A Case Study Tips and Tricks learned while installing Primavera P6 and Contract Manager & Integration with PeopleSoft Financials 9.1 Session 205360 Presentation by: Paul Martin HB.Com., CGA, P.Mgr. Facilities Management Western University Primavera Installation Tips and Tricks and Integration with PeopleSoft

Upload: p6academy

Post on 09-Aug-2015

17 views

Category:

Business


0 download

TRANSCRIPT

Page 1: 205360 integration with peoplesoft

A Case Study

Tips and Tricks learned while installing Primavera P6 and Contract

Manager & Integration with PeopleSoft Financials 9.1

Session 205360

Presentation by:

Paul Martin HB.Com., CGA, P.Mgr.

Facilities Management

Western University

Primavera – Installation Tips and Tricks and

Integration with PeopleSoft

Page 2: 205360 integration with peoplesoft
Page 3: 205360 integration with peoplesoft

This presentation will :

1) Present background information on Western University

Canada projects.

2) Western’s Goals and Plan to install Primavera

3) Results & Lessons learned

4) Tips and Tricks

5) Integration with PeopleSoft

6) Questions

Page 4: 205360 integration with peoplesoft

•Research Intensive University

• 35,000+ Students

• 3500+ Staff and Faculty

• Operating Budget - $555 M

• Research Budget - $208 M

• Located in London, Ontario, Canada

Western University Organization

Page 5: 205360 integration with peoplesoft

Campus Facilities

Richard Ivey School of Business (under construction)

University College ca. 1920

Page 6: 205360 integration with peoplesoft

Campus Geography

Main campus - 155

hectares/380 Acres

Land Holdings – 480

Hectares/1175 Acres

15 KM (9.5 Miles) Roadway

93 Buildings

9 Residences/ almost 5000

beds

Growing

Page 7: 205360 integration with peoplesoft

Annual Projects

• 200 – 300 capital & Infrastructure projects

• $10,000 to $3 Million

• Infrastructure, Classroom and Lab enhancements

• 10 – 15 medium projects

• $5 to $15 Million

• Renovations, Major Infrastructure

• 4 – 5 major projects

• $15 to $100 million

• New Building

• Major retrofit old buildings to new standards

• $150 to $300 million budget

Page 8: 205360 integration with peoplesoft

Staffing Levels

Internal staff

• 20 Project coordinators, Managers and Engineers

• 100 Trades persons (includes 6 person project crew)

• 5 Design persons

External

• 30 to 40 General contractors

• 20 to 35 Consultants and Architects

Page 9: 205360 integration with peoplesoft

PeopleSoft Environment

• PeopleSoft 9.1• Modules – GL, AP, PO, Billing, A/R, Grants, Travel

Expense, Project Costing, Program Management

• One Business Unit

• Chartfields used – Fund, Department, Project and

Account

• Commitment Control and Control Budgets in Track only

setting

• PeopleTools – 8.51.09

Page 10: 205360 integration with peoplesoft

Western’s Goals and Plan to Install

Primavera

Page 11: 205360 integration with peoplesoft

The Goals

• Run all capital projects in Primavera

•Integration to Primavera Contract Management (CM)

to PeopleSoft

•Ensure GL $ = Project Costing $ = Primavera P6 $

•Quick implementation (less than 1 year)

•No customization

Page 12: 205360 integration with peoplesoft

The Plan

• Use an implementation Partner with a good track

record

•Map business process – Industry best practices

•Prototype strategic projects

•Increase number of Projects as prototype proves

concept sound

Page 13: 205360 integration with peoplesoft

Results of Western’s implementation of

Primavera

Page 14: 205360 integration with peoplesoft

The Results

• Integration Partner selected - SAR Associates Inc

•Business Process Mapped

•Primavera running in eight (8) months with 10 strategic

projects

•No customizations

•Core team trained & external consultants using the

product.

•Training done by SAR on site at Western

•Dashboard in P6 running for all major projects four (4)

months after go live

Page 15: 205360 integration with peoplesoft

Western’s P6 Dashboard

Page 16: 205360 integration with peoplesoft

Western’s Business Map

Page 17: 205360 integration with peoplesoft

Lesson Learned

•Implementation partner must have knowledge of

construction rules in your operational area

•Start mapping business process early

•Leave more time to deal with Finance and integration

•Dedicated team required and direct input from user(s)

of the process

•Clearly define your definition of project measurement

•Change management a must

Page 18: 205360 integration with peoplesoft

Tips and Tricks

Page 19: 205360 integration with peoplesoft

Tips and Tricks

•Select a White Knight to lead the project

•You can never Communicate to much

•Get external consultants involved in the testing

Page 20: 205360 integration with peoplesoft

Tips and Tricks

• Be firm all project coordinators and managers will use

the system

•Train people what they need to know

when they need it

•Buy UPK – User Productivity Kit

Page 21: 205360 integration with peoplesoft

UPK

Page 22: 205360 integration with peoplesoft

Integration with PeopleSoft

Page 23: 205360 integration with peoplesoft

Integration

•CM to PeopleSoft Financials

•Purchase Orders

•Vouchers

•PeopleSoft to Primavera CM

•Non-A/P journals (internal charges)

•View to see cheque detail on vouchers

Page 24: 205360 integration with peoplesoft

Questions

Page 25: 205360 integration with peoplesoft

Contact Information

•Paul Martin H.B.COM.,CGA, P.Mgr.

•Director Business Operation

•Facilities Management

•Western University Canada

[email protected]