2017 contech calendar
TRANSCRIPT
2 0 1 7C O N T E C H C A L E N D A R
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
D E C E M B E R | 2 0 1 6
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
J A N U A R Y 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
PIPE SOLUTIONS »
TRANSMISSION LINE SYSTEM IMPROVEMENT
PIPE SOLUTIONS
DECEMBER 2016SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
FEBRUARY 2017SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28
NEW YEAR’S DAY
MARTIN LUTHER KING DAY
Reynolds, Indiana
HEL-COR® CMP, 12 GA, 5x1 with MOBILE PIPE® Mill4,400 LF of 92-in. through 116-in. Installation Date: July 2016
Utilizing the MOBILE PIPE mill to manufacture the pipe needed for caissons to stabilize utility poles, the contractor was able to avoid freighting and unloading any truckloads of pipe. A dedicated Contech crew travels with the mill to efficiently manufacture quality pipe for every job.
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
F E B R U A R Y 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28
STRUCTURES SOLUTIONS »
WEST DOWLING ROAD EXTENSION PHASE II
JANUARY 2017SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
MARCH 2017SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
PRESIDENTS’ DAY
VALENTINE’S DAY
Anchorage, Alaska
BridgeCor® Structural Plate50’-1” span x 27’ rise x 155’ length
Installation Date: July 2015
As the best solution, a 50’-1” x 27’ BridgeCor Structural Plate, 155’ in length, was selected and installed. The BridgeCor structure was more cost effective than a traditional girder bridge. Its ease of installation was a plus on the curved, super elevated road over the structure.
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
M A R C H 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
STORMWATER SOLUTIONS »
Villanova, PennsylvaniaVillanova University constructed a large garage to increase parking capacity for a nearby stadium. A treatment train consisting of a Vortechs hydrodynamic separator, a Terre Arch concrete detention system, and a Jellyfish Filter were selected to effectively treat stormwater in a compact system with a small footprint.
12’ dia. Jellyfish® Filter with 18 high flowcartridges & 4 drain down cartridgesAlso Included: Terre Arch™ Detention & Vortechs® Hydrodynamic SeparatorInstallation Date: March 2016
VILLANOVA UNIVERSITY – PIKE FIELD GARAGE
Filter
FEBRUARY 2017SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28
APRIL 2017SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
ST. PATRICK’S DAY
SPRING EQUINOX
DAYLIGHT SAVING TIME BEGINS
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
A P R I L 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
STRUCTURES SOLUTIONS »
Ocala, FloridaOn Top of the World Community is a premier 55+ active adult community in Ocala, Florida; known for its dedication to quality. When looking for a solution for a bridge overpass, the developer’s passion for creativity in development and excellence in home building made Keystone Stonegate Country Manor the right choice.
Keystone Retaining Wall Systems®
Stonegate® Country Manor®
1,000 SF
Installation Date: July 2014
ON TOP OF THE WORLD HOME COMMUNITY
MARCH 2017SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
MAY 2017SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
TAX DAY EARTH DAY
GOOD FRIDAY
EASTER SUNDAY
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
M A Y 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
PIPE SOLUTIONS »
Westminster, ColoradoA reinforced concrete pipe (RCP) draining Karen’s Pond and running below Pecos Street was showing signs of distress in the deep cover situation. The structural cracks along the invert and crown of the RCP meant it needed to be replaced or relined. DuroMaxx Steel Reinforced Polyethylene (SRPE) pipe was selected to slip line the RCP for its ability to carry the entire load without any contribution from the failing RCP.
DuroMaxx® SRPE Liner Pipe168 LF of 54-in.
Installation Date: August 2016
PECOS STREET CULVERT IMPROVEMENT
STEEL REINFORCED PE TECHNOLOGY
APRIL 2017SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
JUNE 2017SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30MEMORIAL DAY
MOTHER’S DAYPIPE SOLUTIONS
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
J U N E 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
STRUCTURES SOLUTIONS »
Mesquite, NevadaOriginally designed as a two-span girder bridge, the Exit 118 project allowed alternative conceptual designs to be submitted for approval. Working closely with the design team, Contech proposed twin BEBO arches for the project. Garnering enthusiastic reviews from the city, the proposal was accepted.
BEBO® Precast Bridge SystemE-Series78’ twin spans x 27’-10” rise x 152’ length
Installation Date: July 2016
EXIT 118 INTERCHANGE EXPANSION
MAY 2017SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
JULY 2017SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24/31 25 26 27 28 29
FATHER’S DAY SUMMER SOLSTICE
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
J U L Y 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24/31 25 26 27 28 29
STORMWATER SOLUTIONS »
Tacoma, WashingtonThis innovative facility provides treatment for 754 acres in a footprint of only 5,550 square feet using a series of cascade pools, distribution channels, and Filterra treatment cells. The system can treat up to eight million gallons of stormwater per day; capturing the worst pollutants from entering Puget Sound.
