Page 1 of 6 2019 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM A. District: 1 2 3 4 5 6 7 TPK C.O. B. Nomination Category: (Select only one category) Outstanding Major Project Outstanding PD&E/Planning Project Outstanding Design‐Build or CM at Risk Project Outstanding Environmental Project Outstanding Roadway Project Outstanding Special Project Outstanding Bridge Project C. General Description of Project: Project Name (Name as to appear on plaque): I‐275 Bus on Shoulder Pilot Project FDOT FM#:437245‐1 Project Description (150 characters): Pinellas Suncoast Transit Authority (PSTA) ‐ Premium Transit Feasibilty Study Project Narrative (500 char.): FDOT and PSTA conducted a study to assess the feasibility of Bus on Shoulder (BOS) operations on a five mile segment of I‐275. The project will provide a low‐cost innovative solution to allow buses to bypass congestion when traffic speed drops below 35 mph. BOS will improve connectivity and travel time reliability between Downtown St. Petersburg and Downtown Tampa while increasing transit ridership. Lessons learned from this study will be used to finalize the FDOT BOS Statewide Guidance. D. Project Team: (Fill in all that apply; add major contributing sub consultants as needed) 1. Complete this section for Major Projects, Minor Projects or Special Projects only (50 characters max for firm names and 30 characters for person names) a. Design Consultants: Prime Consultant (Name as to appear on plaque): HDR, Inc.

Upload: others

Post on 28-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2019 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM … · 2020-05-05 · Page 2 of 6 Consultant Project Mgr.: Santanu Roy Email Address: Santanu.Roy@hdrinc.com Phone Number:

   

Page 1 of 6

  

2019 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM

PROJECT NOMINATION FORM

 

A. District:   1 2 3 4 5 6 7 TPK C.O. 

B. Nomination Category: (Select only one category) 

 Outstanding Major Project   Outstanding PD&E/Planning Project 

 Outstanding Design‐Build or CM at Risk Project   Outstanding Environmental Project 

 Outstanding Roadway Project       Outstanding Special Project                    

 Outstanding Bridge Project 

C. General Description of Project: 

Project Name (Name as to appear on plaque): I‐275 Bus on Shoulder Pilot Project  

FDOT FM#:437245‐1   Project Description (150 characters): Pinellas Suncoast Transit Authority (PSTA) ‐ 

Premium Transit Feasibilty Study 

Project Narrative (500 char.):  FDOT and PSTA conducted a study to assess the feasibility of Bus on Shoulder 

(BOS) operations on a five mile segment of I‐275. The project will provide a low‐cost innovative solution 

to allow buses to bypass congestion when traffic speed drops below 35 mph. BOS will improve 

connectivity and travel time reliability between Downtown St. Petersburg and Downtown Tampa while 

increasing transit ridership. Lessons learned from this study will be used to finalize the FDOT BOS 

Statewide Guidance.               

D. Project Team: (Fill in all that apply; add major contributing sub consultants as needed) 

1. Complete this section for Major Projects, Minor Projects or Special Projects only 

  (50 characters max for firm names and 30 characters for person names) 

a. Design Consultants: 

Prime Consultant (Name as to appear on plaque): HDR, Inc.     

Page 2: 2019 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM … · 2020-05-05 · Page 2 of 6 Consultant Project Mgr.: Santanu Roy Email Address: Santanu.Roy@hdrinc.com Phone Number:

   

Page 2 of 6

Consultant Project Mgr.: Santanu Roy   Email Address: [email protected] 

Phone Number: (407) 222‐9971    Physical Address: 315 E. Robinson Street #400, Orlando, FL 

32801 

Subconsultant:             Discipline:              Technical Lead:              

Subconsultant:             Discipline:              Technical Lead:             

 

b. CEI Consultants: 

Prime Consultant (Name as to appear on plaque):                

Sr. Project Engr.:            

Subconsultant:              Technical Lead:             

Subconsultant:              Technical Lead:            

c. FDOT Design Project Mgr.:  Ming Gao, Gabrielle Matthews 

d. FDOT Construction Project Engr./Admin.:             

2. Complete this section for Design‐Build, CM at‐Risk or P3 Projects only  

     (Include all that apply. 75 characters max for each item) 

a. Concessionaire:             

b. Prime Contractor:             

c. Design Consultants:             

Prime Consultant (Name as to appear on plaque):               

Consultant Project Mgr.:              Email Address:            

Phone Number:              Physical Address:            

Subconsultant:             Discipline:              Technical Lead:              

Subconsultant:             Discipline:              Technical Lead:             

d. FDOT Design Project Manager:             

e. FDOT Program Management Consultant:                 Technical Lead:            

