2020 entry point schedule effective date: 04/17/2020 ... · this schedule may not include all...
TRANSCRIPT
ALLIANCE CITY PWSOH7600011
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658271EP001
Facility Name: ALLIANCE CITY
Effective Date: 04/17/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 4Facility Source: Surface Water
EP001
EP001
Sample daily when Chlorine Dioxideis applied.
CHLORITE - 1009 1
Sample daily when Chlorine Dioxideis applied.
CHLORINE DIOXIDE - 1008 1
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 1/31/2020Sample(s) Required between1 2/1/2020 and 2/29/2020Sample(s) Required between1 3/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 4/30/2020Sample(s) Required between1 5/1/2020 and 5/31/2020Sample(s) Required between1 6/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 7/31/2020Sample(s) Required between1 8/1/2020 and 8/31/2020Sample(s) Required between1 9/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 10/31/2020Sample(s) Required between1 11/1/2020 and 11/30/2020Sample(s) Required between1 12/1/2020 and 12/31/2020
Not RequiredRADIOLOGICALS
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 4/1/2020 and 6/30/2020 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 1/1/2020 and 1/31/2020Paired Sample Set Required between1 2/1/2020 and 2/29/2020Paired Sample Set Required between1 3/1/2020 and 3/31/2020Paired Sample Set Required between1 4/1/2020 and 4/30/2020Paired Sample Set Required between1 5/1/2020 and 5/31/2020Paired Sample Set Required between1 6/1/2020 and 6/30/2020Paired Sample Set Required between1 7/1/2020 and 7/31/2020Paired Sample Set Required between1 8/1/2020 and 8/31/2020Paired Sample Set Required between1 9/1/2020 and 9/30/2020Paired Sample Set Required between1 10/1/2020 and 10/31/2020Paired Sample Set Required between1 11/1/2020 and 11/30/2020Paired Sample Set Required between1 12/1/2020 and 12/31/2020
A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.
ALLIANCE CITY PWSOH7600011
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658271EP001/LT2001
Facility Name: ALLIANCE CITY
Effective Date: 04/17/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 4Facility Source: Surface Water
EP001
LT2001
Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1
Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. A week is definedas Sunday through Saturday.
*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.
ALLIANCE CITY PWSOH7600011
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658271LT2001
Facility Name: ALLIANCE CITY
Effective Date: 04/17/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 4Facility Source: Surface Water
LT200
LT2001
Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/29/2019 and 1/4/2020Sample(s) Required between1 1/12/2020 and 1/18/2020Sample(s) Required between1 1/26/2020 and 2/1/2020Sample(s) Required between1 2/9/2020 and 2/15/2020Sample(s) Required between1 2/23/2020 and 2/29/2020Sample(s) Required between1 3/8/2020 and 3/14/2020Sample(s) Required between1 3/22/2020 and 3/28/2020Sample(s) Required between1 4/5/2020 and 4/11/2020Sample(s) Required between1 4/19/2020 and 4/25/2020Sample(s) Required between1 5/3/2020 and 5/9/2020Sample(s) Required between1 5/17/2020 and 5/23/2020Sample(s) Required between1 5/31/2020 and 6/6/2020Sample(s) Required between1 6/14/2020 and 6/20/2020Sample(s) Required between1 6/28/2020 and 7/4/2020Sample(s) Required between1 7/12/2020 and 7/18/2020Sample(s) Required between1 7/26/2020 and 8/1/2020Sample(s) Required between1 8/9/2020 and 8/15/2020Sample(s) Required between1 8/23/2020 and 8/29/2020Sample(s) Required between1 9/6/2020 and 9/12/2020Sample(s) Required between1 9/20/2020 and 9/26/2020Sample(s) Required between1 10/4/2020 and 10/10/2020Sample(s) Required between1 10/18/2020 and 10/24/2020Sample(s) Required between1 11/1/2020 and 11/7/2020Sample(s) Required between1 11/15/2020 and 11/21/2020Sample(s) Required between1 11/29/2020 and 12/5/2020Sample(s) Required between1 12/13/2020 and 12/19/2020
Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.
ALLIANCE CITY PWSOH7600011
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ALLIANCE, CITY OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20203CHLORITE - 1009 1/1/2020 andSample(s) Required between 2/29/20203 2/1/2020 andSample(s) Required between 3/31/20203 3/1/2020 andSample(s) Required between 4/30/20203 4/1/2020 andSample(s) Required between 5/31/20203 5/1/2020 andSample(s) Required between 6/30/20203 6/1/2020 andSample(s) Required between 7/31/20203 7/1/2020 andSample(s) Required between 8/31/20203 8/1/2020 andSample(s) Required between 9/30/20203 9/1/2020 andSample(s) Required between 10/31/20203 10/1/2020 andSample(s) Required between 11/30/20203 11/1/2020 andSample(s) Required between 12/31/20203 12/1/2020 and
One sample at each of the following locations: near the first customer, at a location representative of the average residence time, and at alocation reflecting maximum residence time of the water in the distribution system. Consult Chlorine Dioxide plan approval for additionaldistribution requirements unique to your system.
Sample(s) Required between 1/31/202025TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202025 2/1/2020 andSample(s) Required between 3/31/202025 3/1/2020 andSample(s) Required between 4/30/202025 4/1/2020 andSample(s) Required between 5/31/202025 5/1/2020 andSample(s) Required between 6/30/202025 6/1/2020 andSample(s) Required between 7/31/202025 7/1/2020 andSample(s) Required between 8/31/202025 8/1/2020 andSample(s) Required between 9/30/202025 9/1/2020 andSample(s) Required between 10/31/202025 10/1/2020 andSample(s) Required between 11/30/202025 11/1/2020 andSample(s) Required between 12/31/202025 12/1/2020 and
Sample(s) Required between 1/31/202025TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202025 2/1/2020 andSample(s) Required between 3/31/202025 3/1/2020 andSample(s) Required between 4/30/202025 4/1/2020 andSample(s) Required between 5/31/202025 5/1/2020 andSample(s) Required between 6/30/202025 6/1/2020 andSample(s) Required between 7/31/202025 7/1/2020 andSample(s) Required between 8/31/202025 8/1/2020 andSample(s) Required between 9/30/202025 9/1/2020 andSample(s) Required between 10/31/202025 10/1/2020 andSample(s) Required between 11/30/202025 11/1/2020 and
ALLIANCE CITY PWSOH7600011
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ALLIANCE, CITY OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 12/31/202025TOTAL CHLORINE - 1000 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ALLIANCE, CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 TRACTOR SUPPLY 2520 W. STATE ST.
Dual Sample Required between 1/7/2020at: DS201DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2014/1/2020 andDual Sample Required between 7/7/2020at: DS2017/1/2020 andDual Sample Required between 10/7/2020at: DS20110/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ALLIANCE, CITY OF DISTRIBUTION Facility Class: CLASS 1DS202 16125 ARMOUR ST. NE
Dual Sample Required between 1/7/2020at: DS202DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2024/1/2020 andDual Sample Required between 7/7/2020at: DS2027/1/2020 andDual Sample Required between 10/7/2020at: DS20210/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ALLIANCE, CITY OF DISTRIBUTION Facility Class: CLASS 1DS203 VALERO GAS 3414 S. UNION AVE
Dual Sample Required between 1/7/2020at: DS203DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2034/1/2020 andDual Sample Required between 7/7/2020at: DS2037/1/2020 andDual Sample Required between 10/7/2020at: DS20310/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
ALLIANCE CITY PWSOH7600011
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ALLIANCE, CITY OF DISTRIBUTION Facility Class: CLASS 1DS204 HEGGY'S RESTAURANT 1300 W. STATE ST.
Dual Sample Required between 1/7/2020at: DS204DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2044/1/2020 andDual Sample Required between 7/7/2020at: DS2047/1/2020 andDual Sample Required between 10/7/2020at: DS20410/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ALLIANCE, CITY OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
BEACH CITY VILLAGE PWSOH7600212
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BEACH CITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BEACH CITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 601 SECOND AVE. SE, BEACH CITY
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
BEACH CITY VILLAGE PWSOH7600212
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BEACH CITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 11115 DOLPHIN AVE. SW, BEACH CITY
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BEACH CITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
BETH MOBILE HOME PARKOH7600312
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658274EP001
Facility Name: BETH MHP
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
BETH MOBILE HOME PARKOH7600312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BETH MOBILE HOME PARK DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BETH MOBILE HOME PARK DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
BETH MOBILE HOME PARKOH7600312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BETH MOBILE HOME PARK DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 6/30/202010LEAD - 1030 AND COPPER - 1022 1/1/2020 andSample(s) Required between 12/31/202010 7/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
BREWSTER VILLAGE PWSOH7600512
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658276EP001
Facility Name: BREWSTER PWS
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 2Facility Source: Ground Water
EP001
EP001
Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
BREWSTER VILLAGE PWSOH7600512
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BREWSTER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BREWSTER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
BREWSTER VILLAGE PWSOH7600512
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BREWSTER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BREWSTER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
CANAL FULTON CITY PWSOH7600912
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658278EP001
Facility Name: CANAL FULTON CITY OF
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
CANAL FULTON CITY PWSOH7600912
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CANAL FULTON,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20206TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20206 2/1/2020 andSample(s) Required between 3/31/20206 3/1/2020 andSample(s) Required between 4/30/20206 4/1/2020 andSample(s) Required between 5/31/20206 5/1/2020 andSample(s) Required between 6/30/20206 6/1/2020 andSample(s) Required between 7/31/20206 7/1/2020 andSample(s) Required between 8/31/20206 8/1/2020 andSample(s) Required between 9/30/20206 9/1/2020 andSample(s) Required between 10/31/20206 10/1/2020 andSample(s) Required between 11/30/20206 11/1/2020 andSample(s) Required between 12/31/20206 12/1/2020 and
Sample(s) Required between 1/31/20206TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20206 2/1/2020 andSample(s) Required between 3/31/20206 3/1/2020 andSample(s) Required between 4/30/20206 4/1/2020 andSample(s) Required between 5/31/20206 5/1/2020 andSample(s) Required between 6/30/20206 6/1/2020 andSample(s) Required between 7/31/20206 7/1/2020 andSample(s) Required between 8/31/20206 8/1/2020 andSample(s) Required between 9/30/20206 9/1/2020 andSample(s) Required between 10/31/20206 10/1/2020 andSample(s) Required between 11/30/20206 11/1/2020 andSample(s) Required between 12/31/20206 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CANAL FULTON,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
CANAL FULTON CITY PWSOH7600912
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CANAL FULTON,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CANAL FULTON,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
COUNTRY LAWN CENTEROH7601412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658282EP001
Facility Name: COUNTRY LAWN CENTER
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
COUNTRY LAWN CENTEROH7601412
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: COUNTRY LAWN CENTER DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: COUNTRY LAWN CENTER DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
COUNTRY LAWN CENTEROH7601412
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: COUNTRY LAWN CENTER DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
EAST CANTON VILLAGE PWSOH7601503
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EAST CANTON, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EAST CANTON, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
EAST CANTON VILLAGE PWSOH7601503
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EAST CANTON, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EAST CANTON, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
EAST SPARTA VILLAGE PWSOH7601612
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7662485EP002
Facility Name: VILLAGE OF EAST SPARTA NEW
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP002
EP002
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 7/1/2020 and 9/30/2020
EAST SPARTA VILLAGE PWSOH7601612
