2017 construction maps -...

8
FALL • 2017 TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT 0795_072117 “Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.” COLLIN COUNTY CONSTRUCTION PROJECTS 2017 HIGHWAY PROJECTS: Dallas District Office 4777 E. Highway 80 Mesquite, TX 75150 CONTACT INFORMATION Michelle Releford Public Information Officer (214) 320-4485 [email protected] TxDOT graphic SOURCE: Texas Department of Transportation. COLLIN COUNTY PROJECTS UNDER CONSTRUCTION CSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete 1 0047-06-133 US 75 Interchange improvements Interchange improvements Nov-2015 May-2016/ Oct-2018 Zachry Construction Corp. $37.5 M 40% 2 0047-06-139 US 75 From Spring Creek Parkway To SH 121 S. (Sam Rayburn Tollway) Widen 6-lanes to 8-lanes & frntg rds. Dec-2013 Apr-2014/ Nov-2017 MCM $47.5 M 99% 3 0047-06-159 US 75 From Dallas County Line to Telephone Rd. Full depth concrete repair Mar-2017 Sep-2017/ Dec-2017 O. Trevino Construction, LLC $0.66 M 14% 4 0047-14-068 US 75 From Telephone Rd (CR 275) to north of Melissa Rd. Reconstruct/widen 4-lane to 6-lanes & 2-lane frntg rds Aug-2012 Sep-2013/ Nov-2017 Ed Bell Construction Company $63.6 M 99% 5 0047-14-069 US 75 From north of Melissa Rd. to south of FM 455 interchange Reconstruct/widen 4-lane to 6-lanes & 2-lane frntg rds Dec-2015 Jul-2016/ Dec-2019 Austin Bridge & Road Services, LP $79.4 M 42% 6 0047-14-082 US 75 At SH 121 Interchange Landscape treatment of ROW and medians Jul-2017 Mar-2019 AALC, Inc. $2.8 M 0% 7 0091-03-025 SH 289 From FM 455 to north of BUS 289C Landsacpe enhancement Mar-2017 Jun-2017/ Dec-2019 AALC, Inc. $1.4 M$ 32% 8 0091-05-073 SH 289 From PGBT to SH 121 Landsacpe enhancement Aug-2016 Dec-2016/ May-2018 AALC, Inc. $0.47 M 96% 9 0135-11-018 US 380 From west of CR 26 (Denton C/L) to CR 73 (Lovers Lane) east of SH 289 Widen existing 4-ln to 6-ln divided w/ grade separation at SH 289 & DNT Nov-2014 Mar-2014/ Oct-2018 Mario Sinacola & Sons, Excavating, Inc. $58 M 48% 10 0549-03-025 SH 121 At SH 160 Construction of SH 160 grade separation Jan-2016 Oct-2016/ Mar-2018 Austin Bridge & Road Services, LP $14.8 M 70% 11 0549-03-027 SH 121 From SH 5 to 1.65 miles west of FM 455 Widen 2-ln rural to 4-ln divided highway May-2015 Oct-2015/ Oct-2018 Lone Star Civil Construction, Inc. $43.9 M 47% 12 0816-04-044 FM 455 From US 75 NB frontage road to SH 5 Widen facility to 4-ln urban divided ulitimate 6-ln dvided Mar-2013 Aug-2015/ Dec-2017 Lone Star Civil Construction, Inc. $12.4 M 96% 13 0816-05-019 FM 2862 At Elm Grove Creek Replace bridge & approaches Jun-2017 TBD/ Apr-2018 Pierce R & B LLC. $1.6 M 6% 14 1013-01-026 FM 546 From SH 5 to east of County Line/Airport Rd. Construct 4-ln divided facility May-2016 Jan-2017/ Oct-2018 Mario Sinacola & Sons, Excavating, Inc. $17.4 M 61% 15 1973-01-014 FM 1461 From SH 289 to FM 2478 Provide additional paved surface width Jun-2017 TBD/ Apr-2018 Austin Bridge & Road Services, LP $2.7 M 7% 16 2679-03-010 FM 2514 From FM 1378 to east of Lavon Parkway Realign highway construct 4ln divided Mar-2015 Aug-2016/ Nov-2017 Ed Bell Construction Company $6.3 M 99% 17 2977-01-008 FM 2933 From FM 1827 to CR 335 Provide additional paved surface width Jul-2017 TBD Austin Bridge & Road Services, LP $1.6 M 0% 18 3392-01-008 FM 2786 From SH 5 to east of Angel Pkwy. in City of Allen Widen to 4-ln div. (6-ln ultimate) with SH 5 intersection improvements Dec-2014 Apr-2016/ Aug-2018 Ed Bell Construction Company $15.8 M 55% 19 0387-01-014 FM 75 From Main St. to CR 461 Reconstruct existing pavement Aug-2017 Oct-2017/ Apr-2018 Jagoe-Public Co $1.4 M 0% ESTIMATED TOTAL $407.8 M NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of summer 2017. 1 2 3 8 5 4 7 9 10 11 12 15 13 14 18 16 6 17 19 N 2 miles 30 67 COLLIN CO. COLLIN CO. COLLIN CO. DENTON CO. COLLIN CO. DENTON CO. COLLIN CO. DALLAS CO. COLLIN CO. DALLAS CO. GRAYSON CO. FANNIN CO. COLLIN CO. COLLIN CO. GRAYSON CO. ROCKWALL CO. 78 78 78 78 78 78 78 66 121 121 121 121 455 543 545 545 981 455 982 547 546 544 3356 3133 2862 2862 1377 1827 1827 2933 1377 2756 2194 1461 3038 2478 2478 2478 2478 2514 3537 1138 1138 2755 1778 McKINNEY Melissa New Hope Lowry Crossing Princeton Fairview Fate Sasche Garland Richardson Celina Anna Westminster Van Alstyne Weston Prosper Lucas Parker Wylie Lavon Nevada Blue Ridge Trenton Farmersville Allen Addison Plano FRISCO DALLAS Murphy Royse City 5 5 5 5 5 380 380 380 380 75 75 75 75 121 160 121 289 289 121 289 289 190 190 190 205 121 DNT DNT 75 6 6 McKinney Municipal Airport Lavon Lake Lake Ray Hubbard ROCKWALL 2551 1461 455 359 455 Project Limits

Upload: lamlien

Post on 19-Oct-2018

241 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2017 Construction Maps - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/dal/construction-maps.pdf · This map was produced for internal use within the Texas Department of Transportation

FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION

D A L L A S D I S T R I C T

0795

_072

117

“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”COLLIN COUNTY CONSTRUCTION PROJECTS

2017 HIGHWAY PROJECTS:

Dallas District Office4777 E. Highway 80Mesquite, TX 75150

CONTACT INFORMATIONMichelle RelefordPublic Information Officer(214) 320-4485 • [email protected]

TxDOT graphicSOURCE: Texas Department of Transportation.

COLLIN COUNTY PROJECTS UNDER CONSTRUCTIONCSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete

1 0047-06-133 US 75 Interchange improvements Interchange improvements Nov-2015May-2016/Oct-2018

Zachry Construction Corp.

