2019 - welcome to environment · 2019-02-11 · fire fighting system: a suitable fire fighting...

60
D D E E T T E E R R M M I I N N A A T T I I O O N N O O F F T T o o R R F F O O R R E E N N V V I I R R O O N N M M E E N N T T A A L L S S T T U U D D I I E E S S   BHANGAON IRON ORE OPENCAST PROJECT Lease Area – 111.00 Ha. Capacity – 2.00 MTPA       P PR RO OP PO ON NE EN NT T M M/ / s s S S O OU UT T H H W WE E S S T T M MI I N NI I N NG G L L I I M MI I T T E E D D ( ( S S W WM ML L ) ) B B 1 1 3 3 - - 1 1 4 4 , , R R I I I I C C O O I I n n d d u u s s t t r r i i a a l l A Ar r e e a a , , O Op p p p . . R Ra a j j a a s s t t h h a a n n S S t t a a t t e e W Wa a r r e e h h o o u u s s e e , , B B a a r r m me e r r - - 3 3 4 4 4 4 0 0 0 0 1 1   2 2 0 0 1 1 9 9 M/s Crystal Consultants Ranchi, Jharkhand Accredited by NABET as Environment Consultants www.crystalconsultants.org

Upload: others

Post on 19-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

DDEETTEERRMMIINNAATTIIOONN OOFF TTooRR

FFOORR

EENNVVIIRROONNMMEENNTTAALL SSTTUUDDIIEESS

  

BHANGAONIRONOREOPENCASTPROJECT LLeeaassee AArreeaa –– 111111..0000 HHaa..

CCaappaacciittyy –– 22..0000 MMTTPPAA       

PPRROOPPOONNEENNTT

MM//ss SSOOUUTTHH WWEESSTT MMIINNIINNGG LLIIMMIITTEEDD ((SSWWMMLL))

BB 1133--1144,, RRIIIICCOO IInndduussttrriiaall AArreeaa,,

OOpppp.. RRaajjaasstthhaann SSttaattee WWaarreehhoouussee,,

BBaarrmmeerr -- 334444000011

  

22001199

M/sCrystalConsultantsRanchi,Jharkhand

AccreditedbyNABETasEnvironmentConsultantswww.crystalconsultants.org

Page 2: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

CCOONNTTEENNTTSS

11.. FFoorrmm‐‐II

22.. PPrree‐‐FFeeaassiibbiilliittyyRReeppoorrtt

Page 3: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement
Page 4: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

CONTENTS

CHAPTER PARTICULAR PAGENO.

Chapter–I EXECUTIVESUMMARY 01‐05

Chapter–II PROJECTDESCRIPTION 06‐08

Chapter–III PROJECTDESCRIPTION 09‐29

Chapter–IV SITEANALYSIS 30‐38

Chapter–V PLANINGBRIEF 39‐42

Chapter–VI PROPOSEDINFRASTRUCTURE 43‐45

Chapter–VII REHABILITATION&RESETTLEMENTPLAN 46‐46

Chapter–VIII PROJECTSCHEDULE&COSTESTIMATES 47‐49

Chapter–IX ANALYSISOFPROPOSAL 50‐50

LISTOFPLATES

Plate PlateNo.

IndexPlan I

LocationPlan&EnvironmentalMonitoring

StationPlanII

SurfacePlan III

GeologicalPlan IV

ConceptualPlan V

ANNEXURE

PreciseAreaMap(BoundedCo‐Ordinate) Annexure‐I

 

Page 5: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page1M/sCrystalConsultants

CHAPTER–IEXECUTIVESUMMARY

1.0 Bhangaon Iron Ore Block has been vested to M/s South West Mining Limited

(SWML)byGovt.ofJharkhandthroughauctionprocesstoexcavate2.0MTPAofIron

OreinvillageBhangaon,SarandaForestDivision,WestSinghbhum,Jharkhand.

2.0 The allottedmining block has an area of 111 Ha. but the proponent proposes to

confineallprojectactivitiesincludingquarry,externaldump&infrastructurewithin

anareaof62.78Ha.inKarampadaReserveForestofSarandaForestDivision,West

Singhbhum,Jharkhand.

3.0 Theblockisboundedbyfollowinggeodesicaxes:

Latitudes :22001’37.20720”to22002’38.28422”N

Longitudes :85014’22.14298”to83015’21.02400”E

4.0 Basedondetailedgeologicalexploration,aGeologicalReporthasbeenpreparedby

GoJ.Basedonfindingsofthisreport,leaseareahasbeenfixedas111.00Ha.

5.0 BlockcontainsIronOrereserveof25.64MT.Extractablereservehasbeenestimated

as25.1272MTafterconsideringmininglossesof2%.

6.0 MiningPlanhasbeenpreparedtomine2.0MTPAironorebyopencastminingfully

mechanized method using shovel‐dumper combination. Stripping ratio has been

foundtobe1:0.16.Estimatedlifeofmineis14Years.

7.0 The iron ore produced from the mine will be consumed after dry beneficiation

blending & upgradation by the steel plants for commercial purpose as per the

auctionrulewithin&outsideofstate.

8.0 MiningMethod

Overburden will be removed & transported to external or backfilled area for

storage.Ironorewillberemovedbyblasting.

9.0 IronOreProcessing

Initiallyonlycrushingandscreeningoforewillbedoneatminesite.ROMgrade

ore as such cannot be sent directly to the plant. ROM ore will be subjected to

crushinganddryscreening.Thecrusherwillbeequippedwithdustsuppression

system,withthissizinganddryscreeningtherewillbeenhancementinthegrade

oftheorebyaminimumof0.5%.Thedispatchgradeoforewillbemaintainedas

pertherequirementofthebuyers.

The +55% Fe will be upgraded by wet beneficiation outside the mining lease

boundarytoachievetherequiredgradeforsteelplant.

Page 6: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page2M/sCrystalConsultants

Considering300workingdays inayearand threeworkingshift, thesizeof the

mobile crushing& screening plant should be 2000000 tonnes ÷ 300 days ÷ 18

hours per day (effective) = 370 tonnes. So, one 500 tph mobile crushing &

screeningplantisproposedforinstallationinfirstyearitselfataplaceshownon

thedevelopmentplans.FeedSize :Upto500mm

ProductSize Lumps:(+)10mmto(‐)40mm

:(+)5mmto(‐)20mm

Fines :(‐)10mm

:(‐)5mm

RunningHours/day :18Hours

Lumps/sizedoreexpected :30%

Fines :70%

10.0 IronOretransportation

Iron Ore will be transported from quarry face to crusher & screening plant by

dumpers and the sized ore will be transported by Dumpers to loading point at

KarampadaRailwaySiding.

11.0 MineClosurePlan

Attheendofminingoperations,minewillbeclosedasperapprovedMineClosure

Plan.

12.0 Land

Proposed Lease area (111.00Ha.) comprises of total forest land under Bhangaon,

SarandaForestDivision,WestSinghbhum,Jharkhand.

13.0 Accessibility

Karmapada Railway Station (about 5.2 Km away) is nearest railway station. The

block is connected to Chaibasa and Kiriburu by Chaibasa – Barjamda – Kiriburu

StateHighway.Theareaisabout6KmfromKiriburuandapproachedbymotorable

KachaForestRoad.

14.0 Infrastructure

Social Infrastructure ‐ School, Post – Office, Banks are located in Kiriburu

whichis6Kmaway.

Page 7: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page3M/sCrystalConsultants

Power‐Powernetworkpassesbythesideofleasearea.

Water ‐Nearby perennial nallahwould be used forwater supply in initial

two years by constructing a weir across it & later on supplemented by

Quarrywater.

HaulRoadAlignment

Theapproachroadfromthebottomofthehillentersintomineleasearea

atwesternpartof theblockatcontour levelof625MRL .MainMineRoad

will lead through the Check gate to the Crushing / processing area /

dumping / blending /weighing areas and up to the initialmine‐opening

area,preferablyalongthecontoursofthehillslopewithgradientof1:16.

AseparateexistingRoadwillbeusedattheinitialstagesforemptyvehicles

to facilitate smooth traffic movement. Haul road alignment from initial

mineworkingareastotheproposedCrushing/processingarea/dumping

/ blending /weighing areaswill be constructed during the development

stage.

Workshop:

A Work shop made of portacabine will be installed for maintenance ofMobile equipment, engineer’s office and Stores for running requirementof Spares within the block area asshownontheplan.

Store:A store made of portacabine will be installed for keeping adequatestock of the HEMM Spares and Sub‐assemblies and other electrical andmechanicalspares,propercomputerizedsystem formaterialmanagementwillbe installedwithin theblock area as shownon theplan.

Dieseldispensingunit:A diesel dispensing unit will be installed near to the store or out siteof the block areasubjecttoclearancesfromdifferentauthoritiesfordailyconsumptionofdiesel.

OfficeComplex:

An office of the manager of the mine, Personnel Manager’s informationsystem, Account office and pay office made of portacabines will beinstalledwithin the the block area asshownontheplan.

BlastingShelters:Adequate blasting shelters will be provided. Blasting will generallybe done duringchangeoveroffirstandsecondshift.

Restshelter:Restshelterasperstatutewillbeprovided.Firstaidroomwillbeconstructedadjoiningtherestshelter.

Page 8: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page4M/sCrystalConsultants

Ambulance:AnambulancewithwirelesscommunicationwillbeprovidedintheBlockarea.

Lightingsystem:Sodium Vapor lamps will be put around the office complex, securityhouse, workshop,crusherscreeningplant,mines,haulroad,Magazine,etc.

Communicationsystem:An adequate communication system will be provided betweendifferent executives,supervisorsandkeypersonnel

Firefightingsystem:Asuitablefirefightingsystemwillbeinstalled.

