LA Metro – Success
of A Program
Management
Information
System
By: Julie Owen
![Page 2: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/2.jpg)
LA Metro Background
2
3rd largest public transportation system in US
Most populous county in US
88 incorporated cities
Service area covers 1,433 mi²
Transportation planner, designer
builder, operator
Worst traffic delay in the US annual delay
per traveler
![Page 3: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/3.jpg)
What is Measure R?
3
Sales tax measure approved in 2008
$40B in transportation upgrades
30 year program, 550,000 new jobs
Rail network expansion with airport connections
Add carpool lanes, build freeway connectors
Construct sound walls along freeways
Local street improvements
![Page 4: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/4.jpg)
Expectations
4
Measure R Largest Transportation Program
Increased oversight and accountability
Potential aggressive / accelerated schedule
Maxes out Metro resources
Increased expectations for project delivery
Delivery strategy 4-5 project at a time
Current structure 1-2 projects at a time
Paradigm shift required
![Page 5: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/5.jpg)
Challenges
5
Outdated technologies
Manual data manipulation
Departmental Silo’s
Differing information
Challenging audit trails
Redundant data and disconnected
Computerized summary reports not available
Cost reporting in spreadsheets.
Untimely reporting of information
![Page 6: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/6.jpg)
PMIS Solution
6
Project Cost Management Project Schedule Management
•Industry Leader
•Advancing Technologies
•Integrates to Other Oracle
Products
•Deep project controls capabilities
•Integration expertise
•Excel-like, ease-of-use
•Built-in reporting
•Customizable
![Page 7: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/7.jpg)
PMIS Requirements
7
Centralized repository
Improved data accuracy
Automated financial data
Proactive / Timely project status
Enhance communication by removing silos
Provide project and program performance, current status, and forecast trends
Data available via web for stakeholders
BETTER QUALITY, MORE TIMELY!
![Page 8: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/8.jpg)
8
PMIS Solution Overview
![Page 9: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/9.jpg)
System Hosting
9
![Page 10: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/10.jpg)
Projects Organization in P6
10
Level 1 Master
Schedules for
Executive Level
reporting of Project
Status and Progress
Detailed Control
Level Schedules to
track contractor level
progress schedules
![Page 11: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/11.jpg)
Schedule Management
11
Summary
and
control
schedules
linked in
database
![Page 12: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/12.jpg)
EcoSys to P6 Schedule Integration
12
![Page 13: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/13.jpg)
Project Status Reports
13
Live
Link to
status
report
![Page 14: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/14.jpg)
Portfolio Level Dashboard
14
![Page 15: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/15.jpg)
Role Based Dashboard
15
![Page 16: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/16.jpg)
Contract Reporting
16
![Page 17: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/17.jpg)
EcoSys Solution Overview
17
![Page 18: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/18.jpg)
Controls Manager Dashboard
![Page 19: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/19.jpg)
Cost Engineer Dashboard
19
![Page 20: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/20.jpg)
20
CM13 Data Spreadsheet
![Page 21: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/21.jpg)
Actual vs. Budget FTE
21
![Page 22: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/22.jpg)
Realized Benefits
22
Data Integration
“Single version of the truth”
Data Quality & security
Elimination of duplicate data entry and manual compilation
Business rule enforcement with version control & audit trail
Reporting Efficiencies
Automated project status reports at the click of a button
Staff efficiencies from reduced manual logging and
redundant data entry
Document, Change Control, Cost Control
More time for proactive analysis; corrective action
Process Standardization
Management visibility into project /program status
![Page 23: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/23.jpg)
Lessons Learned
23
Define requirements, evaluate work processes
Need management sponsor, system facilitator, early adopter champions
Establish goals and communicate progress
Implement focus groups where needed
Process User groups schedule, document, change and cost control
Institutional data standards to facilitate summary and portfolio-level reporting
No institutional WBS and work around required
![Page 24: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/24.jpg)
Coming Soon – Public Facing Website
Interactive view of key project details. Data automated from EcoSys and P6 data sources. Includes approval controls for
publication. Data refreshed monthly.
24
![Page 25: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/25.jpg)
Coming Soon - Risk Tracking
Risk Tracking performed in P6 R8
25
![Page 26: 204710 la metro](https://reader031.vdocuments.mx/reader031/viewer/2022021922/58a5e3ea1a28abd14d8b6711/html5/thumbnails/26.jpg)
26
Analysis & Management Reports
Earned Value Analysis & Management Reports