2018 snake river salmon recovery board project...
TRANSCRIPT
Pre-Application Due Date: March 15, 2018 Draft Application Due Date: April 5, 2018 Final Application Due Date: July 10, 2018
1
2018 Snake River Salmon Recovery Board Project Application
Complete Application Checklist Summary: Through the application process each of the following elements, depending on the project type, will need to be created and submitted at some point before the final application due date.
� Local Snake River Salmon Recovery Board Application – this does not need to be submitted in PRISM, but is required and will assist in finalizing a complete application – may elements including the project title, description, property details, etc., can be copied and pasted throughout. The SRSRB Application includes this entire form, the pre-application, draft application, and final application sections.
� The relevant Salmon Project Proposal (Appendix C, found in RCO Manual 18), which includes the response to the SRFB Review Panel comments if required.
� Three maps: 1. a general vicinity map, 2. a detailed worksite map for planning and restoration projects or a parcel map for acquisitions, and 3. a map showing the project’s Area of Potential Effect with the section, township, and range identified.
� A minimum of two site photographs in JPEG file format.
� The proposed project design including plans, specifications, and a design report if available (for restoration projects only).
� Detailed Cost Estimate.
� Landowner Acknowledgement Form (Appendix F, found in RCO Manual 18).
� Barrier Evaluation Form (fish passage construction and design projects only).
� Correction Analysis Form (fish passage construction projects only).
� Intensively Monitored Watershed Certification (when relevant).
� Waiver of Retroactivity (for acquisition projects only).
� Deliverables from prior phases of the project (when relevant).
� Project partnership contribution form (when relevant, Appendix G, found in RCO Manual 18).
� Salmon Recovery Funding Board Application Authorization Form
� RCO Fiscal Data Sheet
� Complete required elements of PRISM Online Application: (https://secure.rco.wa.gov/Prism/Sponsor/Account/LogOn).
Please contact the Snake River Salmon Recovery Board Lead Entity office for questions or assistance with the application and application process at 509-382-4115 or [email protected].
Pre-Application Due Date: March 15, 2018 Draft Application Due Date: April 5, 2018 Final Application Due Date: July 10, 2018
2
Pre-Application Section (This section must also must be included as part of the Draft and Final Applications if you don’t submit a pre-application).
Project Title (less than 50 characters including spaces, please create a title that accurately reflects the project): Russell Creek Fish Barrier
Submitting Organization: Walla Walla County Conservation District & Washington Dept. of Fish & Wildlife
Project Contact Information (Complete for each project contact)
Mrs. Ms. Mr. First Name: Renee M. Last Name: Hadley
Address: 325 N 13th Avenue City/Town: Walla Walla State: WA Zip: 99362
Telephone # (509) 522-6340 ext. 110 Cell # ( ) -
E-mail address: [email protected]
Project Location:
The project is located on Russell Creek, south of the City of Walla Walla, Washington in WRIA 32.
Russell Creek is a tributary of Yellowhawk Creek. Both are in a major spawning area listed as a priority
protection reach.
Maps: Provide both a map illustrating project vicinity and a site map. Map descriptions can be placed
in this section but maps should be attached as a separate page. (Contact SRSRB staff for assistance
if needed).
Map with property owners.
Pre-Application Due Date: March 15, 2018 Draft Application Due Date: April 5, 2018 Final Application Due Date: July 10, 2018
3
Project Description
Must be less than 1,500 characters including spaces.
Your Project Description: Past actions have impacted salmonid populations. A historic concrete structure on Russell Creek is a fish barrier. There is a 3.5 foot passage barrier preventing salmonid migration. Dead Oncorhynchus mykiss have been observed below the barrier. This design/construction application aims to place a series of log controls downstream of the barrier to backwater up to the barrier elevation. This streambed control would be designed in accordance with WDFW guidelines. The barrier is located at a corner of 5 parcels. Three of the landowners have expressed interest in resolving this passage concern.
Pre-Application Cost Estimate: List SRFB request, match, and total project costs.
Budget Items SRFB Request Matching Funds Total Project Cost Design of barrier removal 10000 Barrier Removal 30000
Total SRFB Request $ Total Matching Funds $
Total Project Cost $40000
Restoration Project Preliminary Design Requirements Starting in 2013, the SRFB changed the requirement for design review of restoration projects which exceed $250,000 in SRFB requested funds. If your grant request from the SRFB will exceed $250,000 you will be required to submit a preliminary design or equivalent with the final application. Check the SRFB Manual18 (Appendix D) for information of the Design Requirements or contact LE Staff. Please check the appropriate box below as to whether the design requirement can be met.
I have preliminary designs completed and have cross walked them w/ SRFB requirements
I am currently working on preliminary design and may be able to complete by final application deadline
I do not have preliminary designs and will not have them by the final application
Pre-Application Due Date: March 15, 2018 Draft Application Due Date: April 5, 2018 Final Application Due Date: July 10, 2018
4
Evidence that this project is part of the Snake River Salmon Recovery Plan: List the HWS project number and the title of the project as stated in the Snake river Salmon Recovery Region Provisional Work Plan 2013-2018. If project is not directly stated in the Work Plan, list the general project category your project pertains to and describe the correlation. Work Plan Number(s): Remove Fish Passage Barriers 32-Passage Barrier Removal
Assessment and Monitoring Projects: The SRSRB has requested that a project sponsor first seek Columbia River Salmon and Steelhead Endorsement (CRSSE) funding (if eligible) before making a request for SRFB funds. Details on the CRSSE can be found here: http://wdfw.wa.gov/licensing/crss_endorsement/. WDFW develops project proposals for the Columbia River Salmon and Steelhead Recreational Anglers Board (CRSSRAB) to evaluate and rank. To determine project eligibility, please work with regional WDFW staff. If your project is eligible for CRSSE funding, please be advised that your project may not be funded or it may be funded only after receiving CRSSE funds. Is this project eligible for CRSSE funding (please provide relevant communications):
Yes No
This is the end of the PRE-APPLICATION
When submitting your draft application, make sure to update the pre-application information where required as well as completing the following draft application. The pre-application will become part of the draft application to reduce redundant forms.
