Page 1: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:

2017 NER 300 Info Day

15 December 2017

Climate Action

Page 2: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:

EU Climate and Energy Framework

2020

2030

Energy Union governance

-20 % Greenhouse

Gas Emissions

20% Renewable

Energy

20 % Energy

Efficiency

≤-40 % Greenhouse Gas

Emissions (domestic)

27 % Renewable

Energy

27%* Energy Efficiency

10 % Interconnection

15 % Interconnection

* To be reviewed by 2020, having in mind an EU level of 30%

In October 2014 the European Council gave guidance on how to implement the 2030

climate and energy framework

Policy context

2

Page 3: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:

Progress towards meeting Europe 2020 and 2030 targets (total EU GHG emissions)

3 000

3 500

4 000

4 500

5 000

5 500

6 000

1990 1995 2000 2005 2010 2015 2020 2025 2030

Mt

CO

2 eq

uiv

alen

t

Historic emissions

Projections with existing measures -WEM- (based on MS submissions)

Proposed greenhouse gas emissions trajectory

-40% compared to 1990

-20%

compared to

1990

-23%

in 2016

-20% compared to 1990

-40%compared to 1990

Mitigation

Page 4: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:

2030 Climate and Energy Framework

≤-40 % Greenhouse Gas Emissions (domestic)

Max 280 MtCO2eq

Emission Trading System (ETS)

-43 % Including:

Power/Energy Sector and Industry,

Aviation

Land Use, Land Use

Change and Forestry

≤ 0 % "No-Debit"

Non-ETS ≤-30% Including: road transport, buildings, waste, agriculture,

Land Use, Land Use Change and Forestry

Effort Sharing Regulation

-30 %

Full flexibility Max

100 MTCO2eq

New!!

4

Mitigation

Page 5: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:

NER 300: Highlights from 2017

• 6 projects in operation:

• BEST (2013)

• Verbiostraw (2014)

• Windpark Blaiken (2015)

• 3 new projects enter in operation:

• Veja Mate: 01/07/2017

• Windpark Handalm: 03/10/2017

• Nordsee One: 31/12/2017

Climate Action

Page 6: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:

Veja Mate

Offshore windpark of 402 MW capacity 95 km north west of Borkum, Germany 6MW turbines on monopile foundations Own substation Project sponsor Highland Group Holding (59,293%), Siemens Financial Services (40,707%) and Copenhagen Infrastructure II K/S (0,001%) www.vejamate.de Max. NER 300 funding: €112.6 million

Climate Action

Page 7: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:

Windpark Handalm

13 wind turbines with total nominal electric capacity of 39 MW Deutschlandsberg, Styria, Austria Average altitude: 1800m Optimised for wind and site conditions in mountain areas Project sponsor Energie Steiermark AG www.e-steiermark.com/erzeugung/Windkraft/Handalm.aspx Max. NER 300 funding: €11.3 million

Climate Action

Page 8: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:

Nordsee One

Offshore windpark of 332 MW capacity 40 km north of Juist, Germany 6.15MW turbines on monopile foundations Own substation Project sponsor 85 % NPEW North S.à r.l. and 15 % Nordsee Windpark Beteiligungs GmbH www.nordseeone.com Max. NER 300 funding: €70.0 million

Climate Action

Page 9: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:

Communication points (1)

Mention of NER 300 award

Use of NER 300 visual element

Co-funded by the NER 300 programme of the European Union

Climate Action

Page 10: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:

Communication points (2)

Inauguration ceremonies: send invitations as early as possible

Improve section 8. Factsheet (for public use) in annual reports

https://setis.ec.europa.eu/NER300-Doc

Send us photos with permission to use and copyright details

Climate Action

Page 11: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:

Overall state of play

• Overview: projects (number)

Climate Action

Overview: status by volume

6

28

5

In operation

In planning

Withdrawn

€260

€1389m

€456,7

In operation

In planning

Withdrawn

Page 12: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:

NER300 unused funds

NER300 unused funds

(€457m)

InnovFin Energy Demo

Projects

CEF Debt Instrument

• For bankable innovative renewable energy

• Loans & equity-type financing, project development assistance grants

• Blending with NER300 grant possible

• For bankable renewable energy transport

• Loans and guarantees • Blending with CEF grant

possible, current call open until April 2018

→ Both managed by the European Investment Bank, in case of

interest contact the EIB directly.

Climate Action

Page 13: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:

Forthcoming milestones

• 1st call projects:

• Entry into operation: by 31/12/2018 + 1 year of grace

• 2nd call projects:

• FID, permits, State Aid clearance: by 30/06/2018

• Entry into operation: by 30/06/2020 + 1 year of grace

Climate Action

Page 14: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:

Forthcoming deadlines

• Annual reports

• 31 December 2017: for projects before operation

• 15 July 2018 (including energy produced): for projects in operation

• Relevant knowledge

• 15 February 2018: projects in operation to COM

• 30 June 2018: COM confirms to MS

• Annual payment requests

• 15 July 2018: for projects in operation

Page 16: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:

4th amendment of NER 300 Award Decision

• Notifications received in 2017

• for changes in date of entry into operation: Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae

• for withdrawals: France: BIOd UPM Stracel BTL, Netherlands: BIOg Woodspirit, Sweden: BIOc Gobiogas phase 2, UK: OCNb Sound of Islay

• Vote in CCC: 30 November 2017

• Adoption: forthcoming

Climate Action