Warningsystem:Visiblesign‐boardswritteninHindiwillbeerectedatprominentdisplaypointstopreventunauthorizedentriesandprecautionsduringblastingandfrommovingVehicles.

DrinkingWater:Drinking waterwill be provided in themine at suitable point and atother place wherelaboursareengaged.

ResidentialUnit:Itisproposedtoconstruct10Unitsofresidentialunitfortheprojectawayfromleasearea.

15.0 WaterSupply

Total water demand has been estimated as 186 KLD.Water demandwill bemetinitially for twoyears fromnearbyperennialnallahbyconstructingweiracross itandlatersupplementedbyQuarryWater.

16.0 EnvironmentPollutionMitigationA. AirPollution

Arrangementforregularsprinklingwaterondustgenerationsourcesi.e.HaulRoadwillbemade.

Greenbeltwillbeprovidedatstrategiclocations.B. WaterPollution

ETPwillbeprovidedfortreatmentofeffluentfromworkshop. Septictankswillbeprovidingforpitheadbuildings. Hillslopeminingisproposedinthisareabyslicing/contourmining,

therefore thewater flowing through thequarryduring rainy seasonwillflowundergravitythroughagarlanddrainandpassedthroughaseriessettlingtanks,Checkdams&storeintheRainwaterHarvestingpitprior to itsdischarge to thenatural streams.Theoverflowwaterfromtheharvestingpitafterpassingthroughnumberofcheckdamswillbedischargedtoperennialnala.Hencenopumpingarrangementwill be required. Quarterly monitoring of the surface water will be

Page 9: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page5M/sCrystalConsultants

doneasperMoEF&CCnormstomaintainthequalityof thesurfacewater.

C. LandReclamation

Itisproposedtoreclaimexternaldump(12.75Ha.)andbackfilledarea(2.26

Ha.).Physically&biologicallyanduseitformixedplantation.

D. PlantationItisproposedtoraiseplantationwithinleaseareapostmininginOBdump,

benches,avenue,plantation,etc.

E. NoisePollutionControlMajorsourcefornoisepollutionismovementoftransportvehiclesanddaily

operation.It isproposedtoprocureminimalnoisemachineryandmaintain

themregularly.

Page 10: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page6M/sCrystalConsultants

CHAPTER–II

INTRODUCTIONOFTHEPROJECT/BACKGROUNDINFORMATION

2.1 IdentificationoftheProject&ProjectProponent

2.1.1 Project

Government of Jharkhand vide letter No. MSTC/RNC/Department of Mines and

Geology/5/Jharkhand/17‐18/21987dated05.01.2018issuedaNoticeforgrantof

MiningLease(ML)forBhangaonIronoreBlockoveranareaof111.0Hainvillage

Bhangaon,SarandaforestDivision,DistWestSinghbhum,Jharkhandforaresource

sizeof38.25MillionTonnes.Theminehasbeenplannedtoexcavate2.0MTPAof

IronOreasperthepresentminingplan.

Inpursuant to theMinesandMinerals(DevelopmentandRegulation)Amendment

Act, 2015 and The Mineral (Auction) Rules, 2015, Govt. of Jharkhand issued the

notice inviting tender dated January5, 2018 for commencement of the auction

processtograntthemining lease inrespectofBhangaonIronoreblock locatedin

village Bhangaon, Saranda Forest Division, District West Singhbhum, Jharkhand.

Thee‐auction processwas conducted inaccordancewith the tender document and

the Mineral Auction Rule, 2015 for said mineral block and M/s SOUTH WEST

MINING LIMITED (SWML) was declared as the Preferred Bidde runder

Rule9(4)(b)(iii)oftheMineral(Auction)Rules2015.SWMLhasdepositedasumof

INR2,12,38,860/‐(Rupees Two crores Twelve Lakh Thirty Eight Thousand Eight

HundredandSixtyonly)throughGRN1802532732aspaymentoffirstinstallmentie,

10%ofupfrontpaymenton7thAugust,2018.Subsequently,aletterofintent(LoI)was

issuedtoM/sSOUTHWESTMININGLIMITED(SWML)forgrantofmining leaseof

BhangaonIronoreBlockcomprisingof111.0Hawithinthelimitingco‐ordinatesof

the‘PreciseAreaMap’providedbytheGovt.ofJharkhandasattachedinAnnexure‐1.

2.1.2 ProjectProponent

SouthWestMiningLtd(SWML)isaPublicLimitedCompanyhavingitsRegistered

office at JSWMiningOffice Vidyanagar, Talur Cross, Toranagallu, Bellary 583275,

Karnataka.Thecompanywasincorporatedinthenameof“JindalFertilizersLtd”on

8thOctober, 1996. Subsequently thenameof the companywas changed to “South

West Mining Ltd.” with effect from 25th June 2001. The company is primarily

Page 11: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page7M/sCrystalConsultants

engagedincarryingouttheminingactivitieswith itswell‐equippedresources for

Ironore,Lignite,Limestoneetc.

2.2 BriefdescriptionofnatureoftheProject

BhangaonIronOreMineissituatedinNoamunditehsilofWestSinghbhumdistrict

inSarandaForestDivisionwithanareaof111.00Ha.offorestland.

SWMLproposes to carryoutopencastmethodofmining for2.0MTPAof IronOre

from Bhangaon Iron OreMine by fullymechanizedmethod using shovel dumper

combination.TheexcavatedROMore isproposed tobeprocessed in thecrushing

andscreeningplantstoobtainthelumpandfineoreasproductmix.Thetotallifeof

mineisenvisagedas14years.Thetotalmanpowerrequiredfortheprojectwillbe

about206people.Waterrequirementis186KLDfordrinkingandotherpurposes.

Thiswillbemetforinitialtwoyearsbymakingweironaperennialnallahflowing

bysideofleaseareaandlaterbywaterpumpedfromtherainwaterharvestingpit.

MoreoverDTHdrillingisproposedduringthefirstyearofworkingwithinthenon

mineralizedareawhichwillbeusedaswaterdrillholesbasedontheavailabilityof

waterduringdrilling.

2.3 NeedfortheProject&itsImportancetotheCountry&Region

IronoreremainsthemostcrucialdrivingforceforthesteelindustryinIndiaandthe

industry’sgrowthsofarcanlargelybeattributedtothedomesticavailabilityoflow

costandhighqualityironore.Thesteelindustrytodaydirectlycontributesto2%of

India’s Gross Domestic Product (GDP) and its weightage in official Index of

IndustrialProduction(IIP)is6.2%.GloballyalsooverthelasttwodecadesIndiahas

becomeworld’s3rdlargestproducerofcrudesteelprecededbyChinaandJapan.It

isfurtherexpectedthatthesteelproductionwillgrowatamuchfasterpaceinthe

countryand therefore therequirementof ironore for thedomestic ironandsteel

industrywillbequitesubstantialincomingyears.

Developmentoftheminewillcreateemploymentandsourceofincomegeneration

intheregion.Therewillbedevelopmentinsecondary&tertiarysectorsaswell.

Page 12: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page8M/sCrystalConsultants

2.4 Demand&SupplyGap

Thepercapitaconsumptionofsteel in India inFY2017‐18was69Kgagainst the

worldaverageof214.5Kg.TheNationalSteelPolicy2017hasprojectedanannual

demandof437MTofIronOreforsteelindustrytomeetthepercapitasteeloutput

of158KgbyFY2030‐31,anincreaseof89Kgabovethepresentpercapitalevels.

Sothereisabiggapindemandandsupply.

2.5 ImportvsIndigenousProduction

Indiadoesnotneedtoimportironorebutforlasttwoyearsimporthastakenplace

due to court imposed restrictions in key producing states likeKarnataka, Odisha,

Goa, etc. for curbing illegal mining. Production of iron ore from this mine will

partiallymeetthedemandforironore&reduceneedforimport.

2.6 ExportPossibility

Iron Ore excavated from the proposedmine will be transported to the domestic

SteelPlants.Hencenoexportpossibilityexists

2.7 Domestic/ExportMarket

The ironoreproduced from thisminewillbe largely consumedby steel sector in

domesticmarketreducingtheneedforimport.

2.8 EmploymentGeneration(DirectandIndirect)duetotheProject

Therewillbedirectemploymentof206people involvedin ironoremining.There

willbealsoemploymentopportunityinSecondary&TertiarySector.

Page 13: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page9M/sCrystalConsultants

CHAPTER–III

PROJECTDESCRIPTION

3.1 TypeofProject

BhagaonOpencastIronOre(2.0MTPA)shallproduceironorebyopencastmethod

ofminingforthesteelplantswithinandoutsidethestateaspertheauctionrule.

3.2 Location

The area falls under Survey of India OSM No. F45H4&F45H8 and is well

connectedfromChaibasauptoKiriburubyChaibasa‐Barajamda‐KiriburuState

Highway. The area is about 8 KM from Kiriburu and can be approached by a

motorableKachaForestroad.ThetotaldistancefromChaibasatoareaisabout

110KM.TheareacomesunderKiriburupolicestationandNoamundiBlockof

Jagannathpur subdivision,WestSinghbhumDistrict.Thedeposit liesbetween

latitude 220 01’ 37.20720” to 220 02’ 38.28422” N and longitudes 850 14’

22.14298” to 830 15’ 21.02400” E. The deposit area falls under Karmpada

Reserve Forest (R.F) under Saranda Forest Division, West Singhbhum,

Jharkhand.ThevillageBhangaonissitutatedonitsfoothills.

The nearest railway station is Karampada Railway station (Jharkhand) – 5.2 km

fromthebaseoftheleasetowardsN‐WdirectiononKiriburu–BimlagarhBranch

of S‐E Railway. The nearest sea port is Paradeep at a distance of about ‐361 km

(DistancebyRail)fromthedeposit.Kiriburu‐6kmthenearesttownshipfromthe

depositwhichhaveinfrastructurefacilitieslikeBank,PostOffice,PoliceStationand

primaryhealthdispensaryoftheStateGovernment.Chaibasaisataroaddistanceof

about110Km.fromthedeposit.