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EAST SPARTA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EAST SPARTA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
EAST SPARTA VILLAGE PWSOH7601612
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EAST SPARTA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EAST SPARTA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
FOHL VILLAGE MHPOH7601912
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658286EP001
Facility Name: FOHL VILLAGE MHP
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Sample(s) Required betweenRADIOLOGICALS 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
Sample for all the analytes listed below:
RADIUM-226 - 4020 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
FOHL VILLAGE MHPOH7601912
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: FOHL VILLAGE MHP DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: FOHL VILLAGE MHP DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
FOHL VILLAGE MHPOH7601912
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: FOHL VILLAGE MHP DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
FORTY CORNERS MOBILE VILLAGEOH7602012
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658287EP001
Facility Name: FORTY CORNERS MOBILE VLG
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
FORTY CORNERS MOBILE VILLAGEOH7602012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: FORTY CORNERS MOBILE VLG DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: FORTY CORNERS MOBILE VLG DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
FORTY CORNERS MOBILE VILLAGEOH7602012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: FORTY CORNERS MOBILE VLG DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
JACKSON RIDGE REHABILITATION & CAREOH7602112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658288EP001
Facility Name: JACKSON RIDGE REHABILITATION & CARE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
JACKSON RIDGE REHABILITATION & CAREOH7602112
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: JACKSON RIDGE REHABILITATION DISTRIBDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: JACKSON RIDGE REHABILITATION DISTRIBDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
JACKSON RIDGE REHABILITATION & CAREOH7602112
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: JACKSON RIDGE REHABILITATION DISTRIBLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 andNot Required
ALTERCARE OF HARTVILLEOH7602212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658289EP001
Facility Name: ALTERCARE OF HARTVILLE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
ALTERCARE OF HARTVILLEOH7602212
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ALTERCARE OF HARTVILLE DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ALTERCARE OF HARTVILLE DISTRIBUTIONDS201 1420 SMITH-KRAMER ROAD
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
ALTERCARE OF HARTVILLEOH7602212
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ALTERCARE OF HARTVILLE DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
LOUISVILLE MOBILE HOME PARKOH7602512
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658291EP001
Facility Name: LOUISVILLE MHP
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredDIOXIN - 2063
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
LOUISVILLE MOBILE HOME PARKOH7602512
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LOUISVILLE MOBILE HOME P DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LOUISVILLE MOBILE HOME P DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
LOUISVILLE MOBILE HOME PARKOH7602512
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LOUISVILLE MOBILE HOME P DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
LAKE SHERMAN VILLAGE PWSOH7602712
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658292EP001
Facility Name: LAKE SHERMAN VILLAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
LAKE SHERMAN VILLAGE PWSOH7602712
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LAKE SHERMAN VILLAGE DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LAKE SHERMAN VILLAGE DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
LAKE SHERMAN VILLAGE PWSOH7602712
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LAKE SHERMAN VILLAGE DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
LOUISVILLE CITY PWSOH7603012
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658294EP001
Facility Name: LOUISVILLE CITY OF
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
LOUISVILLE CITY PWSOH7603012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LOUISVILLE,CITY OF DISTRIBUTION Facility Class: CLASS 1DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/202010TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and
Sample(s) Required between 1/31/202010TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LOUISVILLE,CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
LOUISVILLE CITY PWSOH7603012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LOUISVILLE,CITY OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LOUISVILLE,CITY OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
MAGNOLIA VILLAGE PWSOH7603112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658295EP001
Facility Name: MAGNOLIA VILLAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
MAGNOLIA VILLAGE PWSOH7603112
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
05/15/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MAGNOLIA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 5/31/20202TOTAL COLIFORM (TCR) - 3100 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Sample(s) Required between 5/31/20202TOTAL CHLORINE - 1000 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MAGNOLIA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MAGNOLIA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
MAGNOLIA VILLAGE PWSOH7603112
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
05/15/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MAGNOLIA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
LOUISVILLE CENTER FOR REHABILITATIONOH7603312
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658297EP001
Facility Name: LOUISVILLE CENTER FOR REHAB
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
LOUISVILLE CENTER FOR REHABILITATIONOH7603312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LOUISVILLE CENTER FOR REHABDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LOUISVILLE CENTER FOR REHABDS201 7187 ST. FRANCIS STREET
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
LOUISVILLE CENTER FOR REHABILITATIONOH7603312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LOUISVILLE CENTER FOR REHABLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
MEADOWS OHIO MHPOH7603412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658298EP001
Facility Name: MEADOWS OHIO MHP
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
MEADOWS OHIO MHPOH7603412
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MEADOWS OHIO MHP DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MEADOWS OHIO MHP DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
MEADOWS OHIO MHPOH7603412
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MEADOWS OHIO MHP DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
MINERVA VILLAGE PWSOH7603812
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658300EP001
Facility Name: MINERVA VILLAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredDIOXIN - 2063
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
MINERVA VILLAGE PWSOH7603812
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MINERVA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20204TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and
Sample(s) Required between 1/31/20204TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MINERVA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
MINERVA VILLAGE PWSOH7603812
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MINERVA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MINERVA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
TOP O HILL MHP PWSOH7603912
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658301EP001
Facility Name: TOP-O-HILL MHP
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 7/1/2020 and 9/30/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
TOP O HILL MHP PWSOH7603912
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: TOP O HILL MHP DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: TOP O HILL MHP DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
TOP O HILL MHP PWSOH7603912
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: TOP O HILL MHP DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
NAVARRE VILLAGE PWSOH7604112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658302EP001
Facility Name: NAVARRE PWS
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
NAVARRE VILLAGE PWSOH7604112
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NAVARRE,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NAVARRE,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 8100 HUDSON DRIVE
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
NAVARRE VILLAGE PWSOH7604112
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NAVARRE,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 4790 ERIE SW
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NAVARRE,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
NORTH CANTON CITY PWSOH7604312
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658303EP001
Facility Name: NORTH CANTON DRINKING WATER TREATMENT PL
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
NORTH CANTON CITY PWSOH7604312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTH CANTON, CITY OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/202025TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202025 2/1/2020 andSample(s) Required between 3/31/202025 3/1/2020 andSample(s) Required between 4/30/202025 4/1/2020 andSample(s) Required between 5/31/202025 5/1/2020 andSample(s) Required between 6/30/202025 6/1/2020 andSample(s) Required between 7/31/202025 7/1/2020 andSample(s) Required between 8/31/202025 8/1/2020 andSample(s) Required between 9/30/202025 9/1/2020 andSample(s) Required between 10/31/202025 10/1/2020 andSample(s) Required between 11/30/202025 11/1/2020 andSample(s) Required between 12/31/202025 12/1/2020 and
Sample(s) Required between 1/31/202025TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202025 2/1/2020 andSample(s) Required between 3/31/202025 3/1/2020 andSample(s) Required between 4/30/202025 4/1/2020 andSample(s) Required between 5/31/202025 5/1/2020 andSample(s) Required between 6/30/202025 6/1/2020 andSample(s) Required between 7/31/202025 7/1/2020 andSample(s) Required between 8/31/202025 8/1/2020 andSample(s) Required between 9/30/202025 9/1/2020 andSample(s) Required between 10/31/202025 10/1/2020 andSample(s) Required between 11/30/202025 11/1/2020 andSample(s) Required between 12/31/202025 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTH CANTON, CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 5455 MARKET AVE. NW
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
NORTH CANTON CITY PWSOH7604312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTH CANTON, CITY OF DISTRIBUTION Facility Class: CLASS 1DS202 2020 E. MAPLE ST. NW WALSH COLLEGE
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTH CANTON, CITY OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202030LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
AQUA OHIO - MASSILLON PWSOH7604512
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658304EP001
Facility Name: AQUA OHIO - MASSILLON
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Ground Water
EP001
EP001
Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
AQUA OHIO - MASSILLON PWSOH7604512
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: AQUA OHIO - MASSILLON DISTRIBUTION Facility Class: CLASS 2DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/202090TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202090 2/1/2020 andSample(s) Required between 3/31/202090 3/1/2020 andSample(s) Required between 4/30/202090 4/1/2020 andSample(s) Required between 5/31/202090 5/1/2020 andSample(s) Required between 6/30/202090 6/1/2020 andSample(s) Required between 7/31/202090 7/1/2020 andSample(s) Required between 8/31/202090 8/1/2020 andSample(s) Required between 9/30/202090 9/1/2020 andSample(s) Required between 10/31/202090 10/1/2020 andSample(s) Required between 11/30/202090 11/1/2020 andSample(s) Required between 12/31/202090 12/1/2020 and
Sample(s) Required between 1/31/202090TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202090 2/1/2020 andSample(s) Required between 3/31/202090 3/1/2020 andSample(s) Required between 4/30/202090 4/1/2020 andSample(s) Required between 5/31/202090 5/1/2020 andSample(s) Required between 6/30/202090 6/1/2020 andSample(s) Required between 7/31/202090 7/1/2020 andSample(s) Required between 8/31/202090 8/1/2020 andSample(s) Required between 9/30/202090 9/1/2020 andSample(s) Required between 10/31/202090 10/1/2020 andSample(s) Required between 11/30/202090 11/1/2020 andSample(s) Required between 12/31/202090 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: AQUA OHIO - MASSILLON DISTRIBUTION Facility Class: CLASS 2DS201 1687 SANDY KNOLL DR.
