2040 lrtp appendix l: cost feasible plan master project list

19
Appendix L Cost Feasible Plan Master Project List March 6, 2015

Upload: north-florida-tpo

Post on 26-Jul-2016

212 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

Appendix L

Cost Feasible Plan Master Project List

March 6, 2015

 

Master Project List

January 26, 2015

 

No. Facility ID From To County Improvement TypeProject Total      

(Year of Expenditure 

Millions of Dollars)

Project 

Completion

1 Chester Road 973 SR 200  SR A1A  Green Pine Road Nassau Add Lanes and Reconstruct $10.30  2018

2 CR 216 504 SR 100 US 17 Putnam Widen to 4 Lanes $0.78  2018

3 CR 218 1027 Cosmos Avenue Aster Avenue Clay Add Lanes and Reconstruct $7.50  2018

4 CR 220 Doctors Inlet Road 50 CR 209 Russell Road  Knight Boxx Road Clay Widen to 4 Lanes $0.81  2018

5 CR 739 Henley Road/ Russell Road  51 CR 218 CR 220 Doctors Inlet Road  Clay Widen to 4 Lanes $0.00  2018

6 Crawford Road  42 CR 121 Old Alabama Trail Nassau Road Reconstruction   $0.29  2018

7 Crawford Road  43 Old Alabama Trail US 301 SR 200 Nassau Road Reconstruction   $3.38  2018

8 Fort Gates Ferry Road 502 SR 19 Mount Royal Ave Putnam Road Reconstruction   $2.25  2018

9 Girvin Road  44 SR 10 Atlantic Boulevard   Ashley Melisse Duval Widen to 5 Lanes $5.74  2018

10 Girvin Road  45 Ashley Melisse Wonderwood Drive Duval Widen to 3 Lanes $7.36  2018

11 Holloway Road 3003 SR 100 Tinsley Road Putnam New Road Construction $1.26  2018

12 I‐10 at I‐95 27 US 17 Roosevelt Boulevard   San Marco Avenue Duval Interchange Improvement $118.77  2018

13 I‐10  3045 US 23 First Coast Expressway US 90 Duval Interchange Improvement $48.10  2018

13 I‐295 5 SR 9B SR 202 J.T. Butler Boulevard  Duval Add 4 Express Lanes $103.35  2018

14 I‐295 1022 Buckman Bridge I‐95 Duval Add Lanes and Reconstruct $2.03  2018

15 I‐295 3016 SR 134 103rd Street Firestone Road Duval Interchange Improvement $6.90  2018

16 I‐95 13 at I‐295/SR 9A North Phase 2 Duval Interchange Ramp (New) $165.02  2018

17 I‐95 64 at SR 102 Airport Road Duval Interchange Improvement $6.60  2018

18 I‐95 66 at Old St. Augustine Road Duval Interchange Improvement $0.90  2018

19 Kolas Ferry Road 3018 Murrhee Road  Kings Ferry Road Nassau Road Reconstruction   $3.64  2018

20 Lake Susan Road 55 Alachua County Line  CR 21 Putnam Widen to 4 Lanes $1.91  2018

21 Old St Augustine Road 53 Greenland Road / Loretto Road I‐295 Duval Widen to 6 Lanes $0.60  2018

22 Parramore Road Extension 970 Youngerman Circle Collins Road Duval New 2 Lane Road $5.00  2018

23 Pecan Park Road  3019 SR 243 JIA North Access Road I‐95 Duval Widen to 4 Lanes $11.83  2018

24 Radio Avenue 40 US 17 Minor Road Nassau New Road Construction $0.24  2018

25 SR 10 Atlantic Boulevard 105 SR 115 Arlington Expressway Monument Road Duval Intersection Improvement $6.84  2018

26 SR 10 US 90 Beaver Street 3004 CR 121 Brandy Branch Road Duval Add Right Turn Lane(s) $0.40  2018

27 SR 10 US 90 Beaver Street 3005 CR 119 Otis Road Duval Add Right Turn Lane(s) $0.19  2018

28 SR 109 University Boulevard 3012 Bartram Drive Cesery Boulevard Duval Intersection Improvement $3.80  2018

29 SR 115 Southside Boulevard 3014 Deercreek Club Road Duval Intersection Improvement $0.52  2018

30 SR 134 103rd Street 3015 at Firestone Road Duval Intersection Improvement $2.20  2018

31 SR 152 Baymeadows 3017 Freedom Commerce Parkway Country Day School Drive Duval Intersection Improvement $6.72  2018

32 SR 20 422 Alachua County Line SW 56th Avenue Putnam Add Lanes and Reconstruct $54.35  2018

33 SR 200 SR A1A 37 I‐95 Still Quarters Road Nassau Add Lanes and Reconstruct $33.02  2018

34 SR 200 SR A1A 38 Still Quarters Road Rubin Lane Nassau Add Lanes and Reconstruct $0.65  2018

35 SR 200 SR A1A 39 Rubin Lane CR 107 Scott Road Nassau Add Lanes and Reconstruct $32.54  2018

36 SR 202 J. T . Butler Boulevard 966 SR 115 Southside Boulevard Duval Interchange Improvement $1.83  2018

37 SR 21 Blanding Boulevard 32 CR 218 Black Creek Clay Add Lanes and Reconstruct $9.23  2018

38 SR 21 Blanding Boulevard 33 Branan Field Road  Old Jennings Road Clay Add Lanes and Reconstruct $15.28  2018

39 SR 21 Blanding Boulevard 34 CR 220 Long Bay Road Allie Murray Road Clay Add Lanes and Reconstruct $19.77  2018

40 SR 212 Beach Boulevard 3008 F.O.P. Way Ryar Road Duval Intersection Improvement $5.41  2018

41 SR 23 First Coast Expressway 17 Argyle Forest Boulevard I‐10 Clay/Duval New Road Construction $12.61  2018

42 SR 23 First Coast Expressway 18 Clay County Line Argyle Forest Boulevard Clay/Duval Widen to 6 Lane Limited Access Toll Road $7.21  2018

43 SR 243 JIA North Access Road 6 SR 102 Airport Road Pecan Park Road Duval New Road Construction $17.20  2018

Path Forward 2040 Long Range Transportation Plan

Master Project List

3/6/2015

Committed Road Capacity Projects

Master Project List 1 3/9/2015

No. Facility ID From To County Improvement TypeProject Total      

(Year of Expenditure 

Millions of Dollars)

Project 

Completion

Path Forward 2040 Long Range Transportation Plan

Master Project List

3/6/2015

44 SR 9B 4 US 1 Philips Highway I‐95 Duval New Road Construction $95.43  2018

45 SR 9B 3002 CR 2209 Duval County Line St. Johns New Road Construction $111.37  2018

46 SR 9B  126 South of SR 9A I‐95 Duval New Road Construction $0.05  2018

47 US 17 SR 15 54 Horse Landing Road Boundary Road in San Mateo Putnam Widen to 4 Lanes $17.65  2018

48 US 301 SR 200 23 South of Baldwin North of Baldwin Duval New 4 Lane Roadway ‐ Baldwin Bypass $37.18  2018

49 CR 218 ‐ Mimosa Avenue SR 21 Blanding Boulevard Clay Bike Path Trail $0.74  2018

50 Pine Avenue ‐ Old Fleming Grove Road Raggedy Point Road Clay Sidewalk $1.30  2018

51 FEC Railway ‐ RAILEX    Duval Rail Capacity $1.14  2018

52 North First Coast Flyer 2323 Downtown Jacksonville  I‐295 Duval Bus Rapid Transit  $33.50  2018

53 Sherry Drive ‐ Duval Sidewalk   $0.45  2018

54 Southeast First Coast Flyer 2391 Downtown Jacksonville  Avenues Mall  Duval Bus Rapid Transit $23.80  2018

55 SR 10 Atlantic Boulevard ‐ Duval Sidewalk $1.20  2018

56 SR 115 Arlington Expressway ‐ Duval Sidewalk $0.30  2018

57 Timuquan Trail ‐ Duval Bike Path Trail $2.00  2018

58 Bailey and Simmons Road ‐ Sports Complex Fletcher Avenue Nassau Sidewalk $1.30  2018

59 Main Street ‐ Junction Road End of Existing Trail Putnam Bike Path Trail $0.77  2018

60 St. Johns Avenue ‐ Sports Complex SR 19 Putnam Bike Path Trail $0.75  2018

61 River Sea Loop Trail ‐       St. Johns Bike Path Trail $0.95  2018

62 SR 13 ‐ Holley Berry Lane Roberts Road St. Johns Sidewalk $0.15  2018

63 SR 207 ‐ Armstrong Trail Heads    St. Johns Bike Path Trail $0.32  2018

64 SR 207 Hastings Trail Heads    St. Johns Bike Path Trail $0.37  2018

The committed projects have a completion date of 2018 and are included in the Transportation Improvement Plan or Adopted Work Program.