ThedepositcanbeapproachedfromKiriburubyanallweatherroaduptothetop

whichcontinuesuptominebottom.Presentlyajeepableroadservesthepurpose.

Thedepositcanbeapproached fromKiriburubyanallweatherroadupto the top

whichcontinuesuptominebottom.Presentlyajeepableroadservesthepurpose.

The location of the Bhangaon Mine has been shown in index plan attached as

Plate‐I and the study area plan showing boundary with co‐ordinates has been

attachedasPlate‐II.

Page 14: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page10M/sCrystalConsultants

3.3 DetailsofAlternativeSites

The block has been vested byGovt. of Jharkhand. The lease area of 111.00Ha.has

sufficientironorereservetocontinueminingoperationfor14yearsandassuchno

alternativesitewasconsidered.

3.4 SizeorMagnitudeofOperation

Thisisanewmineplannedtoproduce2.00MTPAofIronOrecapacitybyopencast

methodwithaproposedleaseareaof111.00Ha.

Physiography&Drainage:‐

Thearearepresentsaveryhillyandruggedtopography.Thehighestpointis863m

abovemeansealevelwhilethelowestaltitudeis587mabovemeansealevel.The

highest altitude comprises of Banded Iron ore formationwhile the lower altitude

bearingareacomprisesshale,lateriteandsoilofreddish&chocolatecolour.

Bhangaon iron ore block area has no perennial streams flowing down the slope.

Thereisnomajorsourceofperennialwaterinthearea.HoweveranumberofNalas

passthroughthenearbyarea.Oneperennialnalaissituatedinthewesterndirection

of the block area, around 1.25Km away. This is locally named as Koinagarand is

flowingtowardsnorth.Thebufferzoneof10Kmareahasshowndentriticpattern

of drainage systemand ismainlydrainedby two rivers viz.KaroandKoina river

whichflowfromsouthtonorth.KaroandKoinaaretheprincipaldrainagechannels

of the area. Karoriver flows on the eastern side and Koina River flows on the

westernsideofKiriburu–Meghahatuburuhillrange.Oneasternpartofblockarea,

there are other seasonal nallas such as Pacherinala, Rogarnalla, Champuanala,

Jhikarianala, Panposhnala and Balagodanala. All these nallas join Kororiver on

easternside.SimilarlyonwesternsidethereareotherseasonalnallaslikeSankoja,

Gagirathi,Meghahatu, Sasangdih, Pardih, Rang‐Ring etc. which join Koinariver on

westernside

RegionalGeology

Geologically,theterrainaroundtheareaformspartoftheoldestmeta‐sedimentary

andmetavolcanicformationsoftheChhotanagpurplateau,situatedontheBudaburu

andBaichindigiburuhillranges,consideredashomotaxialwiththeDharwarsinthe

Indian geological column. It is believed that the iron‐rich formations of theBonai‐

KeonjharrangeformpartoftheIronOreSeries.

Page 15: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEBHANGA

M/sCrys

In

oc

an

w

th

ou

Pr

Jh

fr

cr

re

po

ir

Lo

Th

iro

fri

rep

the

Th

na

Od

Jha

Or

Th

He

Jas

iro

Ba

gre

fou

of

rid

wi

EASIBILITYAONIRONO

stalConsulta

n a generall

ccur betwee

nd the basa

whichuncon

he form of t

utcropsaro

recambrian

harkhand &

om theear

ratonicbloc

emained a

otential of t

on,mangan

ocalGeolog

he IronOre

onorebasin

nge of Sing

positoryof

eBandedH

hisBandedH

rrow horse

disha andw

arkhand.Th

reRange,w

here are fou

eamatite Q

sper (BHJ)

onorewhich

anded Heam

eenishargil

undonthet

this area is

dgetops.Th

thsouth‐w

Y REPORTOREOPENC

ants

ly accepted

en the over

al sandston

formablyov

tuff beds,ha

undtheSin

Singhbhum

& Orissa and

rlyArchaean

ck,knownas

major attr

this belt in

nese,chrom

y

depositso

nwhichisk

ghbhum Cra

ironorede

HaematiteQ

HaematiteQ

e shoe shap

with sides a

heridgefor

whichispers

ur importa

uartzite (B

andBande

harenatura

matite Quar

llaceoussha

topofthes

smainly in

heIronore

westerlydip

T FOR CASTPROJ

d opinion, i

rlying shale

ne conglom

verlaysthe

as been not

ghbhumgra

m cratonic

d preserves

n toat leas

sSinghbhum

raction to t

terms ofm

ite,andlime

fBhangaon

nownasBa

aton located

epositsofEa

Quartzite/Ja

Quartzitecr

pe with clo

about 13Km

rmingthew

sistentfors

nt litho un

BHQ),Metas

edMagnetit

allyconfirm

rtzites are

alerockisp

eriesofthe

the formo

depositsoc

pping.Thed

ECT

Page11

ron ore be

es, phyllites

erates, occu

oldermeta

tedwithin

anitebody.

nucleus of

s imprints

st earlyNeo

mCratonor

the geoscie

majormine

estoneamo

narea is ap

anaisynclino

d in parts o

asternIndia

asperofwh

ropsoutand

osed end to

m apart ope

westernsid

some48Kms

nits identifie

sedimentar

eQuartzite

mableandpr

the basem

present.Th

hillswithin

of heamatit

ccurringint

dipamount

aring Band

, sandstone

urring at th

morphics.P

the BIF. Th

f eastern I

of several

oproterozoi

rasSinghbh

entists and

ral deposits

ongstothers

partof fam

orium.This

of Jharkhan

awhichisp

ichtheyre

disarrange

o the south

en to the N

deoftheho

s.

ed in the B

ybedsof ir

.TheBIFco

resentasre

ment litho u

heexposure

nthearea.T

tewhich oc

theareahas

tvariesbetw

ded Iron Fo

es, lavas, as

he base of

Profusevol

he Iron Ore

ndia falls i

geological

c (Saha199

hum‐Orissa

d miners fo

s such as c

s.

oushorse s

basin,occu

nd and Odis

particularly

epresenten

edasridges

in Keonjha

North‐East i

rseshoeis

Bhangaon a

ronore,Ba

onsistsofB

egularthick

units of BI

softhispa

TheIronOr

ccurswithin

sageneral

ween65º t

ormations (

sh and tuff

iron ore g

lcanicactiv

e Group of r

in the stat

cycles span

94).Thean

IronOreCr

or the imm

opper, uran

shoe (U) sh

urringatwe

sha, is the

yassociated

nrichedpor

sintheform

ar and Bon

n Singhbhu

knownasI

area, viz.Ba

andedHeam

BHQ,BHJ,B

beds.

IF below w

articularuni

remineraliz

n theBIF on

strikeNNE

to75º.How

BIFs)

beds,

group

vityin

rocks

es of

nning

ncient

raton

mense

nium,

haped

stern

main

with

rtion.

mofa

nai in

um in

Iron‐

anded

matite

BMQ&

which

itare

zation

n the

‐SSW

wever,

Page 16: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page12M/sCrystalConsultants

thestrikeoftheIronOrebodiesdiffersatplacesduetolocallydevelopedstructural

disturbances.TheIronOredeposit(Heamatite)ismassive,hardanddarkbrownto

steelgreyincolour,havingwidelyspacedjoints.Flakyandfriableorewithbrownto

greyincolourisalsoavailable.Thedarkbluefinegrainedveryrichtypeofpowdery

IronOre(BlueDust)alsooccursinassociationwithflakyore.Generally,atlowerlevel

Sub‐gradeoresarealsoavailable.

The IronOremineralization in theBhangoanareahasbeen divided into following

types

a) LateriticOre

b) HardandmassiveOre

c) ThicklyLaminatedOre

d) ThinlyLaminatedOre

e) BiscuityOre

f) PowderyOre

LateriticoreisformedduetochemicalweatheringofIronoreexposedintheupper

surfaceinthearea.Massiveorehasbeenformedbycompletelocalenrichmentofthe

ferruginousrock.SoftorPorousshalyorehasbeenformedby leachingoutofsilica

fromBHQ/BHJ.PowderyOreoccurswheretherehasbeenalmostcompleteremoval

ofsilicafromBHQwithoutanycementationoftheremainingHaematitegrainswhich

areleftasloosepowder.

ThegeologicalplanofBhangaonIronOreMinehasbeenattachedasPlate‐IV.

3.5 ProjectDescriptionwithProcessDetails

MethodofMining:‐

Beingahill‐topdeposit,Bhangaonironoreblockisamenabletoopencastminingby

fullymechanizedmethodwithafairlyhighdegreeofmechanization.

OpencastminingisidealfortheBhangaonIronOreBlockespecially,inviewoflow

OB/waste thickness and high iron ore thickness. Due to the gentle slope of the

BhangaonironoreBlock,theconventionalhorizontalbenchmethodofmininghasto

be adopted for this deposit.Mining fronts are planned to advance almost north –

South parallel to the surface contours & strike length of the ore. This will allow

miningof fullprofileof the ironore thicknesswith longer strike therebyenabling

blendingfromdifferenttop&bottomsections.

Page 17: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page13M/sCrystalConsultants

In order to take into account the interburden pockets of ferruginous clay

intersectioninbetweentheorezone,specialprecautionsneedtobetakentoavoid

dilutionoftheore.

