Pre-Application Due Date: March 15, 2018 Draft Application Due Date: April 5, 2018 Final Application Due Date: July 10, 2018 1 2018 Snake River Salmon Recovery Board Project Application Complete Application Checklist Summary: Through the application process each of the following elements, depending on the project type, will need to be created and submitted at some point before the final application due date. Local Snake River Salmon Recovery Board Application – this does not need to be submitted in PRISM, but is required and will assist in finalizing a complete application – may elements including the project title, description, property details, etc., can be copied and pasted throughout. The SRSRB Application includes this entire form, the pre-application, draft application, and final application sections. The relevant Salmon Project Proposal (Appendix C, found in RCO Manual 18), which includes the response to the SRFB Review Panel comments if required. Three maps: 1. a general vicinity map, 2. a detailed worksite map for planning and restoration projects or a parcel map for acquisitions, and 3. a map showing the project’s Area of Potential Effect with the section, township, and range identified. A minimum of two site photographs in JPEG file format. The proposed project design including plans, specifications, and a design report if available (for restoration projects only). Detailed Cost Estimate. Landowner Acknowledgement Form (Appendix F, found in RCO Manual 18). Barrier Evaluation Form (fish passage construction and design projects only). Correction Analysis Form (fish passage construction projects only). Intensively Monitored Watershed Certification (when relevant). Waiver of Retroactivity (for acquisition projects only). Deliverables from prior phases of the project (when relevant). Project partnership contribution form (when relevant, Appendix G, found in RCO Manual 18). Salmon Recovery Funding Board Application Authorization Form RCO Fiscal Data Sheet Complete required elements of PRISM Online Application: (https://secure.rco.wa.gov/Prism/Sponsor/Account/LogOn). Please contact the Snake River Salmon Recovery Board Lead Entity office for questions or assistance with the application and application process at 509-382-4115 or [email protected].

Upload: others

Post on 06-Feb-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Pre-Application Due Date: March 15, 2018 Draft Application Due Date: April 5, 2018 Final Application Due Date: July 10, 2018

1

2018 Snake River Salmon Recovery Board Project Application

Complete Application Checklist Summary: Through the application process each of the following elements, depending on the project type, will need to be created and submitted at some point before the final application due date.

� Local Snake River Salmon Recovery Board Application – this does not need to be submitted in PRISM, but is required and will assist in finalizing a complete application – may elements including the project title, description, property details, etc., can be copied and pasted throughout. The SRSRB Application includes this entire form, the pre-application, draft application, and final application sections.

� The relevant Salmon Project Proposal (Appendix C, found in RCO Manual 18), which includes the response to the SRFB Review Panel comments if required.

� Three maps: 1. a general vicinity map, 2. a detailed worksite map for planning and restoration projects or a parcel map for acquisitions, and 3. a map showing the project’s Area of Potential Effect with the section, township, and range identified.

� A minimum of two site photographs in JPEG file format.

� The proposed project design including plans, specifications, and a design report if available (for restoration projects only).

� Detailed Cost Estimate.

� Landowner Acknowledgement Form (Appendix F, found in RCO Manual 18).

� Barrier Evaluation Form (fish passage construction and design projects only).

� Correction Analysis Form (fish passage construction projects only).

� Intensively Monitored Watershed Certification (when relevant).

� Waiver of Retroactivity (for acquisition projects only).

� Deliverables from prior phases of the project (when relevant).

� Project partnership contribution form (when relevant, Appendix G, found in RCO Manual 18).

� Salmon Recovery Funding Board Application Authorization Form

� RCO Fiscal Data Sheet

� Complete required elements of PRISM Online Application: (https://secure.rco.wa.gov/Prism/Sponsor/Account/LogOn).

Please contact the Snake River Salmon Recovery Board Lead Entity office for questions or assistance with the application and application process at 509-382-4115 or [email protected].

Pre-Application Due Date: March 15, 2018 Draft Application Due Date: April 5, 2018 Final Application Due Date: July 10, 2018

2

Pre-Application Section (This section must also must be included as part of the Draft and Final Applications if you don’t submit a pre-application).

Project Title (less than 50 characters including spaces, please create a title that accurately reflects the project): Russell Creek Fish Barrier

Submitting Organization: Walla Walla County Conservation District & Washington Dept. of Fish & Wildlife

Project Contact Information (Complete for each project contact)

Mrs. Ms. Mr. First Name: Renee M. Last Name: Hadley

Address: 325 N 13th Avenue City/Town: Walla Walla State: WA Zip: 99362

Telephone # (509) 522-6340 ext. 110 Cell # ( ) -

E-mail address: [email protected]

Project Location:

The project is located on Russell Creek, south of the City of Walla Walla, Washington in WRIA 32.