$37.5 M 40%

2 0047-06-139 US 75From Spring Creek Parkway To SH 121 S. (Sam Rayburn Tollway)

Widen 6-lanes to 8-lanes & frntg rds. Dec-2013Apr-2014/Nov-2017

MCM $47.5 M 99%

3 0047-06-159 US 75From Dallas County Line to Telephone Rd.

Full depth concrete repair Mar-2017Sep-2017/Dec-2017

O. Trevino Construction, LLC

$0.66 M 14%

4 0047-14-068 US 75From Telephone Rd (CR 275) to north of Melissa Rd.

Reconstruct/widen 4-lane to 6-lanes & 2-lane frntg rds

Aug-2012Sep-2013/Nov-2017

Ed Bell Construction Company

$63.6 M 99%

5 0047-14-069 US 75From north of Melissa Rd. to south of FM 455 interchange

Reconstruct/widen 4-lane to 6-lanes & 2-lane frntg rds

Dec-2015Jul-2016/Dec-2019

Austin Bridge & Road Services, LP

$79.4 M 42%

6 0047-14-082 US 75 At SH 121 InterchangeLandscape treatment of ROW and medians

Jul-2017 Mar-2019 AALC, Inc. $2.8 M 0%

7 0091-03-025 SH 289From FM 455 to north of BUS 289C

Landsacpe enhancement Mar-2017Jun-2017/Dec-2019

AALC, Inc. $1.4 M$ 32%

8 0091-05-073 SH 289 From PGBT to SH 121 Landsacpe enhancement Aug-2016Dec-2016/May-2018

AALC, Inc. $0.47 M 96%

9 0135-11-018 US 380From west of CR 26 (Denton C/L) to CR 73 (Lovers Lane) east of SH 289

Widen existing 4-ln to 6-ln divided w/ grade separation at SH 289 & DNT

Nov-2014Mar-2014/Oct-2018

Mario Sinacola & Sons, Excavating, Inc.

$58 M 48%

10 0549-03-025 SH 121 At SH 160Construction of SH 160 grade separation

Jan-2016Oct-2016/Mar-2018

Austin Bridge & Road Services, LP

$14.8 M 70%

11 0549-03-027 SH 121From SH 5 to 1.65 miles west of FM 455

Widen 2-ln rural to 4-ln divided highway

May-2015Oct-2015/Oct-2018

Lone Star Civil Construction, Inc.

$43.9 M 47%

12 0816-04-044 FM 455From US 75 NB frontage road to SH 5

Widen facility to 4-ln urban divided ulitimate 6-ln dvided

Mar-2013Aug-2015/Dec-2017

Lone Star Civil Construction, Inc.

$12.4 M 96%

13 0816-05-019 FM 2862 At Elm Grove Creek Replace bridge & approaches Jun-2017TBD/ Apr-2018

Pierce R & B LLC. $1.6 M 6%

14 1013-01-026 FM 546From SH 5 to east of County Line/Airport Rd.

Construct 4-ln divided facility May-2016Jan-2017/Oct-2018

Mario Sinacola & Sons, Excavating, Inc.

$17.4 M 61%

15 1973-01-014 FM 1461 From SH 289 to FM 2478 Provide additional paved surface width Jun-2017TBD/ Apr-2018

Austin Bridge & Road Services, LP

$2.7 M 7%

16 2679-03-010 FM 2514From FM 1378 to east of Lavon Parkway

Realign highway construct 4ln divided Mar-2015Aug-2016/Nov-2017

Ed Bell Construction Company

$6.3 M 99%

17 2977-01-008 FM 2933 From FM 1827 to CR 335 Provide additional paved surface width Jul-2017 TBDAustin Bridge & Road Services, LP

$1.6 M 0%

18 3392-01-008 FM 2786From SH 5 to east of Angel Pkwy. in City of Allen

Widen to 4-ln div. (6-ln ultimate) with SH 5 intersection improvements

Dec-2014Apr-2016/Aug-2018

Ed Bell Construction Company

$15.8 M 55%

19 0387-01-014 FM 75 From Main St. to CR 461 Reconstruct existing pavement Aug-2017Oct-2017/Apr-2018

Jagoe-Public Co $1.4 M 0%

ESTIMATED TOTAL $407.8 M

NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of summer 2017.

1

2

3

8

5

4

7

9

10

11

12

15

13

14

18

16

6

17

19

N

2 miles30

67

COLLIN CO. COLLIN CO.

COLLIN CO.

DENT

ON CO

.

COLL

IN CO

.

DENT

ON CO

.

COLL

IN CO

.

DALLAS CO.

COLLIN CO.

DALLAS CO.

GRAYSON CO.

COLL

IN CO

.CO

LLIN

CO.

HUNT

CO.

FANNIN CO.

COLLIN CO.

COLLIN CO.

GRAYSON CO.

ROCKWALL CO.

78

78

78

78

78

78

78

66

66

121121

121

121

455

543

545

545

981

981

455

982

547

546

544

3356

3133

2862

2862

13771827

1827

2933

1377

2756

2194

1461

3038

2478

2478

2478

2478

2514

3537

1138

11382755

1778

1777

McKINNEY

Melissa

New Hope

LowryCrossing

Princeton

Fairview

Fate

Sasche

Garland

Richardson

Celina

Anna

Westminster

Van Alstyne

Weston

Prosper

Lucas

Parker

Wylie Lavon

Nevada

BlueRidge

Trenton

Farmersville

Allen

Addison

Plano

FRISCO

DALLAS

Josephine

Murphy

Royse City

5

5

5

5

5

380

380

380

380

75

75

75

75

121160

121

289

289

121

289

289

190

190

190

205

121

69

DNT

DNT

75

36

6

6

McKinneyMunicipal Airport

LavonLake

Lake RayHubbard

ROCKWALL

2551

1461

455

359

455

Project Limits

Page 2: 2017 Construction Maps - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/dal/construction-maps.pdf · This map was produced for internal use within the Texas Department of Transportation

FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION

D A L L A S D I S T R I C T

0799

_072

717

“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”DALLAS COUNTY CONSTRUCTION PROJECTS

2017 HIGHWAY PROJECTS:

TxDOT graphicSOURCE: Texas Department of Transportation.

DALLAS COUNTY PROJECTS UNDER CONSTRUCTIONCSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete

1 0281-02-039 SH 78From Spring Creek Pkwy. to SH 205

Widen to 6-lane divided roadway

Jun-2012Sep-2013/Nov-2017

Glenn Thurman, Inc. $21.3 M 92%

2 0364-02-017 SH 121From S of FM 2499 to N of BUS 121H

Convert 4-lane to 10-lane hwy with FRs (Phase 2)

Jul-2013Mar-2014/Dec-2017

OHL USA, Inc. $58.8 M 93%

3 0918-45-761 CSOn S Marsalis Ave. at Five Mile Creek - 0.077 mi.