The table was prepared based on the Adopted Transportation Improvement Program as of February 1, 2015.

Committed Multimodal Projects

Atlantic Beach Elementary 

Intracoastal Waterway BridgeService RoadsKingsley Connector

Master Project List 2 3/9/2015

No. Facility ID From To County Improvement TypeProject Total      

(Year of Expenditure 

Millions of Dollars)

Project 

Completion

Path Forward 2040 Long Range Transportation Plan

Master Project List

3/6/2015

101 5th Street (McDuff Avenue Phase 3) 1019 Melson Avenue Huron Street Duval Widen to 3 Lanes $2.54 2019‐2020102 Alta Drive 2 Faye Road Burkit Lane Duval Widen to 5 Lanes $10.71 2019‐2020103 Alta Drive / Yellow Bluff Road  2 I‐295 New Berlin Road (north)  Duval Widen to 4 Lanes $29.44 2031‐2040104 Alta Drive Realignment 1 SR 105 Zoo Parkway North of New Berlin Road (south) Duval New 4 Lane Road $29.22 2026‐2030105 Amelia Island Parkway  704 South 14th Street CR 105A  Buccaneer Trail  Nassau Widen to 4 Lanes $8.47 2031‐2040106 Cahoon Road 1016 Lenox Avenue US 90  Beaver Street  Duval Reconstruct 2 Lanes $13.77 2021‐2025107 Cecil Field Connector 972 SR 23  First Coast Expressway Commerce Center Duval New 2 Lane Road $16.97 2021‐2025108 Chaffee Road 971 SR 228  Normandy Boulevard Crystal Springs Road Duval Widen to 5 Lanes $40.50 2021‐2025109 Cheswick Oak Avenue Extension 13 Oakleaf Plantation Parkway  Savannah Glen Boulevard Clay New 4 Lane Road $84.61 2031‐2040110 Clark Road Extension 1020 Broward Road Clark Road Duval New 3 Lane Road $1.22 2021‐2025111 Collins Road 930 Shindler Drive Rampart Road Duval Widen to 4 Lanes $6.41 2019‐2020112 Collins Road 932 Old Middleburg Road S Shindler Drive Duval Widen to 4 Lanes $4.96 2019‐2020113 Collins Road 15 SR 21  Blanding Boulevard Pine Verde Duval Widen to 4 Lanes $16.46 2019‐2020114 Concourse Loop Road  501 License Road  Amelia Concourse Nassau New 2 Lane Road $5.01 2031‐2040115 CR 105A Buccaneer Trail  705 South Fletcher Avenue  Canopy Drive Nassau Turn Lane Improvements $2.86 2031‐2040116 CR 218 1026 US 301 Cosmos Avenue Clay Widen to 4 Lanes $122.82 2031‐2040117 CR 218 1027 Cosmos Avenue Pine Tree Lane Clay Widen to 4 Lanes $23.53 2031‐2040118 CR 220  Doctors Inlet Road 33 SR 21  Blanding Boulevard Knight Boxx Road (end of four lane) Clay Widen to 4 Lanes $49.76 2021‐2025119 CR 220  Doctors Inlet Road 34 College Drive US 17 Clay Widen to 6 Lanes $64.77 2026‐2030120 CR 2209  813 CR 214 CR 208  St. Johns New 4 Lane Road $42.96 2031‐2040121 CR 2209  816 CR 208 SR 16 St. Johns New 4 Lane Road $32.52 2026‐2030122 CR 2209  815 SR 16 International Golf Parkway St. Johns New 4 Lane Road $29.23 2031‐2040123 CR 2209  812 International Golf Parkway SR 16 Connector  St. Johns New 6 Lane Road $19.08 2026‐2030124 CR 2209  811 SR 16 Connector SR 23 First Coast Expressway   St. Johns New 6 Lane Road $18.06 2021‐2025125 CR 2209  810 SR 23 First Coast Expressway   CR 210 St. Johns New 6 Lane Road $19.36 2019‐2020126 CR 305  818 CR 204 SR 206 St. Johns New 2 Lane Road $13.50 2021‐2025

127 Dixie Highway / Pellicer Lane 1025 SR 207 CR 214 King Street St. JohnsReconstruct 2 Lanes and Widen to add Sidewalks and Bike Lanes

$5.97 2021‐2025

128 Eastport Road  37 SR 105  Heckscher Drive  Pulaski Road  Duval Widen to 3 Lanes $14.28 2019‐2020129 Florida Boulevard 1021 Penman Road SR 10 Atlantic Boulevard Duval Widen to 3 Lanes $6.41 2019‐2020130 Hartley Road  49 SR 13  San Jose Boulevard  Old St. Augustine Road  Duval Widen to 3 Lanes $10.16 2019‐2020131 I‐10 402 Baker/Nassau County Line Nassau/Duval County Line Nassau Add 4 Express Lanes $8.55 2031‐2040132 I‐10 403 Nassau/Duval County Line US 301 Duval Add 4 Express Lanes $106.34 2031‐2040133 I‐10 406 US 301 SR 23 First Coast Expressway   Duval Add 4 Express Lanes $156.87 2026‐2030134 I‐10 432 I‐295 I‐95 Duval Add 4 Express Lanes $732.60 2031‐2040135 I‐10 454 at I‐295 Duval Modify Interchange $267.64 2031‐2040

136 I‐295 57 SR 13 San Jose Boulevard  W of US 17 Roosevelt Boulevard (Buckman Bridge) Duval Add 4 Express Lanes on Bridge $272.27 2026‐2030

137 I‐295 121 SR 113 Southside Connector  SR 202 J. T. Butler Boulevard Duval Add 4 Express Lanes $230.18 2021‐2025138 I‐295 407 I‐95 North Interchange Dames Point Bridge/ SR 105 Heckscher Drive Duval Add 4 Express Lanes $242.00 2031‐2040139 I‐295 408 North of Trout River I‐95 North Interchange Duval Add 4 Express Lanes $171.81 2031‐2040140 I‐295 409 South of US 1 New Kings Road   North of Trout River Duval Add 4 Express Lanes $54.63 2031‐2040141 I‐295 410 SR 134 103rd Street  I‐10   Duval Add 4 Express Lanes $215.24 2026‐2030142 I‐295 411 I‐10 South of US 1 New Kings Road Duval Add 4 Express Lanes $129.32 2031‐2040143 I‐295 431 US 17 Roosevelt Boulevard  SR 134 103rd Street  Duval Add 4 Express Lanes $103.33 2031‐2040144 I‐295 964 Duval Modify Interchange $44.66 2021‐2025145 I‐295 1022 I‐95 South SR 13 San Jose Boulevard (Buckman Bridge) Duval Add 2 Express Lanes $1.00 2019‐2020146 I‐295 1023 SR 202 J. T. Butler Boulevard  SR 9B Duval Add 2 Express Lanes $1.00 2019‐2020147 I‐95 418B International Golf Parkway St. John's/Duval County Line St. Johns Add 4 Express Lanes $139.18 2021‐2025148 I‐95 418A Duval/St. John's County Line I‐295 Duval Add 4 Express Lanes $85.37 2021‐2025