Filterra® Bioscape with 5,550 SF of Filterra media, a CDS® hydrodynamic separator for pretreatment, and StormGate® high flow bypass structureInstallation Date: December 2015
POINT DEFIANCE REGIONAL TREATMENT RETROFIT
®
JUNE 2017SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
AUGUST 2017SUN MON TUES WED THUR FRI SAT
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
INDEPENDENCE DAY
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
A U G U S T 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
PIPE SOLUTIONS »
Houston, TexasImprovements to the terminal area at the George Bush Intercontinental Airport included storm water and surface water drainage and treatment. Contech Slotted Drain with CDS® pretreatment was selected as the optimal solution providing a practical, aesthetically pleasing system.
Contech Slotted Drain™ and CDS® Pretreatment (3 - 10’ units)1,980 LF of 24-in. Slotted Drain
Installation Date: October 2016
IAH AIRPORT TERMINAL C IMPROVEMENTS
PIPE SOLUTIONS
JULY 2017SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24/31 25 26 27 28 29
SEPTEMBER 2017SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
S E P T E M B E R 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
STRUCTURES SOLUTIONS »
Columbia, South CarolinaThis Continental Pedestrian Truss bridge spans over an active rail line that was previously posing a serious safety concern to the general public visiting the zoo. Trains utilized this route multiple times a day traveling at high rates of speed. The beautifully designed bridge now safely links the parking lot directly to the remodeled zoo.
Continental® Pedestrian Truss BridgeKeystone® style115’ span x 12’ width
Installation Date: May 2016
RIVERBANKS ZOO PEDESTRIAN CROSSWALK
AUGUST 2017SUN MON TUES WED THUR FRI SAT
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
OCTOBER 2017SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
LABOR DAY
FALL EQUINOX
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
O C T O B E R 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
PIPE SOLUTIONS »
Monmouth, OregonThe Monmouth Main Street Park uses an UrbanGreen Rainwater Harvesting System to collect water from a splash pad which is then filtered, stored, and disinfected before being used for spray irrigation of the park grass and landscaping. The system is saving the City hundreds of thousands of gallons of potable water.
UrbanGreen® Rainwater Harvesting System with a 20,000 gal. SRPE Tank, mechanical system, and a CDS® hydrodynamic separator for pretreatmentInstallation Date: May 2016
CITY OF MONMOUTH MAIN STREET PARK
Stormwater Solutions from Contech®
SEPTEMBER 2017SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
NOVEMBER 2017SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
COLUMBUS DAY
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
N O V E M B E R 2 0 1 7
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
STRUCTURES SOLUTIONS »
Lewiston, IdahoThe Spalding Bridge Scour Repair Project, winner of the AASHTO President’s Transportation Award, was rated among the top 10 most scour-critical bridges in the state. Several piers of the 1,200-ft bridge built in 1962 were in danger of undermining. A-Jacks concrete armor units were installed in high flowing water conditions to stabilize the piers without needing to dewater or divert the river while protecting the sensitive habitat.
A-Jacks® Concrete Armor Units14,982 24-in. units
Installation Date: July 2015
SPALDING BRIDGE SCOUR MITIGATION PROJECT
OCTOBER 2017SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
DECEMBER 2017SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24/31 25 26 27 28 29 30
VETERANS DAY
DAYLIGHT SAVING TIME ENDS
THANKSGIVING
WINNER OF THE
PRESIDENT’S AWARD
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 31 25 26 27 28 29 30
9025 CENTRE POINTE DRIVE, SUITE 400 | WEST CHESTER, OH 45069
Bridges & Structures
Erosion Control
Pipe
Retaining Walls
Stormwater Management
© 2016 Contech Engineered Solutions LLC
ENGINEERED SOLUTIONS
D E C E M B E R 2 0 1 7
ENGINEERED SOLUTIONSCOMPLETE SITE SOLUTIONS
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STORMWATER SOLUTIONS »
Jalisco, MexicoThe local regulating water authority requires new developments to retain their stormwater on site. This helps control flooding in the area due to the increased runoff that the existing infrastructure can no longer handle. Contech provided the most cost-effective solution through the use of 2 perforated CMP systems.
Contech CMP Infiltration SystemSystem 1 - 814 LF of 72” and 78” CMP System 2 - 715 LF of 78” and 84” CMP
Installation Date: June 2016
ELEMENT RESIDENTIAL DEVELOPMENT
NOVEMBER 2017SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
JANUARY 2018SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
WINTER SOLSTICE
CHRISTMAS DAY
CHRISTMAS EVE
NEW YEAR’S EVE