Replace bridge and approaches

Jun-2014Mar-2015/Nov-2017

Massana Construction, Inc.

$2.9 M 98%

4 0918-45-757 CSFrom 2nd Ave. to White Rock Creek

Replace bridge and approaches

Aug-2017Oct-2017/May-2019

Sema Construction $2.8 M 0%

5 0918-45-864 CSOn Whitlock Rd. from I-35E to Old Denton Rd. in Carrollton

Reconstruct rdwy to 4-lane divided facility

Jul-2014Oct-2016/Jan-2018

Tiseo Paving Co. $3.4 M 53%

6 0353-05-088 SL 12 From W of Midway to US 75Intersection improvements

Aug-2014Feb-2015/Nov-2017

Rebcon, Inc. $7.7 M 92%

7 0009-02-045 SH 78From Garland Rd. from S of Tranquilla to SP 244 (NW Hwy.)

Nine intersection improvements

Feb-2015 TBDLone Star Civil Construction, Inc.

$7.8 M 0%

8 0353-05-082 SL 12From W of Harry Hines to W of Midway in Dallas

Intersection improvements & utility adjustments

May-2015Nov-2015/Nov-2017

Ragle Construction, Inc.

$6.7 M 91%

9 0196-03-256 I-35E From SP 348 to Valley View LnMill and inlay; mainlanes/shoulders

Jun-2015Aug-2015/Dec-2017

Oldcastle Materials Texas, Inc.

$7.3 M 98%

10 2374-03-077 I-20From W of Haymarket Rd. to W of US 175 in City of Dallas

Construct frontage roads and ramps connecting I-20

Jun-2015Feb-2016/Oct-2017

Haydon Building Corp.

$7.4 M 95%

11 0092-14-080 I-345 From I-30 to SP 366Rehab. Julius Schepps: overhead bridge repair/replace steel elements

Sep-2015Feb-2016/Jul-2018

Gibson & Associates, Inc.

$30.5 M 83%

12 0442-02-157 I-35E From I-20 to LP 12Full depth repair and overlay mainlanes

Sep-2015Apr-2016/Dec-2017

Austin Bridge & Road Services, LP

$3.2 M 98%

13 0918-45-791 CSRed Oak Rd. at Ten Mile Creek in City of Lancaster

Rehab existig bridge and approaches

Nov-2015May-2016/Sep-2017

Hodges and Son Constru. Co., Inc.

$1.3 M 98%

14 1068-04-122 I-30From Belt Line Rd. to MacArthur Blvd.

Construct 3-lane frontage road

Dec-2015Jul-2016/Aug-2018

Haydon Central, LLC $25.2 M 55%

15 0197-02-122 US 175 From I-45 to E of Bexar St.Extend US 175; recon SM Wright/SH 310

Feb-2016Jun-2016/Sep-2019

Webber, LLC $103.9 M 55%

16 1068-04-148 I-30 From NW 7th St. to Belt Line Rd.Construct 3-lane EB frontage road & ramp mods

Feb-2016May-2016/Jul-2018

Austin Bridge & Road Services, LP

$8 M 48%

17 2374-04-077 I-20From E of Kirnwood Dr. to Wheatland Rd.

Intersection improvements

May-2016Sep-2016/Aug-2017

Texas-Reyes Group, Ltd.

$1.2 M 99%

18 0092-02-122 SH 310 From I-20 to 0.91 mi. S of SL 12Improve guardrail to design standards

Jun-2016Sep-2016/Oct-2017

Ragle Construction, Inc.

$1.3 M 99%

19 0009-11-233 I-30 At St. FrancisConstruct pedestrian bridge

Jul-2016May-2017/May-2018

Rama Enterprises, LLC

$2.3 M 15%

20 0095-02-102 US 80From I-635 from S of Gross Rd. to US 80 to US 80 from Gus Thomasson to Galloway

Ramp mods and additional lane on FR

Jul-2016Nov-2016/Sep-2019

Sterling Delaware Holding Company, Inc.

$10.4 M 55%

More Projects On Back Page »TxDOT graphicSOURCE: Texas Department of Transportation.

20

8

12

16 14

1

2

3

5

6

7

10

11

13

15

17

18

4

9

35E

35E

35E

35E

35E

DNT

DNT

DALLAS

635635

635

2020

45

45

45

20

20

30

30

30

121

114

114161

161

360

360

360

360

180

180

342

342

342

352352

183

356

183

121

121

121

190190

289

289

190

190

190

205

205

1382

1382

N

5 miles

75

75

75

67

80

80

80

67

77

77

67

78

78

6666

78

78

12

12

12

12

12

Lavon Lake

COLLIN CO.

DALLAS CO.

DENTON CO.

TARR

ANT C

O.

COLLIN CO.

DALLAS CO.

ROCK

WALL

CO.

DALL

AS CO

.

DALL

AS CO

.

DALLAS CO.

ELLIS CO.

DALLAS CO.

ELLIS CO.

KAUF

MAN

CO.

DALL

AS CO

.

TARR

ANT C

O.

DALL

AS CO

.

1171

544

740

740

548

269

550

175

175

175

3039

2757

660

664664

664

Garland Rd.

Mesquite

Garland

Richardson

PlanoLewisville

Sachse

Murphy

Irving

Grand Prairie

Las Colinas

FarmersBranch

Coppell Carrollton

Addison

Duncanville

Desoto

Hutchins Seagoville

WilmerLancaster

Forney

Crandall

Lawson

Combine

Sunnyvale

Mesquite

Garland

Richardson

PlanoLewisville

Sachse

Murphy

Irving

Grand Prairie

Las Colinas

FarmersBranch

Coppell Carrollton

Addison

Duncanville

Desoto

Hutchins Seagoville

WilmerLancaster

Forney

Crandall

Lawson

Combine

Sunnyvale

Balch Springs

Rowlett

WylieSaintPaul

Lavon

Rowlett

WylieSaintPaul

Lavon

ROCKWALL

WhiteRockLake

Lake RayHubbard

Mountain CreekLake

NorthLake

Dallas Love FieldAirport

Dallas ExecutiveAirport

DFW Int’l.Airport

Joe PoolLake

W Belt Line Rd.

S B

elt Li

ne Rd

.

University Park

Highland Park

Cockrell Hill

University Park

Highland Park

Cockrell Hill

HeathHeath

Red Oak

Oak LeafOvilla

FerrisRed Oak

Oak LeafOvilla

Ferris

Shiloh Rd.

E Belt Line Rd.

Malloy Bridge Rd.

LancasterRegionalAirport

MesquiteMetro

Airport

S Be

l t Lin

e Rd.

77

287

Projects from Reverse PageProjects Under Construction

6730

Balch Springs

Page 3: 2017 Construction Maps - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/dal/construction-maps.pdf · This map was produced for internal use within the Texas Department of Transportation

FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION

D A L L A S D I S T R I C T

0799

_072

717

“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”DALLAS COUNTY CONSTRUCTION PROJECTS

2017 HIGHWAY PROJECTS:

Dallas District Office4777 E. Highway 80Mesquite, TX 75150

CONTACT INFORMATIONMichelle Releford – Public Information Officer(214) 320-4485 • [email protected]

DALLAS COUNTY PROJECTS UNDER CONSTRUCTION

CSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost

% Complete

21 1047-03-070 FM 1382At Cedar Hill State Park Spine Rd.