LRTP Road Capacity Projects

at US 17 Roosevelt Boulevard to Wells Road

Master Project List 3 3/9/2015

No. Facility ID From To County Improvement TypeProject Total      

(Year of Expenditure 

Millions of Dollars)

Project 

Completion

Path Forward 2040 Long Range Transportation Plan

Master Project List

3/6/2015

149 I‐95 434 I‐295 SR 202 J. T. Butler Boulevard Duval Add 4 Express Lanes $691.67 2031‐2040150 I‐95 433 SR 202 J. T. Butler Boulevard  SR 10 Atlantic Boulevard  Duval Add 4 Express Lanes $571.84 2031‐2040

151 I‐95 414 North of Fuller Warren Bridge SR 104 Dunn Avenue  Duval Add 4 Express Lanes  $10.00

This project is funded for PE only    2031‐

2040

152 I‐95 962 Duval Modify Interchange $43.14 2026‐2030153 I‐95 419 Duval Modify Interchange $90.60 2026‐2030154 I‐95 68 Duval Modify Interchange $8.25 2021‐2025155 Kernan Boulevard  73 SR 202 J. T. Butler Boulevard   Glen Kernan Parkway  Duval Widen to 6 Lanes $5.45 2019‐2020156 Kernan Boulevard  933 SR 10 Atlantic Boulevard McCormick Road Duval Widen to 6 Lanes $20.21 2019‐2020157 National Cemetery Road 1033 Lannie Road Arnold Road Duval New 2 Lane Road $34.51 2031‐2040158 New Berlin Road 948 Pulaski Road Yellow Bluff Road Duval Widen to 4 Lanes $86.62 2031‐2040159 New Berlin Road 949 Yellow Bluff Road Cedar Point Road Duval Widen to 4 Lanes $86.62 2031‐2040160 New World Avenue 1034 SR 23  First Coast Expressway Chaffee Road Duval New 2 Lane Road $6.84 2026‐2030161 Old Middleburg Road 1015 Argyle Forest Boulevard SR 134 103rd Street  Duval Widen to 4 Lanes $27.95 2019‐2020162 Pulaski Road 953 Eastport Road I‐295 Duval Widen to 4 Lanes $3.73 2019‐2020163 Race Track Road 827 St. Johns Parkway  Bartram Park Boulevard  St. Johns Widen to 4 Lanes $82.80 2031‐2040164 Race Track Road 828 Bartram Park Boulevard   Bartram Springs  St. Johns Widen to 4 Lanes $40.50 2021‐2025

165Ramona Boulevard (Crystal Springs Road Phase 2)

935 Hammond Boulevard Cahoon Road Duval Widen to 5 Lanes $3.27 2019‐2020

166 Ricker Road  934 Morse Avenue Old Middleburg Road  Duval Widen to 3 Lanes $11.37 2019‐2020167 San Pablo Road 1009 US 90 Beach Boulevard SR 10 Atlantic Boulevard Duval Widen to 3 Lanes $13.19 2019‐2020168 Shindler Drive 101 Collins Road  SR 134 103rd Street  Duval Widen to 3 Lanes $13.79 2019‐2020169 SR 10  Atlantic Boulevard   714 Duval Intersection Improvements $9.27 2021‐2025170 SR 10  Atlantic Boulevard   715 Duval Intersection Improvements $9.27 2021‐2025171 SR 10  Atlantic Boulevard   716 Duval Intersection Improvements $9.27 2021‐2025172 SR 104  Dunn Avenue   940 US 1 SR 15  New Kings Road  I‐295 Duval Widen to 4 Lanes $40.89 2026‐2030173 SR 104 Dunn Avenue  941 Old Kings Road US 23 New Kings Road Duval Intersection Improvements $5.57 2026‐2030

174 SR 115 Arlington Expressway 100 SR 109 University Boulevard  SR 10 Atlantic Boulevard Duval Widen to 6 Lanes  $20.00

This project is funded for PE only    2031‐

2040

175 SR 115 Lem Turner Road 74 I‐295 US 1 Kings Road  / Callahan Duval Widen to 4 Lanes  $1.00

This project is funded for PE only    2031‐

2040

176 SR 115 Mathews Bridge 79 US 1 Alt. MLK Jr. Parkway  SR 109 University Boulevard  Duval New 6 Lane Bridge and Transit  $40.00

This project is funded for PE only    2031‐

2040

177 SR 115 Southside Boulevard 102 US 1/SR 5  Philips Highway   I‐95 Ramps Duval Widen to 6 Lanes $1.54 2026‐2030178 SR 115 Southside Boulevard 103 SR 202 J. T. Butler Boulevard  US 90 Beach Boulevard Duval Widen to 6 Lanes  $19.29 2031‐2040179 SR 115 Southside Boulevard 960 Gate Parkway Hogan Road  Duval Intersection Improvements $27.35 2019‐2020180 SR 115 Southside Boulevard 967 Duval Underpass  $12.99 2031‐2040181 SR 115 Southside Boulevard 966 Duval Modify Interchange $57.86 2031‐2040182 SR 115 Southside Boulevard 968 Duval Intersection Improvements $4.46 2021‐2025183 SR 16 106 CR 218 SR 15A Oakridge Avenue Clay Widen to 4 Lanes $110.02 2031‐2040184 SR 16 908 US 17 Shands Bridge Clay Widen to 4 Lanes $72.50 2026‐2030185 SR 16 835 International Golf Parkway  South Francis Road  St. Johns Widen to 4 Lanes $6.66 2019‐2020186 SR 200 981 I‐95 Fernandina  Nassau Intersection Improvements $15.23 2031‐2040

at US 1/SR 15 MLK

at Airport Road  (SR 102) ‐ Phase 2

at Girvin Roadat Hodges Boulevard at San Pablo Boulevard 

at SR 152 Baymeadows Road at SR 202 J. T. Butler Boulevard at SR 10  Atlantic Boulevard  

at SR 115 Southside Boulevard 

Master Project List 4 3/9/2015

No. Facility ID From To County Improvement TypeProject Total      

(Year of Expenditure 

Millions of Dollars)

