· 2017. 11. 7. · brent bogar, loadpass consultant 701-770-3048 [email protected] ...

17
Janet Sanford & Brent Bogar WDEA Annual Meeting November 2, 2017 www.LoadPassPermits.com

Upload: others

Post on 06-Nov-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

Janet Sanford & Brent Bogar

WDEA Annual Meeting

November 2, 2017

www.LoadPassPermits.com

Page 2:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

Permit System History

• 1984 – Truck Permit System started by Western Dakota Energy Association to track and monitor overweight (non-divisible loads) and over-dimension trucks on oil county roads

– Paper Permits, Regulations different for each county

• 1995 – System became uniform for all member counties

• 2010 - ePermit Management System was developed

• ePermits AND Paper Permits were issued for the next five years

2

Page 3:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

Road Restriction Communication System

• In 2012, the County Road Restriction Communication System was implemented

– Member counties/cities/townships can post their load restrictions, road closings, restriction removals etc. The information is emailed or texted out to all who are registered to receive the notifications

3

Page 4:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

Restricted Road Map

• In 2015, the Restricted Road Map was added

– In response to requests from the industry, we introduced an interactive restricted road map to display restricted roads in member counties

4

Page 5:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

Recent Enhancements

• 2015 – Discontinued paper permits

• 2016 – Added ACH payment option for users

• 2016 – Added ACH payments to Political Subdivisions

• 2017 – Rebranded to LoadPass Permits

5

Page 6:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

Permit System Re-Branding

6

Formerly ND Uniform County Truck Permit System

Page 7:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

Types of Permits

• Trip Permit – Graduated Fee Schedule

• Restricted Road Permit - $5 per ton per mile over restricted weight plus $1 per ton per mile for each axle over the restricted axle weight

• Xcess Permit - assesses a $5 per ton per mile fee on loads over 150,000 lbs

• Rig Move Permit $500 – Permission to move drilling rig

7

Page 8:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

8

20,64226,244

36,934

50,629

94,132

116,758

97,339102,466

58,747

75,630

FY 2007-2008 FY 2008-2009 FY 2009-2010 FY 2010-2011 FY 2011-2012 FY 2012-2013 FY 2013-2014 FY 2014-2015 FY 2015-2016 FY 2016-2017

Total Number of Permits Sold on Behalf of all Members Annually

2007-2017

Page 9:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

2007-2017Total Permits Sold - 679,521

9

Page 10:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

2007-2017 Permit Fees Collected by County/City ($57,280,170)

10

Page 11:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

Current LoadPass Work

• 2016 – The WDEA Executive Board approved the expansion of LoadPass Permits to North Dakota counties outside of oil country

• 2017 – HB 1320 passed and signed into law

11

Page 12:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

Truck Permit Compliance and Road Enforcement

• Requires participation of township governments if the township is in a participating county

• Sets up notification process for fee changes

• Allows additional fees when it makes sense

• Provides counties and WDEA truck permit system an enforcement tool to discourage damage to roads when restrictions are in place

HB 1320 -

• WDEA amended its uniform truck permit system bylaws to allow board participation by members from non-oil producing counties.

• Enhanced mapping/routing software development is underway.

Page 13:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

• Notwithstanding any other provision of this chapter, a city, county, or township having control of roads may not impose additional fees for the use of roads beyond the fees established under a uniform permit program. A city, county, or township may issue a penalty to a person that violates a posted road restriction. If a permit is denied, a person may receive an additional fee or condition from the city, county, or township in exchange for authorization to move an oversized or overweight vehicle on a road under the jurisdiction of the city, county, or township.

HB 1320 – What’s in the Bill

Enforcement Authority

Page 14:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

LoadPass –Routable Map Enhancement

• In 2017, the WDEA Executive Board approved the development of a Routable Road Map

– Funded by a 0-4% Member Special Project Permit Fee Share

– Current Special Project fee - 2.5% of Permit Fees

14

Page 15:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

Routable Map ProjectPhase 1

• Develop and maintain GIS Platform– Server and Software

– Routable Road Network

• Incorporate GIS features into LoadPass– Route Creation

– Route Review and Revise

– Route Selection

15

Page 16:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

Routable Map ProjectFuture Potential

• Restricted Roads Management/Integration

• Restricted Roads in Routing

• Mobile App

– Routing with turn-by-turn instructions

16

Page 17:  · 2017. 11. 7. · Brent Bogar, LoadPass Consultant 701-770-3048 bcbogar@jadestoneconsulting.com  17. Title: PowerPoint Presentation Author: Tiffany …

Contact Information

Janet Sanford, LoadPass [email protected] 701-770-1632

Brent Bogar, LoadPass Consultant [email protected]