Install traffic signal; hike/bike trails

Jul-2016Mar-2017/Mar-2018

FNH Construction. LLC

$6 M 57%

22 0047-07-229 US 75From SP 366 (Woodall Rodgers Frwy.) to I-635 in City of Dallas

Landscape development Aug-2016Nov-2016/Aug-2018

DBI Services, LLC $0.8 M 79%

23 2374-02-149 I-635At Elam Rd. and at Lake June Rd.

Landscape development Aug-2016Nov-2016/Jul-2018

AALC, Inc. $0.8 M 60%

24 0196-03-272 I-35EFrom Oak Lawn Ave. to Harry Hines Blvd.

Mill, full depth repair and overlay on FR

Oct-2016Apr-2017/Dec-2017

Austin Bridge & Road Services, LP

$3.3 M 47%

25 0353-04-095 SH 114From Freeport Pkwy. to Esters Blvd.

Construct WB FR and ramp mods

Jan-2017Apr-2017/Dec-2017

Ed Bell Construction Company

$3.9 M 50%

26 0197-02-118 US 175 From Lake June Rd. to I-20WB FR, mill, full depth repair, overlay & pav markings

Feb-2017Apr-2017/Dec-2017

Austin Bridge & Road Services, LP

$1.5 M 98%

27 0047-06-160 US 75 From I-635 to PGBT SH 190 Water blast barrier and walls Mar-2017May-2017/Nov-2017

S & S Bridge Painting, Inc.

$0.7 M 95%

28 0581-02-145 SL 12From Shady Grove Rd. to SH 183

Mill, full depth repair and overlay

Apr-2017TBD/ Jan-2018

O. Trevino Constru., LLC

$1.5 M 15%

29 0261-02-074 US 67From Belt Line Rd. to Wheatland Rd.

Widen frwy. from 4-lanes to 6-lanes

May-2017Sep-2017/Sep-2019

Flatiron Contractors, Inc.

$59 M 0%

30 1047-03-072 FM 1382From E Grand Prairie Rd. to N of SH 180

Retaining wall and bridge abutment repairs

May-2017Oct-2017/Mar-2018

Ragle Construction, Inc.

$1.7 M 0%

31 0009-03-045 SH 66From Western City Limits of Rowlet to Heritage Parkway

Landscape enhancement Jun-2017Aug-2017/Aug-2019

AALC, Inc. $1.8 M 8%

32 0196-03-268 I-35EFrom I-30 to N of Oak Lawn Ave.

Reconstruct 2-lane FR and interchanges

Jun-2017Oct-2017/Sep-2020

Balfour Beatty Infrastructure, Inc.

$78.8 M 0%

33 0196-07-031 SS 366From Woodall Rodgers FR N Lamar St. to N Central Expy.

Concrete full depth repair on FRs

Jun-2017Dec-2017/Jan-2018

IIPL USA LLC $0.7 M 0%

34 2374-04-049 I-20 From W of Carrier Pkwy. to FM 1382 (Belt Line Rd.)

Construct 6-lane frontage roads and ramp mods

Jun-2017Nov-2017/Dec-2020

Fluor Heavy Civil, LLC

$54.2 M 0%

35 0918-47-118 PWAt Cedar Hill State Park in Shady Ridge Camping Area

Reconstruct park road including parking lots

Jul-2017Nov-2017/Feb-2018

Texas-Reyes Group. Ltd.

$1 M 0%

36 2374-01-187 I-635From west of FM 78 to Greenville Ave.

Improve guardrail Jul-2017Nov-2017/Aug-2018

SJ & J Construction, LLC

$3.5 M 0%

37 0196-02-068I-35E(35Express)

From south of I-635 to US 380

Construct add'l. lane each direction, reversible Texpress Lanes, SB bridge over Lewisville Lake, Belt Line Road intersection reconstruction and multiple intersection and bridge improvements.

Constru. Began:Oct. 2013

Lanes opened in May and ribbon cutting in November

AGL $1.4 B 99%

38 0442-02-088

I-35E/US 67(The Southern Gateway)

From 8th St. to US 67 and US 67 from I-35E to I-20

Widen highway and add reversible non-tolled express lanes

Jun-2017 2017 – 2021Pegasus Link Constructors, LLC

$666 M 0%

ESTIMATED TOTAL $2.6 B

TxDOT graphicSOURCE: Texas Department of Transportation.

31

36

19

23

35

29

23

32

38

28

30

24

23

25

26

27

34

33

37 To US 380

35E

35E

35E

35E

35E

DNT

DNT

DALLAS

635635

635

2020

45

45

45

20

20

30

30

30

121

114

114161

161

360

360

360

360

180

180

342

342

342

352352

183

356

183

121

121

121

190190

289

289

190

190

190

205

205

1382

1382

N

5 miles

75

75

75

67

80

80

80

67

77

77

67

78

78

6666

78

78

12

12

12

12

12

Lavon Lake

COLLIN CO.

DALLAS CO.

DENTON CO.

TARR

ANT C

O.

COLLIN CO.

DALLAS CO.

ROCK

WALL

CO.

DALL

AS CO

.

DALL

AS CO

.

DALLAS CO.

ELLIS CO.

DALLAS CO.

ELLIS CO.

KAUF

MAN

CO.

DALL

AS CO

.

TARR

ANT C

O.

DALL

AS CO

.

1171

544

740

740

548

269

550

175

175

175

3039

2757

660

664664

664

Garland Rd.

Mesquite

Garland

Richardson

PlanoLewisville

Sachse

Murphy

Irving

Grand Prairie

Las Colinas

FarmersBranch

Coppell Carrollton

Addison

Duncanville

Desoto

Hutchins Seagoville

WilmerLancaster

Forney

Crandall

Lawson

Combine

Sunnyvale

Mesquite

Garland

Richardson

PlanoLewisville

Sachse

Murphy

Irving

Grand Prairie

Las Colinas

FarmersBranch

Coppell Carrollton

Addison

Duncanville

Desoto

Hutchins Seagoville

WilmerLancaster

Forney

Crandall

Lawson

Combine

Sunnyvale

Balch Springs

Rowlett

WylieSaintPaul

Lavon

Rowlett

WylieSaintPaul

Lavon

ROCKWALL

WhiteRockLake

Lake RayHubbard

Mountain CreekLake

NorthLake

Dallas Love FieldAirport

Dallas ExecutiveAirport

DFW Int’l.Airport

Joe PoolLake

W Belt Line Rd.

S B

elt Li

ne Rd

.

University Park

Highland Park

Cockrell Hill

University Park

Highland Park

Cockrell Hill

HeathHeath

Red Oak

Oak LeafOvilla

FerrisRed Oak

Oak LeafOvilla

Ferris

Shiloh Rd.

