2020 year a look back at in review achievements & projects

4
A look back at notable numbers, achievements & projects in St. Peters 2020 Year in Review $24,160 (Dec. 2019-Nov. 2020) from residents to Senior Center’s Meals on Wheels program through Voluntary Utility Round Up Program—another record amount! • Salt River Road at Arrowhead Industrial Blvd. Improvements • Jungermann Road Bridge Replacements • Jungermann Road Safety Improvements • Spencer Road at Premier Pkwy. Intersection Improvements • Intersection Conflict Warning System – Mexico Rd. at Sierra Dr. • Traffic Signal Timing Updates (for better traffic flow) (Mexico from St. Peters Centre Blvd. to Belleau Creek/Knaust Rd.; Salt Lick Road; Jungermann from McClay Road to Walmart; Harvester Road; Mid Rivers Mall Drive from Ohmes Rd./Miralago Shore Dr. to Route 364; Spencer Road; and various standalone intersections) • 2,167 street signs replaced • 1,441,547 lineal feet of pavement marking • 116,147 square yards of asphalt pavement resurfaced (Major paving projects: Mid Rivers Mall Dr. from Mexico to McMenemy; Jungermann from Bartley St. to Willott; Mid Rivers Mall Dr. shoulder at Dye Club Dr.; City Hall parking lots) • 45,041 square yards of concrete pavement replaced (Major concrete projects: City Hall entrance repairs, island renovations and concrete stamping; atrium patio renovation and pathways behind City Hall; entrance patio and ADA sidewalk at Rec-Plex South ice rink entrance) • 10,737 lineal feet of curbs replaced • 130,295 lineal feet of crack seal material placed • 31,020 square feet of concrete sidewalks replaced ROAD IMPROVEMENTS: ROAD IMPROVEMENTS: DONATED: DONATED: INSPECTED: • 906 restaurants for food and health safety • 43 residential properties for mosquito control • 20,830 residential properties (proactive maintenance inspections) • 200 sewer laterals (new homes, sewer lateral repair program and follow-ups) • 37 miles of sanitary sewers • 34 stormwater quality best management practices inspections on commercial properties Continued on next page City of St. Peters, MO • Page 1 of 4 Learn how you can help at Learn how you can help at www.stpetersmo.net/Donate. www.stpetersmo.net/Donate.

Upload: others

Post on 22-Oct-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2020 Year A look back at in Review achievements & projects

A look back at notable numbers, achievements & projects in St. Peters

2020 Year in Review

$24,160 (Dec. 2019-Nov. 2020) from residents to Senior Center’s Meals on Wheels program through Voluntary Utility Round Up Program—another record amount!

• Salt River Road at Arrowhead Industrial Blvd. Improvements• Jungermann Road Bridge Replacements• Jungermann Road Safety Improvements• Spencer Road at Premier Pkwy. Intersection Improvements• Intersection Conflict Warning System – Mexico Rd. at Sierra Dr.• Traffic Signal Timing Updates (for better traffic flow)

(Mexico from St. Peters Centre Blvd. to Belleau Creek/Knaust Rd.; Salt Lick Road; Jungermann from McClay Road to Walmart; Harvester Road; Mid Rivers Mall Drive from Ohmes Rd./Miralago Shore Dr. to Route 364; Spencer Road; and various standalone intersections)

• 2,167 street signs replaced• 1,441,547 lineal feet of pavement marking

• 116,147 square yards of asphalt pavement resurfaced (Major paving projects: Mid Rivers Mall Dr. from Mexico to McMenemy; Jungermann from Bartley St. to Willott; Mid Rivers Mall Dr. shoulder at Dye Club Dr.; City Hall parking lots)

• 45,041 square yards of concrete pavement replaced (Major concrete projects: City Hall entrance repairs, island renovations and concrete stamping; atrium patio renovation and pathways behind City Hall; entrance patio and ADA sidewalk at Rec-Plex South ice rink entrance)

• 10,737 lineal feet of curbs replaced• 130,295 lineal feet of crack seal material placed• 31,020 square feet of concrete sidewalks replaced

ROAD IMPROVEMENTS:ROAD IMPROVEMENTS:

DONATED:DONATED:INSPECTED:• 9 06 restaurants for food and

health safety• 43 residential properties for

mosquito control• 20,830 residential properties

(proactive maintenance inspections)

• 200 sewer laterals (new homes, sewer lateral repair program and follow-ups)

• 37 miles of sanitary sewers• 34 stormwater quality best management practices

inspections on commercial properties

Continued on next page

City of St. Peters, MO • Page 1 of 4

Learn how you can help at Learn how you can help at www.stpetersmo.net/Donate.www.stpetersmo.net/Donate.