Russell Creek: 3.5 foot Passage Barrier
*Note the incised channel is a little over 10 feet from top bank to water surface
_̂
Barrier Location
MudCree
k
DryCreek
Walla Walla River
Mill Creek
LONE
FIR RD
J B GEORGE RD
NE C ST
BOYER AVEW HWY 12
RUSSELL CREEK RD
PEPP
ERS
BRID
GE R
D
PLAZ
AWA
Y
BLALOCK DR
STINSONAVE
BERGEVIN SPRINGS RD
S COL
LEGE
AVE
N WILBUR
AVE
NW B ST
SCHO
OLAV
E
STUR
MAV
E
WALLULA AVE
WHISTLING
DUCK RD
HOME
AVE
TAUMARSON RD
DELLAVE
SE 12TH ST
SPRINGDALERD
DELLAVE
NOLA
NDSTHERITAGE RD
NE ROSE ST
S WILB
URAV
E
LOWER WAITSBURG RD
BEET RD
COUNTRY
CLUB RD
BARLEENDR
W PINE ST
BERNEY DR
STATELINE RD
FARMLAND RDSUMMERSCIR
E ALDER ST
TULL DR
VIEW DR
CENT
ER S
T
S 4TH AVE
VALLEY GROVE RD
BOYERAVE
WALLACE ST
SW 1ST STBANDRA
DR
BUSSELL RD
G ST
SW BA
DE AV
E
W REESAVE
PLEASANT ST
A ST
FST
BRAD
EN R
D
E ST
C ST
BRICKNERRD
AUBREELN
S 9TH AVE
HOWA
RD ST
HAWK DR
E MAIN
ST
W ALDER ST
W ROSE ST
W POPLAR ST
E SUMACH ST
WAGG
ONER
RD
WALLAWALLA
AVE
SE GARRISON
VILLAGE WAY
BRYANT AVE
J ST
WHITELEYRD
ISAACS AVE
SUDBURYRD
FUTURARD
CONVAIRST
E BIRCH STN 9T
HAV
E
MILL CREEK RDLEONARD DR
GREENLN
COYO
TERID
GE DR
CARL ST
E LEARAVE
RAINIER ST
SAPOLILEAST RD
S 3RD
AVE
JUNIPER ST
FERN AVE
W WHITMAN DR
SAPO
LIL R
D
S 2ND AVE
RALSTONRD
BETZ LN
N HW
Y 125
HARVEY SHAW RD
HILL RDETHEL RD
S TAUSICK
WAY
PRAN
GER
RD
ROME ST
CANB
ERRA
DR
FOUN
TAIN
HILL
S
VIDEL
LN
MOJONNIER RD
WHEAT
RIDGE LN
E BEECH AVE
WHITMAN ST
RESERVOIR RD
E WHITMAN DR
E HWY 12
LAWSONLN
RESER RD
FIVE
MILE
RD
PEARMAIN AVENEWTOWN RD
OLD MILTON HWY
ELECTRICAVE
ROOK
SPA
RK R
DTWO
ACRE LN
KEND
ALL R
D
SMITH RD
YORK ST
RILEY RD
W HWY12 ONRAMP
BURO
KER
RD
A INT
RUSSET RD
AUFTY LN
BALDWINRD
COPE
LAND
LN
STATELINE RD
FOST
ER R
D
TITUSLN
THE DALLES
MILITARY RD
MIDDLE WAITSBURG RD
BIAGILN
KIBLER RD
OLD HWY 12
ROBI
SON
RANC
H RD
WYLIE LN
S 125
S 125
HOOD
RD
COTTONWOOD RD
MCIN
ROE R
D
POWE
R LIN
E RD
CHASE RD
EVAN
S RD
DAGU
E RD
Cartographer: Lisa Stearns·
0 0.9 1.8 2.70.45Miles
1:79,000
3/14/2018
DISCLAIMER: While every precaution was taken in preparing this map, the publisher disclaims anywarranty of fitness or accuracy of the data.The map is approximate in nature, based on compilation of data from multiple sources, and should notbe relied upon or referenced in legal documents, including property deeds, title reports, and contractdocuments, nor substituted for appropriate survey and\or engineering analysis. The user of the mapacknowledges its limitations, assumes all responsibility for its use, and agrees to hold the publisherharmless for any damages that may result from the use of this map. This map is subject to changewithout notice.©Copyright WWCCD 2018
Document Path: \\SERVERWWCD\gis\Grant Proposals\Russel_Creek_Barrier_2018.mxd
Russell Creek Barrier Project
_̂
Barrier Location
BRISB
ANE S
T
DEMARINI DRS 4TH AVE
S 3RD
AVE
CALDWELL RDMCCORKLE LN
YELLOWHAWK ST
SORR
EL D
RS 2
ND AV
E
CANBERRA DR
W LANGDON RD
DEMARINI DR
YELLOWHAWK ST
S 3RD
AVE
S 3RD
AVE
CALDWELL RD
SORR
EL D
R
W LANGDON RD
S 3RD
AVE
W LANGDON RDW LANGDON RD
_̂
0 550 1,100275 Feet 1:5,000