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
AQUA OHIO - MASSILLON PWSOH7604512
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: AQUA OHIO - MASSILLON DISTRIBUTION Facility Class: CLASS 2DS202 6211 RICHVILLE DR
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: AQUA OHIO - MASSILLON DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
SHADY KNOLL MHPOH7605012
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658307EP001
Facility Name: SHADY KNOLL MHP
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
SHADY KNOLL MHPOH7605012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SHADY KNOLL MHP DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SHADY KNOLL MHP DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
SHADY KNOLL MHPOH7605012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SHADY KNOLL MHP DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
GREEN MEADOWS HEALTH AND WELLNESS CENTEROH7605212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658308EP001
Facility Name: GREEN MEADOWS HEALTH & WELLNESS CENTER
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
GREEN MEADOWS HEALTH AND WELLNESS CENTEROH7605212
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GREEN MEADOWS HEALTH & WELLNESS CENDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GREEN MEADOWS HEALTH & WELLNESS CENDS201 ADDRESS NOT KNOWN
Dual Sample Required between 1/14/2020at: DS201DISINFECTION BYPRODUCTS 1/8/2020 andDual Sample Required between 4/14/2020at: DS2014/8/2020 andDual Sample Required between 7/14/2020at: DS2017/8/2020 andDual Sample Required between 10/14/2020at: DS20110/8/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
GREEN MEADOWS HEALTH AND WELLNESS CENTEROH7605212
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GREEN MEADOWS HEALTH & WELLNESS CENLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
SKYLAND HILLS MHPOH7605412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658309EP001
Facility Name: SKYLAND HILLS MHP
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
SKYLAND HILLS MHPOH7605412
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SKYLAND HILLS MHP DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SKYLAND HILLS MHP DISTRIBUTION Facility Class: CLASS 1DS201 LOT 15
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
SKYLAND HILLS MHPOH7605412
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SKYLAND HILLS MHP DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
THUNDERBIRD TERRACE MHPOH7605512
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658310EP001
Facility Name: THUNDERBIRD TERRACE MHP
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
THUNDERBIRD TERRACE MHPOH7605512
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: THUNDERBIRD TERRACE MHP DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: THUNDERBIRD TERRACE MHP DISTRIBUTIONDS201 1581 PEKIN DRIVE SOUTHEAST
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
THUNDERBIRD TERRACE MHPOH7605512
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: THUNDERBIRD TERRACE MHP DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
WAYNESBURG VILLAGE PWSOH7605712
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658311EP001
Facility Name: WAYNESBURG VILLAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
WAYNESBURG VILLAGE PWSOH7605712
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WAYNESBURG, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WAYNESBURG, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
WAYNESBURG VILLAGE PWSOH7605712
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WAYNESBURG, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WAYNESBURG, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
WILMOT VILLAGE PWSOH7606012
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658313EP001
Facility Name: WILMOT WTP
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
WILMOT VILLAGE PWSOH7606012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WILMOT, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WILMOT, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
WILMOT VILLAGE PWSOH7606012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WILMOT, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
LINCOLN SQUARE APARTMENTSOH7606612
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658315EP001
Facility Name: LINCOLN SQUARE APARTMENTS
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
LINCOLN SQUARE APARTMENTSOH7606612
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LINCOLN SQUARE APARTMENTS DISTRIBUTIODS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LINCOLN SQUARE APARTMENTS DISTRIBUTIODS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
LINCOLN SQUARE APARTMENTSOH7606612
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LINCOLN SQUARE APARTMENTS DISTRIBUTIOLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
CASTLEBAR APARTMENTS PWSOH7606922
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658318EP001
Facility Name: CASTLEBAR APARTMENTS
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
CASTLEBAR APARTMENTS PWSOH7606922
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CASTLEBAR APARTMENTS DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CASTLEBAR APARTMENTS DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
CASTLEBAR APARTMENTS PWSOH7606922
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CASTLEBAR APARTMENTS DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
DLH BOWLES, INC.OH7607112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658320EP001
Facility Name: DLH BOWLES, INC.
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
DLH BOWLES, INC.OH7607112
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DLH BOWLES, INC. DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DLH BOWLES, INC. DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DLH BOWLES, INC. DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
STARK COUNTY WATER DISTRICTOH7607303
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: STARK COUNTY WATER DISTR DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20208TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20208 2/1/2020 andSample(s) Required between 3/31/20208 3/1/2020 andSample(s) Required between 4/30/20208 4/1/2020 andSample(s) Required between 5/31/20208 5/1/2020 andSample(s) Required between 6/30/20208 6/1/2020 andSample(s) Required between 7/31/20208 7/1/2020 andSample(s) Required between 8/31/20208 8/1/2020 andSample(s) Required between 9/30/20208 9/1/2020 andSample(s) Required between 10/31/20208 10/1/2020 andSample(s) Required between 11/30/20208 11/1/2020 andSample(s) Required between 12/31/20208 12/1/2020 and
Sample(s) Required between 1/31/20208TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20208 2/1/2020 andSample(s) Required between 3/31/20208 3/1/2020 andSample(s) Required between 4/30/20208 4/1/2020 andSample(s) Required between 5/31/20208 5/1/2020 andSample(s) Required between 6/30/20208 6/1/2020 andSample(s) Required between 7/31/20208 7/1/2020 andSample(s) Required between 8/31/20208 8/1/2020 andSample(s) Required between 9/30/20208 9/1/2020 andSample(s) Required between 10/31/20208 10/1/2020 andSample(s) Required between 11/30/20208 11/1/2020 andSample(s) Required between 12/31/20208 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: STARK COUNTY WATER DISTR DISTRIBUTION Facility Class: CLASS 1DS201 13381 THEELAND, UNIONTOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
STARK COUNTY WATER DISTRICTOH7607303
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: STARK COUNTY WATER DISTR DISTRIBUTION Facility Class: CLASS 1DS202 3851-52 HUGH, UNIONTOWN
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: STARK COUNTY WATER DISTR DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
LAKE AVENUE TERRACEOH7607412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658323EP001
Facility Name: LAKE AVENUE TERRACE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
LAKE AVENUE TERRACEOH7607412
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LAKE AVENUE TERRACE DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LAKE AVENUE TERRACE DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
LAKE AVENUE TERRACEOH7607412
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LAKE AVENUE TERRACE DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
OAKHILL MANOR CARE CENTEROH7608012
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658326EP001
Facility Name: OAKHILL MANOR CARE CENTER
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
OAKHILL MANOR CARE CENTEROH7608012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OAKHILL MANOR CARE CENTE DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OAKHILL MANOR CARE CENTE DISTRIBUTIONDS201 4466 LYNNHAVEN AVE. NE
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
OAKHILL MANOR CARE CENTEROH7608012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OAKHILL MANOR CARE CENTE DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
CANTON PUBLIC WATER SYSTEMOH7608112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658279EP001
Facility Name: CANTON PWS NORTHEAST PLANT
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
CANTON PUBLIC WATER SYSTEMOH7608112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658280EP002
Facility Name: CANTON PWS NORTHWEST PLANT
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Ground Water
EP002
EP002
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
CANTON PUBLIC WATER SYSTEMOH7608112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658281EP003
Facility Name: CANTON PWS SUGAR CREEK PLANT
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Ground Water
EP003
EP003
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
CANTON PUBLIC WATER SYSTEMOH7608112
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CANTON PWS DISTRIBUTION Facility Class: CLASS 2DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/2020100TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/2020100 2/1/2020 andSample(s) Required between 3/31/2020100 3/1/2020 andSample(s) Required between 4/30/2020100 4/1/2020 andSample(s) Required between 5/31/2020100 5/1/2020 andSample(s) Required between 6/30/2020100 6/1/2020 andSample(s) Required between 7/31/2020100 7/1/2020 andSample(s) Required between 8/31/2020100 8/1/2020 andSample(s) Required between 9/30/2020100 9/1/2020 andSample(s) Required between 10/31/2020100 10/1/2020 andSample(s) Required between 11/30/2020100 11/1/2020 andSample(s) Required between 12/31/2020100 12/1/2020 and
Sample(s) Required between 1/31/2020100TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/2020100 2/1/2020 andSample(s) Required between 3/31/2020100 3/1/2020 andSample(s) Required between 4/30/2020100 4/1/2020 andSample(s) Required between 5/31/2020100 5/1/2020 andSample(s) Required between 6/30/2020100 6/1/2020 andSample(s) Required between 7/31/2020100 7/1/2020 andSample(s) Required between 8/31/2020100 8/1/2020 andSample(s) Required between 9/30/2020100 9/1/2020 andSample(s) Required between 10/31/2020100 10/1/2020 andSample(s) Required between 11/30/2020100 11/1/2020 andSample(s) Required between 12/31/2020100 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CANTON PWS DISTRIBUTION Facility Class: CLASS 2DS201 1025 LAKE CENTER, HARTVILLE
Dual Sample Required between 1/7/2020at: DS201DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2014/1/2020 andDual Sample Required between 7/7/2020at: DS2017/1/2020 and
CANTON PUBLIC WATER SYSTEMOH7608112
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CANTON PWS DISTRIBUTION Facility Class: CLASS 2DS201 1025 LAKE CENTER, HARTVILLE
Dual Sample Required between 10/7/2020at: DS201DISINFECTION BYPRODUCTS 10/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CANTON PWS DISTRIBUTION Facility Class: CLASS 2DS202 626 30TH ST
Dual Sample Required between 1/7/2020at: DS202DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2024/1/2020 andDual Sample Required between 7/7/2020at: DS2027/1/2020 andDual Sample Required between 10/7/2020at: DS20210/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CANTON PWS DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
CONGRESS LAKE CLUB-MAINTENANCE
2020 MONITORING SCHEDULE
OH7620012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CONGRESS LAKE CLUB-MAINT DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CONGRESS LAKE CLUB-MAINTENANCE
2020 MONITORING SCHEDULE
OH7620012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CONGRESS LAKE CLUB MAINT.Ground Water
7658327
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CONGRESS LAKE CLUB-BOATHOUSE
2020 MONITORING SCHEDULE
OH7620112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: CONGRESS LAKE CLUB-BOAT. DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CONGRESS LAKE CLUB-BOATHOUSE
2020 MONITORING SCHEDULE
OH7620112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CONGRESS LAKE CLUB-BOAT. DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CONGRESS LAKE CLUB-BOATHOUSE
2020 MONITORING SCHEDULE
OH7620112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CONGRESS LAKE CLUB BOATHOUSEGround Water
7658328
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CONGRESS LAKE CLUB-HALFWAY HOUSE
2020 MONITORING SCHEDULE
OH7620212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: CONGRESS LAKE CLUB-HALFW DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CONGRESS LAKE CLUB-HALFWAY HOUSE
2020 MONITORING SCHEDULE
OH7620212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CONGRESS LAKE CLUB-HALFW DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CONGRESS LAKE CLUB-HALFWAY HOUSE
2020 MONITORING SCHEDULE
OH7620212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CONGRESS LAKE CLUB HALFWAY HSGround Water
7658329
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PATTYS PLACE FAMILY RESTAURANT
2020 MONITORING SCHEDULE
OH7620312 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PATTYS PLACE FAMILY RESTAURANT DISTGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PATTYS PLACE FAMILY RESTAURANT
2020 MONITORING SCHEDULE
OH7620312 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PATTYS PLACE FAMILY RESTAURANTGround Water
7658330
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
B AND H MACHINE, INC.OH7630512
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658333EP001
Facility Name: B & H MACHINE INC
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
B AND H MACHINE, INC.OH7630512
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: B&H MACHINE, INC. DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: B&H MACHINE, INC. DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
BAYLOR BEACH PARK, INC. PWS
2020 MONITORING SCHEDULE
OH7630612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: BAYLOR BEACH PARK, INC. DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BAYLOR BEACH PARK, INC. PWS
2020 MONITORING SCHEDULE
OH7630612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BAYLOR BEACH PARK, INC. DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BAYLOR BEACH PARK, INC. PWS
2020 MONITORING SCHEDULE