Russell Creek is a tributary of Yellowhawk Creek. Both are in a major spawning area listed as a priority

protection reach.

Maps: Provide both a map illustrating project vicinity and a site map. Map descriptions can be placed

in this section but maps should be attached as a separate page. (Contact SRSRB staff for assistance

if needed).

Map with property owners.

Pre-Application Due Date: March 15, 2018 Draft Application Due Date: April 5, 2018 Final Application Due Date: July 10, 2018

3

Project Description

Must be less than 1,500 characters including spaces.

Your Project Description: Past actions have impacted salmonid populations. A historic concrete structure on Russell Creek is a fish barrier. There is a 3.5 foot passage barrier preventing salmonid migration. Dead Oncorhynchus mykiss have been observed below the barrier. This design/construction application aims to place a series of log controls downstream of the barrier to backwater up to the barrier elevation. This streambed control would be designed in accordance with WDFW guidelines. The barrier is located at a corner of 5 parcels. Three of the landowners have expressed interest in resolving this passage concern.

Pre-Application Cost Estimate: List SRFB request, match, and total project costs.

Budget Items SRFB Request Matching Funds Total Project Cost Design of barrier removal 10000 Barrier Removal 30000

Total SRFB Request $ Total Matching Funds $

Total Project Cost $40000

Restoration Project Preliminary Design Requirements Starting in 2013, the SRFB changed the requirement for design review of restoration projects which exceed $250,000 in SRFB requested funds. If your grant request from the SRFB will exceed $250,000 you will be required to submit a preliminary design or equivalent with the final application. Check the SRFB Manual18 (Appendix D) for information of the Design Requirements or contact LE Staff. Please check the appropriate box below as to whether the design requirement can be met.

I have preliminary designs completed and have cross walked them w/ SRFB requirements

I am currently working on preliminary design and may be able to complete by final application deadline

I do not have preliminary designs and will not have them by the final application

Pre-Application Due Date: March 15, 2018 Draft Application Due Date: April 5, 2018 Final Application Due Date: July 10, 2018

4

Evidence that this project is part of the Snake River Salmon Recovery Plan: List the HWS project number and the title of the project as stated in the Snake river Salmon Recovery Region Provisional Work Plan 2013-2018. If project is not directly stated in the Work Plan, list the general project category your project pertains to and describe the correlation. Work Plan Number(s): Remove Fish Passage Barriers 32-Passage Barrier Removal

Assessment and Monitoring Projects: The SRSRB has requested that a project sponsor first seek Columbia River Salmon and Steelhead Endorsement (CRSSE) funding (if eligible) before making a request for SRFB funds. Details on the CRSSE can be found here: http://wdfw.wa.gov/licensing/crss_endorsement/. WDFW develops project proposals for the Columbia River Salmon and Steelhead Recreational Anglers Board (CRSSRAB) to evaluate and rank. To determine project eligibility, please work with regional WDFW staff. If your project is eligible for CRSSE funding, please be advised that your project may not be funded or it may be funded only after receiving CRSSE funds. Is this project eligible for CRSSE funding (please provide relevant communications):

Yes No

This is the end of the PRE-APPLICATION

When submitting your draft application, make sure to update the pre-application information where required as well as completing the following draft application. The pre-application will become part of the draft application to reduce redundant forms.

Russell Creek: 3.5 foot Passage Barrier

*Note the incised channel is a little over 10 feet from top bank to water surface