The mine will be worked by fully mechanized opencast mining method. The

sequenceofminingoperationisgivenbelow:‐

Step–AremovalofOverburden/Interburden Forminingofironore,seamneedstobeexposedbyremovingoverburden/

interburden. For removal of overburden / interburden blast holes will be drilled using

drills. Blastholeswillbe filledwithexplosivesandblastingwillbe carriedout to

breakthemassofOverburden. Blastedmaterialwillbeloadedintodumpersbyshovel. Overburdenwillbestoredoverareaspecifiedfordumps.

Step–BForminingofironore,activitieswillbecarriedoutinfollowingsequence: Drillingblastholesinironoredeposit. Fillingdrillholeswithexplosives. Blasting Loadingofblastedmassofironoretodumpersbyshovels. TransportofROMironoretomobilecrushingplant.

Step–C ROMironorewillbecrushed inprimarycrushers tomaximumsizeof200

mm. Aftercrushing,thecrushedmaterialwillgotosecondaryconetypecrusher. The crushed material from secondary crusher will be screened through

varioustypesofscreensizestomaketheproductsize+5mmto+20mmand+10mmto40mmandfinesof‐10mmto‐5mm.

Step‐D IronOrewillbecarriedtoloadingpointatRailwaySidingthroughdumpers.

ThesurfaceplanofBhangaonIronOreMinehasbeenattachedasPlate‐III.

Thesalientproposedminedesignfeaturesaregivenbelowintable3.1

Table3.1:DesignFeaturesofProposedMine

Benchheight Upto6m

Benchwidth 9m

Individualbenchslope 700

Overallpitslope Almost270

Page 18: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page14M/sCrystalConsultants

SequenceandDirectionofAdvance

Considering the above factors, from the hill top around 860mmining operation will be

started by slicing / contour mining to the down ward followed by the hill slope in the

southern part of the lease area by developed haul road of 10mwidth of gradient 1:16.

Developmentwillbecontinueduptothethirdyeartowardsnortherndirectionfollowedby

thestrikeoftheterrain&almost700mlongfacewillbedeveloped&2.0MtROMwillbe

producedfromthisdevelopedfacesbyaveragetwoorthreebenchesfurtherineveryyear.

Inthisareathethicknessofoverburdenisverylow;thisOB&sub‐gradeironorewillbe

produced in the top benches. This produced sub‐grade will be stacked on the non

mineralizedareaasshownontheplan.Wastewillbedumpedinthenonmineralizedarea

byterracinginthehillslopeofaverage10mheightofeveryterrace.Toewallorparapetof

2mwidth&1.5mheightof looseboulders/concretewillbeconstructedinthetoeofthe

dumpforstabilityofthedump.Garlanddrainchannelwillbeconstructedbycuttingof2m

width & 1.5m depth at the toe of the dump& connected to a number of check dams &

settlingpondsforsedimentationetc.

The details of the first five years individual development, production etc. is tabulated in

table3.2

Table3.2:DetailsofthefirstfiveyearsDevelopmentandProduction

Description 1styear 2ndyear 3rdyear 4thyear 5thyear

Height of thebenches(M)

6m 6m 6m 6m 6m

Width of the

benches(M)

9m 9m 9m 9m 9m

bench slope

angle

700 700 700 700 700

Ave. Quarry

dimension

LengthXWidthX

Height(M)

200X137x29 242X138x27 226X224x39 500X137X12 560X130X18

Overall direction

ofExcavation

Startsfromavirginlocation (topmost part)in southernpart of the

Fromthe1styear’spositionadvancedtowardsnorthern

From the2nd year’spositionadvancedtowardsnorthern

Two

benches

further

depth below

Three

benches

further

depth below

Page 19: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page15M/sCrystalConsultants

area &advancestowards theSouth

directionalong thetrend of thehill &followingthe strike oftheore

directionalong thetrend of thehill &followingthe strike oftheore

the previous

year’s

workings

the previous

year’s

workings

Number of

proposed

benches under

working

5 5 7 2 3

Floor RL of the

top‐most bench

(mRL)

854m 854m 854m 824m 818m

Floor RL of the

lowest‐most

bench(mRL)

830m 830m 818m 812m 800m

Proposed Qty. of

ROM produced

(MillionTonnes)

1.2 1.5 2.0 2.0 2.0

Waste Removal

(MCum)

0.042 0.075 0.375 0.123 0.038

Average

stripping ratio

(M.Cum:M.T.)

1:0.04 1:0.05 1:0.19 1:0.06 1:0.02

AverageGrade of

ROMore(Fe%)

61.55 57.6 60.88 60.88 60.88

ExtentofMechanization

The configuration of equipment, essential for production at the initial stage &

throughtheintermediatestagetothefinalstageshouldmatchwiththetotalsystem

withtheobjectivesofensuring‐

Auniformequipmentsize

Reducedinventory

Highefficiencyoftheequipment.

Page 20: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page16M/sCrystalConsultants

Highskillsofoperation&maintenanceThis will further reduced disturbance to operations arising from changes in theequipment patterns as the operators takes some times to acquire required skills.Thebasicequipmentwillhavetobedieselpowerbased.AdequacyofMachine:Detailsofrequirementofdeepholedrillingmachinesareasfollows:Table28

Sl.No. Particular Deephole Remarks/calculationparameter

1. Heightofthebench

6m.

2. Diaofholes

150mm

3. Averagedepthofhole

6m

4. Burdenandspacing

4x4.5inm.

5. Yieldperhole

108Cu.mt. Row3xRow4

6. Outputrequiredperdayyear‐wiseinCu.mt.

1351/1761/3266/2427/2148

Asperannualexcavationperday(workingdays300daysinayear)

7. No.ofholerequiredperday 13/17/30/23/20 Row6/Row58. Effectivelengthofhole 6.6m. Benchheight+0.6msub‐grade

drilling@10%ofthehole9. Yieldpermeter 18 Row5/Row310. Drillingrequiredperday

year‐wiseinmeter86/112/198/152/132 Row7xRow8

11. Drillingrequiredperyearinmeter.

25800

33600

59400

45600

39600

Row10x300workingdaysinayear

12. Possibledrillingperdaywith80%availabilityfactor

160m.permachine ‐

13. Drillingperyearpermachine

48000m.peryear Row12x300workingdaysperyear.

14. Drillingmachinerequiredyear‐wise

0.5

0.7

1.2

1.0

0.8say1/1/2/1/1+1additional

Row11/Row13

Page 21: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page17M/sCrystalConsultants

In addition to this, four numbers of IR drilling machine for drilling shot hole and one

numberofrockbreakerwillbeproposedforbreakingthebiggerboulders.

Loadingequipment:

It has been decided to induct hydraulic excavator to remove the blasted inter‐burden/

wasteandorematerialgeneratedfromorezoneandwastezonebyloadingtodumpersby

thismachinetoachieveenvisagedproductionlevel.

The calculation of loading equipment for the envisaged production level is shown in the

followingtable:

Detailsofrequirementofloadingmachinesareasfollows:Table29

Sl.No. Description Ore+SGOre(A) Waste(B) Remarks/CalculationParameter

1.Excavation

needed/dayinCu.mt.

1217

1511

2018

2018

2020

139

250

1248

409

128

2.WorkingdaysinaYear

300 300

3.Hours/dayof02shifts

12hrs. 12hrs.

4. Fillfactor 0.70 0.75

5.Tonnagefactor

3.3 3.3

6.

Bucketcapacity3.5cu.mt.

8tones ‐CapacityxRow4xRow5

Bucketcapacity2.5cu.mt.

‐‐ 6.19CapacityxRow4xRow5

7.

Av.cycletimeforonebucketswing,hoist&

crowd

40Second 40Second

8.Effectivetime

inhour50Min.or3000Sec. 50Min.or3000Sec.

9.

Numberofbucketthatcanbeloadedperhour

75 75 Row8Row7

10.

Tonnagethatcanbe

handledbyHydraulic

600 464.25 Row9xrow6

Page 22: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page18M/sCrystalConsultants

excavator/poclainperhr.intones.

11.

Tonnagerequired/hr.intonesyear

wise.

335

416

555

555

556

38

69

343

112

35

(Row1xRow5)Row3

12.

Hydraulicexcavatorworking/hr.required/Yr.forgivenproduction

2008

2493

3330

3330

3333

296.4

533.1

2661.3

872.2

273.0

(Row1xRow5x300days)Row10

13.

AvailablehoursforoneHydraulicexcavatorinanyearwith

90%availabilityfactor

2520 2700

Daysxrow3xRow4

14.

No.ofHydraulic

excavator(forore&

interburden/waste

requiredformine)

0.8

1.0

1.3

1.3

1.3Say1/1/2/2/2+1Additional

0.1

0.2

1.0

0.3

0.1Say1/1/1/1/1+1Additional

Row12row13

HaulageandTransportEquipment:

ItmaybenotedthattheIronorewillbetransportedfromquarryfacestoCrusherand

ScreeningplantwithintheminingsitebyDumpers.Thesizedorewillbetransportedfrom

crusherandscreeningplanttokarampadaRailwaysidingbydumpers.

Thedistanceoftransportationandqualityofmaterialtobetransportedfromquarryfaceto

CrusherandScreeningplantbydumpersfor1styr.to5thyr.ofoperationismentionedbelow:

Page 23: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page19M/sCrystalConsultants

(i)Tocrusherplantwithinleasearea,thevolumeofore&subgradeoretocarryincumper

dayincludingswellingfactor1.2 :

1217X1.2=1460

1511X1.2= 1813

2018X1.2= 2422

2018X1.2= 2422

2020X1.2= 2424

Av.distancehaul(oneway) : 2.0Km

(ii)TowastedumpatmineCu.m.perdayincludingswellFactor1.2

139X1.2= 167

250X1.2= 300

1248X1.2= 1498

409X1.2= 491

128X1.2= 154

Av.distancetohaul (oneway) :2.5Km

FromtheaboveitmaybenotedthatthetotalhauldistancesforIronorewillbe2.0km.inoneway

andwastewillbeabout2.5km.inoneway.