OH7630612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BAYLOR BEACH PARK INCGround Water
7658334
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 4/1/2020 and 6/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BEAR CREEK CAMPGROUND
2020 MONITORING SCHEDULE
OH7630712 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BEAR CREEK CAMPGROUND DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BEAR CREEK CAMPGROUND
2020 MONITORING SCHEDULE
OH7630712 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP003 Facility Source:
Facility Name: BEAR CREEK CAMPGROUND PLANT 3
7662498
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BEAR CREEK CAMPGROUND
2020 MONITORING SCHEDULE
OH7630712 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP002 Facility Source:
Facility Name: BEAR CREEK CAMPGROUND PLANT 2
7662497
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
TOWPATH CABINN PWS
2020 MONITORING SCHEDULE
OH7631812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: TOWPATH CABINN DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
TOWPATH CABINN PWS
2020 MONITORING SCHEDULE
OH7631812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: TOWPATH CABINNGround Water
7658339
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BUDS CORNER PWS
2020 MONITORING SCHEDULE
OH7631912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BUDS CORNER DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BUDS CORNER PWS
2020 MONITORING SCHEDULE
OH7631912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BUDS CORNERGround Water
7658340
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CAMP WANAKE - MAIN WELL
2020 MONITORING SCHEDULE
OH7632112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CAMP WANAKE - MAIN WELL DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020
Sample(s) Required between1 2/1/2020 and 2/29/2020
Sample(s) Required between1 3/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Sample(s) Required between1 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CAMP WANAKE - MAIN WELL
2020 MONITORING SCHEDULE
OH7632112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAMP WANAKEGround Water
7658341
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CAMP WANAKE - OUTPOST BARN
2020 MONITORING SCHEDULE
OH7632122 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: CAMP WANAKE - OUTPOST BA DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CAMP WANAKE - OUTPOST BARN
2020 MONITORING SCHEDULE
OH7632122 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CAMP WANAKE - OUTPOST BA DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CAMP WANAKE - OUTPOST BARN
2020 MONITORING SCHEDULE
OH7632122 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAMP WANAKE OUTPOST BARNGround Water
7658342
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ELMS COUNTRY CLUB
2020 MONITORING SCHEDULE
OH7634112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ELMS COUNTRY CLUB DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ELMS COUNTRY CLUB
2020 MONITORING SCHEDULE
OH7634112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ELMS COUNTRY CLUBGround Water
7658351
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SAMANTHA'S FRONTIER RESTAURANT
2020 MONITORING SCHEDULE
OH7634612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: FRONTIER RESTAURANT DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SAMANTHA'S FRONTIER RESTAURANT
2020 MONITORING SCHEDULE
OH7634612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: FRONTIER RESTAURANTGround Water
7658352
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
GREIF PACKAGING, LLCOH7635012
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658353EP001
Facility Name: GREIF PACKAGING, LLC
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
GREIF PACKAGING, LLCOH7635012
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GREIF PACKAGING, LLCDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GREIF PACKAGING, LLCLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
CANDLES KITCHEN, INC. PWS
2020 MONITORING SCHEDULE
OH7636512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CANDLES KITCHEN, INCGround Water
7658357
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HARTVILLE FAMILY MINI MART
2020 MONITORING SCHEDULE
OH7637412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HARTVILLE FAMILY MINI MART DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HARTVILLE FAMILY MINI MART
2020 MONITORING SCHEDULE
OH7637412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HARTVILLE FAMILY MINI MARTGround Water
7658363
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LEXINGTON ELEMENTARY SCHOOLOH7637812
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658364EP001
Facility Name: LEXINGTON ELEMENTARY SCHOOL
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
LEXINGTON ELEMENTARY SCHOOLOH7637812
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LEXINGTON ELEM. SCHOOL DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LEXINGTON ELEM. SCHOOL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
MARLBORO CHRISTIAN CHURCH
2020 MONITORING SCHEDULE
OH7638312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MARLBORO CHRISTIAN CH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MARLBORO CHRISTIAN CHURCH
2020 MONITORING SCHEDULE
OH7638312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP002 Facility Source:
Facility Name: MARLBORO CHRISTIAN CHURCH STU 2Ground Water
7660599
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MARLBORO CHRISTIAN CHURCH
2020 MONITORING SCHEDULE
OH7638312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MARLBORO CHRISTIAN CHURCH STU 1Ground Water
7658366
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MARLBORO ELEMENTARY SCHOOLOH7638412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658367EP001
Facility Name: MARLBORO ELEMENTARY SCHOOL
Effective Date: 09/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
MARLBORO ELEMENTARY SCHOOLOH7638412
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
09/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MARLBORO ELEM. SCHOOL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 12/31/202010LEAD - 1030 AND COPPER - 1022 7/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
MARLBORO MFG INCOH7638512
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658368EP001
Facility Name: MARLBORO MFG INC
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
MARLBORO MFG INCOH7638512
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MARLBORO MFG INC DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MARLBORO MFG INC DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
NORTH NIMISHILLEN ELEMENTARYOH7639412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658373EP001
Facility Name: NORTH NIMISHILLEN ELEM SCH
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 10/1/2020 and 12/31/2020
NORTH NIMISHILLEN ELEMENTARYOH7639412
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTH NIMISHILLEN ELEM DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTH NIMISHILLEN ELEM DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTH NIMISHILLEN ELEM DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
CANAAN ACRES CHURCH CAMP
2020 MONITORING SCHEDULE
OH7639612 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CANAAN ACRES CHR CAMP DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CANAAN ACRES CHURCH CAMP
2020 MONITORING SCHEDULE
OH7639612 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CANAAN ACRES CHURCH CAMPGround Water Facility Class: CLASS A
7658374
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PINE VIEW ACRES, LLC - DINING HALL
2020 MONITORING SCHEDULE
OH7640412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PINE VIEW ACRES - DINING HALLGround Water
7658379
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PINE VIEW ACRES, LLC - BOYS DORM
2020 MONITORING SCHEDULE
OH7640512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 11/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PINE VIEW ACRES - BOYS DORM DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PINE VIEW ACRES, LLC - BOYS DORM
2020 MONITORING SCHEDULE
OH7640512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 11/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PINE VIEW ACRES - BOYS DORMGround Water
7658380
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PINE VIEW ACRES, LLC - GIRLS DORM
2020 MONITORING SCHEDULE
OH7640612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 11/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PINE VIEW ACRES - GIRLS DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PINE VIEW ACRES, LLC - GIRLS DORM
2020 MONITORING SCHEDULE
OH7640612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 11/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PINE VIEW ACRES - GIRLS DORMGround Water
7658381
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BEACH CITY BIBLE METHODIST CHURCH
2020 MONITORING SCHEDULE
OH7640812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BEACH CITY BIBLE METHODIST DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BEACH CITY BIBLE METHODIST CHURCH
2020 MONITORING SCHEDULE
OH7640812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BEACH CITY BIBLE METHODISTGround Water
7658382
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SACRED HEART OF MARY PARISH
2020 MONITORING SCHEDULE
OH7642012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SACRED HEART OF MARY SCL DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020
Sample(s) Required between1 2/1/2020 and 2/29/2020
Sample(s) Required between1 3/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Sample(s) Required between1 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SACRED HEART OF MARY PARISH
2020 MONITORING SCHEDULE
OH7642012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP002 Facility Source:
Facility Name: SACRED HEART OF MARY PARISHGround Water
7662385
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SCHONER CHEVROLET SALESOH7642212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658388EP001
Facility Name: SCHONER CHEVROLET INC
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
SCHONER CHEVROLET SALESOH7642212
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SCHONER CHEVROLET SALES DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SCHONER CHEVROLET SALES DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
SKYLAND PINES RUSTIC LODGE PWS
2020 MONITORING SCHEDULE
OH7642512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SKYLAND PINE RUSTIC LODGE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SKYLAND PINES RUSTIC LODGE PWS
2020 MONITORING SCHEDULE
OH7642512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SKYLAND PINES RUSTIC LODGEGround Water
7658390
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WILDERNESS CENTER INC
2020 MONITORING SCHEDULE
OH7643012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WILDERNESS CENTER INC DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WILDERNESS CENTER INC
2020 MONITORING SCHEDULE
OH7643012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WILDERNESS CENTER INCGround Water Facility Class: CLASS A
7658393
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CHILDRENS TOY FUND
2020 MONITORING SCHEDULE
OH7643212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CHILDRENS TOY FUND DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CHILDRENS TOY FUND
2020 MONITORING SCHEDULE
OH7643212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CHILDRENS TOY FUNDGround Water
7658394
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
THOMPSONS DAIRY LAND
2020 MONITORING SCHEDULE
OH7643412 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: THOMPSONS DAIRY LAND DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
THOMPSONS DAIRY LAND
2020 MONITORING SCHEDULE
OH7643412 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: THOMPSONS DAIRY LANDGround Water
7658396
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
VFW POST 7490
2020 MONITORING SCHEDULE
OH7643912 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: VFW POST 7490 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
VFW POST 7490
2020 MONITORING SCHEDULE
OH7643912 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: VFW POST 7490Ground Water
7658400
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WALKER ELEMENTARY SCHOOLOH7644112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658401EP001
Facility Name: WALKER ELEM SCH
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
WALKER ELEMENTARY SCHOOLOH7644112
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WALKER ELEM SCHOOL DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WALKER ELEM SCHOOL DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WALKER ELEM SCHOOL DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WALKER ELEM SCHOOL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
WASHINGTON ELEMENTARY SCHOOLOH7644312
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658402EP001
Facility Name: WASHINGTON ELEMENTARY SCHOOL
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
WASHINGTON ELEMENTARY SCHOOLOH7644312
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WASHINGTON ELEM. SCHOOL DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WASHINGTON ELEM. SCHOOL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
PAWPAWS COUNTRY MART
2020 MONITORING SCHEDULE
OH7645912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
07/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PAW PAWS CTRY MART-DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PAWPAWS COUNTRY MART
2020 MONITORING SCHEDULE
OH7645912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
07/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PAW PAWS COUNTRY MARTGround Water Facility Class: CLASS A
7658408
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
THE LIGHTHOUSE PWS
2020 MONITORING SCHEDULE
OH7646112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: THE LIGHTHOUSE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
THE LIGHTHOUSE PWS
2020 MONITORING SCHEDULE
OH7646112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: THE LIGHTHOUSEGround Water
7658409
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ROADSIDE TAVERN, INC. PWS
2020 MONITORING SCHEDULE
OH7646412 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ROADSIDE TAVERN, INC. DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ROADSIDE TAVERN, INC. PWS
2020 MONITORING SCHEDULE
OH7646412 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ROADSIDE TAVERN INCGround Water
7658410
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
RANSOM H BARR ELEMENTARYOH7647212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658415EP001
Facility Name: RANSOM H BARR ELEMENTARY
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
RANSOM H BARR ELEMENTARYOH7647212
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: RANSOM H BARR ELEMENTARY DISTRIBUTIO Facility Class: CLASS 1DS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: RANSOM H BARR ELEMENTARY DISTRIBUTIO Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
SPUDS CORNER PWS