E Belt Line Rd.

Malloy Bridge Rd.

LancasterRegionalAirport

MesquiteMetro

Airport

S Be

l t Lin

e Rd.

77

287

Projects from Reverse PageProjects Under Construction

6730

Balch Springs

NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of summer 2017.

Page 4: 2017 Construction Maps - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/dal/construction-maps.pdf · This map was produced for internal use within the Texas Department of Transportation

FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION

D A L L A S D I S T R I C T

0798

_072

517

“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”DENTON COUNTY CONSTRUCTION PROJECTS

2017 HIGHWAY PROJECTS:

Dallas District Office4777 E. Highway 80Mesquite, TX 75150

CONTACT INFORMATIONMichelle RelefordPublic Information Officer(214) 320-4485 • [email protected]

DENTON COUNTY PROJECTS UNDER CONSTRUCTIONCSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete

1 0134-09-063 US 380 From west of FM 156 to I-35Widen 2-lane to 6-lane divided urban highway

Jul-2012May-2013/Jul-2018

Texas Sterling Construction Co.

$39.3 M 99%

2 0134-09-034 US 380From west of Bonnie Brae St. to US 377

Reconst. and widen to 6-lane divided

Nov-2012Nov-2014/Oct-2017

Jagoe-Public Company

$15.1 M 98%

3 1315-02-009 FM 423From US 380 to 0.8 mi. south of FM 2934(Eldorado Pkwy.)

Widen 2-lane to 6-lane divided urban

Sep-2013Oct-2014/Nov-2017

MCM $29.8 M 98%

4 1567-01-025 FM 720From Eldorado Pkwy. (FM 720) to south of Martop St.

Widen 2-lane to 6-lane divided

Feb-2014Oct-2015/Dec-2017

Haydon Building Corp.

$15.6 M 74%

5 1567-02-032 FM 423From Stewarts Creek Rd. to SH 121

Widen to 6-8 lane divided urban rdwy.

May-2014Oct-2014/Dec-2017

Webber, LLC $57.9 M 98%

6 2681-01-012 FM 2499From FM 2181 North to I-35E in Corinth

Construct new location 6-lane divided urban facility

Jul-2014Apr-2015/Apr-2018

Webber, LLC $34.9 M 91%

7 0619-05-036 FM 544From FM 2281 to Parker Rd./ Dozier Rd.

Replace brideg and widen roadway

Sep-2014Jul-2015/Oct-2019

MCM $35.4 M 56%

8 0353-02-063 SH 114 At FM 156Construct interchange

Feb-2015Jan-2017/Jul-2019

Ed Bell Construction Company

$30.6 M 49%

9 2681-01-022 FM 2499From FM 2181 to Hickory Creek - 1.112 mi.

Landscape development

May-2015Aug-2015/Apr-2018

Apex Landscape & Irrigation, LLC

$0.4 M 84%

10 0081-13-041 I-35W From Eagle Pkwy. to SH 114Construct 2-lane SB frtg. rd., Litsey Rd. Bridge

Sep-2015Feb-2016/Mar-2018

Mario Sinacola & Sons, Excavating, Inc.

$15.4 M 5%

11 0718-01-064 FM 156 From SH 114 to 12th St. in JustinWiden 2-lane to 4-lane divided urban

Nov-2015Mar-2017/Mar-2019

Mario Sinacola & Sons, Excavating, Inc.

$32.5 M 20%

12 0135-10-055 US 377At various locations in Denton County

Full depth concrete repair and pavement markings

Jan-2016Aug-2016/Nov-2017

Silver Creek Construction, Inc.

$5.2 M 99%

13 0353-02-074 SH 114From Trophy Lake Dr. in Trophy Club to Tarrant C/L ( west of FM 1938) 1.071 mi.

Widen freeway from 4 to 6 lanes; SH 170: constr. ml./ overpass at Parrish Ln.

Jul-2016Oct-2016/Jun-2018

Mario Sinacola & Sons, Excavating, Inc.

$24.9 M 68%

14 0816-02-076 FM 455From west of Dyer to west of Indian - 1.939 mi.

Constructu paved shoulders

Jul-2016Nov-2016/Jun-2018

Jagoe-Public Company

$5 M 89%

15 0918-46-272* CSFrom Swisher Rd. in Lake Dallas to Kelton Rd. - 0 1.520 mi.

Hike and bike trails (Phase 3: A-train rail)

Jul-2016Apr-2017/Feb-2019

Encino Landscaping, Inc.

$6.7 M 27%

16 0196-01-106 I-35EFrom State School Rd. / Mayhill Rd. (FM 2499) to SL 288

Constr. grade sep. and intersection improvements

Sep-2016Apr-2017/Aug-2018

OHL USA, Inc. $27.1 M 14%

17 1785-01-032 FM 1830From FM 407 to US 377 - 5.477 mi.

Base repair, shoulder and culvert widening

Oct-2016Apr-2017/Aug-2018

Jagoe-Public Company

$5.9 M 26%

18 0081-13-057 I-35W From Eagle Pkwy. to SH 114Construct 2-lane NB frgt. rd. with ramp

Jun-2017Sep-2017/Mar-2019

Ed Bell Construction Company

$15.2 M 0%

19 0918-46-274 CSSouth of Blue Mound Rd. at Elizabeth Creek

Replace bridges and approaches

Jun-2017Sep-2017/Oct-2018

Coppell Constru. Co., Inc.

$1.6 M 9%

20 0364-03-099 BS 121HFrom Post Oak St. to FM 544 - 4.282 mi.

Landscape treatment of medians

Jul-2017 Oct-2018Apex Landscape & Irrigation, LLC

$1.9 M 0%

21 2054-02-015 FM 2181From Lillian Miller in Denton to W of FM 2499 (Barrel Strap Rd.)

Widen to 6-lane divided urban

Jul-2017 Jan-2020 MCM $35 M 0%

ESTIMATED TOTAL $435.4 MTxDOT graphic* Not mapped. SOURCE: Texas Department of Transportation.

1 2

34

5

7

9

1018

11

12

13

14

17

19

20

166

21

8

455455

455

428 428428

428

35W

35W

35E

35E

DNT

377

380

380

377

377

TARRANT CO.

DENTON CO. DENTON CO.

COOKE CO.

WISE

CO.

DENT

ON CO

.

WISE

CO.

DENT

ON CO

.

DENT

ON CO

.

COLL

IN CO

.

DENT

ON CO

.

COLL

IN CO

.

2450

1173

1173

2622

2153

Hackberry

Hebron

Sanger

Aubrey

Lincoln Park

Cross Roads

Oak Point

The Colony

Lewisville

Coppell

CopperCanyon

HickoryCreek

Shady Shores

Krum

Bolivar

Ponder

Northlake

Justin

FlowerMound

RoanokeTrophy Club

PilotPoint

Krugerville

Argyle

DENTON

Fort WorthAlliance Airport

DentonMunicipalAirport

Texas MotorSpeedway

Ray RobertsLake

GrapevineLake

LewisvilleLake

156

156

156

407

407 407

407

288 288

288

423

3163

2449

1171 1171

2499

2499

2181

2499

21642931

1385

121

121

190

121

121

114

114

170

423

380 377 1385

380

455

35E

77Corral City

35

35

377

2 miles

156

1830

Corinth

TxDOT graphicSOURCE: Texas Department of Transportation.

NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of summer 2017.

Page 5: 2017 Construction Maps - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/dal/construction-maps.pdf · This map was produced for internal use within the Texas Department of Transportation

FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION

D A L L A S D I S T R I C T

0792

_071

817

“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”ELLIS COUNTY CONSTRUCTION PROJECTS

2017 HIGHWAY PROJECTS:

Dallas District Office4777 E. Highway 80Mesquite, TX 75150

CONTACT INFORMATIONMichelle RelefordPublic Information Officer(214) 320-4485 • [email protected] TxDOT graphicSOURCE: Texas Department of Transportation.

ELLIS COUNTY PROJECTS UNDER CONSTRUCTIONCSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete

1 0048-04-079 I-35EFrom US 77 north of Waxahachie to US 77 south of Waxahachie

Reconstruct and widen from 4 lanes to 6 lanes

Aug-2015Mar-2016/ Jul-2019

OHL USA, Inc. $126.4 M 29%

2 0048-08-049 I-35EFrom south of FM 566 (Hill C/L) to US 77 south of Waxahachie

Widen 4 lanes to 6 lanes Sep-2015Feb-2016/Jan-2018

OHL USA, Inc. $35.8 M 67%

3 0172-08-053 US 287From south of SH 34 to I-45 south in Ennis

Widen 2 ln to 4 lane divided hwy. with grade seperated interchanges

Jan-2017May-2017/Apr-2020

Fluor Heavy Civil, LLC

$61.7 M 12%

4 0596-02-037 FM 66 At West Fork Weakly BranchReplace bridge and approaches

Nov-2015Dec-2016/Sep-2018

IEA, Inc.. $2.7 M 11%

5 0596-02-039 FM 66 At West Fork Greathouse BranchReplace bridge and approaches

Jun-2015Oct-2016/Mar-2018

Massana Construction, Inc.

$3.4 M 38%

6 0596-02-042 FM 66 At Greathouse Road Add left turn lanes Jul-2015Jan-2017/Mar-2018

O. Trevino Construction, LLC

$2.1 M 67%

7 0596-02-043 FM 66 From FM 308 to Brindley RoadWiden pavement, safety trat fixed objects and centerline texturing

Jul-2015Jan-2016/Nov-2017

Oldcastle Materials Texas, Inc.

$4.3 M 99%

8 0596-04-041 FM 878Along FM 878, FM 664 and FM 813

Mill, base repair & resurface & add shoulders

Nov-2016Mar-2017/ Mar-2018

Big Creek Construction, Ltd.

$7 M 32%

9 0815-08-031 FM 8750.6 miles west of Norrell to 0.3 miles north of Jordan 1.50 mi.

Widen, safety treat fixed objects and centerline texturing

Apr-2016Jun-2016/Dec-2017

Knife River Corporation - South

$8.8 M 88%

10 0918-22-141 CR Forest Brook Dr at Red Oak CreekReplace bridge and approaches

Dec-2015Jan-2017/Aug-2017

DCI Contracting, Inc.

$1 M 1%

11 1050-01-017 FM 85 From I-45 to FM 1182Add shoulders & rehabilitate roadway

Oct-2015Mar-2016/Jun-2018

Big Creek Construction, Ltd.

$12.9 M 80%

12 1051-01-042 FM 664From north of BUS 287R to south of Red Oak Creek in Ovilla

Add 3-foot paved shoulders

Mar-2015Jun-2015/Nov-2017

Ed Bell Construction Company

$11.1 M 99%

13 1051-02-017 FM 876 At Big Onion Creek 0.117 mi.Replace bridge and approaches

Feb-2015Sep-2015/Oct-2017

Massana Construction, Inc.

$1.7 M 99%

14 1159-01-022 FM 875 At Waxahachie CreekReplace bridge and approaches

Jun-2015May-2017/Jan-2018

Massana Construction, Inc.

$3.7 M 17%

15 1159-02-032 FM 879From 2.1 mi. west of Ike Rd. to 0.3 mi. west of FM 1722

Provide additional paved surface width

Jun-2015Sep-2015/Nov-2017

Ed Bell Construction Company

$9.5 M 99%

16 1211-01-018 FM 984At Draw, 1.7 mi. south of SH 34; At Onion Creek Relief 1 & 2

Replace bridge and approaches

Jan-2015Feb-2016/Jul-2018

IEA, Inc.. $2.3 M 46%

17 1451-01-020 FM 55 At Little Onion Creek 0.178 mi.Replace bridge and approaches

May-2015Feb-2016/Jun-2018

IEA, Inc.. $2 M 45%

18 1451-01-024 FM 55From SH 34 to south of Nash Howard Rd.

Rehabilitate existing pavement

Jul-2014Dec-2014/Nov-2017

Big Creek Construction, Ltd.

$5.5 M 99%

19 1451-01-025 FM 55 At Big Onion CreekReplace bridge and approaches

Aug-2015Nov-2016/Sep-2018

IEA, Inc.. $1.5 M 10%

20 0092-15-002 SS 469 BI 45G Ennis to FM 879 Restore Pavement Jul-2017ECD Mar-2018

Johnson Bros. $2.8 M 0%

ESTIMATED TOTAL $306.2 M

7

6

48

1

2

3

5

9

10 11

13

12

1

2

34

5

9

6

7

8

10

11

12

13

1415

20

17

161819

CORSICANA

MIDLOTHIAN

ENNIS

WAXAHACHIE

CORSICANA

MIDLOTHIAN

ENNIS

WAXAHACHIE

45

45

77

77

77

7767

67

287

67

45

45

45

35E

35E

35E35W

FerrisOvilla

Pecan Hill

Red Oak

Trumbull

Milford

Palmer

Maypearl

Garrett

Rosser

Rice

Emhouse

Barry

Frost

BloomingGrove

Alma

Bardwell

Italy

Forreston

JOHN

SON

CO.

ELLIS CO.

NAVARRO CO.

ELLIS CO.

NAVARRO CO.

HILL CO.ELLIS CO.

ELLIS

CO.

JOHN

SON

CO.

ELLIS

CO.

KAUFMAN CO.

ELLIS CO.

DALLAS CO.

ELLIS CO.DALLAS CO.TARRANT CO.

ELLIS CO.

BardwellLake

LakeWaxahachie

Mid-WayRegionalAirport

660

983

813

878879

876

308

934

308

667

877

984

984985

744

660

1390

1182

1603

1126

1722

916

157

875

663

34

34

34

34

34

22

22

31

287

287

287

287

287

287

66

66

66

55

55

55

Combine

LancasterAirport

Cedar Hill

LancasterDeSoto WilmerJoe Pool

Lake1382

35

N

2 miles

664

1387

664

1446

Wes

tmor

elan

d Rd

.