TheCalculationofhaulingmachineryasrequiredfortheenvisagedproductionlevelisshown

below:

Page 24: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page20M/sCrystalConsultants

Detailsofrequirementofhaulingmachinesareasfollows:

Sl.No. Particular ROMhaulagetocrusherandscreeningplant(A)

WastehaulageTowastedump(B)

Remarks/Calculationparameters

1. Dumpercapacity 20tones 20tones Tipper2. Hydraulicexcavator

bucketcapacity3.5cu.mt. 2.5cu.mt. ‐

3. Hauldistance 2.0Km. 2.5Km. Oneway4. Haultime@18Kph.

insidethehillyarea7min 8min. Oneway

5. (a) For swing+hoist +crowd

(b)No.ofswingforfillingoneDumper

40Sec.Or0.67min2nos.

40Sec.Or0.67min.3nos.

(Row1BulkDensity3.3)Row2

6. TimerequiredforfillingoneDumper

1.34min. 2.01min. Row5(a)xRow5(b)

7. Dumperunloadingtime(includingplacementtime)

1.00min. 1.00min. ‐

8. Haultime 14min. 16min. Bothway9. Spottingtime&delays 0.5min. 0.5min. ‐10. Totalcycletime 16.84min.

say17min19.51min.say20min

Row(6+7+8+9)

11. No.oftripsaDumpercanmake/hr.(50min.)

2.94nos.Say3nos.

2.5nos.Say3nos.

(Taking50min.effectiveoperatingtimeinHr.Row10)

12. Production/Dumper/day

504Tonnesor152.72Cum

504Tonnesor152.72Cum

Row(11x1)x12x0.7hours(2shiftsforore)Row11x1x12x0.7hours(2shiftforwaste)

13 Production/dayrequiredyr.inCu.mt.

1460

1813

2422

2422

2424

167

300

1498

491

154

14. Dumperrequired 9.6

11.9

15.9

15.9

15.9Say10/12/16/16/16+2Additional

1.1

2.0

9.8

3.2

1.1Say2/2/10/4/2+1Additional

Row13/Row12

Page 25: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page21M/sCrystalConsultants

DetailsofHeavymachineriestobeused/proposedaregivenbelow:

Sl.No.

Typeofmachine

Dia.Ofholes

Size/capac‐ity

Make Motivepower

HP Number1st/2nd/3rd/4th/5thyr.

1. Wagondrill 150mm

20mt.depthofdrilling

AtlasCopcoL‐8

Compressedairoperated

‐ 1/1/2/1/1+1

additional

2.Rock–Breaker

‐ ‐PC‐200

L&T

Dieseloperated

‐ 1

3 Loader ‐3.5cu.mt.

120EVolvo

Dieseloperated

‐ 1

4.

HydraulicExcavator/ElectricalShovel

‐3.5Cu.mtBucketcapacity

O&KTerex/

L&T

Dieseloperated/

ElectricPowerOperated

‐ 1/1/2/1/1+1additional

inOre

5

HydraulicExcavator/ElectricalShovel

2.5Cu.mtBucketcapacity

Komatsu

Dieseloperated/

ElectricPowerOperated

‐ 1/1/1/1/1

+1AdditionalinWaste

6. Dozer ‐ ‐BEMLBD355

Dieseloperated

400 1

7. Dumper ‐

20Metricton

Terex/BEML

Dieseloperated

‐ 10/12/16/16/16

+2AdditionalinOre

8. Dumper ‐20Metricton

Terex/BEML

Dieseloperated

‐ 2/2/10/4/2

+1Additionalinwaste

9. RoadGrader ‐ ‐ Komats‐u/Volvo

Dieseloperated

‐ 1

10. Crawlermountedbulldozer

‐ ‐ CaterpillarD8T

Dieseloperated

410 1

11. JackHammer 32‐34mm

Atlas

Copco

RH658

CompressedAir

1

12. Air ‐ 450cfm Atlas Diesel ‐ 1/1/2/1/1+1

Page 26: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page22M/sCrystalConsultants

compressor Copco operated additional

13. AirCompressor

300cfm AtlasCopco

Dieseloperated

‐ 1

14. Watertanker ‐ 28,000ltr.

TATA Dieseloperated

‐ 2

15. Watersprinklerfittedwithtruck

‐ ‐ TATA Dieseloperated

‐ 2

16. Crushingplantcompletewithgyratory/conecrusher/apronfeeder/screenwithdustsuppressionarrangementmobile

‐ ‐ ‐ ‐

‐ 500TPH

Capacity1Numbers

17 Filedvan

Fourwheeler MahindraBulero/scorpio

Dieseloperated

‐ 2

18 WaterPump Kirloskar

Dieseloperated

200 2

19 Ambulance

MahindraMarshal

Dieseloperated

‐ 1

20 TyreHandler ‐‐‐‐‐‐ ‐‐‐ ‐‐‐ ‐‐‐ 2

21 DieselBrowser

12Kl ‐ 1

22 MaintenanceVan

TATA407Dieseloperated

‐ 2

23 VibratoryCompactor

L&TDieseloperated

‐ 1

24 Crane

20–40

tonnes TATADieseloperated

‐ 1

25 Generator

1000KV

A KirolskarDieseloperated

‐ 2

Page 27: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page23M/sCrystalConsultants

26 PortableTowerLight

SiemensDieseloperated

‐ 5

27 Tractor

MasseyFerguson

Dieseloperated

35 1

28 WeighBridge

100

Tonnes

with

Vehicle

‐ ‐

‐ 3

Blasting

Althoughproposed area is very far away from any population, precautionwill be

takentominimizenuisancecausedbyblasting.Allnecessarysafetyprecautionwill

betakeninaccordancewiththeExplosiveAct.Precautionwillalsobetakenasper

permissionobtainedunderMMR1961106(2)byDirectorofMinesSafetyfordeep

holedrilling&Blastingandusageofheavyearthmovingmachinery.

Vibration:Inordertominimizevibration,thefollowingprecautionswillbetaken:

1. Blastholeswillbeinitiatedbynon‐electricDTHdelaydetonators.

2. Carewillbetakentoensurethateffectiveburdenwillnotbeexcessiveandthe

facewillbekeptsufficientlylong.Theburdenwillbekeptat4m&spacingwill

be4.5m

3. Numberofblastholesperdelaywillbekeptaslowaspossible.

4. Thedepthoftheholewillbenormally6m,whichincludesabout1meterofsub

gradedrilling.Thediameteroftheholeiskeptat150mm(6inch).

5. AdoptionoftworowblastingandVpatternoffiring.

6. Thefiringofmaximumpossibleno.ofblastholestowardsfreeface.

7. Useofdelaydetonatorsbetweentheholesandrowsofblasting.

Noise:

Thefollowingstepswillbetakentominimizepollutionbynoise.

1. Blastingwillbewelldesigned&blastedperiodicallyratherthancoupleofhastily

unplannedblastdaily.Alltheexplosiveandtheraydet(NONEL)isputwithinthe

blasthole&detonatingfuseisnotusedfortrunkline.

Page 28: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page24M/sCrystalConsultants

2. Blastingwillbesoplannedtominimizeboulders,sothatsecondaryblastingwill

bereduced.

3. Greenbeltwithtreesofvaryingheightwillbedevelopedaroundthequarryto

absorbtheblastnoise&reducenoise.

MethodofBlasting

Inthismine,deepholewillbeinpractice.Holeswillbemadeinhardformationby

Wagondrillhavingdiameterfrom150mmuptodepth6m.Burdenandspacingwill

bemaintained4mx4.5m.Dependinguponthecompactnessofthestrata/formation

yield108cumor356tonnesofexplosiveswillbeusedandthepowderfactorwillbe

approx5tonnes/Kg.

Blast‐Patternscanbeextrapolatedforrequirednumberofrows.Thesearestraight‐

line pattern & staggered pattern. Suitability of blast pattern will be established

throughactualfieldtrials&accordinglyadopted.Theblastholesareproposedtobe

chargedwith SMS by the loading Truck. Suitable stemmingmaterial such as drill

holecuttingmaybeusedorpossibilitiesmaybeexploredforusingsizedmaterialto

increasetheblast‐efficiency.Thebroadblastingparametersoftheprimaryblasting

operationsproposedtobecarriedoutatthisareaaregiveninthetable3.7

Page 29: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page25M/sCrystalConsultants

Table3.7:BroadBlastingParameters

Sl.No. Description Ore+SGOre(A) Waste(B) Remarks/CalculationParameter

1.Excavation

needed/dayinCu.mt.

1212

1511

2018

2018

2020

139

250

1248

409

128

2.Workingdaysin

aYear300 300

3.Heightofthebench

6m.

6 Heightofthebench

4.Diaofholes

150mm

150mm Diaofholes

5.Averagedepthofhole

6m

6m Averagedepthofhole

6.Burdenandspacing

4x4.5inm.

4x4.5inm. Burdenandspacing

7. Yieldperhole 108Cu.mt. 108cu.m Row5XRow6

8.

No.ofholerequiredperday

11

14

19

19

19

1

2

12

4

1

Row1÷Row7

10.Charge/hole

15.0kgmaxperm 12.0kgmaxperm

12Stemminglength

2.5m 2.5m

13. Chargecolumn 3.5m 3.5m 14. ChargeperHole 53kg 42kg Row10XRow1315. Powderfactor 7tonnesperKG 7tonnesperKG (Row7XRow15)÷Row1416. BulkDensity 3.3 2.5 17 FiringSequence Broad'V'pattern Broad'V'pattern

18

Explosivesrequiredperday

inkg

583

742

1007

1007

1007

42

84

504

168

42

Row8XRow14

Page 30: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page26M/sCrystalConsultants

StorageofExplosives

Theblastingwill bedone in this areabyanagencywithvalid explosive license.An

agreement will be done with these agency after all statutory clearances & before

commencementofminingoperation.

