    BHEL

    Established in 1964. Engaged in design, engineering, manufacture, construction, testing,

    commissioning and servicing of a wide range of products and services for

    the core sectors of the economy, viz. Power, Transmission, Industry,

    Transportation, Renewable Energy, Oil & Gas and Defense.

    It has 15 manufacturing divisions, two repair units, four regional offices,eight service centre, eight overseas offices and 15 regional centre and

    currently operate at more than 150 project sites across India and abroad.

    Workforce of over 49,000 employees

    Vision: A global engineering enterprise providing solutions for a better

    tomorrow. Mission: Providing sustainable business solutions in the fields of energy,

    industry & infrastructure.

  • 7/31/2019 206_232

    2/7

    Project1: Supply of Onshore Drilling Rigs (ONGC)

    Valued at over Rs.7,740 Million

    The order envisages manufacture and supply of 6 numbers state-of-

    the-art 2000 HP onshore drilling rigs with AC drives.

    BHEL has established facilities and a dedicated group of expert

    engineers for manufacture, refurbishment and up gradation of onshore

    drilling rigs/rig equipment.

    The mechanical equipment will be manufactured by BHELs Hyderabad

    plant, while the electrical equipments will be manufactured by the

    companys Bhopal plant.

    BHEL has supplied 84 rigs so far, of which 71 rigs have been supplied to

    ONGC and 13 to Oil India Limited (OIL).

    For ONGC, BHEL has also successfully carried out refurbishment and up

    gradation of 33 onshore drilling rigs & is presently in the process of

    completing it for 7 more.

  • 7/31/2019 206_232

    3/7

    Project 2: Setting up a 300 MW Thermal Power Plant

    in Visakhapatnam ( Abhijeet Projects Limited )

    Valued at Rs.6,300 Million

    The contract envisages design, engineering, manufacture, supply,

    erection, testing and commissioning of Boilers, Steam Turbines and

    Turbo-Generators along with state-of-the-art Controls & Instrumentation

    (C&I) and other associated auxiliaries for 300 MW Thermal Power Plant

    in Visakhapatnam.

  • 7/31/2019 206_232

    4/7

    Project 3: Installation of 160 MW Combined Cycle

    Power Plant

    (Rajasthan Rajya Vidyut Utpadan Nigam Limited )

    Valued at Rs.3800 Million

    BHELs scope of work in this contract envisages design, engineering,

    manufacture, supply, erection and commissioning of the Main Plant &

    equipment for the Gas-based power project comprising one Frame 9E Gas

    Turbine with Generator, one Heat Recovery Steam generator, one

    Steam Turbine Generator and Associated Auxiliaries with state-of-the-art Controls & Instrumentation (C&I) system.

    The equipment for the project will be supplied by BHELs Hyderabad,

    Trichy and Bangalore plants, while BHELs Power Sector Northern

    Region will undertake the job of erection and commissioning of the

    equipment. BHEL which has Coal-based Thermal sets up to 1,000 MW rating has

    introduced new rating Thermal sets of 150 MW, 270 MW, 300 MW, 525

    MW and 600 MW, in addition to 250 MW and 500 MW sets in the sub-

    critical range in order to meet customer demand.

    Tender document t3.pdf

    http://localhost/var/www/apps/conversion/current/tmp/scratch26070/t3.pdfhttp://localhost/var/www/apps/conversion/current/tmp/scratch26070/t3.pdf
  • 7/31/2019 206_232

    5/7

    Project4: Supply and installation of ESP package for

    2x660MW Supercritical Thermal Power Project (NTPC)

    The order for the Electrostatic Precipitator (ESP) package has been placedon BHEL by NTPC Limited for the supercritical Solapur STPP-II in

    Maharashtra, being set up under the Mega Power Project Policy of the

    Government of India.

    BHELs scope of work in the contract involves design, engineering,

    manufacture, supply and erection & commissioning of the complete

    Electrostatic Precipitator package.

    The ESP shall be manufactured at BHELs Ranipet plant while the

    High Voltage Rectifier Transformers will be supplied by the companys

    Jhansi plant. BHELs Power Sector Western Region will be responsible

    for erection and commissioning of the ESP.

    Tender document t4.pdf

    http://localhost/var/www/apps/conversion/current/tmp/scratch26070/t4.pdfhttp://localhost/var/www/apps/conversion/current/tmp/scratch26070/t4.pdf
  • 7/31/2019 206_232

    6/7

    Project 5: 500 MW thermal power plant in M.P (NTPC)

    Valued at Rs.11,430 Million

    The contract envisages setting up a 1x500 MW thermal powergenerating unit at NTPCs Vindhyachal Super Thermal Power Station

    (STPS), in Madhya Pradesh.

    On commissioning of the unit, 12 million units of electricity will be

    added to the grid of the power deficit state M.P. every day.

    BHELs scope of work in the contract envisages design, engineering,manufacture, supply and erection & commissioning of Steam

    Generator and Steam Turbine Generator along with associated

    Auxiliaries and state-of-the-art Controls & Instrumentation.

    The equipment for the project will be manufactured at BHELs Trichy,

    Ranipet, Haridwar, Hyderabad, Bangalore and Bhopal Plants, while thecompanys Power Sector Western Region will be responsible for

    erection and commissioning of the equipment.

    Project synopsis t5.pdf

    http://localhost/var/www/apps/conversion/current/tmp/scratch26070/t5.pdfhttp://localhost/var/www/apps/conversion/current/tmp/scratch26070/t5.pdf
  • 7/31/2019 206_232

    7/7

    Project 6: 1,020 MW Hydroelectric Project in Bhutan

    (Punatsangchhu Hydroelectric Project Authority)

    Valued at Rs.9,500 Million The order envisages manufacture, supply, erection and commissioning

    of the electro-mechanical equipment for the 1,020 MW

    Punatsangchhu-II Hydroelectric project.

    For this contract, the six Francis Turbines and Generators of 170 MW

    each and associated equipment will be manufactured and supplied byBHELs Bhopal facility while the Control system will be manufactured and

    supplied by BHELs Electronic Division at Bangalore.

    Till now, the company has successfully executed three Hydro Projects

    there, 336 MW Chukha, 60 MW Kurichu and 1,020 MW Tala .These

    projects today account for nearly 95% of the total power generatingcapacity in Bhutan.