Projects Under Construction

879

85

TxDOT graphicSOURCE: Texas Department of Transportation.

NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of summer 2017.

Page 6: 2017 Construction Maps - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/dal/construction-maps.pdf · This map was produced for internal use within the Texas Department of Transportation

FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION

D A L L A S D I S T R I C T

“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”

0784

_062

717

KAUFMAN COUNTY CONSTRUCTION PROJECTS2017 HIGHWAY PROJECTS:

Dallas District Office4777 E. Highway 80Mesquite, TX 75150

TxDOT graphicSOURCE: Texas Department of Transportation.

CONTACT INFORMATIONMichelle RelefordPublic Information Officer (214) [email protected]

KAUFMAN COUNTY PROJECTS UNDER CONSTRUCTIONCSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete

1 0095-03-087 US 80 FM 460 to FM 740Relocate eastbound US 80 entrance/exit ramps; extension of eastbound frontage road

Jun-2016Feb-2017/Feb-2018

Ed Bell Construction Company

$5 M 35%

2 0095-14-028 I-20Dallas C/L to SS 557; I-635 to Kaufman C/L

Concrete pavement repair Jun-2017 Feb-2018 HPL USA, LLC $1.1 M 0%

3 0197-03-075 US 175Dallas C/L to Brushy Creek relief

Rehabilitation existing mainlanes Apr-2017TBD/ Nov-2017

Austin Bridge & Road, LP

$4 M 80%

4 0751-03-038 FM 148 FM 1388 to FM 3094 NReconstruct existing pavement and add shoulders

Jun-2017Oct-2017/Dec-2018

Big Creek Constru., Ltd. $4.1 M 0%

5 0918-11-091 CRCR 324 at Greasy Creek Tributary

Replace bridge and approaches Apr-2017Jul-2017/Jan-2018

Stateline Construction, LLC

$0.7 M 50%

6 1016-06-011 FM 1392 US 80 to SH 205Reconstruct existing pavement and add shoulders

Apr-2017Sep-2017/ Aug-2018

A. L. Helmcamp, Inc. $5.7 M 5%

7 1217-03-019 FM 1388 FM 148 to US 175Provide additional pavement surface & overlay

Dec-2015Apr-2016/Jun-2018

Austin Bridge & Road, LP

$22 M 76%

8 1397-01-030 FM 1836 FM 2515 to FM 90 Rehabilitation of existing roadway Nov-2015Apr-2016/Dec-2017

D. L. Lennon, Inc. $6.1 M 99%

9 1494-03-001 FM 3486 FM 986 to SH 34 Construct new 2-lane FM highway Apr-2016Jul-2016/Nov-2017

Ed Bell Constru. Company

$4.8 M 99%

10 2512-02-010 FM 2728 FM 429 to US 80Provide additional pavement surface and overlay

May-2017Jul-2017/Mar-2018

A. K. Gillis & Sons, Inc. $3.8 M 40%

11 2555-01-011 FM 2578 US 175 to FM 987 Restore existing pavement and add shoulders Oct-2016Feb-2017/Jan-2018

A. L. Helmcamp, Inc. $6.9 M 60%

12 2981-01-007 FM 2932 FM 741 to FM 148Reconstruct existing pavement and add shoulders

Feb-2017May-2017/Mar-2018

Oldcastle Materials Texas, Inc.

$4 M 55%

13 0197-03-073 US 175 FM 148 to CR 4106 Pavement repair Aug-2017Dec-2017/May-2018

IOC Company LLC $2.3 M 0%

14 0197-05-054 US 175 FM 1895 to SH 198 Pavement repair Aug-2017Dec-2017/May-2018

O.Trevino Construction LLC

$1.4 M 0%

15 0495-01-074 I-20 SH 34 to Van Zandt C/L Mill and overlay Jul-2017Nov-2017/Jul-2018

Oldcastle Materials Texas, Inc.

$9.1 M 0%

16 0751-03-037 FM 148 At King’s Creek Replace bridge and approaches Jul-2017Oct-2017/Oct-2018

Stateline Construction LLC

$1.3 M 0%

ESTIMATED TOTAL $82.3 M

NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of summer 2017.

1

12

14

2211

3

4

5

110

15

2213

16

2

6

9

7

8

To I-63520

KAUFMAN CO.

HUNT CO.

ELLIS CO.

KAUFMAN CO.

HENDERSON CO.

KAUFMAN CO.

KAUF

MAN

CO.

KAUF

MAN

CO.

VAN

ZAND

T CO.

DALL

AS CO

.

KAUF

MAN

CO.

ROCKWALL CO.

KAUFMAN CO.

VAN

ZAND

T CO.

TERRELL

N

5 miles

Elmo

KAUFMAN

LakeRayHubbard

Crandall

Combine

Malloy Bridge

Rd.

Cedar CreekReservoir

NewTerrell CityLake

Post OakBend City

RosserCottonwood Grays Prairie

Ennis

Oak Grove

Kemp

Scurry

Talty

Mabank

Oak Ridge

WillsPoint

Forney

Heath Mclendon-Chisholm

Seagoville

Mesquite

DALLAS CO.

ELLIS CO.

429751

429

429

429103

148

148

660

557740

548

740

741

987

90

90

2578

1392

205

243243

90

198

198

274

34

34

34

34

175

175

175

175

80

80

2860

1390

1390

2613

3094

3396

3080

1391

1836

1895

1895

2727

2515

2965

34

34

80

80

2728

20

20

986548

740

1641

2451

148

148

2728

148

205

1836

1388

To I-635

148

175

3039

2728

2932

Projects Under Construction

TxDOT graphicNOTE: Highlighted areas are not drawn to scale.

Page 7: 2017 Construction Maps - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/dal/construction-maps.pdf · This map was produced for internal use within the Texas Department of Transportation

FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION

D A L L A S D I S T R I C T

“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”

0801

_101

317

NAVARRO COUNTY CONSTRUCTION PROJECTS2017 HIGHWAY PROJECTS:

CONTACT INFORMATIONMichelle RelefordPublic Information Officer (214) [email protected]

Dallas District Office4777 E. Highway 80Mesquite, TX 75150NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of summer 2017.

NAVARRO COUNTY PROJECTS UNDER CONSTRUCTIONCSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete

1 0092-06-101 I-45From 2.1 miles S of of Bus 45 to I-45 Bus north in Corsicana

Widen freeway FR four to six lanes and install wireless ITS

Jul-2015Apr-2016/Mar-2019

Sterling Delaware Holding Co., Inc.

$58.8 M 57%

2 0093-01-098 I-45From S of FM 246 to 2.1 miles S of BI 45F

Widen freeway FR four to six lanes and install wireless ITS

Jul-2015Oct-2015/Dec-2018

Webber, LLC $72 M 82%

3 0093-02-015 SH 14 At UP RR S of Richland Replace RR underpass Aug-2013Dec-2013/Jul-2017

JW Payne Constr., LLC

$6.6 M 99%

4 0162-11-001 SH 31From 3.2 miles W of FM 2555 to 3.7 miles E of I-45

Concrete new location relief route Nov-2015Oct-2016/Apr-2020

Sundt Constr., Inc.