Page 3: 2019 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM … · 2020-05-05 · Page 2 of 6 Consultant Project Mgr.: Santanu Roy Email Address: Santanu.Roy@hdrinc.com Phone Number:

   

Page 3 of 6

f. FDOT CEI Consultants:   

Prime Consultant (Name as to appear on plaque):                

Sr. Project Engr.:            

Subconsultant:              Technical Lead:             

Subconsultant:              Technical Lead:            

E. Project Completion Date:  May 2018 

F. Detailed Project Information (Address all applicable award criteria):  

(750 characters max for each item) 

1. Complexity of Project:  The purpose of the BOS project is to improve connectivity and increase transit 

ridership between St. Petersburg and Tampa. The improvement of the quality, reliability, and efficiency 

of transit service will support the mobility needs of an expanding population and employment base in 

the region. This innovative project maximizes the use of existing infrastructure and offers a cost 

effective alternative to expensive premium transit modes. This pilot effort is the first attempt to run 

buses on interstate shoulders in Florida. The complexities evolved around developing new design 

criteria and concept of operations as well as garnering support from multiple stakeholders (FDOT, PSTA, 

FHP, local law enforcement, FHWA, and other agencies).  

2. Scheduling Challenges:  The scheduling challenges involved extensive coordination with many 

stakeholders, both internal and external to FDOT (Transit, Design, Traffic Operations, PSTA, Pinellas 

County, City of St. Petersburg, Forward Pinellas, law enforcement agencies, etc.). The BOS Team 

identified the issues in the corridor, discussed different alternatives, developed a Concept of Operations 

that all parties can implement, and established an implementation timeline. A low bid RFP will be 

released in a few months and the project is expected to open in 2020.  

3. Innovative Technical Concepts: Innovation is at the heart of this project. It provides a low cost, 

innovative transportation solution to better connect two major cities while improving transit service. It 

provides an early win for the Tampa Bay region which has been struggling to implement highly 

expensive intercity premium transit service. In addition, innovative technical elements of the project 

include analyzing existing congestion patterns using National Performance Management Research Data 

Set (NPMRDS), establishing multi‐agency operating protocols including incident management, and 

developing unique design features involving new signage, replacing rumble strips with profiled 

thermoplastic line, refuge areas for broken vehicles, ramp metering, etc.   

4. Cost savings: The project is a low cost solution to improve regional connection between St. 

Petersburg and Tampa. It takes advantage of the existing infrastructure to add a dedicated transit lane 

for use when speed drops below 35 mph. The construction cost of the project is approximately $2.5M, 

Page 4: 2019 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM … · 2020-05-05 · Page 2 of 6 Consultant Project Mgr.: Santanu Roy Email Address: Santanu.Roy@hdrinc.com Phone Number:

   

Page 4 of 6

which is a small fraction of the cost of premium transit modes like BRT and LRT. In addition, the project 

is expected to generate an additional $305,123 in fare revenue for PSTA.   

5. Public Involvement/Support: The project has received unanimous support from all stakeholders 

including PSTA, Forward Pinellas, Pinellas County, City of St. Petersburg, FHWA, FHP and others. A public 

outreach and education campaign will be developed and implemented prior to and during the initial 

deployment of the BOS project. This effort will involve broadcast and print media, online information, as 

well as a wide variety of targeted strategies to reach people in the communities most likely to use the 

facility.   

6. Minimization of Negative Impacts: The project is expected to have negligible negative impacts to 

traffic operations, safety and environmental conditions. Project construction to prepare the shoulder for 

the buses will take place at night to minimize the impact to the traveling public. The corridor will be 

swept regularly to minimize impacts on bus tires.  

7. Partnering: This project is an excellent example of successful multi‐agency partnership. 

Implementation of the project will require significant coordination between many stakeholders to 

ensure that the shoulders are ready, drivers are trained, and the public is informed on how the service 

operates. The partnering organizations include: FDOT, PSTA, Forward Pinellas, Law Enforcement, 

Emergency Responders, and Local Motorists. A detailed Concept of Operations plan has been prepared 

to identify the responsibilities of each of the partnering agencies. The team is committed to making this 

pilot project a success.   

8. Functionality of Project: The goal of the project is to improve travel time reliability of buses traveling 

between Downtown St. Petersburg and Downtown Tampa. This is accomplished by allowing the buses 

to bypass congestion through using the shoulder when the mainline speed drops below 35 mph. The 

buses are then able to maintain a higher average speed requiring less time to transverse the corridor. As 

a result, the commuter route can be operated with fewer resources and should increase ridership as the 

bus will have a travel time comparable or even faster than the automobile during peak hours.  