Project 

Completion

Path Forward 2040 Long Range Transportation Plan

Master Project List

3/6/2015

187 SR 200 SR A1A   703 Amelia Island Parkway Sadler Road  Nassau Widen to 6 Lanes $6.03 2026‐2030188 SR 207 113 I‐95 South Holmes Boulevard  St. Johns Widen to 6 Lanes $53.80 2031‐2040189 SR 21  Blanding Boulevard 114 SR 16 CR 215 Blanding Boulevard Clay Widen to 4 Lanes $47.25 2021‐2025190 SR 21  Blanding Boulevard 9 I‐295 Wilson Boulevard  Duval Widen to 6 Lanes $101.50 2021‐2025191 SR 21  Blanding Boulevard 957A Duval Intersection Improvements $7.02 2019‐2020192 SR 21  Blanding Boulevard 957B Duval Intersection Improvements $7.02 2019‐2020193 SR 21  Blanding Boulevard 957C Duval Intersection Improvements $7.02 2019‐2020194 SR 23 First Coast Expressway 8202 SR 21 Blanding Boulevard US 17 Clay New 4 Lane Road $698.08 2021‐2025195 SR 23 First Coast Expressway 8203 US 17 I‐95 New 6 Lane Road $949.48 2021‐2025196 SR 23 First Coast Expressway 840 St. Johns New Interchange $47.57 2021‐2025197 SR 23 First Coast Expressway 847 St. Johns New Interchange $56.70 2021‐2025198 SR 23 First Coast Expressway 841 St. Johns New Interchange $47.57 2021‐2025199 SR 23 First Coast Expressway 1013 Clay New Interchange $47.57 2021‐2025200 SR 23 First Coast Expressway 1012 Clay New Interchange $47.57 2021‐2025201 SR 23 First Coast Expressway 41 Clay New Interchange $56.70 2021‐2025202 SR 243 JIA North Access Road  701 SR 102 Airport Road  Pecan Park Road Duval Widen to 4 Lanes $43.16 2021‐2025203 SR 312 115 US 1/SR 5 Dixie Highway SR A1A St. Johns Widen to 6 Lanes $47.71 2031‐2040204 SR 313 831 SR 207 SR 16 St. Johns New 6 Lane Road $66.55 2019‐2020205 SR 313 832 SR 16 US 1 Dixie Highway St. Johns New 4 Lane Road $98.21 2026‐2030206 SR 9B 1024 Philips Highway (US 1) I‐295 St. Johns Add 2 Auxiliary Lanes $1.00 2019‐2020207 SR A1A 1008 St. Johns Intersection Improvements $4.24 2019‐2020208 SR A1A 800 Mickler Road   Palm Valley Road  St. Johns Widen to 4 Lanes $50.56 2026‐2030209 SR A1A 151 SR 116 Wonderwood Drive Naval Station Mayport North  Gate Duval Widen to 4 Lanes  $6.29 2031‐2040210 SR A1A 706 South Fletcher Avenue  Amelia Island Parkway Nassau Turn Lane Improvements  $7.11 2031‐2040211 SR A1A SR 200 427 Nassau Intersection Improvements $7.11 2031‐2040212 Trout River Boulevard 955 Old Kings Road US 23  New Kings Road  Duval Widen to 4 Lanes $10.49 2026‐2030213 US 1 SR 5 Philips Highway 94 SR 9B I‐295 Duval Widen to 6 Lanes  $15.23 2031‐2040214 US 1 SR 5 Philips Highway 95 I‐95 at the Avenues SR 202 J. T. Butler Boulevard Duval Widen to 6 Lanes  $15.23 2031‐2040215 US 1 SR 5 Philips Highway 845 St. Johns Modify Interchange $43.20 2021‐2025216 US 17 707 Nassau/Duval County Line Harts Road Nassau Intersection Improvements $4.72 2026‐2030217 US 17 1037 Governor Street Haven Avenue Clay Context Sensitive Solutions $31.04 2019‐2020218 US 17 Main Street 1017 New Berlin Road Pecan Park Road Duval Widen to 4 Lanes $111.51 2021‐2025219 US 17 Main Street 959 Duval New Interchange $28.89 2021‐2025220 US 17 Roosevelt Boulevard 16 Duval New Interchange $48.60 2021‐2025221 US 1B King Street 1029 US 1 Ponce de Leon Boulevard Avenida Menendez St. Johns Context Sensitive Solutions $9.14 2031‐2040222 US 1B San Marco Avenue 1030 Bridge of Lions SR 16 St. Johns Context Sensitive Solutions $17.26 2031‐2040223 US 301 SR 200   708 Nassau Intersection Improvements $14.53 2031‐2040224 US 90  Beaver Street  7 Cahoon Road McDuff Avenue Duval Widen to 4 Lanes $55.11 2021‐2025

at CR 2209at CR 16 Aat SR 16at CR 739at CR 218

at Red Cox/Coquina Rd

at US 17

at CR 210

at Eastport Roadat Collins Road 

at US 1 S Kings Road 

at I‐95

at Collins Road at SR 134 103rd Street at Cedar Hills Boulevard

Master Project List 5 3/9/2015

No. Facility ID From To County Improvement TypeProject Total      

(Year of Expenditure 

Millions of Dollars)

Project 

Completion

Path Forward 2040 Long Range Transportation Plan

Master Project List

3/6/2015

301 CSX 2239 Duval/Clay Capacity Upgrade for Commuter Rail $715.78 2031‐2040302 CSX 2240 Duval/Nassau Capacity Upgrade for Commuter Rail $661.43 2031‐2040

303East First Coast Flyer BRT (SR 115 and SR 212)

2385 Downtown Jacksonville SR A1A 3rd Street (Jacksonville Beach) Duval BRT $32.67 2019‐2020

304 North First Coast Flyer BRT (I‐95) 2326 Gateway Mall Jacksonville International Airport Duval BRT $16.47 2021‐2025$18.15 2031‐2040

305 Lenox Avenue CSS8 SR 228 Normandy Boulevard  SR 111 Cassat Avenue DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

306 Mandarin Road CSS10 SR 13 San Jose Boulevard Westberry Road DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

307 Merrill Road  CSS11 SR 109 University Boulevard Townsend DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

308Moncrief Road/Myrtle Avenue/8th 

StreetCSS12 US 17 Main Street Myrtle Avenue Duval

Mobility and Transit Accessibility Enhancements

Shown above 2031‐2040

309 Park Street CSS15 US‐17 I‐95 DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

310 Plummer Cove Road CSS17 Scott Mill Road SR 13 San Jose Boulevard DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

311 SR 104 Dunn Avenue CSS5 I‐295 I‐95 DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

312 SR 109 University Boulevard CSS18 St. Augustine Road  Fort Caroline Road  DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

313 SR 111 Cassat Avenue CSS4 SR 21 Blanding Boulevard  SR 111 Edgewood Avenue DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

314 SR 111 Edgewood Avenue CSS6 SR 111 Cassat Avenue US 17 North Main Street DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

315 SR 115 Arlington Expressway CSS1 SR 115 Mathews Bridge Regency DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

316 SR 115 Lem Turner Road CSS7 Downtown I‐295 DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

317 SR 21 Blanding Boulevard CSS3 Duval County Line/Clay County Line US‐17 DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

318 SR 228 Normandy Boulevard CSS14 I‐295 SR 111 Cassat Avenue DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

319 US 1 SR 15 New Kings Road CSS13 I‐95  US 1 MLK Parkway DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

320 US 1 SR 5 Philips Highway CSS16 I‐95 South SR 115 Southside Boulevard DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

321 US 17 Main Street CSS9 US 17 SR 228 State Street Clark Road DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

322 US 90 Beach Boulevard CSS2 I‐95 SR 115 Southside Boulevard DuvalMobility and Transit Accessibility Enhancements

Shown above 2031‐2040

323 Myrtle Avenue Underpass CSS19 DuvalLighting, Landscape, and Painting Enhancements

$0.06 2019‐2020

324 Park and Ride Lots Regional Regional Park and Ride Lots $12.34 2019‐2020325 Regional Transportation Center 2355 Duval $40.51 2021‐2026326 Soutel Transit Hub Duval Transit Hub $3.39 2019‐2020327 Southeast Commuter Rail (FEC) 2327 Downtown Jacksonville St. Augustine (St. John's County) Duval/St. Johns Commuter Rail $354.44 2031‐2040328 Southwest Commuter Rail (CSX) 2358 Downtown Jacksonville Green Cove Springs (Clay County) Duval/Clay Commuter Rail  $447.62 2031‐2040

329 Streetcar ‐ Downtown Sports Complex 2349 Downtown Jacksonville (Bay Street & Main Street) Sports Complex Duval Streetcar  $61.22 2026‐2030

Green Cove Springs to JacksonvilleJacksonville to Yulee

Mobility and Transit Accessibility Enhancements

at CSX

Downtown Multimodal Transit Intermodal Facility

LRTP Transit Capacity Projects

Master Project List 6 3/9/2015

No. Facility ID From To County Improvement TypeProject Total      

(Year of Expenditure 

Millions of Dollars)

Project 

Completion

Path Forward 2040 Long Range Transportation Plan

Master Project List

3/6/2015

330 Streetcar ‐ Five Points/Core/Brooklyn 2350 Downtown Jacksonville (Bay Street & Main Street) Five Points/Core/Brooklyn Duval Streetcar  $172.55 2031‐2040