2020 MONITORING SCHEDULE
OH7648312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SPUDS CORNER DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SPUDS CORNER PWS
2020 MONITORING SCHEDULE
OH7648312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SPUDS CORNERGround Water
7658421
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NORTH LAWRENCE FIRE DEPT
2020 MONITORING SCHEDULE
OH7649512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: NORTH LAWRENCE FIRE DEPT DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NORTH LAWRENCE FIRE DEPT
2020 MONITORING SCHEDULE
OH7649512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: NORTH LAWRENCE VOLUNTEER FIRE DEPTGround Water
7658424
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
AKRON CANTON JELLYSTONE PARK
2020 MONITORING SCHEDULE
OH7650132 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: AKRON CANTON JELLYSTONE PARKGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
AKRON CANTON JELLYSTONE PARK
2020 MONITORING SCHEDULE
OH7650132 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
02/14/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: AKRON CANTON JELLYSTONE PARKGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020
Sample(s) Required between1 2/1/2020 and 2/29/2020
Sample(s) Required between1 3/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Sample(s) Required between1 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
AKRON CANTON JELLYSTONE PARK
2020 MONITORING SCHEDULE
OH7650132 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: AKRON CANTON JELLYSTONE PARKGround Water Facility Class: CLASS A
7658429
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CONGRESS LAKE CLUB-CLUBHOUSE
2020 MONITORING SCHEDULE
OH7650212 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CONGRESS LAKE CLUBHOUSE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CONGRESS LAKE CLUB-CLUBHOUSE
2020 MONITORING SCHEDULE
OH7650212 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CONGRESS LAKE CLUBHOUSEGround Water
7658430
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CUTTYS SUNSET CAMP PWS
2020 MONITORING SCHEDULE
OH7650322 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: CUTTYS SUNSET CAMP DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CUTTYS SUNSET CAMP PWS
2020 MONITORING SCHEDULE
OH7650322 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CUTTYS SUNSET CAMP DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CUTTYS SUNSET CAMP PWS
2020 MONITORING SCHEDULE
OH7650322 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP004 Facility Source:
Facility Name: CUTTYS SUNSET CAMP STU 4Ground Water
7662178
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CUTTYS SUNSET CAMP PWS
2020 MONITORING SCHEDULE
OH7650322 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP002 Facility Source:
Facility Name: CUTTYS SUNSET CAMP STU 2Ground Water
7660601
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CUTTYS SUNSET CAMP PWS
2020 MONITORING SCHEDULE
OH7650322 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP003 Facility Source:
Facility Name: CUTTYS SUNSET CAMP STU 3Ground Water
7658576
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CUTTYS SUNSET CAMP PWS
2020 MONITORING SCHEDULE
OH7650322 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CUTTYS SUNSET CAMP STU 1Ground Water
7658431
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SPRINGWOOD LAKE CAMP CLUBOH7651212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to4/1 11/30
SamplingLocation
Facility ID: SMP ID:
7658432EP001
Facility Name: SPRINGWOOD LAKE CAMP CLUB
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 4/1/2020 and 6/30/2020
SPRINGWOOD LAKE CAMP CLUBOH7651212
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to4/1 11/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SPRINGWOOD LAKE CAMP CLU DISTRIBUTIODS000
Sample(s) Required between 4/30/20201TOTAL COLIFORM (TCR) - 3100 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SPRINGWOOD LAKE CAMP CLU DISTRIBUTIODS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SPRINGWOOD LAKE CAMP CLU DISTRIBUTIOLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
SPRINGWOOD LAKE CAMP CLUBOH7651212
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to4/1 11/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SPRINGWOOD LAKE CAMP CLU DISTRIBUTIOSUP01
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative beforethe system may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements.If your start date is different from last year, please contact your Ohio EPA District Representative.***
UNITED FELLOWSHIP CLUB
2020 MONITORING SCHEDULE
OH7651412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: UNITED FELLOWSHIP CLUB DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
UNITED FELLOWSHIP CLUB
2020 MONITORING SCHEDULE
OH7651412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
07/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: UNITED FELLOWSHIP CLUB DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
UNITED FELLOWSHIP CLUB
2020 MONITORING SCHEDULE
OH7651412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: UNITED FELLOWSHIP CLUBGround Water
7658433
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WILLOWDALE LAKE COUNTRY CLUB
2020 MONITORING SCHEDULE
OH7651512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WILLOWDALE LAKE CC DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WILLOWDALE LAKE COUNTRY CLUB
2020 MONITORING SCHEDULE
OH7651512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WILLOWDALE LAKE COUNTRY CLUBGround Water
7658434
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 3 PWS
2020 MONITORING SCHEDULE
OH7651812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: ZELLERS AMLC 3 DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 3 PWS
2020 MONITORING SCHEDULE
OH7651812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ZELLERS AMLC 3 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 3 PWS
2020 MONITORING SCHEDULE
OH7651812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ZELLERS AMLC NO 3Ground Water
7658435
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 1 PWS
2020 MONITORING SCHEDULE
OH7652912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: ZELLERS AMLC 1 DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 1 PWS
2020 MONITORING SCHEDULE
OH7652912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ZELLERS AMLC 1 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 1 PWS
2020 MONITORING SCHEDULE
OH7652912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ZELLERS AMLC NO 1Ground Water
7658438
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 2 PWS
2020 MONITORING SCHEDULE
OH7653012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: ZELLERS AMLC 2 DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 2 PWS
2020 MONITORING SCHEDULE
OH7653012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 12/31
05/15/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ZELLERS AMLC 2 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Sample(s) Required between1 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 2 PWS
2020 MONITORING SCHEDULE
OH7653012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ZELLERS AMLC NO 2Ground Water
7658439
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MOMENTS WORSHIP HALL
2020 MONITORING SCHEDULE
OH7653712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MOMENTS WORSHIP HALL DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MOMENTS WORSHIP HALL
2020 MONITORING SCHEDULE
OH7653712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MOMENTS WORSHIP HALLGround Water
7658442
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HARTVILLE CHRISTIAN SCHOOL PWSOH7653812
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658443EP001
Facility Name: HARTVILLE CHRISTIAN SCHOOL
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 10/1/2020 and 12/31/2020
HARTVILLE CHRISTIAN SCHOOL PWSOH7653812
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: HARTVILLE CHRISTIAN SCHO DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: HARTVILLE CHRISTIAN SCHO DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
LAKE CENTER CHRISTIAN SCHOOLOH7653912
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658444EP001
Facility Name: LAKE CENTER CHRISTIAN SCHOOL
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
LAKE CENTER CHRISTIAN SCHOOLOH7653912
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LAKE CENTER CHRISTIAN SC DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LAKE CENTER CHRISTIAN SC DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
ZELLERS AMLC 4 PWS
2020 MONITORING SCHEDULE
OH7654712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: ZELLERS AMLC 4 DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 4 PWS
2020 MONITORING SCHEDULE
OH7654712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ZELLERS AMLC 4 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 4 PWS
2020 MONITORING SCHEDULE
OH7654712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ZELLERS ALMC 4 PWSGround Water
7658449
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CLAYS PARK CAMPING RESORT PWS
2020 MONITORING SCHEDULE
OH7654812 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: CLAYS PARK CAMPING RSRT DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CLAYS PARK CAMPING RESORT PWS
2020 MONITORING SCHEDULE
OH7654812 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CLAYS PARK CAMPING RSRT DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CLAYS PARK CAMPING RESORT PWS
2020 MONITORING SCHEDULE
OH7654812 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP002 Facility Source:
Facility Name: CLAYS PARK CAMPING RESORT STU 2Ground Water Facility Class: CLASS A
7658451
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CLAYS PARK CAMPING RESORT PWS
2020 MONITORING SCHEDULE
OH7654812 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CLAYS PARK CAMPING RESORT STU 1Ground Water Facility Class: CLASS A
7658450
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LMT HARTVILLEOH7655312
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658454EP001
Facility Name: LMT HARTVILLE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
LMT HARTVILLEOH7655312
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LMT HARTVILLE DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LMT HARTVILLE DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
CANTON DROP FORGEOH7655412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658455EP001
Facility Name: CANTON DROP FORGING AND MFG CO STU 1
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
CANTON DROP FORGEOH7655412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7660602EP002
Facility Name: CANTON DROP FORGE STU 2
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP002
EP002
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
CANTON DROP FORGEOH7655412
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CANTON DROP FORGE DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CANTON DROP FORGE DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CANTON DROP FORGE DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
KAUFMAN CENTER
2020 MONITORING SCHEDULE
OH7655712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: KAUFMAN CENTER DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020
Sample(s) Required between1 2/1/2020 and 2/29/2020
Sample(s) Required between1 3/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Sample(s) Required between1 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
KAUFMAN CENTER
2020 MONITORING SCHEDULE
OH7655712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: KAUFMAN CENTERGround Water
7658457
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MT PLEASANT BAPTIST CHURCH
2020 MONITORING SCHEDULE
OH7655812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MT PLEASANT BAPTIST CH. DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MT PLEASANT BAPTIST CHURCH
2020 MONITORING SCHEDULE
OH7655812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MT PLEASANT BAPTIST CHURCHGround Water
7658458
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SPRING VALLEY GOLF COURSE
2020 MONITORING SCHEDULE
OH7656512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: SPRING VALLEY GOLF COURSE DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SPRING VALLEY GOLF COURSE
2020 MONITORING SCHEDULE
OH7656512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SPRING VALLEY GOLF COURSE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SPRING VALLEY GOLF COURSE
2020 MONITORING SCHEDULE
OH7656512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SPRING VALLEY GOLF COURSEGround Water
7658462
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NEW BALTIMORE COMMUNITY CHURCH
2020 MONITORING SCHEDULE
OH7657612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: NEW BALTIMORE CHURCH & S DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NEW BALTIMORE COMMUNITY CHURCH
2020 MONITORING SCHEDULE
OH7657612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: NEW BALTIMORE CHURCH & SCHOOLGround Water
7658471
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ADVENTURE PLACEOH7658112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658474EP001
Facility Name: ADVENTURE PLACE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
ADVENTURE PLACEOH7658112
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ADVENTURE PLACE DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ADVENTURE PLACE DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
MT UNION COLLEGE NATURE CENTER
2020 MONITORING SCHEDULE
OH7658312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MT UNION COLLEGE NATURE CENTER DISTGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MT UNION COLLEGE NATURE CENTER
2020 MONITORING SCHEDULE
OH7658312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MT UNION COLLEGE NATURE CENTERGround Water
7658476
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BRENCKLE FARMS
2020 MONITORING SCHEDULE
OH7658512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: BRENCKLE FARMS DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BRENCKLE FARMS
2020 MONITORING SCHEDULE
OH7658512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BRENCKLE FARMS DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BRENCKLE FARMS
2020 MONITORING SCHEDULE
OH7658512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BRENKLE FARMS MIGRANT CAMPGround Water
7658478
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 5 PWS
2020 MONITORING SCHEDULE
OH7658612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: ZELLERS AMLC 5 DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 5 PWS
2020 MONITORING SCHEDULE
OH7658612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ZELLERS AMLC 5 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 5 PWS
2020 MONITORING SCHEDULE
OH7658612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ZELLERS AMLC NO 5Ground Water
7658479
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 6 PWS
2020 MONITORING SCHEDULE
