2039 content management for smartplant 3d with smartplant reference data · smartplant reference...
TRANSCRIPT
Intergraph 2008 – Experience The Power
Process, Power & Marine
SmartPlant Reference Data and the StandardDatabase for Content Management
Neeraj Saxena
21-22 August 2008
Hilton Opera Hotel
Hanoi, Vietnam
Intergraph 2008 – Experience The Power
Process, Power & Marine
August 26, 2008 – 2 –
Agenda
Companies and People Involved
The ET-200 document
Project Goals
Setting the Standards
Inputting Data
Presenting Data
Seeding Data to SP3D
Intergraph 2008 – Experience The Power
Process, Power & Marine
August 26, 2008 – 3 –
Companies and People Involved
Carlos Firmino
Fernando Costa
Flaviano Oliveira
Gilberto Silva e Sousa
Hernon Viana Filho
Luiz Salles Pereira
Roberto dos Santos
Rodrigo Brasiliense
Bruno Shimanoe
Felipe Correra
Frederico Buchner
Gabriel Severino
Marcos Akinaga
Paulo Andrade
Rodrigo Ito
Anton Schreibmueller
Anuja Mithantaya
Arun Kumar
Lakshmana Chintala
Pre Sales
Support
Marcelo Joaquim
Michael Buss
Intergraph 2008 – Experience The Power
Process, Power & MarineAbout Petrobras
Areas Value
Market valueUS$ 287,1 billion (R$
430 billion)
Service stations more than 8,000
Employees 68,931
Production platforms 109
Thermoelectric plants 10
Refinery 15
Average oil & natural gas production -april/2008
2,381,045 barrels/day
Investment in biofuels – 2008/2012 $1.5 billion
*Source: Reputation Institute 2007
Information available at www.petrobras.com
August 26, 2008 – 4 –
Intergraph 2008 – Experience The Power
Process, Power & Marine
August 26, 2008 – 5 –
About Petrobras
www.petrobras.com
Active in 27 countries
Intergraph 2008 – Experience The Power
Process, Power & Marine
August 26, 2008 – 6 –
About Sisgraph
www.sisgraph.com.br
History
Founded in 1980
Over 150 Employees
Average growth of 25% per year in the past 10 years
Relationship with Intergraph
Sales distributor of Intergraph PPM products in Brazil
Sales distributor of Intergraph SGI products in LatinAmerica
Intergraph sub contracted services provider forInternational Implementations Worldwide
Intergraph 2008 – Experience The Power
Process, Power & Marine
August 26, 2008 – 7 –
About Sisgraph
www. caxperts.com
History
Founded in May 2002
Focus on providing IT-solutions for the process andpower industry
World-wide activities, with projects in every continent
Relationship with Intergraph
Development Alliance with Intergraph, Huntsville
Consulting partners for many Intergraph offices allover the world.
Intergraph distributes CAXperts solutions in manyregions of the world where there is directrepresentation of Intergraph
Relationship with Sisgraph
Partners since 2007
Activities in SP Instrumentation SP3D and SPReference Data/SP Materials
Intergraph 2008 – Experience The Power
Process, Power & Marine
August 26, 2008 – 8 –
Project Basis: The ET-200
History
Technical Specification used foroffshore piping
Created in may 1985
Used in PDS since 1997 (PlatformP-19)
Contents
Service symbols, pressure ratingand piping
Piping material standardization
Reference standards
Branch connections tables
Fully tight valves
Valve Descriptions
Piping Material Descriptions
[...]
Intergraph 2008 – Experience The Power
Process, Power & Marine
August 26, 2008 – 9 –
1 – Provide Petrobras a reliable tool for SPEC managing
Work Harder
Project Goals
Work Smarter
Revision Control and the ET-200 managing will be made easier
Intergraph 2008 – Experience The Power
Process, Power & Marine
August 26, 2008 – 10 –
2 – Have SPRD become the single entry point of new materials in SP3D
Project Goals
Intergraph 2008 – Experience The Power
Process, Power & Marine
August 26, 2008 – 11 –
Setting the Standards
Intergraph´s Standard DataBase
Used as a starting point
At least 50% of total materialsavailable
Pre-configured Integration withSP3D
Further developments
New materials inserted, suchas a wide range of non-metallicmaterials
Partnership
These new developments havebeen made available forIntergraph´s usage in SDB
Intergraph 2008 – Experience The Power
Process, Power & Marine
August 26, 2008 – 12 –
Setting the Standards
Assuring the Standards
Concurrent projects will beseeded with the same data
This grants that once the datais sent back to Petrobras, thecorporate standards have beenfollowed
Updates will be made byPetrobras through ET-200revisions in SPRD
These revisions may then seedthe standards on new projects
Petrobras
Corporate Standards
Project A
Petrobras Standards
E P C
Project B
Petrobras Standards
E P C
Project Y
Petrobras Standards
E P C
Intergraph 2008 – Experience The Power
Process, Power & Marine
August 26, 2008 – 13 –
Inserting New Data
Heavy Use of Automation
“ I’m not a guy who believes in
manual data entry. Whenever
you have information available
in softcopies (Excel, text) let
me know and we think whether
we rather load them or not.”
Anton SchreibmuellerDirector
CAXperts Australia
Workload eased by using datafrom PCD files from PDS,customized by Petrobras in thepast
Intergraph 2008 – Experience The Power
Process, Power & Marine
August 26, 2008 – 14 –
Presenting the Data
Report Matching the ET-200
Report will be extracted in theET-200 standard format, fromSPMat interface
Will allow SPEC issuing toprojects from SPMat itself
Intergraph 2008 – Experience The Power
Process, Power & Marine
August 26, 2008 – 15 –
Seeding the SPECs to SP3D
Intergraph 2008 – Experience The Power
Process, Power & Marine
August 26, 2008 – 16 –
Workflow: SPRD to SP3D
First
Phase
Second
Phase
Third
Phase
SP3D TeamSPMat Team
SPMat Team
Intergraph 2008 – Experience The Power
Process, Power & Marine
SmartPlant Reference Data and the StandardDatabase for Content Management
Neeraj Saxena
21-22 August 2008
Hilton Opera Hotel
Hanoi, Vietnam