331 Streetcar ‐ Riverside/Avondale 2352 Five Points Riverside (King Street) Duval Streetcar  $35.44 2021‐2025332 Streetcar ‐ Springfield 2354 FSCJ Station 8th Street/ Medical Complex Duval Streetcar  $93.73 2031‐2040333 SR A1A St. Johns Ferry 2331 Duval Ferry Slip Replacement $13.23 2021‐2025334 SR 21 Blanding Boulevard  2308 CR 218 Wells Road Clay BRT $50.63 2021‐2025335 SR 21 Blanding Boulevard  2386 Wells Road Downtown Duval/Clay BRT $22.99 2019‐2020336 SR 115 Southside Boulevard 2325 US 90 Beach Boulevard Avenues Mall  Duval BRT $24.30 2021‐2025337 SR 134 103rd Street 2321 SR 21 Blanding Boulevard SR 228 Normandy Boulevard Duval BRT $22.96 2021‐2025338 SR 228 Normandy Boulevard 2322 Downtown Jacksonville SR 134 103rd Street  Duval BRT $57.01 2026‐2030339 Transit Hubs  ‐ Countywide Duval $4.84 2019‐2020340 US 1 SR 5 New Kings Road 2323 Downtown Jacksonville Edgewood Avenue Duval BRT $16.09 2019‐2020

at St. Johns River

Master Project List 7 3/9/2015

No. Facility ID From To County Improvement TypeProject Total      

(Year of Expenditure 

Millions of Dollars)

Project 

Completion

Path Forward 2040 Long Range Transportation Plan

Master Project List

3/6/2015

401 CSX Transportation 2205 Duval Multi Modal Corridor $97.03 2031‐2040402 CSX Transportation 2258 Duval Multi Modal Corridor $11.77 2031‐2040403 CSX Transportation 2201 Clay Roadway Grade Separation $91.65 2021‐2025404 CSX Transportation 2200 Clay Roadway Grade Separation $91.65 2021‐2025405 CSX Transportation 2204 Duval Capacity Upgrade $11.13 2026‐2030406 CSX Transportation 2202 Duval Roadway Grade Separation $172.89 2026‐2030407 CSX Transportation 2203 Nassau Roadway Grade Separation $129.58 2026‐2030408 CSX Transportation 2242 Duval Roadway Grade Separation $78.66 2021‐2025409 CSX Transportation 2243 at US 301 / Crawford Road Nassau Roadway Grade Separation $46.83 2019‐2020410 Florida East Coast Railway 2260 Duval Roadway Grade Separation $97.03 2031‐2040411 Florida East Coast Railway 2259 Duval Roadway Grade Separation $128.26 2031‐2040412 Florida East Coast Railway 2207 Duval Capacity Upgrade $22.99 2021‐2025413 Florida East Coast Railway 2208 Duval Capacity Upgrade $12.59 2019‐2020414 Intermodal Logistics Center Regional Intermodal Logistics Center $156.72 2031‐2040415 Jacksonville Port Authority 1006 Duval New 2 Lane Bridge $194.99 2031‐2040416 Jacksonville Port Authority 2233 Duval Harbor Dredging $684.00 2019‐2020417 Norfolk Southern 2214 Duval Roadway Grade Separation $21.18 2019‐2020418 Port of Fernandina 2247 Nassau Access Improvements $7.02 2019‐2020

501 Bicycle and Pedestrian  ‐ Duval  $                      33.00 

502 Bicycle and Pedestrian  ‐ Regional  $                      26.79 

503 Bicycle and Pedestrian  ‐ Regional  $                      72.50 

504 TSM&O Projects  ‐ Regional  $                      34.21 

at Fernandina PortLRTP Boxed Funds

Duval County LOGT Boxed FundsThe total funding is 

shown. There is funding in each band.

Other State Highways Bicycle and Pedestrians Boxed Funds

Transportation Alternatives (TALU and TALT)

Transportation Management Area

at Norfolk Southern Railway (Near Simpson Yard)

Beaver Street Interlockingat SR 104 Busch Driveat SR A1A (SR 200) / Yuleeat US 301 (SR 200) / Baldwin

at Shad Roadat Sunbeam Road at Bowden Intermodal

at Jacksonville BridgeTo be determined

Spoil Island Connector BridgeHarbor Deepening

at Wells Road

LRTP Freight Projects

North Rail Corridors Phase 1North Rail Corridors Phase 2at SR 224 Kingsley Avenue

Master Project List 8 3/9/2015

Cost Feasible Plan Summary 

January 26, 2015

 

Total Project Costs in Year of Expenditure Millions of Dollars

No. Facility ID From To County Improvement Type Fund Source

Years 

2019‐

2020

Years 

2021‐

2025

Years 

2026‐

2030

Years 

2031‐

2040

22‐Year 

Total

101 5th Street (McDuff Avenue Phase 3) 1019 Melson Avenue Huron Street Duval Widen to 3 Lanes Duval LOGT $2.54 $2.54

102 Alta Drive 2 Faye Road Burkit Lane Duval Widen to 5 Lanes Duval LOGT $10.71 $10.71

103 Alta Drive / Yellow Bluff Road  2 I‐295 New Berlin Road (north)  Duval Widen to 4 Lanes Duval CIP $29.44 $29.44

104 Alta Drive Realignment 1 SR 105 Zoo Parkway North of New Berlin Road (south) Duval New 4 Lane Road Transportation Management Area $7.37 $21.85 $29.22

105 Amelia Island Parkway  704 South 14th Street CR 105A  Buccaneer Trail  Nassau Widen to 4 Lanes Nassau $8.47 $8.47

106 Cahoon Road 1016 Lenox Avenue US 90  Beaver Street  Duval Reconstruct 2 Lanes Duval LOGT $13.77 $13.77

107 Cecil Field Connector 972 SR 23  First Coast Expressway Commerce Center Duval New 2 Lane Road Duval LOGT $16.97 $16.97

108 Chaffee Road 971 SR 228  Normandy Boulevard Crystal Springs Road Duval Widen to 5 Lanes Duval LOGT $40.50 $40.50

109 Cheswick Oak Avenue Extension 13 Oakleaf Plantation Parkway  Savannah Glen Boulevard Clay New 4 Lane Road Transportation Management Area $28.75 $55.87 $84.61

110 Clark Road Extension 1020 Broward Road Clark Road Duval New 3 Lane Road Duval LOGT $1.22 $1.22

111 Collins Road 930 Shindler Drive Rampart Road Duval Widen to 4 Lanes Duval LOGT $6.41 $6.41

112 932 Old Middleburg Road S Shindler Drive Duval Widen to 4 Lanes Duval LOGT $4.96 $4.96

113 15 SR 21  Blanding Boulevard Pine Verde Duval Widen to 4 Lanes Duval LOGT $16.46 $16.46

114 Concourse Loop Road  501 License Road  Amelia Concourse Nassau New 2 Lane Road Nassau $5.01 $5.01

115 CR 105A Buccaneer Trail  705 South Fletcher Avenue  Canopy Drive Nassau Turn Lane Improvements Nassau $2.86 $2.86

116 CR 218 1026 US 301 Cosmos Avenue Clay Widen to 4 Lanes Clay $122.82 $122.82

117 1027 Cosmos Avenue Pine Tree Lane Clay Widen to 4 Lanes Clay $3.12 $8.25 $11.37

TRIP $3.12 $5.39 $3.65 $12.16

118 CR 220  Doctors Inlet Road 33 SR 21  Blanding BoulevardKnight Boxx Road (end of four lane)

Clay Widen to 4 Lanes Clay $49.76 $49.76

119 34 College Drive US 17 Clay Widen to 6 Lanes Clay $64.77 $64.77

120 CR 2209  813 CR 214 CR 208  St. Johns New 4 Lane Road St. Johns $42.96 $42.96

121 816 CR 208 SR 16 St. Johns New 4 Lane Road St. Johns $32.52 $32.52

122 815 SR 16 International Golf Parkway St. Johns New 4 Lane Road Transportation Management Area $29.23 $29.23

123 812 International Golf Parkway SR 16 Connector  St. Johns New 6 Lane Road Transportation Management Area $19.08 $19.08

124 811 SR 16 Connector SR 23 First Coast Expressway   St. Johns New 6 Lane Road Transportation Management Area $7.26 $10.80 $18.06

125 810 SR 23 First Coast Expressway   CR 210 St. Johns New 6 Lane Road Transportation Management Area $19.36 $19.36