Page 2: 2020 Year A look back at in Review achievements & projects

370 LAKESIDE PARK: • 525 St. Peters Rotary Club Dog Park

memberships• 22,973 RV site nightly reservations*

• 5,365 equipment rentals*• 2,507 Archery Range day passes• 220 Archery Range memberships• 3,534 fishing/lake day passes • 73 fishing/lake annual passes*Indicates record number

PROP P STORMWATER PROJECTS COMPLETED*:• P-33 Hunters Valley Stormwater

Improvements• P-28 Jungermann Road Stream & Trail

Improvement (pictured)• P-24 Country Hills Phase 2 Storm Sewer

Improvements• P-21 Sun River Village / McClay Meadows

Stormwater Improvements*Funded with ½-cent stormwater/parks sales tax fund

PARK PROJECTS:• City Centre campus improvements

(landscaping, parking lots, front entrance, and courtyard)

• Laurel Park accessible fishing pier, pond renovations, and trail repairs

• 370 Lakeside Campground Dog Park for campers

• Water’s Edge Banquet Center island ceremony site

• Inclusive slide at Spencer Creek Park satellite playground

• Tot Lot Park basketball court resurfaced• City Centre Diamond 18 fencing for foul

ball protection

WELCOMED:119,474 Rec-Plex member check-ins (includes 17,876 SilverSneakers, 11,202 Renew Active & 204 Silver & Fit check-ins)

Organic Resources (Earth Centre)• 76,890 cubic yards of yard waste• 8,390 wet tons of biosolids• 872 Christmas trees• $146,753 in GOLD GROW biosolids

compost sales• $20,290 in mulch sales

Commodities (Recycle City)• 11,189 households recycled (Blue Cart Crew

single-family and apartment households)• 9.8 million pounds of recycled commodities sold• 2,869 pounds of holiday light strands• 29,120 pounds of shredded documents from

688 “Shred It & Forget It” customers

2020 Year in Review

TREES: • 20 lane miles of trees trimmed for right-of-

way clearance• 326 new trees planted• 140 dead or hazard trees removed• 104 new trees added to tree inventory• 12,224 total trees in Tree Inventory database

GOLF & BANQUETS: • 31,624 rounds of golf at

St. Peters Golf Club (despite closing 1 month due to COVID-19)

• 32 Banquets and 92 Hourly Rentals at Water’s Edge Banquet Center (despite closing 3 months due to COVID-19)

RECYCLED:

Jungermann Road Stream & Trail Project

City of St. Peters, MO • Page 2 of 4

Page 3: 2020 Year A look back at in Review achievements & projects

RECOGNIZED: • Named No. 13 Best Place to Live in

America and No. 1 in Missouri by Money Magazine

• Certificate of Achievement for Excellence in Financial Reporting and Distinguished Budget Award from Government Finance Officers Association

• Tree City USA designation (22nd consecutive year) and Tree City USA Growth Award (20th year) from National Arbor Day Foundation

FILLED:The tires of 264 vehicles withfuel-saving nitrogen

SAVED $2.6 Million:• $700,000 by refunding outstanding

bonds associated with road projects

• $1.9 million by refunding outstanding bonds associated with Rec-Plex projects

EXHIBITED:184 works of visual art submitted by 61 artists at Cultural Arts Centre

ISSUED:• 3,317 St. Peters Resident

Privilege Cards• 448 pavilion reservations• 37 City Centre Gazebo

reservations• 2,981 athletic field reservations

HELPED:• 34 families repair their homes*• 102 people with essential transportation needs*• 10 elderly or disabled families with lawn

mowing** Helped with Community Development Block Grant from

U.S. Department of Housing & Urban Development

TREATED:• 1.1 billion gallons of water for safe

consumption• 2.3 billion gallons of wastewater

SNOW REMOVAL:1,836 tons of salt placed for 14 snow/ice control events during winter 2019/2020

REPAIRED:• 85 water service lines ($170,121)• 66 sewer lateral lines ($432,045)

RESPONDED:1,681 Animal Control calls

COLLECTED:• 105,892 tons of waste processed

through Recycle City- 32,798 tons from St. Peters residents- 1,953 tons from Cottleville residents- 50,717 tons from commercial haulers- 20,424 tons from walk-ins

PERMITTED:• 634 residential building permits worth $22,144,682 – includes construction of

67 new single-family homes worth $14,078,892• 156 commercial building permits worth $166,761,535 – includes construction

of 12 new commercial buildings worth $123,717,090

CONNECTED:• Many people did business remotely with the City while social distancing

during the pandemic• 1.7 million web page views at www.stpetersmo.net• 3,000+ residents use STP COLLECTS mobile app for trash collection

(1,500+ downloaded the app in 2020)• New CitizenServe online application service for Licensing, Permitting,

Planning & Zoning, and Development Projects—www.stpetersmo.net/Apply

INMISSOURI

RENOVATED:Cultural Arts Centre restrooms, including accessibility updates

City of St. Peters, MO • Page 3 of 4

Page 4: 2020 Year A look back at in Review achievements & projects

Economic Development: 2020 in Review

Planned Development:• Chick Fil-A - Mid Rivers Mall Dr. & Suemandy Dr.• St. Charles County Ambulance District base house - Queensbrooke

Blvd. and Woodstone Dr. • Andy’s Custard - Mid Rivers Mall Dr., south of Mexico Rd.• Electro Savings Credit Union - Mid Rivers Mall Dr., south of St. Peters