9. Aesthetics: When the Bus on Shoulder service is implemented, it will have unique signage installed 

along the corridor informing the public that the shoulder is for transit use only and for them to watch for 

buses traveling on the shoulder during times of congestion. In addition, the buses will be branded to 

promote the new service. The aesthetics of the shoulders will improve due to better maintenance.    

10. Environmental Impacts/Benefits: When the Bus on Shoulder service starts in 2020, it is expected to 

increase transit ridership between the St. Petersburg and Tampa, taking approximately 2,113 cars off 

the road during its first year of operation. This decreases carbon emissions by 148.56 tons and NOx 

emissions by 29.19 tons. This grows to 595.51 tons of carbon in 2040 and 117 tons of NOx with 8,478 

cars removed from the road.  

Page 5: 2019 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM … · 2020-05-05 · Page 2 of 6 Consultant Project Mgr.: Santanu Roy Email Address: Santanu.Roy@hdrinc.com Phone Number:

   

Page 5 of 6

11. Sustainability: Transit is a sustainable transportation mode that reduces the number of automobiles 

on a roadway. This leads to lower emissions and particulate matter released into the atmosphere. By 

implementing this project, the route will operate a higher average speed, decreasing travel time 

between the two cities, making it a more attractive alternative to commuters.  

12. Cost Overruns and Time Extensions: To minimize the potential for cost overruns and time 

extensions, a low‐bid design‐build RFP is being prepared that will incentivize on time delivery of the 

project within the budget.   

13. Technical/Engineering Challenges Overcome: The corridor is a five mile segment of I‐275 from the I‐

375 interchange north to Gandy Boulevard. Within this segment, the shoulder is less than 12 feet in 

width and includes eight overpasses that must be successfully navigated. The solution is for the bus to 

use the outside shoulder and increase the shoulder width to 12 feet along the corridor. At each overpass 

location, the travel lanes are shifted towards the median to avoid widening on the bridges. The rumble 

strips will be replaced with thermoplastic strips to provide a clear delineation between the travel lane 

and the shoulder while ensuring a smooth ride for the transit customers.  

14. Safety Improvements: By implementing Bus on Shoulder, transit becomes a more attractive option 

for those commuting between St. Petersburg and Tampa along I‐275. This shifts people from driving 

their cars to riding the bus, reducing the number of cars on the facility. As a result, there is expected to 

be a decrease in the total of number of crashes on I‐275, saving lives, property, and financial impacts to 

the community. The expected safety benefits over the study period from 2020 to 2040 is expected to 

exceed $158,000. 

G.  Photo/Drawing Bearing Project Name Required  

(Submit Photo with Other Supporting Documentation) 

H. Other Supporting Documentation Included (Check all that apply): 

(Note: Supporting documentation, excluding photographs and district endorsement must 

 be formatted and submitted as a single, 8½x11 PDF document not to exceed five (5) 

 pages in length.)  

Photos   Drawings    News Articles  Commendations 

Other (Describe): Renderings and Maps 

I. Nominator Contact Information: 

Nominator Contact: Santanu Roy    

Company: HDR, Inc.   Email Address: [email protected] 

Page 6: 2019 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM … · 2020-05-05 · Page 2 of 6 Consultant Project Mgr.: Santanu Roy Email Address: Santanu.Roy@hdrinc.com Phone Number:
Page 7: 2019 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM … · 2020-05-05 · Page 2 of 6 Consultant Project Mgr.: Santanu Roy Email Address: Santanu.Roy@hdrinc.com Phone Number:

I-275 Bus on Shoulder Pilot Project An important first step toward achieving the regional transit vision

Page 8: 2019 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM … · 2020-05-05 · Page 2 of 6 Consultant Project Mgr.: Santanu Roy Email Address: Santanu.Roy@hdrinc.com Phone Number:

Project Location

Page 9: 2019 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM … · 2020-05-05 · Page 2 of 6 Consultant Project Mgr.: Santanu Roy Email Address: Santanu.Roy@hdrinc.com Phone Number:
Page 10: 2019 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM … · 2020-05-05 · Page 2 of 6 Consultant Project Mgr.: Santanu Roy Email Address: Santanu.Roy@hdrinc.com Phone Number:

Typical Section

Page 11: 2019 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM … · 2020-05-05 · Page 2 of 6 Consultant Project Mgr.: Santanu Roy Email Address: Santanu.Roy@hdrinc.com Phone Number:

https://www.bizjournals.com/tampabay/news/2019/02/25/fdot-to-start-bus-pilot-project-on-i-275.html

Gabe MatthewsTransit Planning Research Administrator

Florida Department of Transportation605 Suwannee Street, MS 26

Tallahassee, FL 32399(850)414-4803