126 CR 305  818 CR 204 SR 206 St. Johns New 2 Lane Road St. Johns $13.50 $13.50

301 CSX Transportation 2239 Green Cove Springs to Jacksonville Duval/Clay Capacity Upgrade for Commuter Rail SIS Multimodal $715.78 $715.78

302 2240 Jacksonville to Yulee Duval/Nassau Capacity Upgrade for Commuter Rail SIS Multimodal $661.43 $661.43

401 2205 North Rail Corridors Phase 1 Duval Multi Modal Corridor SIS Multimodal $97.03 $97.03

402 2258 North Rail Corridors Phase 2 Duval Multi Modal Corridor SIS Multimodal $11.77 $11.77

403 2201 at SR 224 Kingsley Avenue Clay Roadway Grade Separation SIS Multimodal $91.65 $91.65

404 2200 at Wells Road Clay Roadway Grade Separation SIS Multimodal $91.65 $91.65

405 2204 Beaver Street Interlocking Duval Capacity Upgrade SIS Multimodal $11.13 $11.13

406 2202 at SR 104 Busch Drive Duval Roadway Grade Separation SIS Multimodal $172.89 $172.89

407 2203 at SR A1A (SR 200) / Yulee Nassau Roadway Grade Separation SIS Multimodal $129.58 $129.58

408 2242 at US 301 (SR 200) / Baldwin Duval Roadway Grade Separation SIS Multimodal $64.53 $14.13 $78.66

409 2243 at US 301  / Crawford Diamond Nassau Roadway Grade Separation SIS Multimodal $46.83 $46.83

328 2358 Downtown Jacksonville Green Cove Springs (Clay County) Duval/Clay Commuter Rail SIS Multimodal $447.62 $447.62

127 Dixie Highway / Pellicer Lane 1025 SR 207 CR 214 King Street St. Johns TRIP $0.70 $2.28 $2.98

St. Johns $2.75 $2.75

303 East First Coast Flyer 2385 Downtown JacksonvilleSR A1A 3rd Street (Jacksonville Beach)

Duval BRT State and Federal Transit $24.50 $24.50

SR 115 and SR 212 Transit Local Match $8.17 $8.17

128 Eastport Road  37 SR 105  Heckscher Drive  Pulaski Road  Duval Widen to 3 Lanes Duval LOGT $14.28 $14.28

129 Florida Boulevard 1021 Penman Road SR 10 Atlantic Boulevard Duval Widen to 3 Lanes Duval LOGT $6.41 $6.41

410 Florida East Coast Railway 2260 at Shad Road Duval Roadway Grade Separation SIS Multimodal $97.03 $97.03

411 2259 at Sunbeam Road  Duval Roadway Grade Separation SIS Multimodal $128.26 $128.26

412 2207 at Bowden Intermodal Duval Capacity Upgrade SIS Multimodal $22.99 $22.99

413 2208 at Jacksonville Bridge Duval Capacity Upgrade SIS Multimodal $12.59 $12.59

327 2327 Downtown Jacksonville St. Augustine (St. John's County) Duval/St. Johns Commuter Rail State and Federal Transit $114.69 $151.14 $265.83

Transit Local Match $38.23 $50.38 $88.61

130 Hartley Road  49 SR 13  San Jose Boulevard  Old St. Augustine Road  Duval Widen to 3 Lanes Duval LOGT $10.16 $10.16

131 I‐10 402 Baker/Nassau County Line Nassau/Duval County Line Nassau Add 4 Express Lanes SIS $0.30 $1.10 $7.15 $8.55

Reconstruct 2 Lanes and Widen to add Sidewalks and Bike Lanes

Total Project Costs in Year of Expenditure Millions of Dollars

No. Facility ID From To County Improvement Type Fund Source

Years 

2019‐

2020

Years 

2021‐

2025

Years 

2026‐

2030

Years 

2031‐

2040

22‐Year 

Total

132 403 Nassau/Duval County Line US 301 Duval Add 4 Express Lanes SIS $3.10 $4.65 $98.58 $106.34

133 406 US 301 SR 23 First Coast Expressway   Duval Add 4 Express Lanes SIS $156.87 $156.87

134 432 I‐295 I‐95 Duval Add 4 Express Lanes SIS $3.09 $729.52 $732.60

135 454 at I‐295 Duval Modify Interchange Other State Highways $267.64 $267.64

136 I‐295 1022 I‐95 SouthSR 13 San Jose Boulevard (Buckman Bridge)

Duval Add 2 Express Lanes SIS $1.00 $1.00

137 57 SR 13 San Jose Boulevard W of US 17 Roosevelt Boulevard     (Buckman Bridge)

Duval Add 4 Express Lanes on Bridge SIS $7.38 $264.90 $272.27

138 431 US 17 Roosevelt Boulevard  SR 134 103rd Street  Duval Add 4 Express Lanes SIS $103.33 $103.33

139 410 SR 134 103rd Street  I‐10   Duval Add 4 Express Lanes SIS $16.09 $199.15 $215.24

140 411 I‐10 South of US 1 New Kings Road Duval Add 4 Express Lanes SIS $5.47 $123.86 $129.32

141 409 South of US 1 New Kings Road   North of Trout River Duval Add 4 Express Lanes SIS $3.12 $51.51 $54.63

142 408 North of Trout River I‐95 North Interchange Duval Add 4 Express Lanes SIS $1.16 $170.66 $171.81

143 407 I‐95 North InterchangeDames Point Bridge/ SR 105 Heckscher Drive

Duval Add 4 Express Lanes SIS $3.23 $238.78 $242.00

144 121 SR 113 Southside Connector  SR 202 J. T. Butler Boulevard Duval Add 4 Express Lanes SIS $11.86 $218.32 $230.18

145 1023 SR 202 J. T. Butler Boulevard  SR 9B Duval Add 2 Express Lanes SIS $1.00 $1.00

146 964 at US 17 Roosevelt Boulevard to Wells Road Duval Modify Interchange SIS $44.66 $44.66

147 I‐95 418B International Golf Parkway St. John's/Duval County Line St. Johns Add 4 Express Lanes SIS $139.18 $139.18

148 418A Duval/St. John's County Line I‐295 Duval Add 4 Express Lanes SIS $21.86 $63.52 $85.37

149 434 I‐295 SR 202 J. T. Butler Boulevard Duval Add 4 Express Lanes SIS $73.04 $618.63 $691.67

150 433 SR 202 J. T. Butler Boulevard  SR 10 Atlantic Boulevard  Duval Add 4 Express Lanes SIS $78.34 $493.50 $571.84

151 414 North of Fuller Warren Bridge SR 104 Dunn Avenue  Duval Add 4 Express Lanes  Other State Highways $100.00 $100.00

152 962 at SR 115 Southside Boulevard  Duval Modify Interchange Duval Southside Vision Plan $43.14 $43.14

153 419 at US 1/SR 15 MLK Duval Modify Interchange SIS $5.90 $84.70 $90.60

154 68 at Airport Road  (SR 102) ‐ Phase 2 Duval Modify Interchange SIS $8.25 $8.25

304 2326 Gateway Mall Jacksonville International Airport Duval North First Coast Flyer BRT State and Federal Transit $12.35 $12.35

Transit Local Match $4.12 $4.12

414 Intermodal Logistics Center Regional Intermodal Logistics Center SIS Multimodal $156.72 $156.72

415 Jacksonville Port Authority 1006 Spoil Island Connector Bridge Duval New 2 Lane Bridge SIS Multimodal $194.99 $194.99

416 2233 Harbor Deepening Regional Harbor Dredging SIS Multimodal $186.50 $186.50

Federal Seaport Grant $311.00 $311.00

JAXPORT $186.50 $186.50

155 Kernan Boulevard  73 SR 202 J. T. Butler Boulevard   Glen Kernan Parkway  Duval Widen to 6 Lanes Duval LOGT $5.45 $5.45

156 933 SR 10 Atlantic Boulevard McCormick Road Duval Widen to 6 Lanes Duval LOGT $20.21 $20.21