ProductionDetails

TheDetailsoftargetedproductionfromtheblockareaistabulatedbelowintable3.8

considering2%miningloss.

Table3.8:DetailsofTargetedProductionfromtheblockareaYear ProductionofOre+SG(ROM)inMT

1st 1.2

2nd 1.5

3rd 2.0

4th 2.0

5th 2.0

SubTotal 8.7

From6thyearto14thyear 16.4272

GrandTotal 25.1272

Page 31: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEBHANGA

M/sCrys

EASIBILITYAONIRONO

stalConsulta

Iro

Y REPORTOREOPENC

ants

onOreFlow

T FOR CASTPROJ

wDiagram

ECT

Page27

mofBhangaaonOpencaastProject

t(2.0MTPA

A)

Page 32: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page28M/sCrystalConsultants

PrimaryStockpile(‐200mm)3.6 RawMaterial

RemovalofOB&miningofironoreneedsexplosives&dieselasrawmaterial.

3.7 ResourceOptimization

Majornaturalresourcetobeusedforthisprojectislandandwater.Outofthetotal

forestlandof111.00Ha.providedinlease,58.20Ha(48.22Haunbrokenland+4.57

HaSafetyZone)+enrichment5.41Ha.shallbeleftuntouched.Theprojecthasbeen

plannedtoreusetheusedresourcesforusefulproductivepurpose.

A. Land

Theprojecthasbeenplannedinsuchawayastominimumuseofforest

land.

Therearefewhutmentsinforestareawithinleasearea.Theywillneed

toberelocated.

Efforts have beenmade to plan reclamation of the land in such away

that they are stable, non‐polluting and can be used for productive

purposeswithrestorationofecologyasfaraspossible.

B. Water

AttheoperationalstageofmineETP&SepticTanksaretobeprovidedto

treateffluents.

Hill slopemining is proposed in this area by slicing / contourmining

therefore the water flow through the quarry during rainy season will

flowundergravitythroughsettlingtankandcheckdamsuptorainwater

harvestingpit.

Rainwaterharvestingstructurewouldbeinstalled.

3.8 AvailabilityofWaterandPower

Water

The total water requirement for this project is 186 KLDand the water will be

available fromKoinagaranallahwhich flowsnorthside&perennial innature later

onsupplementbyquarrywater.Thewaterdemandfortheprojectisgivenintable

3.9

Page 33: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page29M/sCrystalConsultants

Table3.9:WaterDemand

Power

The power requirement for the proposed project will be taken from the nearest

grid.

3.9 WasteGeneration&itsManagement

A. Liquidwaste

ETPwouldbeprovidedfortreatmentofworkshopeffluent(about60MLD)

Municipalsewagewouldbetreatedbyseptictanks.

B. Solidwaste

(i) Frommine

Incourseofminingof ironorebyopencastmethod, thesolidwaste

willbegeneratedasoverburden.Total4.00McumOBwillberemoved

duringthelifeofmine.Mostofitwillbedisposedinexternaldump&

remainingquantitywillbeusedforbackfillingquarry.

(ii) SludgefromETP

The sludge from ETP will be disposed off into secured land fills to

avoidcontaminationoflandorwater.

Particulars WaterDemand(UnitKLD)

Potable 11

Greenbelt 25

DustSuppression 70

Workshop 80

Total 186

Page 34: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page30M/sCrystalConsultants

CHAPTER–IVSITEANALYSIS

4.1 Connectivity

The nearest railway station is Karampada Railway station (Jharkhand) – 5.2

km from the base of the lease towards N‐W direction on Kiriburu –Bimlagarh

BranchofS‐ERailway.Thenearest sea port is Paradeepat a distance of about ‐

361 km (Distance by Rail) from the deposit. Kiriburu‐ 6 km the nearest

township from the deposit which have infrastructure facilities like Bank, Post

Office, Police Station and primary health dispensary of the State Government.

Chaibasaisataroaddistanceofabout110Km.fromthedeposit.

4.2 LandForm,LandUseandLandOwnership

Totalminingleaseareaoftheprojectis111haisForestLand.

Non‐Forest(ha) Forest(ha)

Nil 111ha

4.3 Topography

The area represents a very hilly and rugged topography. The highest point is

at863mabovemean sea levelwhile the lowest altitude is 587mabovemean sea

level. The highest altitude comprises of Banded Iron formation while the lower

altitude areas comprise of shale, laterite and soil of reddish & chocolate colour.

Bhangaon iron ore block area has no perennial streams flowing down the slope.

Thereisnomajorsourceofperennialwaterinthearea.HoweveranumberofNalas

passthroughthenearbyarea.Theperennialnalasituatedinthewesterndirection

oftheblockarea,around1.25Kmaway, locallynamedasKoinagaraflowstowards

north. The buffer zone of 10 Km area has shown dentritic pattern of drainage

system and ismainly drained by two rivers viz. Karo andKoina riverwhich flow

fromsouthtonorth.KaroandKoinaaretheprincipaldrainagechannelsofthearea.

Karoriver flowson the eastern side andKoinaRiver flowson thewestern sideof

Kiriburu–Meghahatuburuhillrange.Oneasternpartofblockarea,thereareother

seasonal nallas such as Pacherinala, Rogarnalla, Champuanala, Jhikarianala,

Panposhnala and Balagodanala. All these nallas join Kororiver on eastern side.

Similarly on western side there are other seasonal nallas like Sankoja, Gagirathi,

Page 35: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page31M/sCrystalConsultants

Meghahatu, Sasangdih, Pardih, Rang‐Ring etc. which join Koinariver on western

side.

4.4 ExistingLandUsePattern

Theexistinglandusepatternisgivenintable4.1

Table4.1:ExistingLandUsePattern

DetailsExistinglanduse

(ha)

Quarry/Benches 1.179

Road 1.5

WasteDump 0

StockYard,Crushing

Screening

0

ParapetWall/Toewall 0

GarlandDrain 0

RainWaterHarvesting

Pond

0

MudHutments 0.19

Sub‐gradest‐ackyard&

blendingyard

0

7.5msafetybarrier 0

Temporary

infrastructuremadeof

portacabine

0

Enrichmentplantation 0

SubTotal 2.869ha

Unusedland 108.131 ha

TOTAL 111ha

4.5 ExistingInfrastructure

Theareaisabout6KMfromKiriburuandcanbeapproachedbyamotorableKacha

Forest road. The total distance from Chaibasa to area is about 110 KM. The area

comes under Kiriburu police station and Noamundi Block of Jagannathpur sub

division, West Singhbhum District. The nearest railway station is Karampada

Page 36: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page32M/sCrystalConsultants

Railway station (Jharkhand) – 5.2 km from the base of the lease towards N‐W

direction onKiriburu – BimlagarhBranch of S‐ERailway. The nearest sea port is

Paradeep at a distance of about ‐361 km (Distance by Rail) from the deposit.

Kiriburu‐ 6 km the nearest township from the deposit which have infrastructure

facilitieslikeBank,PostOffice,PoliceStationandprimaryhealthdispensaryof

theStateGovernment.

4.6 SoilClassification

i) Reliable information on the location extent and quantity of soil & land

resources is the first requirement in planning for the sustainable

management of land resources. The components of land i.e. soil, climate,

water,nutrients&biotawhichprovideavarietyofservicesthatareessential

tothemaintenanceofthelifesupportsystemandproductivecapacityofthe

environment, knowledge of soil fertility status & problems of soil like soil

acidity / alkalinity become essential for development of a sustainable land

useplan.Fertilitystatusofthesoilisprimarily&importantlydependenton

boththemacroandmicro‐nutrientsreserveofthatsoil.

ii) The leaseareahasundulating topography.Thearearepresentsaveryhilly

and rugged topography. The highest point is 866 mabove mean sea level

whilethelowestaltitudeis666mabovemeansealevel.Thehighestaltitude

comprisesofBandedIronformationwhiletheloweraltitudeareascomprise

ofshale,lateriteandsoilofreddish&chocolatecolour.

iii) Micro‐Nutrients

Proper understanding ofmicro nutrients availability in soils and extent of

their deficiencies is the pre‐requisite for efficient management of micro‐

nutrients fertilizers tosustaincropproductivity.Therefore it isessential to

knowthemicro‐nutrientstatusofsoilbeforeanytypeoflanduse.

AvailableIron

Availableironcontentinsurfacesoilhavebeenfoundtorangebetween13.6

to172mgperKg.

AvailableManganese

Availablemanganesecontentinsoilrangesbetween20.5to107mgperKg.

Page 37: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page33M/sCrystalConsultants

AvailableZinc

Availablezincinsurfacesoilrangesbetween0.32to2.8mgperKg.

iv) Macro‐Nutrients

Soil found in thearea isslightlyacidic (pH6.4).Organiccarboncontenthas

been found in the rangeof0.7 to1.2% (low).Availablenitrogenhasbeen

foundtobe192Kg/Ha.

Soil available in the area has been found to contain available

phosphorus as 17.2 Kg/Ha., available potassium as 121 Kg/Ha., available

sulphuras16Kg/Ha.,availableironas27mg/Kg.

4.7 ClimateDatafromSecondarySources

The climate of this district is characterized by a hot summer, well distributedrainfall during the southwest monsoon season and mild humid post monsoonseason. The year may be divided into four seasons. The cold seasoncommences from December to February. The hot season from March to firstweek of June and themonsoon season is from June to September. October andNovember constitute the post monsoon season or transitional period betweensouthwestmonsoon andwinterseasons.