OH7658712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: ZELLERS AMLC 6 DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 6 PWS
2020 MONITORING SCHEDULE
OH7658712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ZELLERS AMLC 6 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 6 PWS
2020 MONITORING SCHEDULE
OH7658712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ZELLERS AMLC NO 6Ground Water
7658480
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 7 PWS
2020 MONITORING SCHEDULE
OH7658812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: ZELLERS AMLC 7 DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 7 PWS
2020 MONITORING SCHEDULE
OH7658812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ZELLERS AMLC 7 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 7 PWS
2020 MONITORING SCHEDULE
OH7658812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ZELLERS AMLC NO 7Ground Water
7658481
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ODNR-QUAIL HOLLOW MANOR HOUSE
2020 MONITORING SCHEDULE
OH7659112 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: QUAIL HOLLOW MANOR HOUSE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ODNR-QUAIL HOLLOW MANOR HOUSE
2020 MONITORING SCHEDULE
OH7659112 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: QUAIL HOLLOW MANOR HOUSEGround Water Facility Class: CLASS A
7658483
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
EAST SPARTA RECREATION
2020 MONITORING SCHEDULE
OH7659212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: EAST SPARTA RECREATION DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
EAST SPARTA RECREATION
2020 MONITORING SCHEDULE
OH7659212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: EAST SPARTA RECREATIONGround Water
7658484
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BIERY CHEESE COMPANYOH7659812
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658489EP001
Facility Name: BIERY CHEESE CO
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
BIERY CHEESE COMPANYOH7659812
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BIERY CHEESE COMPANY DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BIERY CHEESE COMPANY DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BIERY CHEESE COMPANY DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
BUCKEYE PACKAGING, INC.OH7660412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658493EP001
Facility Name: BUCKEYE PACKAGING CO INC
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
BUCKEYE PACKAGING, INC.OH7660412
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BUCKEYE PACKAGING, INC. DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BUCKEYE PACKAGING, INC. DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
CLAYS PARK - WATER PARK PWS
2020 MONITORING SCHEDULE
OH7661312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: CLAYS PARK - WATER PARK DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CLAYS PARK - WATER PARK PWS
2020 MONITORING SCHEDULE
OH7661312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CLAYS PARK - WATER PARK DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CLAYS PARK - WATER PARK PWS
2020 MONITORING SCHEDULE
OH7661312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CLAYS PARK - WATER PARK STU 1Ground Water Facility Class: CLASS A
7658499
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CLAYS PARK - WELCOME CENTER PWS
2020 MONITORING SCHEDULE
OH7661512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CLAYS PARK - WELCOME CENTER DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CLAYS PARK - WELCOME CENTER PWS
2020 MONITORING SCHEDULE
OH7661512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CLAYS PARK - WELCOME CENTERGround Water
7658502
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SONS OF HERMAN
2020 MONITORING SCHEDULE
OH7661712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SONS OF HERMAN DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SONS OF HERMAN
2020 MONITORING SCHEDULE
OH7661712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SONS OF HERMANGround Water
7658504
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BEECH MENNONITE CHURCH
2020 MONITORING SCHEDULE
OH7661912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BEECH MENNONITE CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BEECH MENNONITE CHURCH
2020 MONITORING SCHEDULE
OH7661912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BEECH MENNONITE CHURCHGround Water
7658506
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
VFW POST 5047
2020 MONITORING SCHEDULE
OH7662112 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: VFW POST 5047Ground Water
7658508
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
GRACE BRETHREN CHURCH-MIDDLEBRANCH
2020 MONITORING SCHEDULE
OH7662412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: GRACE BRETHREN CH-MIDDLE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
GRACE BRETHREN CHURCH-MIDDLEBRANCH
2020 MONITORING SCHEDULE
OH7662412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GRACE BRETHREN CH MIDDLEBRANCHGround Water
7658511
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
DIAMOND COMMUNITY PARK PWS
2020 MONITORING SCHEDULE
OH7663012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: DIAMOND COMMUNITY PARK DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
DIAMOND COMMUNITY PARK PWS
2020 MONITORING SCHEDULE
OH7663012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
06/19/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DIAMOND COMMUNITY PARK DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
DIAMOND COMMUNITY PARK PWS
2020 MONITORING SCHEDULE
OH7663012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: DIAMOND COMMUNITY PARKGround Water
7658516
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SABLE CREEK GOLF COURSE
2020 MONITORING SCHEDULE
OH7663112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SABLE CREEK GOLF DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SABLE CREEK GOLF COURSE
2020 MONITORING SCHEDULE
OH7663112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SABLE CREEK GOLF COURSEGround Water
7658517
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WATERS EDGE VINEYARD
2020 MONITORING SCHEDULE
OH7663512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WATER'S EDGE VINEYARDGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WATERS EDGE VINEYARD
2020 MONITORING SCHEDULE
OH7663512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WATER'S EDGE VINEYARDGround Water
7658521
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BOCCA GRANDE
2020 MONITORING SCHEDULE
OH7663612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BOCCA GRANDE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BOCCA GRANDE
2020 MONITORING SCHEDULE
OH7663612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BOCA GRANDEGround Water
7658522
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CARLOS TRATTORIA PWS
2020 MONITORING SCHEDULE
OH7663812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CARLOS TRATTORIA DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CARLOS TRATTORIA PWS
2020 MONITORING SCHEDULE
OH7663812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CARLOS TRATTORIOGround Water
7658524
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CLEARVIEW GOLF COURSE
2020 MONITORING SCHEDULE
OH7663912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CLEARVIEW GOLF COURSEGround Water
7658525
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
COUNTRY CONES
2020 MONITORING SCHEDULE
OH7664112 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to4/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: COUNTRY CONES DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
COUNTRY CONES
2020 MONITORING SCHEDULE
OH7664112 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to4/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: COUNTRY CONES DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
COUNTRY CONES
2020 MONITORING SCHEDULE
OH7664112 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to4/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: COUNTRY CONESGround Water
7658526
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
DISABLED AM VET 50 PWS
2020 MONITORING SCHEDULE
OH7664612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISABLED AM VET 50 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
DISABLED AM VET 50 PWS
2020 MONITORING SCHEDULE
OH7664612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: DISABLED AM VET NO 50Ground Water
7658529
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
EDGEWATER GOLF COURSE
2020 MONITORING SCHEDULE
OH7664712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: EDGEWATER GOLF COURSE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
EDGEWATER GOLF COURSE
2020 MONITORING SCHEDULE
OH7664712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: EDGEWATER GOLF COURSEGround Water
7658530
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WHINERY ELM INN PWS
2020 MONITORING SCHEDULE
OH7664912 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WHINERY ELM INN LTD DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WHINERY ELM INN PWS
2020 MONITORING SCHEDULE
OH7664912 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WHINERY ELM INNGround Water
7658532
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BURGER KING 373-HARTVILLE
2020 MONITORING SCHEDULE
OH7665312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BURGER KING-HARTVILLE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BURGER KING 373-HARTVILLE
2020 MONITORING SCHEDULE
OH7665312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BURGER KING HARTVILLEGround Water Facility Class: CLASS A
7658535
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HITCHIN POST
2020 MONITORING SCHEDULE
OH7665412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HITCHIN POST DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HITCHIN POST
2020 MONITORING SCHEDULE
OH7665412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HITCHIN POSTGround Water
7658536
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HOT LAPS SPORTS BAR, INC.
2020 MONITORING SCHEDULE
OH7666012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HOT LAPS SPORTS BAR, INC. DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HOT LAPS SPORTS BAR, INC.
2020 MONITORING SCHEDULE
OH7666012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HOT LAPS SPORTS BAR INCGround Water
7658540
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LYONS DEN GOLF PWS
2020 MONITORING SCHEDULE
OH7666112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 11/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: LYONS DEN GOLF DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LYONS DEN GOLF PWS
2020 MONITORING SCHEDULE
OH7666112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 11/30
04/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LYONS DEN GOLF DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 11/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LYONS DEN GOLF PWS
2020 MONITORING SCHEDULE
OH7666112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 11/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LYONS DEN GOLF COURSEGround Water
7658541
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
OLD LANDMARK TAVERN
2020 MONITORING SCHEDULE
OH7666312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: OLD LANDMARK TAVERN DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
OLD LANDMARK TAVERN
2020 MONITORING SCHEDULE
OH7666312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: OLD LANDMARK TAVERNGround Water
7658543
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PLEASANT VIEW GOLF COURSE
2020 MONITORING SCHEDULE
OH7666412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PLEASANT VIEW GOLF COURS DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PLEASANT VIEW GOLF COURSE
2020 MONITORING SCHEDULE
OH7666412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PLEASANT VIEW GOLF COURSEGround Water
7658544
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
RED DOG SALOON
2020 MONITORING SCHEDULE
OH7666512 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: RED DOG SALOON DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
RED DOG SALOON
2020 MONITORING SCHEDULE
OH7666512 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: RED DOG SALOONGround Water
7658545
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SEVEN HILLS GOLF
2020 MONITORING SCHEDULE
OH7666912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: SEVEN HILLS GOLF DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SEVEN HILLS GOLF
2020 MONITORING SCHEDULE
OH7666912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SEVEN HILLS GOLF DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SEVEN HILLS GOLF
2020 MONITORING SCHEDULE
OH7666912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SEVEN HILLS GOLFGround Water
7658549
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
GRACE PETROLEUM - FOHL ROAD SUNOCO PWS
2020 MONITORING SCHEDULE
OH7667012 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: GRACE PETROLEUM - FOHL ROAD SUNOCO DIST.Ground Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
GRACE PETROLEUM - FOHL ROAD SUNOCO PWS
2020 MONITORING SCHEDULE
OH7667012 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GRACE PETROLEUM - FOHL ROAD SUNOCOGround Water Facility Class: CLASS A
7658550
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
YOHE PLAZA
2020 MONITORING SCHEDULE
OH7667612 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: YOHE PLAZA DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
YOHE PLAZA
2020 MONITORING SCHEDULE
OH7667612 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: YOHE PLAZAGround Water Facility Class: CLASS A
7658556
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
TANNENHAUF GOLF CLUB-CLUBHOUSE
2020 MONITORING SCHEDULE
OH7667812 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: TANNENHAUF GOLF CLUB CLU DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
TANNENHAUF GOLF CLUB-CLUBHOUSE
2020 MONITORING SCHEDULE
OH7667812 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: TANNENHAUF GOLF CLUB CLUBHOUSEGround Water
7658557
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WACO MARATHON
2020 MONITORING SCHEDULE
OH7668012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WACO MARATHON DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WACO MARATHON
2020 MONITORING SCHEDULE
OH7668012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WACO MARATHONGround Water Facility Class: CLASS A
7658559
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ANHEUSER-BUSCH SALES OF CANTONOH7668312
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658562EP001
Facility Name: ANHEUSER-BUSCH SALES OF CANTON
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
ANHEUSER-BUSCH SALES OF CANTONOH7668312
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ANHEUSER-BUSCH SALES OF DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ANHEUSER-BUSCH SALES OF DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