$106 M 16%

5 0918-18-126 CRNW CR 2310 at Rush Creek 0.064 mile

Replace bridges and approaches Sep-2016Jan-2017/Dec-2017

Pierce Bridges and Approaches

$1.1 M 73%

6 0997-02-039 FM 1838From 0.9 mile N of CR 4270 to FM 638 1.553 miles

Construct paved shoulders and safety treat fixed objects

Dec-2016Feb-2017/Dec-2017

Knife River Corp. - South

$3.9 M 88%

7 1289-01-029 FM 1126At Chambers Creek SW of I-45

Bridge replacement Apr-2016Aug-2016/Dec-2017

Coppell Constru., Co., Inc.

$6.7 M 80%

ESTIMATED TOTAL $255.1 M

TxDOT graphicSOURCE: Texas Department of Transportation.

3

2

1

45

6

7

171

309

Project Limits45

45

45

45

45

45

45

BUS

287

287

287

287

287

287287

N

5 miles

CORSICANA

NavarroMills Lake

Richland ChambersReservoir

Cedar CreekReservoir

BardwellLake

34

34

22

2222

31

31

31

31

31

31

34

45

ENNIS

Frost

BloomingGrove

Barry

Raleigh

SilverCity

Emhouse

RiceChat�eld

Powell

Kerens

Tool

SevenPoints

Goodlow

Mildred

Eureka

Navarro

Angus

Richland

Purdon

Dawson

AlmaBardwell

Wortham

Hubbard

85

85

55

85

ELLIS CO.

NAVARRO CO.

ELLIS CO.

NAVARRO CO.

HILL CO.NAVARRO CO.

LIMESTONE CO.

NAVARRO CO.

FREESTONE CO.NAVARRO CO.

HENDERSON CO.

HENDERSON CO.

ELLIS CO.

NAVARRO CO.

1182

1126 3383

1839

2452

3041

1603

1129

1393

1129

274

274

984

984

877

985

744667

744

744

55

55

14 75

75

14

709

709

642641

638

636

246

416

833

488

637

TxDOT graphicNOTE: Highlighted areas are not drawn to scale.

Page 8: 2017 Construction Maps - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot-info/dal/construction-maps.pdf · This map was produced for internal use within the Texas Department of Transportation

FALL • 2017TEXAS DEPARTMENT OF TRANSPORTATION

D A L L A S D I S T R I C T

“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”

0800

_101

317

ROCKWALL COUNTY CONSTRUCTION PROJECTS2017 HIGHWAY PROJECTS:

CONTACT INFORMATIONMichelle RelefordPublic Information Officer (214) 320-4485 • [email protected]

Dallas District Office4777 E. Highway 80Mesquite, TX 75150

ROCKWALL COUNTY PROJECTS UNDER CONSTRUCTIONCSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete

1 0009-04-061 SH 66W of FM 1141 to Collin C/L

Provide additional pavement surface width

Mar-2016Mar-2017/Apr-2019

Apac-Texas, Inc. $15.9 M 35%

2 0009-12-072 I-30 At FM 3549Reconstruct interchange, incorporate frontage roads and ramp construction

Jun-2016Sep-2016/Oct-2018

Sema Construction, Inc.

$32.9 M 35%

3 0009-12-212 I-30 Dallas C/L to Hunt C/LFull depth concrete pavement repair

Mar-2017Sep-2017/Mar-2018

O. Trevino Construction, LLC

$2.3 M 0%

4 0009-12-214 I-30 SH 205 to John King Blvd. Reverse I-30 ramps east of SH 205 Apr-2016Jul-2016-Oct-2017

Ed Bell Construction Company

$3.5 M 99%

5 1014-02-041 FM 548 SH 205 to SH 66Provide additional pavement surface width and overlay

Oct-2015Mar-2016/Oct-2017

Zachry Construction Corp.

$13.8 M 68%

6 1014-03-049 FM 740FM 549/FM 550 Intersection

Widen 2-lane to 4-lane divided urban

Aug-2013Jul-2015/Mar-2018

Ed Bell Construction Company

$13 M 70%

7 1015-01-022 FM 3549 SH 66 to FM 552 Base repair, level-up and overlay Feb-2015Aug-2015/Oct-2017

D. L. Lennon, Inc.

$2.6 M 99%

8 1015-01-025 FM 549Various highways In Rockwall County

Provide additional pavement surface width and overlay

Jun-2015Feb-2015/Feb-2018

Ed Bell Construction Company

$7.7 M 70%

9 1016-03-013 FM 1138 SH 66 toCollin C/LProvide additional pavement shoulders

May-2016Aug-2016/Dec-2017

Apac-Texas, Inc. $2 M 99%

10 3148-01-006 FM 3097FM 740 to east of Tubbs Rd.

Reconstruct and widen to 4-lane divided

Jul-2014Jan-2016/Oct-2017

Ed Bell Construction Company

$9.3 M 85%

11 1091-04-022 FM 549 FM 550 to SH 205 Addtl. pvmt. Surface and overlay Jul-2017Nov-2017/Jan-2010

Ed Bell Construction Company

$11.5 M 0%

ESTIMATED TOTAL $114.5 M

TxDOT graphicSOURCE: Texas Department of Transportation.

1

3

1

4

5

6

7

2

10

11

9

8

HUNT

CO.

ROCK

WALL

CO.

KAUFMAN CO.

HUNT

CO.

KAUF

MAN

CO.

KAUFMAN CO.

ROCKWALL CO.

ROCK

WALL

CO.

DALL

AS CO

.

COLLIN CO.

ROCKWALL CO.

COLLIN CO.

ROCKWALL CO.

DALL

AS CO

.

ROCK

WAL

L CO.

DALL

AS CO

.

ROCKWALL CO.

Princeton Rd. Lakeview Pkwy.

Dalton Rd.

John Kin g Blvd.

Roch

elle R

d.

Smirl Dr.

Pullen Rd.

Klutts Rd.

Smith Rd.

Neal Rd.

Mann Rd.

McDonald Rd.

Stevens Rd.

Valley View

Dowell Rd.

Edwards Rd.

Kuban Rd.

Wallace Rd.

Blackland Rd.

Crenshaw Rd.

Poetry Rd.

Jones Rd.

S Munson Rd.

Highpoint Rd.

N Munson Rd.

Old m

illwoo

d Rd.

N L

akesho re Dr.

Heath

McLendon-Chisholm

Mobile City

Royse City

Royse City

Fate

ROCKWALL

N

1 mile

Lake RayHubbard

Lake RayHubbard

30

30

67

67

205

205

205

205

276

205

205

205

1138 1777

1141

1139

3097

1140

2458

66

66

66

66

66

551

550

548

740

740

740

740

740

552552

2453

35

550

550

550

549

549

548243

548

548

548

548

276

J ohn King Blvd.

3549

NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of summer 2017.