305 Lenox Avenue CSS8 SR 228 Normandy Boulevard  SR 111 Cassat Avenue DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00

306 Mandarin Road CSS10 SR 13 San Jose Boulevard Westberry Road DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00

307 Merrill Road  CSS11 SR 109 University Boulevard Townsend DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00

308 Moncrief Road/Myrtle Avenue/8th Street CSS12 US 17 Main Street Myrtle Avenue DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00

323 Myrtle Avenue Underpass CSS19 DuvalLighting, Landscape, and Painting Enhancements

Duval LOGT $0.06 $0.06

157 National Cemetery Road 1033 Lannie Road Arnold Road Duval New 2 Lane Road Transportation Management Area $34.51 $34.51

158 New Berlin Road 948 Pulaski Road Yellow Bluff Road Duval Widen to 4 Lanes Duval Mobility Plan $86.62 $86.62

159 949 Yellow Bluff Road Cedar Point Road Duval Widen to 4 Lanes Duval Mobility Plan $86.62 $86.62

160 New World Avenue 1034 SR 23  First Coast Expressway Chaffee Road Duval New 2 Lane Road Duval CIP $6.84 $6.84

417 Norfolk Southern 2214 at Norfolk Southern Railway (Near Simpson Yard) Duval Roadway Grade Separation SIS Multimodal $21.18 $21.18

161 Old Middleburg Road 1015 Argyle Forest Boulevard SR 134 103rd Street  Duval Widen to 4 Lanes Duval LOGT $27.95 $27.95

309 Park Street CSS15 US‐17 I‐95 DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00 $0.00

310 Plummer Cove Road CSS17 Scott Mill Road SR 13 San Jose Boulevard DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00 $0.00

Total Project Costs in Year of Expenditure Millions of Dollars

No. Facility ID From To County Improvement Type Fund Source

Years 

2019‐

2020

Years 

2021‐

2025

Years 

2026‐

2030

Years 

2031‐

2040

22‐Year 

Total

418 Port of Fernandina 2247 at Fernandina Port Nassau Access Improvements SIS Multimodal $7.02 $7.02

162 Pulaski Road 953 Eastport Road I‐295 Duval Widen to 4 Lanes Duval LOGT $3.73 $3.73

163 Race Track Road 827 St. Johns Parkway  Bartram Park Boulevard  St. Johns Widen to 4 Lanes St. Johns $75.66 $75.66

827 St. Johns Parkway  Bartram Park Boulevard  St. Johns Widen to 4 Lanes TRIP $7.15 $7.15

164 828 Bartram Park Boulevard   Bartram Springs  St. Johns Widen to 4 Lanes Transportation Management Area $40.50 $40.50

325 Regional Transportation Center 2355 Downtown Facility Duval Regional Transportation Center State and Federal Transit $30.38 $30.38

Transit Local Match $10.13 $10.13

165 Ramona Boulevard (Crystal Springs Road Phase 2) 935 Hammond Boulevard Cahoon Road Duval Widen to 5 Lanes Duval LOGT $3.27 $3.27

166 Ricker Road  934 Morse Avenue Old Middleburg Road  Duval Widen to 3 Lanes Duval LOGT $11.37 $11.37

167 San Pablo Road 1009 US 90 Beach Boulevard SR 10 Atlantic Boulevard Duval Widen to 3 Lanes Duval LOGT $13.19 $13.19

168 Shindler Drive 101 Collins Road  SR 134 103rd Street  Duval Widen to 3 Lanes Duval LOGT $13.79 $13.79

326 Soutel Transit Hub ‐ ‐ Duval Transit Hub Duval LOGT $3.39 $3.39

329 Streetcar ‐ Sports Complex 2349 Sports Complex Duval Streetcar  State and Federal Transit $45.91 $45.91

Transit Local Match $15.30 $15.30

330 Streetcar ‐ Five Points/Core/Brooklyn 2350 Five Points/Core/Brooklyn Duval Streetcar  State and Federal Transit $129.41 $129.41

Transit Local Match $43.14 $43.14

331 Streetcar ‐ Riverside/Avondale 2352 Duval Streetcar  State and Federal Transit $26.58 $26.58

Transit Local Match $8.86 $8.86

332 Streetcar ‐ Springfield 2354 FSCJ Station 8th Street/ Medical Complex Duval Streetcar  State and Federal Transit $70.29

Transit Local Match $23.43

169 SR 10  Atlantic Boulevard   714 at Girvin Road Duval Intersection Improvements Duval LOGT $9.27 $9.27

170 715 at Hodges Boulevard  Duval Intersection Improvements Duval LOGT $9.27 $9.27

171 716 at San Pablo Boulevard  Duval Intersection Improvements Duval LOGT $9.27 $9.27

172 SR 104  Dunn Avenue   940 US 1 SR 15  New Kings Road  I‐295 Duval Widen to 4 Lanes Duval Mobility Plan $40.89 $40.89

311 CSS5 I‐295 I‐95 DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00

173 941 Old Kings Road US 23 New Kings Road Duval Intersection Improvements Other State Highways $5.57 $5.57

312 SR 109 University Boulevard CSS18 St. Augustine Road  Fort Caroline Road  DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00

313 SR 111 Cassat Avenue CSS4 SR 21 Blanding Boulevard SR 111 Edgewood Avenue DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00

314 SR 111 Edgewood Avenue CSS6 SR 111 Cassat Avenue US 17 North Main Street DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00

174 SR 115 Arlington Expressway 100 SR 109 University Boulevard  SR 10 Atlantic Boulevard Duval Widen to 6 Lanes  Other State Highways $20.00 $20.00

315 CSS1 SR 115 Mathews Bridge Regency DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00

175 SR 115 Lem Turner Road 74 I‐295 US 1 Kings Road  / Callahan Duval/Nassau Widen to 4 Lanes  Transportation Management Area $1.00 $1.00

316 CSS7 Downtown I‐295 DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00

176 SR 115 Mathews Bridge 79 US 1 Alt. MLK Jr. Parkway  SR 109 University Boulevard  Duval New 6 Lane Bridge and Transit  Duval LOGT $40.00 $40.00

177 SR 115 Southside Boulevard 102 US 1/SR 5  Philips Highway   I‐95 Ramps Duval Widen to 6 Lanes Duval Southside Vision Plan $0.00 $0.00 $1.54 $0.00 $1.54

178 103 SR 202 J. T. Butler Boulevard  US 90 Beach Boulevard Duval Widen to 6 Lanes  Other State Highways $19.29 $19.29

179 960 Gate Parkway Hogan Road  Duval Intersection Improvements Duval LOGT $27.35 $27.35

180 967 at SR 152 Baymeadows Road  Duval Underpass  Other State Highways $12.99 $12.99

181 966 at SR 202 J. T. Butler Boulevard  Duval Modify Interchange Other State Highways $57.86 $57.86

182 968 at SR 10  Atlantic Boulevard   Duval Intersection Improvements Duval LOGT $4.46 $4.46

335 2325 US 90 Beach Boulevard Avenues Mall  Duval BRT State and Federal Transit $18.23 $18.23

Transit Local Match $6.08 $6.08

336 SR 134 103rd Street 2321 SR 21 Blanding Boulevard SR 228 Normandy Boulevard Duval BRT State and Federal Transit $17.22 $17.22

Transit Local Match $5.74 $5.74

183 SR 16 106 CR 218 SR 15A Oakridge Avenue Clay Widen to 4 Lanes Other State Highways $86.59 $23.43 $110.02

184 908 US 17 Shands Bridge Clay Widen to 4 Lanes Other State Highways $72.50 $72.50

185 835 International Golf Parkway  South Francis Road  St. Johns Widen to 4 Lanes Other State Highways $6.66 $6.66

186 SR 200 981 I‐95 Fernandina  Nassau Intersection Improvements Other State Highways $15.23 $15.23

187 SR 200 SR A1A   703 Amelia Island Parkway Sadler Road  Nassau Widen to 6 Lanes Nassau $6.03 $6.03

Downtown Jacksonville (Bay Street & Main Street)