RAINFALLRecords of rainfall in the district are available for eleven raingauge stations forperiod ranging from 10 to 45 years. The details of the rainfall at these stationsand for the district as awhole are given inTables 1and 2. The average annualrainfall inthedistrict is1288.2mm.DuringthesouthwestmonsoonmonthsJuneto September the district receives about 82% of the annual normal rainfall.August is the rainiestmonthwithanaverage rainfallof327.0mm.Thevariationin the rainfall from year to year is large. In the fifty year period 1951 to 2000,the highestannual rainfallamounting to 144%of the normal occurred in 1956,while the lowest annual rainfall which was 62% of the normal occurred in2000. In the same fifty year period there were 8 years in which the annualrainfall in the district wasless than 80% of thenormal. However, noneofthemwere consecutive years. It is seen from Table 2 that the rainfall was between1001mmand1500mmin28yearsoutof45.On an average there are 65 rainy days (i.e. days with rainfall of 2.5 mm or

more) in a year in the district. This number varies from 57 atManjhari to 71

at Majhgaon. The heaviest rainfall recorded in 24 hours at any station in the

districtwas401.1mmatManjharion21June1977.

Page 38: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page34M/sCrystalConsultants

TEMPERATUREThere is only one observatory in the district located at Chaibasa. The records oftemperatures and other climatological parameters prevailing at this station may betaken to be broadly representative of the whole district. Temperatures begin todecrease progressively from November. December and January is the coldest partof the year with the mean maximum temperature at abour 25.8°C and the meanminimum temperature at 11.5°C. In association with cold waves, which affect thedistrict in winter months in the wake of western disturbances which move acrossnorth India, the minimum temperature may go down to about 4°C on individualdays.Temperaturesbegin to rise steadily after mid February till first week of June.May and early part of June before the onset of southwest monsoon constitute thehottest part of the year. In May the mean maximum temperature is at 39.3°C andthe mean minimum temperature is at 25.7°C. During this period, maximumtemperature may reach about 45°C on some days. The maximum temperaturedecreases andweatherbecomes appreciably coolwith the advance of the southwestmonsoon by about thesecond week of June and continues to be so throughout theseason. From November temperatures begin to decrease. The highest maximumtemperature and the lowest minimum temperature ever recorded at Chaibasa(observatory) were 46.7°C on 22 May 1948 and 4.4°C on 19 January 1934respectively.HUMIDITYThe summer months March to May are driest part of the year when the relativehumidity in morning is about 50% to 60% and about 30% to 40% in theafternoon. The air is humid in southwest monsoon season, when the relativehumidity is about 80%. During the rest of the year the air is generally dry andmildhumidwiththerelativehumidityatabout50%to70%.CLOUDINESSIn the winter andearly part of summer skies are generally clear or lightly clouded.However, on some days inthewinter in thewake ofwestern disturbancesskies areheavily clouded to overcast. The cloudiness increases from April to southwestmonsoon months, skies are heavily clouded or overcast. Cloudiness decreases fromOctober.WINDSWinds are generally light with slight increase in force in the latter part of summerand southwest monsoon season. In summer and southwest monsoon season windsare predominantlysouthwester1y. In the rest of the year winds arecalm.

SPECIALWEATHERPHENOMENA

Depressions originating in the Bay of Bengal during the southwest monsoon affectthe weather of the district and its neighbourhood during their northwesterly or

Page 39: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page35M/sCrystalConsultants

wester1y movement after crossing the coast. This causes gusty winds andwidespread heavy rain. Thunderstorms occur throughout the year except inDecember. Its frequency is more in latter part of summer and southwestmonsoonseason.Tables 3, 4 and 5 give normals of temperature and relative humidity, meanwindspeed andspecialweather phenomena respectivelyforChaibasa observatory.

Page 40: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page36M/sCrystalConsultants

Page 41: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page37M/sCrystalConsultants

Page 42: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page38M/sCrystalConsultants

4.7 SocialInfrastructureAvailableInthearea,someofthevillageshavepowerline,primaryschool&blocklevelhealthcarecenters.

Page 43: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page39M/sCrystalConsultants

CHAPTER–VPLANNINGBRIEF

5.1 PlanningConcept

TheBhangaonIronOreOpencastProject isplannedtoproduce2.00MTPAofiron

oreforsaletoironore&steelindustrywithinandoutsidethestate.Theminingwill

involvedrilling,blastingandhandlingofoverburden&orethroughshoveldumper

combination.Theironorewillbecrushedbyprimaryandsecondarymobilecrusher

and then taken to Karmapada Railway Siding by dumpers. The leasehold area is

111.00Ha.

5.2 PopulationProjection

This is a Greenfieldminewith totalmanpower projection of 161coveringmining

engineer, geologist, skilled, unskilled and semiskilled manpower. Unskilled and

semiskilled manpower which will be sourced from the neighboring area. Skilled

workersandexecutiveswillbesourcedfromoutside.Theprojecthasestimatedlife

of14years.Therewillbe likely increase inpopulationdue to indirectand tertiary

activities.

5.3 LandUsePlanning

Leaseareameasures111.00Ha.Thedetailsaregivenintable5.1

Table–5.1:LandUsePlanning

Details

Existing/pre‐mininglanduse

Attheendoffirstfiveyearsplanperiod

Attheendoflifeofthemine/postminingladuse

AreainhaQuarry/Benches 1.179 14.91 28.72Road 1.5 4.29 2.44WasteDump 0 4.11 12.75StockYard,CrushingScreening

01.2 1.2

ParapetWall/Toewall 0 0.13 0.29GarlandDrain 0 0.605 0.15RainWaterHarvestingPond

01.53 1.53

MudHutments 0.19 0.19 0.19Sub‐gradest‐ackyard&blendingyard

01.83 1.83

7.5msafetybarrier 0 4.57 4.57Temporary 0 3.7 3.7

Page 44: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page40M/sCrystalConsultants

infrastructuremadeofportacabinsEnrichmentplantation 0 0 5.41SubTotal 2.869 37.065 62.78Unusedland 108.131 73.935 48.22TOTAL 111 111 111

TheconceptualplanofBhangaonIronOreMinehasbeenattachedasPlate‐V.

5.4 AssessmentofInfrastructureDemand(Physical&Social),Amenities&Facilities

PowerSupply

The power line passes nearby lease area and the existing power networkwill be

utilizedwithfacilityofstandbygenerators.

MobileCrushing&ScreeningPlant

Initiallyonlycrushingandscreeningoforewillbedoneatminesite.ROMgradeore

assuchcannotbesentdirectly to theplant.ROMorewillbesubjected tocrushing

anddryscreening.Thecrusherwillbeequippedwithdustsuppressionsystem.With

thissizinganddryscreening,therewillbeenhancementinthegradeoftheorebya

minimum of 0.5%. The dispatch grade of ore will be maintained as per the

requirementofthebuyers.

The +55% Fe will be upgraded by wet beneficiation outside the mining lease

boundary to achieve the required grade for steel plant. Considering 300 working

daysinayearandthreeworkingshifts,thesizeofthemobilecrushing&screening

plant shouldbe2,000,000 tonnes÷300days÷18hoursperday(effective)=370

tonnes. So, one 500 tph mobile crushing & screening plant is proposed for

installationinfirstyearitselfataplaceshownonthedevelopmentplans.

FeedSize :Upto500mm

ProductSizeLumps :(+)10mmto(‐)40mm

:(+)5mmto(‐)20mm

Fines :(‐)10mm

:(‐)5mm

RunningHours/day :18Hours

Lumps/sizedoreexpected :30%

Fines :70%

Page 45: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page41M/sCrystalConsultants

Pumping

Hillslopeminingisproposedinthisareabyslicing/contourmining.Thereforethe

water flowing through the quarry during rainy season will flow under gravity

throughagarlanddrainandpassedthroughaseriesofsettlingtanks&checkdams

and stored in the Rainwater Harvesting pit prior to its discharge to the natural

streams.Theoverflowwaterfromtheharvestingpitafterpassingthroughnumberof

check damswill be discharged to perennial nala. Hence no pumping arrangement

will be required. Quarterly monitoring of the surface water will be done as per

MoEF&CCnorms tomaintain thequalityof thesurfacewater.Theplanningofde‐

wateringoftheminehasbeendoneinsuchawaythatasfaraspossibletheworking

faces remain dry. The layout of the quarry provides suitable gradient along the

quarryfloorsandthebenchestofacilitateself‐drainageofwatertothesumpatthe

lowestlevelofthequarry.

Workshop:A Work shop made of portacabine will be installed for maintenance of Mobileequipment, engineer’s office and Stores for running requirement of Spareswithin the block area asshownontheplan.Store:A storemade of portacabine will be installed for keeping adequate stock of theHEMM Spares and Sub‐assemblies and other electrical and mechanical spares,proper computerized system for material management will be installed withintheblock area as shownon theplan.Dieseldispensingunit:A diesel dispensing unit will be installed near to the store or out site of theblock areasubjecttoclearancesfromdifferentauthoritiesfordailyconsumptionofdiesel.OfficeComplex:An office of the manager of the mine, Personnel Manager’s information system,Account office and pay office made of portacabines will be installed within the block area asshownontheplan.BlastingShelters:Adequate blasting shelters will be provided. Blasting will generally bedone duringchangeoveroffirstandsecondshift.

Page 46: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page42M/sCrystalConsultants

Restshelter:Restshelterasperstatutewillbeprovided.Firstaidroomwillbeconstructedadjoiningtherestshelter.Ambulance:AnambulancewithwirelesscommunicationwillbeprovidedintheBlockarea.Lightingsystem:Sodium Vapor lamps will be put around the office complex, security house,workshop,crusherscreeningplant,mines,haulroad,Magazine,etc.Communicationsystem:An adequate communication system will be provided between differentexecutives,supervisorsandkeypersonnelFirefightingsystem:Asuitablefirefightingsystemwillbeinstalled.Warningsystem:Visiblesign‐boardswritteninHindiwillbeerectedatprominentdisplaypointstopreventunauthorizedentriesandprecautionsduringblastingandfrommovingVehicles.DrinkingWater:Drinking waterwill be provided in themine at suitable point and at otherplace wherelaboursareengaged.ResidentialUnit:Itisproposedtoconstruct10Unitsofresidentialunitfortheprojectawayfromleasearea.