IRONROCK CAPITAL-PLANTOH7669112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658569EP001
Facility Name: IRONROCK CAPITAL INC - PLANT
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 10/1/2020 and 12/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
IRONROCK CAPITAL-PLANTOH7669112
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: IRONROCK CAPITAL-PLANT DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: IRONROCK CAPITAL-PLANT DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: IRONROCK CAPITAL-PLANT DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
EDISON PARK PLAZAOH7669212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658570EP001
Facility Name: EDISON PARK PLAZA STU 1
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
EDISON PARK PLAZAOH7669212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7660926EP002
Facility Name: EDISON PARK PLAZA STU 2
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP002
EP002
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
EDISON PARK PLAZAOH7669212
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EDISON PARK PLAZA DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EDISON PARK PLAZA DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
NORTH PLAZA-HARTVILLE
2020 MONITORING SCHEDULE
OH7669312 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: NORTH PLAZA-HARTVILLE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NORTH PLAZA-HARTVILLE
2020 MONITORING SCHEDULE
OH7669312 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: NORTH PLAZA HARTVILLEGround Water
7658571
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
GENTLEBROOK CHURCH & DAYCAREOH7669612
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658573EP001
Facility Name: GENTLEBROOK CHURCH & DAYCARE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
GENTLEBROOK CHURCH & DAYCAREOH7669612
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GENTLEBROOK CHURCH & DAYCARE DIST Facility Class: CLASS 1DS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: GENTLEBROOK CHURCH & DAYCARE DIST Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
LAKE O PINES PWS
2020 MONITORING SCHEDULE
OH7670312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: LAKE OPINES DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LAKE O PINES PWS
2020 MONITORING SCHEDULE
OH7670312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LAKE OPINES DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LAKE O PINES PWS
2020 MONITORING SCHEDULE
OH7670312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LAKE OPINESGround Water
7658579
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 8 PWS
2020 MONITORING SCHEDULE
OH7670412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: ZELLERS AMLC 8 DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 8 PWS
2020 MONITORING SCHEDULE
OH7670412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ZELLERS AMLC 8 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ZELLERS AMLC 8 PWS
2020 MONITORING SCHEDULE
OH7670412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ZELLERS AMLC NO 8Ground Water
7658580
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
KINGDOM HALL JEHOVAH WITNESS-MINERVA PWS
2020 MONITORING SCHEDULE
OH7670512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: KINGDOM HALL JEHOVAH WITNESS-MINERVA DISGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
KINGDOM HALL JEHOVAH WITNESS-MINERVA PWS
2020 MONITORING SCHEDULE
OH7670512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: KINGDOM HALL JEHOVAH WITNESS - MINERVAGround Water
7660842
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
RESCO PRODUCTS, INC.OH7671012
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658584EP001
Facility Name: RESCO PRODUCTS INC
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
RESCO PRODUCTS, INC.OH7671012
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: RESCO PRODUCTS, INC. DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: RESCO PRODUCTS, INC. DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
THE CHAPEL & DAYCARE IN MARLBOROOH7671212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7658586EP001
Facility Name: THE CHAPEL IN MARLBORO
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
THE CHAPEL & DAYCARE IN MARLBOROOH7671212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7661917EP002
Facility Name: THE CHAPEL IN MARLBORO STU 2
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP002
EP002
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 7/1/2020 and 9/30/2020
THE CHAPEL & DAYCARE IN MARLBOROOH7671212
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: THE CHAPEL IN MARLBORO DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: THE CHAPEL IN MARLBORO DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
BARKER SPRING CANTON PARK COMMISSION
2020 MONITORING SCHEDULE
OH7671312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BARKER SPRING CANTON PKS DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BARKER SPRING CANTON PARK COMMISSION
2020 MONITORING SCHEDULE
OH7671312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BARKER SPRING CANTON PKSGround Water
7658587
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NEW BALTIMORE ICE CREAM
2020 MONITORING SCHEDULE
OH7672112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: NEW BALTIMORE ICE CREAM DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NEW BALTIMORE ICE CREAM
2020 MONITORING SCHEDULE
OH7672112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
05/15/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: NEW BALTIMORE ICE CREAM DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NEW BALTIMORE ICE CREAM
2020 MONITORING SCHEDULE
OH7672112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: NEW BALTIMORE ICE CREAMGround Water
7658594
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WALBORN RESERVOIR MARINA
2020 MONITORING SCHEDULE
OH7672612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WALBORN RESERVOIR MARINA DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WALBORN RESERVOIR MARINA
2020 MONITORING SCHEDULE
OH7672612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WALBORN RESERVOIR MARINAGround Water
7660719
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
AL LENO PARK
2020 MONITORING SCHEDULE
OH7672712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: AL LENO PARK DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
AL LENO PARK
2020 MONITORING SCHEDULE
OH7672712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 10/31
04/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: AL LENO PARK DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
AL LENO PARK
2020 MONITORING SCHEDULE
OH7672712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to6/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: AL LENO PARKGround Water
7660747
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NEW HOPE CHAPEL PWS
2020 MONITORING SCHEDULE
OH7673012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: NEW HOPE CHAPEL DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NEW HOPE CHAPEL PWS
2020 MONITORING SCHEDULE
OH7673012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: NEW HOPE CHAPELGround Water
7661031
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MAIZE VALLEY FARM MARKET PWS
2020 MONITORING SCHEDULE
OH7673112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MAIZE VALLEY FARM MARKET DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MAIZE VALLEY FARM MARKET PWS
2020 MONITORING SCHEDULE
OH7673112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MAIZE VALLEY FARM MKT.Ground Water
7661124
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HARTVILLE MARKETPLACE PWSOH7673312
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7661221EP001
Facility Name: HARTVILLE MARKETPLACE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
HARTVILLE MARKETPLACE PWSOH7673312
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: HARTVILLE MARKETPLACE DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: HARTVILLE MARKETPLACE DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
HARTVILLE MARKETPLACE PWSOH7673312
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: HARTVILLE MARKETPLACE DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
FELLOWSHIP BAPTIST CHURCH-CANTON PWS
2020 MONITORING SCHEDULE
OH7673412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: FELLOWSHIP BAPTIST CHURCH-CANTON DISTRIBGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
FELLOWSHIP BAPTIST CHURCH-CANTON PWS
2020 MONITORING SCHEDULE
OH7673412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: FELLOWSHIP BAPTIST CHURCH-CANTONGround Water Facility Class: CLASS A
7661271
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PERENNIAL WINERY PWS
2020 MONITORING SCHEDULE
OH7673712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PERENNIAL WINERY DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PERENNIAL WINERY PWS
2020 MONITORING SCHEDULE
OH7673712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PERENNIAL WINERYGround Water
7661420
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LAKE SCHOOLS BUS GARAGE PWS
2020 MONITORING SCHEDULE
OH7673812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LAKE SCHOOLS BUS GARAGE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LAKE SCHOOLS BUS GARAGE PWS
2020 MONITORING SCHEDULE
OH7673812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LAKE SCHOOLS BUS GARAGEGround Water
7661547
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SREE GANGA LLC - VALERO CANTON
2020 MONITORING SCHEDULE
OH7673912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: JSK PETROLEUM DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SREE GANGA LLC - VALERO CANTON
2020 MONITORING SCHEDULE
OH7673912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: JSK PETROLEUMGround Water
7661651
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PUMP IT UP PWS
2020 MONITORING SCHEDULE
OH7674112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PUMP IT UP DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PUMP IT UP PWS
2020 MONITORING SCHEDULE
OH7674112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PUMP IT UPGround Water
7661695
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CALVARY BAPTIST CHURCH PWS
2020 MONITORING SCHEDULE
OH7674212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CALVARY BAPTIST CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CALVARY BAPTIST CHURCH PWS
2020 MONITORING SCHEDULE
OH7674212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CALVARY BAPTIST CHURCHGround Water
7661716
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CUSTOM POLY BAG INC PWSOH7674312
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7661732EP001
Facility Name: CUSTOM POLY BAG INC
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
CUSTOM POLY BAG INC PWSOH7674312
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CUSTOM POLY BAG INC. DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CUSTOM POLY BAG INC. DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
DEVILLE APARTMENTSOH7674412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7661744EP001
Facility Name: DEVILLE APARTMENTS
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
DEVILLE APARTMENTSOH7674412
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEVILLE APARTMENTS DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEVILLE APARTMENTS DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
DEVILLE APARTMENTSOH7674412
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEVILLE APARTMENTS DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
CORNERSTONE CHRISTIAN CHURCH PWS
2020 MONITORING SCHEDULE
OH7674512 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CORNERSTONE CHRISTIAN CHURCH DISTRIBUTIOGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CORNERSTONE CHRISTIAN CHURCH PWS
2020 MONITORING SCHEDULE
OH7674512 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CORNERSTONE CHRISTIAN CHURCHGround Water
7661759
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CHRISTIAN LIFE MENNONITE PWS
2020 MONITORING SCHEDULE
OH7674612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CHRISTIAN LIFE MENNONITE DISTRIBUTION DSGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CHRISTIAN LIFE MENNONITE PWS
2020 MONITORING SCHEDULE
OH7674612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CHRISTIAN LIFE MENNONITEGround Water
7661821
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WARSTLER BROTHERS LANDSCAPING INC PWS
2020 MONITORING SCHEDULE
OH7674712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WARSTLER BROS. LANDSCAPING, INC. DISTRIBGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WARSTLER BROTHERS LANDSCAPING INC PWS
2020 MONITORING SCHEDULE
OH7674712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WARSTLER BROS LANDSCAPINGGround Water
7661827
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MAPLE GROVE MENNONITE CHURCH PWS
2020 MONITORING SCHEDULE
OH7674812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MAPLE GROVE MENNONITE CHURCH DISTRIBUTIOGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MAPLE GROVE MENNONITE CHURCH PWS
2020 MONITORING SCHEDULE
OH7674812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MAPLE GROVE MENNONITE CHURCHGround Water
7661848
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BETHANY MENNONITE CHURCH-HARTVILLE
2020 MONITORING SCHEDULE
OH7674912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BETHANY MENNONITE CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BETHANY MENNONITE CHURCH-HARTVILLE
2020 MONITORING SCHEDULE
OH7674912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BETHANY MENNONITE CHURCHGround Water
7661860
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MILLER WELD MASTER PWSOH7675112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7661867EP001
Facility Name: MILLER WELD MASTER
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 4/1/2020 and 6/30/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
MILLER WELD MASTER PWSOH7675112
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MILLER WELD MASTER DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MILLER WELD MASTER DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
WOODBURY GLEN CONDOMINIUMS PWSOH7675212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7661892EP001
Facility Name: WOODBURY GLEN CONDOMINIUMS
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
WOODBURY GLEN CONDOMINIUMS PWSOH7675212
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WOODBURY GLEN CONDOMINIUMS DISTRIBUDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WOODBURY GLEN CONDOMINIUMS DISTRIBUDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
WOODBURY GLEN CONDOMINIUMS PWSOH7675212
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WOODBURY GLEN CONDOMINIUMS DISTRIBULC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
ST JOSEPH CHURCH PWS
2020 MONITORING SCHEDULE
OH7675412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ST JOSEPH CHURCHGround Water
7661975