Howell Rd.• QuikTrip rebuild - So. St. Peters Pkwy., east of Kisker Road• Discount Tire - So. St. Peters Pkwy., next to Fresh Thyme Market• Dollar Tree - So. St. Peters Pkwy., west of Fresh Thyme Market• Cheer St. Louis - Trade Center Dr.• Blackbird Motor Works - Mid Rivers Mall Dr. & Didion Dr. • Richline Motorsports - Veterans Memorial Pkwy. & Cambridgeshire• St. Peters Medical - urgent care, Sutters Mill Rd. & Jungermann Rd. • Teal Industries - medical marijuana manufacturing facility, Salt River

Rd., south of Arrowhead Industrial Blvd.

Notable Openings:• FedEx Ground* - 490,000-sq.-ft. distribution facility at Premier 370

Business Park, creating 1,200 jobs• Central States Manufacturing* - producer of metal roofing and

siding opened 53,600-sq.-ft. plant at Premier 370 Business Park, creating 88 jobs

• DMI* - logistics company opened in 375,000-sq.-ft. office/warehouse building in Premier 370 Business Park, creating 111 jobs

• Holiday Inn Express* - 4-floor hotel with 81 guest rooms on Veterans Memorial Pkwy., east of Richmond Center Blvd.

• St. Charles County Ambulance District* - new base house, Jungermann Rd. and Old Mill Pkwy.

• Gevers Paving* - Ecology Drive• Imo’s Pizza* - Mid Rivers Mall Dr., north of Mexico Rd.• Pappy’s BBQ - I-70 North Service Rd., Shoppes of Mid Rivers• Swade Cannabis Dispensary - Hospital Dr., west of Jungermann Rd.• Whistle Stop - boutique/gift shop, 301 Main Street• Dentists of St. Peters* - Mexico Rd., east of Mid Rivers Mall Dr.• Learning Express* - two locations: Queensbrooke Dr., east of

Jungermann Rd., and Florence Dr. at Montecito subdivision• Soapify Car Wash* - St. Peters Square*Indicates construction of new building(s) as part of opening

Expanding/Renovations:• 308-314 Mid Rivers Mall Drive - renovated with a new façade• Scandinavian Designs - furniture/home décor store renovating

former Toys R Us store for its new location at Mid Rivers Plaza• Mint Dispensary - medical marijuana dispensary renovating and

opening in former Bob Evans restaurant on Mid Rivers Mall Dr.• Lou Fusz Pre-Owned Vehicles - Executive Centre Pkwy., north of I-70 • Great Central Lumber - expanded on Ecology Dr.• Rush Truck Centers - expanded on Veterans Memorial Pkwy.• Napleton Automotive - renovated former Granada Cyclery location

on I-70 North Service Rd. (Granada moved to Mid Rivers Mall Dr.)• Complete Auto Body and Truck Repair - renovated, expanded and

moved into the former Kenworth building on I-70 North Service Rd.• Vet Stop - kennel/veterinarian renovated and moved into building

on Mexico Rd., east of Mid Rivers Mall Dr.• Meineke Car Care - renovated and expanded on Route 364• CertaPro Painters - converted home into office on Jungs Station Rd.

Residential Development:• Bold on Boulevard

- 272-unit apartment complex with amenities under construction in the Town Centre development on Executive Centre Parkway and St. Peters Centre Blvd

• Clarendale St. Peters - senior living community with mix of independent, assisted, and memory care units opened on Mexico Road, east of Mid Rivers Mall Dr.

• Village Pointe - 57 maintenance-free single-family homes on Mid Rivers Mall Drive, south of Mexico Rd., plus one commercial lot

• Meadowridge Apartments - 180 units in 3-story buildings with amenities, on Route 364, east of Robertridge Dr.

• Aspen Heights - 100 townhouses and amenities under construction on Central School Rd., west of Kisker Rd.

• Woodstone Apartments - 180 units planned south of South St. Peters Pkwy., east of Woodstone Dr., plus one commercial lot

• Reserve - 462-apartment development under construction on Route 364, east of Mid Rivers Mall Dr.

• St. Peters Senior Community - mix of independent, assisted, and memory care units planned for Woodstone Dr. and Old Highway 94

Under Construction:• Medline - 811,400-sq.-ft. distribution center in Premier 370 Business

Park—$47.5 million investment creating 150 jobs• St. Charles County Ambulance District - 141,562-sq.-ft.

administration, training & operations facility on Salt River Rd., east of Mid Rivers Mall Dr.

• Project Smile - 142,670-sq.-ft. office/warehouse facility, on Spencer Rd., north of Highway 370 in Premier 370 Business Park.

• QuikTrip - rebuilding at Willot Rd. and Mid Rivers Mall Dr.

Medline under construction at Premier 370 Business Park

Bold on Boulevard construction

DID YOU KNOW? Premier 370 Business Park has added 8,000 jobs to our local economy with more on the way!

City of St. Peters, MO • Page 4 of 4