Landowner Complexity

3.5’ Barrier

Current IssuesDead Brook Lamprey Dead Oncorhynchus mykiss

Barrier Location

MudCree

k

DryCreek

Walla Walla River

Mill Creek

LONE

FIR RD

J B GEORGE RD

NE C ST

BOYER AVEW HWY 12

RUSSELL CREEK RD

PEPP

ERS

BRID

GE R

D

PLAZ

AWA

Y

BLALOCK DR

STINSONAVE

BERGEVIN SPRINGS RD

S COL

LEGE

AVE

N WILBUR

AVE

NW B ST

SCHO

OLAV

E

STUR

MAV

E

WALLULA AVE

WHISTLING

DUCK RD

HOME

AVE

TAUMARSON RD

DELLAVE

SE 12TH ST

SPRINGDALERD

DELLAVE

NOLA

NDSTHERITAGE RD

NE ROSE ST

S WILB

URAV

E

LOWER WAITSBURG RD

BEET RD

COUNTRY

CLUB RD

BARLEENDR

W PINE ST

BERNEY DR

STATELINE RD

FARMLAND RDSUMMERSCIR

E ALDER ST

TULL DR

VIEW DR

CENT

ER S

T

S 4TH AVE

VALLEY GROVE RD

BOYERAVE

WALLACE ST

SW 1ST STBANDRA

DR

BUSSELL RD

G ST

SW BA

DE AV

E

W REESAVE

PLEASANT ST

A ST

FST

BRAD

EN R

D

E ST

C ST

BRICKNERRD

AUBREELN

S 9TH AVE

HOWA

RD ST

HAWK DR

E MAIN

ST

W ALDER ST

W ROSE ST

W POPLAR ST

E SUMACH ST

WAGG

ONER

RD

WALLAWALLA

AVE

SE GARRISON

VILLAGE WAY

BRYANT AVE

J ST

WHITELEYRD

ISAACS AVE

SUDBURYRD

FUTURARD

CONVAIRST

E BIRCH STN 9T

HAV

E

MILL CREEK RDLEONARD DR

GREENLN

COYO

TERID

GE DR

CARL ST

E LEARAVE

RAINIER ST

SAPOLILEAST RD

S 3RD

AVE

JUNIPER ST

FERN AVE

W WHITMAN DR

SAPO

LIL R

D

S 2ND AVE

RALSTONRD

BETZ LN

N HW

Y 125

HARVEY SHAW RD

HILL RDETHEL RD

S TAUSICK

WAY

PRAN

GER

RD

ROME ST

CANB

ERRA

DR

FOUN

TAIN

HILL

S

VIDEL

LN

MOJONNIER RD

WHEAT

RIDGE LN

E BEECH AVE

WHITMAN ST

RESERVOIR RD

E WHITMAN DR

E HWY 12

LAWSONLN

RESER RD

FIVE

MILE

RD

PEARMAIN AVENEWTOWN RD

OLD MILTON HWY

ELECTRICAVE

ROOK

SPA

RK R

DTWO

ACRE LN

KEND

ALL R

D

SMITH RD

YORK ST

RILEY RD

W HWY12 ONRAMP

BURO

KER

RD

A INT

RUSSET RD

AUFTY LN

BALDWINRD

COPE

LAND

LN

STATELINE RD

FOST

ER R

D

TITUSLN

THE DALLES

MILITARY RD

MIDDLE WAITSBURG RD

BIAGILN

KIBLER RD

OLD HWY 12

ROBI

SON

RANC

H RD

WYLIE LN

S 125

S 125

HOOD

RD

COTTONWOOD RD

MCIN

ROE R

D

POWE

R LIN

E RD

CHASE RD

EVAN

S RD

DAGU

E RD

Cartographer: Lisa Stearns·

0 0.9 1.8 2.70.45Miles

1:79,000

3/14/2018

DISCLAIMER: While every precaution was taken in preparing this map, the publisher disclaims anywarranty of fitness or accuracy of the data.The map is approximate in nature, based on compilation of data from multiple sources, and should notbe relied upon or referenced in legal documents, including property deeds, title reports, and contractdocuments, nor substituted for appropriate survey and\or engineering analysis. The user of the mapacknowledges its limitations, assumes all responsibility for its use, and agrees to hold the publisherharmless for any damages that may result from the use of this map. This map is subject to changewithout notice.©Copyright WWCCD 2018

Document Path: \\SERVERWWCD\gis\Grant Proposals\Russel_Creek_Barrier_2018.mxd

Russell Creek Barrier Project

Barrier Location

BRISB

ANE S

T

DEMARINI DRS 4TH AVE

S 3RD

AVE

CALDWELL RDMCCORKLE LN

YELLOWHAWK ST

SORR

EL D

RS 2

ND AV

E

CANBERRA DR

W LANGDON RD

DEMARINI DR

YELLOWHAWK ST

S 3RD

AVE

S 3RD

AVE

CALDWELL RD

SORR

EL D

R

W LANGDON RD

S 3RD

AVE

W LANGDON RDW LANGDON RD

0 550 1,100275 Feet 1:5,000