

Page 23: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 23

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

October 2007 Ad hoc Meeting• Motion the 802.21 WG to hold an ad hoc

meeting if required in October 2007

– Moved By: Marc– Seconded By: Qiaobing

– Yes: 13– No: 03– Abstain: 08

– Result: Motion passes

From July 2007 San Francisco Meeting

Page 24: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 24

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Future Sessions - 2007

• Plenary: Nov 11th – 16th,2007, Atlanta– Co-located with all 802 groups

Page 25: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 25

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Future Sessions - 2008• Interim: Jan 13th – 18th , 2008 (Taipei, Howard Plaza Hotel)

– Meeting co-located with all 802 groups • Plenary: March 16th – 21st ,2008, Orlando, Florida

– Co-located with all 802 groups• Interim: May 11th – 16th , 2008 (Jacksonville)

– Meeting co-located with 802.11/15/18/19/20/22• Plenary: July 13th – 18th,2008, Denver, Colorado

– Co-located with all 802 groups• Interim: Sept 7th – 12th ,2008, (Minneapolis ??)

– Meeting co-located with 802.11/15/18/19/20/22• Plenary: Nov 9th – 14th,2008, Dallas, TX

– Co-located with all 802 groups

Page 26: 21-07-0335-00-0000-WGsession22_Opening_Notes.ppt September 2007 Vivek Gupta, Chair, 802.21Slide 1 IEEE 802.21 Session #22 Big Island, Hawaii Opening Plenary

September 2007

Vivek Gupta, Chair, 802.21Slide 26

21-07-0335-00-0000-WGsession22_Opening_Notes.ppt

Future Sessions - 2009• Interim: Jan ????

– Meeting co-located with 802.11/15/18/19/20/22• Plenary: March Vancouver/Rome (Which one??)

– Co-located with all 802 groups• Interim: May ????

– Meeting co-located with 802.11/15/18/19/20/22• Plenary: July ????

– Co-located with all 802 groups• Interim: Sept ????

– Meeting co-located with 802.11/15/18/19/20/22• Plenary: Nov ????

– Co-located with all 802 groups