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ALLIANCE CHURCH OF CHRIST PWS
2020 MONITORING SCHEDULE
OH7675712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ALLIANCE CHURCH OF CHRIST DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ALLIANCE CHURCH OF CHRIST PWS
2020 MONITORING SCHEDULE
OH7675712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ALLIANCE CHURCH OF CHRISTGround Water
7662022
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
RIVERSIDE BAR AND GRILL
2020 MONITORING SCHEDULE
OH7675812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
RIVERSIDE BAR AND GRILL
2020 MONITORING SCHEDULE
OH7675812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: RIVERSIDE BAR AND GRILLGround Water
7662045
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
KIDS COUNTRY PWSOH7675912
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7662076EP001
Facility Name: KIDS COUNTRY
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
KIDS COUNTRY PWSOH7675912
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: KIDS COUNTRY DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: KIDS COUNTRY DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
THE CHRISTADELPHIANS PWS
2020 MONITORING SCHEDULE
OH7676012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: THE CHRISTADELPHIANS DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
THE CHRISTADELPHIANS PWS
2020 MONITORING SCHEDULE
OH7676012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: THE CHRISTADELPHIANSGround Water
7662161
Sample(s) Required betweenBARIUM - 1010 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
INDIAN RUN CHRISTIAN CHURCH
2020 MONITORING SCHEDULE
OH7676112 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: INDIAN RUN CHRISTIAN CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
INDIAN RUN CHRISTIAN CHURCH
2020 MONITORING SCHEDULE
OH7676112 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: INDIAN RUN CHRISTIAN CHURCHGround Water
7662165
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HARTVILLE CHURCH OF CHRIST
2020 MONITORING SCHEDULE
OH7676212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HARTVILLE CHURCH OF CHRIST DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HARTVILLE CHURCH OF CHRIST
2020 MONITORING SCHEDULE
OH7676212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HARTVILLE CHURCH OF CHRISTGround Water
7662179
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SPEE-D-FOODS #29 PWS
2020 MONITORING SCHEDULE
OH7676412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SPEE-D-FOODS DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SPEE-D-FOODS #29 PWS
2020 MONITORING SCHEDULE
OH7676412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SPEE-D-FOODS LOUISVILLEGround Water Facility Class: CLASS A
7662215
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LOUISVILLE BAPTIST TEMPLE PWS
2020 MONITORING SCHEDULE
OH7676512 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
04/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LOUISVILLE BAPTIST TEMPLE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020
Sample(s) Required between1 2/1/2020 and 2/29/2020
Sample(s) Required between1 3/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Sample(s) Required between1 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LOUISVILLE BAPTIST TEMPLE PWS
2020 MONITORING SCHEDULE
OH7676512 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LOUISVILLE BAPTIST TEMPLEGround Water
7662247
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SCENIC CREEK APARTMENTS PWSOH7676612
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7662256EP001
Facility Name: SCENIC CREEK APARTMENTS PWS
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Sample(s) Required betweenRADIOLOGICALS 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
SCENIC CREEK APARTMENTS PWSOH7676612
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SCENIC CREEK APARTMENTS DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SCENIC CREEK APARTMENTS DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
SCENIC CREEK APARTMENTS PWSOH7676612
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SCENIC CREEK APARTMENTS DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 6/30/20205LEAD - 1030 AND COPPER - 1022 1/1/2020 andSample(s) Required between 12/31/20205 7/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
WORD OF GOD COMMUNITY CHURCH INC PWS
2020 MONITORING SCHEDULE
OH7676812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WORD OF GOD COMMUNITY CHURCH DISTRIBUTIOGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WORD OF GOD COMMUNITY CHURCH INC PWS
2020 MONITORING SCHEDULE
OH7676812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WORD OF GOD COMMUNITY CHURCH INCGround Water
7662261
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SCOTT PROCESS SYSTEMS INC PLANT 1 PWSOH7676912
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7662270EP001
Facility Name: SCOTT PROCESS SYSTEMS INC PLANT 1
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
SCOTT PROCESS SYSTEMS INC PLANT 1 PWSOH7676912
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SCOTT PROCESS SYS PLT 1 DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: SCOTT PROCESS SYS PLT 1 DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
GRACE BAPTIST CHURCH-CANTON PWS
2020 MONITORING SCHEDULE
OH7677112 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: GRACE BAPTIST CHURCH-CANTON DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
GRACE BAPTIST CHURCH-CANTON PWS
2020 MONITORING SCHEDULE
OH7677112 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GRACE BAPTIST CHURCH-CANTONGround Water
7662274
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
DOLLAR GENERAL #14174 - HOMEWORTH
2020 MONITORING SCHEDULE
OH7677612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DOLLAR GENERAL #14174 - DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
DOLLAR GENERAL #14174 - HOMEWORTH
2020 MONITORING SCHEDULE
OH7677612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: DOLLAR GENERAL #14174 - HOMEWORTHGround Water
7662469
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BEECH CREEK BOTANICAL GARDENS PWS
2020 MONITORING SCHEDULE
OH7677614 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BEECH CREEK BOTANICAL GARDENS DISTGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BEECH CREEK BOTANICAL GARDENS PWS
2020 MONITORING SCHEDULE
OH7677614 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BEECH CREEK BOTANICAL GARDENSGround Water
7662471
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
RIVER OF LIFE CHURCH
2020 MONITORING SCHEDULE
OH7677615 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: RIVER OF LIFE CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020
Sample(s) Required between1 2/1/2020 and 2/29/2020
Sample(s) Required between1 3/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Sample(s) Required between1 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
RIVER OF LIFE CHURCH
2020 MONITORING SCHEDULE
OH7677615 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: RIVER OF LIFE CHURCHGround Water
7662472
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ST JACOBS EVANGELICAL LUTHERAN CHURCH
2020 MONITORING SCHEDULE
OH7677617 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ST JACOBS EVANGELICAL LUTHERAN CHURCH
2020 MONITORING SCHEDULE
OH7677617 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ST JACOBS EVANGELICAL LUTHERAN CHURCHGround Water
7662474
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
TIMOTHY ENTERPRISES LLC
2020 MONITORING SCHEDULE
OH7677618 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
TIMOTHY ENTERPRISES LLC
2020 MONITORING SCHEDULE
OH7677618 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: DOLLAR GENERAL STORE # 6564Ground Water
7662475
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BEILER'S PENN DUTCH MARKET PWS
2020 MONITORING SCHEDULE
OH7677619 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BEILER'S PENN DUTCH MARKET PWS
2020 MONITORING SCHEDULE
OH7677619 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BEILER'S PENN DUTCH MARKETGround Water
7662476
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
DOLLAR GENERAL #9449 - CANTON SOUTH
2020 MONITORING SCHEDULE
OH7677621 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
DOLLAR GENERAL #9449 - CANTON SOUTH
2020 MONITORING SCHEDULE
OH7677621 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: DOLLAR GENERAL STORE # 9449Ground Water
7662478
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
KRAUS PIZZA PWS
2020 MONITORING SCHEDULE
OH7677622 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
KRAUS PIZZA PWS
2020 MONITORING SCHEDULE
OH7677622 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: KRAUS PIZZA
7662479
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HARTVILLE PROPERTIES-GEORGIO'S PIZZA PWS
2020 MONITORING SCHEDULE
OH7677623 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HARTVILLE PROPERTIES-GEORGIO'S PIZZA PWS
2020 MONITORING SCHEDULE
OH7677623 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HARTVILLE PROPERTIES - GEORGIO'S PIZZAGround Water
7662481
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MARATHON PETROLEUM COMPANY-CANTON TRUCKOH7677624
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7662480EP001
Facility Name: MARATHON PETROLEUM CO - CANTON TRUCK
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020
MARATHON PETROLEUM COMPANY-CANTON TRUCKOH7677624
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
SPRINGWATER GARDENS CONDOMINIUMS PWSOH7677628
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7662486EP001
Facility Name: SPRINGWATER GARDENS CONDOMINIUMS
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
SPRINGWATER GARDENS CONDOMINIUMS PWSOH7677628
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DISTRIBUTIONDS201 UNKNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
PEACE, LOVE AND LITTLE DONUTS PWS
2020 MONITORING SCHEDULE
OH7677629 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
05/15/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020
Sample(s) Required between1 2/1/2020 and 2/29/2020
Sample(s) Required between1 3/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Sample(s) Required between1 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PEACE, LOVE AND LITTLE DONUTS PWS
2020 MONITORING SCHEDULE
OH7677629 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PEACE, LOVE AND LITTLE DONUTSGround Water
7662487
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
DOLLAR GENERAL #18257 - EAST SPARTA
2020 MONITORING SCHEDULE
OH7677630 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
DOLLAR GENERAL #18257 - EAST SPARTA
2020 MONITORING SCHEDULE
OH7677630 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: EAST SPARTA DOLLAR GENERALGround Water
7662488
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CREEKSIDE COTTAGE WINERY
2020 MONITORING SCHEDULE
OH7677632 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020
Sample(s) Required between1 2/1/2020 and 2/29/2020
Sample(s) Required between1 3/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Sample(s) Required between1 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CREEKSIDE COTTAGE WINERY
2020 MONITORING SCHEDULE
OH7677632 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CREEKSIDE COTTAGE WINERY PLANTGround Water
7662490
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
THE WHETSTONE CENTER
2020 MONITORING SCHEDULE
OH7677633 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTION
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
THE WHETSTONE CENTER
2020 MONITORING SCHEDULE
OH7677633 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WHETSTONE CENTER PLANTGround Water
7662491
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
DOLLAR GENERAL #18872 - ROBERTSVILLE
2020 MONITORING SCHEDULE
OH7677634 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTION
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
DOLLAR GENERAL #18872 - ROBERTSVILLE
2020 MONITORING SCHEDULE
OH7677634 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: DOLLAR GENERAL - ROBERTSVILLE PLANTGround Water
7662492
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
FRY FAMILY PARK
2020 MONITORING SCHEDULE
OH7677635 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
07/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTION
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
FRY FAMILY PARK
2020 MONITORING SCHEDULE
OH7677635 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
07/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: FRY FAMILY PARK PLANTGround Water
7662493
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HERITAGE TRUCK EQUIPMENT PWSOH7677637
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7662495EP001
Facility Name: HERITAGE TRUCK EQUIPMENT PLANT
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
HERITAGE TRUCK EQUIPMENT PWSOH7677637
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
MARLBORO CHURCH OF CHRIST
2020 MONITORING SCHEDULE
OH7677638 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTION
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MARLBORO CHURCH OF CHRIST
2020 MONITORING SCHEDULE
OH7677638 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MARLBORO CHURCH OF CHRIST
7662496
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BARGAIN BARN
2020 MONITORING SCHEDULE
OH7677639 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTION
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BARGAIN BARN
2020 MONITORING SCHEDULE
OH7677639 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BARGAIN BARN PLANT
7662499
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NEW BALTIMORE ICE CREAM-HARTVILLE
2020 MONITORING SCHEDULE
OH7677641 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
07/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTION
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NEW BALTIMORE ICE CREAM-HARTVILLE
2020 MONITORING SCHEDULE
OH7677641 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
07/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: NEW BALTIMORE ICE CREAM-HARTVILLE PLANT
7662501
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MOTTS GREENHOUSE
2020 MONITORING SCHEDULE
OH7677645 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
08/14/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTION
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MOTTS GREENHOUSE
2020 MONITORING SCHEDULE
OH7677645 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
09/18/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MOTTS GREENHOUSE PLANT
7662504
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
GREEN FARMS
2020 MONITORING SCHEDULE
OH7677646 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
08/14/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTION
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
GREEN FARMS
2020 MONITORING SCHEDULE
OH7677646 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
09/18/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GREEN FARMS PLANT
7662505
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or