Downtown Jacksonville (Bay Street & Main Street)

Total Project Costs in Year of Expenditure Millions of Dollars

No. Facility ID From To County Improvement Type Fund Source

Years 

2019‐

2020

Years 

2021‐

2025

Years 

2026‐

2030

Years 

2031‐

2040

22‐Year 

Total

188 SR 207 113 I‐95 South Holmes Boulevard  St. Johns Widen to 6 Lanes Other State Highways $53.80 $53.80

189 SR 21 Blanding Boulevard 114 SR 16 CR 215 Blanding Boulevard Clay Widen to 4 Lanes Other State Highways $47.25 $47.25

190 9 I‐295 Wilson Boulevard Duval Widen to 6 Lanes Duval LOGT $101.50 $101.50

317 CSS3 Duval County Line/Clay County Line US‐17 DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00 $0.00

191 957A at Collins Road  Duval Intersection Improvements Duval LOGT $7.02 $7.02

192 957B at SR 134 103rd Street  Duval Intersection Improvements Duval LOGT $7.02 $7.02

193 957C at Cedar Hills Boulevard Duval Intersection Improvements Duval LOGT $7.02 $7.02

334 2308 CR 218 Wells Road Clay BRT State and Federal Transit $37.97 $37.97

Transit Local Match $12.66 $12.66

335 2386 Wells Road Downtown Duval/Clay BRT State and Federal Transit $17.24 $17.24

Transit Local Match $5.75 $5.75

338 SR 228 Normandy Boulevard 2322 Downtown Jacksonville SR 134 103rd Street  Duval BRT State and Federal Transit $31.39 $11.37 $42.76

Transit Local Match $10.46 $3.79 $14.25

318 CSS14 I‐295 SR 111 Cassat Avenue DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00 $0.00

194 SR 23 First Coast Expressway 8202 SR 21 Blanding Boulevard US 17 Clay New 4 Lane Road Turnpike/Tolls $698.08 $698.08

195 8203 US 17 I‐95 Clay/St. John's New 6 Lane Road Turnpike/Tolls $949.48 $949.48

196 840 at I‐95 St. Johns New Interchange Turnpike/Tolls $47.57 $47.57

197 847 at CR 2209 St. Johns New Interchange Turnpike/Tolls $56.70 $56.70

198 841 at CR 16 A St. Johns New Interchange Turnpike/Tolls $47.57 $47.57

199 1013 at SR 16 Clay New Interchange Turnpike/Tolls $47.57 $47.57

200 1012 at CR 739 Clay New Interchange Turnpike/Tolls $47.57 $47.57

201 41 at CR 218 Clay New Interchange Turnpike/Tolls $56.70 $56.70

202 SR 243 JIA North Access Road  701 SR 102 Airport Road  Pecan Park Road Duval Widen to 4 Lanes Other State Highways $12.04 $31.12 $43.16

203 SR 312 115 US 1/SR 5 Dixie Highway SR A1A St. Johns Widen to 6 Lanes Other State Highways $47.71 $47.71

204 SR 313 831 SR 207 SR 16 St. Johns New 6 Lane Road Other State Highways $66.55 $66.55

205 832 SR 16 US 1 Dixie Highway St. Johns New 4 Lane Road Other State Highways $34.99 $63.22 $98.21

206 SR 9B 1024 Philips Highway (US 1) I‐295 Duval Add 2 Auxiliary Lanes SIS $1.00 $1.00

207 SR A1A 1008 at Red Cox/Coquina Rd St. Johns Intersection Improvements Other State Highways $4.24 $4.24

208 800 Mickler Road   Palm Valley Road  St. Johns Widen to 4 Lanes Other State Highways $50.56 $50.56

209 151 SR 116 Wonderwood DriveNaval Station Mayport North  Gate

Duval Widen to 4 Lanes  Other State Highways $6.29 $6.29

210 706 South Fletcher Avenue  Amelia Island Parkway Nassau Turn Lane Improvements  Other State Highways $7.11 $7.11

211 SR A1A SR 200 427 at US 17 Nassau Intersection Improvements Other State Highways $7.11 $7.11

333 SR A1A St. Johns Ferry 2331 Duval Ferry Slip Replacement Transportation Management Area $6.62 $6.62

Duval Ferry Slip Replacement FTA Passenger Ferry Grant $6.62 $6.62

212 Trout River Boulevard 955 Old Kings Road US 23  New Kings Road  Duval Widen to 4 Lanes Duval Mobility Plan $10.49 $10.49

319 US 1 SR 15 New Kings Road CSS13 I‐95  US 1 MLK Parkway DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00 $0.00

340 US 1 SR 5 New Kings Road 2323 Downtown Jacksonville Edgewood Avenue Duval BRT State and Federal Transit $12.07 $12.07

Transit Local Match $4.02 $4.02

213 US 1 SR 5 Philips Highway 94 SR 9B I‐295 Duval Widen to 6 Lanes  Other State Highways $15.23 $15.23

214 95 I‐95 at the Avenues SR 202 J. T. Butler Boulevard Duval Widen to 6 Lanes  Other State Highways $15.23 $15.23

215 845 at CR 210 St. Johns Modify Interchange Other State Highways $43.20 $43.20

320 CSS16 I‐95 South SR 115 Southside Boulevard DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00 $0.00

216 US 17 707 Nassau/Duval County Line Harts Road Nassau Intersection Improvements Nassau $4.72 $4.72

217 1037 Governor Street Haven Avenue Clay Context Sensitive Solutions Other State Highways $31.04 $31.04

321 CSS9 US 17 / US 17 SR 228 State Street Clark Road DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00

218 US 17 Main Street 1017 New Berlin Road Pecan Park Road Duval Widen to 4 Lanes Other State Highways $111.51 $111.51

219 959 at Eastport Road Duval New Interchange Duval LOGT $28.89 $28.89

220 US 17 Roosevelt Boulevard 16 at Collins Road  Duval New Interchange Duval LOGT $48.60 $48.60

221 US 1B King Street 1029 US 1 Ponce de Leon Boulevard Avenida Menendez St. Johns Context Sensitive Solutions Other State Highways $9.14 $9.14

Total Project Costs in Year of Expenditure Millions of Dollars

No. Facility ID From To County Improvement Type Fund Source

Years 

2019‐

2020

Years 

2021‐

2025

Years 

2026‐

2030

Years 

2031‐

2040

22‐Year 

Total

222 US 1B San Marco Avenue 1030 Bridge of Lions SR 16 St. Johns Context Sensitive Solutions Other State Highways $17.26 $17.26

223 US 301 SR 200   708 US 1 S Kings Road  Nassau Intersection Improvements Nassau $14.53 $14.53

224 US 90 Beaver Street  7 Cahoon Road McDuff Avenue Duval Widen to 4 Lanes Duval LOGT $55.11 $55.11

322 US 90 Beach Boulevard CSS2 I‐95 SR 115 Southside Boulevard DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $0.00 $0.00

501 Various Duval Bicycle and Pedestrian Improvements Duval LOGT $9.50 $23.50 $33.00

339 Duval Countywide Transit Hubs Duval LOGT $4.84 $4.84

305‐322 DuvalMobility and Transit Accessibility Enhancements

Duval LOGT $18.15 $18.15

324 Regional Park and Ride Lots State and Federal Transit $9.26 $9.26

Transit Local Match $3.09 $3.09

502 Bicycle and Pedestrian  (Boxed Funds) Regional Bicycle and Pedestrian  Other State Highways $1.82 $5.06 $5.96 $13.95 $26.79

503 Bicycle and Pedestrian Improvements Transportation Alternatives (TALT) $3.78 $9.38 $9.38 $18.76 $41.30

503 Transportation Alternatives (TALU) $2.80 $7.10 $7.10 $14.20 $31.20

504 TSM&O Projects  (Boxed Funds) Regional TSM&O Projects  Transportation Management Area $2.18 $6.61 $2.22 $23.20 $34.21