Page 47: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page43M/sCrystalConsultants

CHAPTER–VIPROPOSEDINFRASTRUCTURE

6.1 IndustrialArea

MobileCrushingPlant

Initiallyonlycrushingandscreeningoforewillbedoneatminesite.ROMgradeore

assuchcannotbesentdirectly to theplant.ROMorewillbesubjected tocrushing

anddryscreening.Thecrusherwillbeequippedwithdustsuppressionsystem.With

thissizinganddryscreeningtherewillbeenhancementinthegradeoftheorebya

minimum of 0.5%. The dispatch grade of ore will be maintained as per the

requirementofthebuyers.

The+55%Fewillbeupgradedbywetbeneficiationoutsidethemininglease

boundarytoachievetherequiredgradeforsteelplant.Considering300working

daysinayearandthreeworkingshift,thesizeofthemobilecrushing&screening

plantshouldbe2,000,000tonnes÷300days÷18hoursperday(effective)=370

tonnes.So,one500tphmobilecrushing&screeningplantisproposedfor

installationinfirstyearitselfataplaceshownonthedevelopmentplans.

FeedSize :Upto500mm

ProductSizeLumps :(+)10mmto(‐)40mm

:(+)5mmto(‐)20mm

Fines :(‐)10mm

:(‐)5mm

RunningHours/day :18Hours

Lumps/sizedoreexpected :30%

Fines :70%

Workshop:A Work shop made of portacabine will be installed for maintenance of Mobileequipment, engineer’s office and Stores for running requirement of Spareswithin the block area asshownontheplan.

Page 48: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page44M/sCrystalConsultants

6.2 ResidentialArea

Buildings

Housingofonlyexecutivesisproposed.Forworkersnearbyexistingfacilitieswillbe

availed.

6.3 GreenBelt

Green belt within the leasehold area including safety zone is envisaged. Avenue

plantation,OBdumpplantation&plantationonbencheswillbedone.Outof111.00

Ha.forestland58.2Ha.willbeleftintactorenriched.

6.4 SocialInfrastructure

Kiriburu,nearesttownshipis6Kmawayandhasallnecessarysocialinfrastructure

facilitieslikebank,postoffice,policestation,primaryhealthcentre,etc.

6.5 Connectivity

The approach road from the bottom of the hill enters into mine lease area at

western part of the block at contour level of 625MRL.MainMineRoadwill lead

through the Check gate to the Crushing / processing area/ dumping / blending/

weighing areas and up to the initial mine‐opening area, preferably along the

contoursofthehillslopewithgradientof1:16.AseparatealreadyexistingRoadwill

beusedattheinitialstagesforemptyvehiclestofacilitatesmoothtrafficmovement.

Haul road alignment from initialmineworking areas to the proposed Crushing /

processing area/ dumping / blending/weighing areaswill be constructed during

thedevelopmentstage.

6.6 DrinkingWaterManagement

Drinking water will be provided in the mine at suitable points and other places

wherelaboursareengaged.

Page 49: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page45M/sCrystalConsultants

6.7 SewageSystem

MunicipalSewage

Municipal sewage generated fromoffice, rest shelter, etc.will be treated in septic

tanks.

MineWater

Minewaterwillbehandledthroughgravityflowtoseriesofsettlingtankpit&then

takentorainwaterharvestingpit.

6.8 IndustrialWasteManagement

The industrial sewage generated fromworkshop, &washing etc. shall be treated

throughETP.

6.9 SolidWasteManagement

MineWaste

Themineincourseofminingbyopencastmethodwillgeneratesolidwasteinterms

of overburden.During the lifeofminea total of4.0Mcumwill be generatedwhich

willbestoredinOBDump&backfilledarea.

MunicipalWaste

Municipalwastedumpwillbe identifiedwith thehelpof local authorities for safe

dumping.

IndustrialWaste

SludgefromETPshallbedisposedinsecuredlandfill.

6.10 PowerRequirement&Supply/Source

Power linepassesnearby leaseholdareaas thereare also twoadjoiningminesof

SAILandShahBrothers&Co.Thisnetworkwillbeextendedtothismine.

Page 50: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page46M/sCrystalConsultants

CHAPTER–VII

REHABILITATION&RESETTLEMENTPLAN

There is no proposal to acquire tenancy land as the entire lease area is forest land.

However, thereare fewhutments thatneed toberelocated if required,outside the lease

area.ForthispurposeanamountofRs.2.25Crorehasbeenprovidedinthebudget.

Page 51: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page47M/sCrystalConsultants

CHAPTER–VIII

PROJECTSCHEDULE&COSTESTIMATES

8.1 LikelyDateofStartofConstruction&LikelyDateofCompletion

Theminewillstartafterpossessionofland,forestclearanceandenvironmental

clearance.Thefullproductionstartsfromthethirdyear.

Production

The mine is will be fully developed from 3rd year of working and the rate ofproductionwillbearound2.0MTperannum.From the hill top around 860m mining operation will be started by slicing /contourmining to the downward followedbythehill slope inthesouthernpartof the lease area by developed haul road of 10m width of gradient 1:16.Development will be continued up to the third year towards northern directionfollowedbythestrikeoftheterrain&almost700mlongfacewillbedeveloped&2.0MtROMwill beproduced fromthisdeveloped facesbyaverage twoor threebenchesfurther in everyyear. TheDetails of targetedproduction from the blockarea istabulatedbelowconsidering2%miningloss.Table8.1:DetailsofTargetedProductionfromtheblockarea

Year ProductionofOre+SG(ROM)inMT

1st 1.2

2nd 1.5

3rd 2.0

4th 2.0

5th 2.0

SubTotal 8.7

From6thyearto14thyear 16.4272

GrandTotal 25.1272

Cumulative quantity is tabulated above based on the availability of exploration dataprovided by the Govt. of Jharkhand before the process of auction. Further, asmentioned above under para “anticipated life of mine” exploration is proposedduring the mining operation & development hence, reserve may be enhancedaccordingly&theconceptualplanmaybemodified.

Page 52: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page48M/sCrystalConsultants

GenerationofOB&Waste:‐

In this area the thickness of over burden is very low; this OB & sub‐grade ironore will be produced from the top benches. This produced sub‐grade will bestacked on the non mineralized area as shown on the plan initially & will beblended for utilization of sub‐grade ore in pursue of Mineral conservation. TheDetailedgenerationofOB&wasteistabulatedbelow:‐

Table8.2:DetailsofGenerationofOBandWaste

Description

1styear

2nd

year

3rd

year

4th

year

5th

year

ConceptualPeriod

TotalAfterlifeofmine

ProposedQty.ofROM(MillionTonnes)

1.2

1.5

2.0

2.0

2.0

16.0744

24.7744say25MT

WasteRemoval(MCum)

0.042

0.075

0.375

0.123

0.038

3.21

3.863Say

Averagestrippingratio(M.Cum:

1:0.04

1:0.05

1:0.19

1:0.06

1:0.02

1:0.2

1:0.2

DisposalofOB&WastemineralthroughDumping/backfilling

8.2 EstimatedProjectCost&EconomicsViability

DetailedProjectReportfortheprojectisunderpreparation.Theprojectcostwillbe

finalizedinDetailedProjectReport.Howeverbroadtheestimatedcapitalcostofthe

projectisgivenbelowintable8.3

Table8.3:EstimatedCapitalCostoftheProject

Sl.No. Particular Cost(crore)

1. LandforTownship,CompensatoryAfforestationandfor

StackingofRawMaterialnearRailwaySiding

24.16

2. StatutoryCosts:EC,FC,DGMS,StampDuty,NPV,etc. 38.83

3. PlantandMachinery 10.00

4. ReliefandRehabilitation 2.25

Page 53: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page49M/sCrystalConsultants

5. MineInfrastructure:Water,Power,DG,Communication,

Environment,Workshop,Weighbridge,Office,Township,etc.

17.81

6. MineDevelopment:Survey,Exploration,Tests,Roads,

Explosives,Fencing,Levelling,Engineering,Project

Management,Training,etc.

23.92

A. SubTotal 116.97

B. Contingency@5% 5.85

C. TotalCapex 122.82

Note:TheupfrontpaymentofRs.40.35CroresisoverandabovetheCapex

Page 54: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement

PRE-FEASIBILITY REPORT FOR BHANGAONIRONOREOPENCASTPROJECT

Page50M/sCrystalConsultants

CHAPTER–IX

ANALYSISOFPROPOSAL

9.1 Financial&Socialbenefitswithspecialemphasisonthebenefittothelocalpeople

includingTribalpopulation

FinancialBenefits

i) TheprojectwillsupplyIronoretothesteelplantsoperatingwithinand

outsidethestate.

ii) Theprojectwillcontributetowardscess&royaltytotheStateGovt.

iii) Projectwillprovidedirectemploymenttolocalpeople.

iv) Itwillalsoprovideopportunityforincomegeneration.

SocialBenefits

TheprojectwilltakeupschemesunderCSRwhichwillimprovesocio‐economic

profileofthearea.Besidesthis,theprojectwouldalsoimprovephysical

infrastructureinthestudyarea.

Page 55: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement
Page 56: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement
Page 57: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement
Page 58: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement
Page 59: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement
Page 60: 2019 - Welcome to Environment · 2019-02-11 · Fire fighting system: A suitable fire fighting system will be installed. ... notice inviting tender dated January5, 2018 for commencement