2016 02-22 consulting parties meeting presentation final · 22.02.2016  · consulting parties...

48
WELCOME WELCOME NATIONAL AIR AND SPACE MUSEUM NATIONAL AIR AND SPACE MUSEUM MALL BUILDING REVITALIZATION CONSULTING PARTIES MEETING CONSULTING PARTIES MEETING #2 22 FEBRUARY 2016

Upload: others

Post on 22-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

WELCOMEWELCOME

NATIONAL AIR AND SPACE MUSEUMNATIONAL AIR AND SPACE MUSEUMMALL BUILDING REVITALIZATIONCONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2

22 FEBRUARY 2016

Page 2: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

MEETING AGENDAMEETING AGENDA

• Welcome/Introductions

P f M ti• Purpose of Meeting

• Project Background

• Section 106 OverviewSection 106 Overview

• Project Elements

• Next Steps and Timeline

• Discussion of Effects on Historic Resources

Page 3: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

PURPOSE OF TODAY’S MEETINGPURPOSE OF TODAY S MEETING

• Inform the public of project updates

• Record public input related to alternativesrelated to alternatives considered

• Discuss effects on historic resources

Page 4: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

PROJECT LOCATIONPROJECT LOCATION

National Air andNational Air and Space Museum

Page 5: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

EXISTING SITE CONTEXTEXISTING SITE CONTEXT

Page 6: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

PROPOSED AREA OF POTENTIAL EFFECTPROPOSED AREA OF POTENTIAL EFFECT

Page 7: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

NASM MALL BUILDING BACKGROUNDNASM MALL BUILDING BACKGROUND

• 1958 planned location authorized• 1958 – planned location authorized by President Eisenhower

• 1971 – Congress appropriated $41 million for building’s construction

• 1972-1973 – design by Hellmuth, Obata & Kassabaum (HOK)( )

• 1976 – opened to the public on July 1 as part of Nation’s BicentennialBicentennial

• 1995-1997 – last previous major work on stone façade

• 1997-2001 – skylight & window wall replacement

Page 8: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

NASM MALL BUILDING BACKGROUNDNASM MALL BUILDING BACKGROUND

• Contributes to the National Mall National Register Historic District

• Entry on Axis with National Gallery of Art West Building and has same exteriorBuilding and has same exterior cladding

• Stone façade is exclusive çweather barrier

• Mechanical systems date to the building’s construction

Page 9: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

NASM MALL BUILDING BACKGROUNDNASM MALL BUILDING BACKGROUND

Building dimensions:Roof:9,027 m2 [97,168 s.f.]M l i l f l

g

• 209 meters (685 feet) in length

• 69 meters (225 feet) in width

Multiple roof replacement projects ranging from 1989 to 2006

• 25 meters (83 feet) in height

Stone Cladding:Building:12,735 exterior panels13 823 2 [148 787 f ]13,823m2 [148,787 s.f.]Site:16,202 exterior panels18,815m2 [202,526 s.f.]Curtain Wall:

4,800m2 [51,676 s.f.]

Skylights:4,831m2 [52,003 s.f.]

Page 10: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

MASTER PLANR PRECOMMENDED PROJECTS

• Complete replacement of building systems and cladding

• Entry Revitalization – Vestibules d C i

Revitalization of the National Mall Building

and Canopies

Entry Revitalization

• Terrace Revitalization – including landscape, storm water management, accessibility g , yimprovements

Terrace Revitalization

Page 11: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

PROJECT SCOPE AND GOALSPROJECT SCOPE AND GOALS

• Replace building systems to provide a safe and appropriate environment for visitors staff and artifactsvisitors, staff, and artifacts.

• Reduce carbon emissions and energy consumption.

• Improve access, queuing and security screening conditions by revitalizing theconditions by revitalizing the terraces, entrances and improve overall visitor experience.

Page 12: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

PROJECT COMPONENTSPROJECT COMPONENTS

• Cladding and Glazing Replacement

• Terrace and Perimeter Security Improvement

• Expanded Vestibules and Canopies

• Solar Panels Addition

Page 13: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

CLADDING EXISTING CONDITIONSCLADDING EXISTING CONDITIONS

Page 14: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

CLADDING MATERIAL ALTERNATIVESCLADDING MATERIAL ALTERNATIVES

TennesseeMarble:Match

DifferentStone With

SimilarOriginal Similar Character-

istics

Titanium: Ceramic:Titanium: Considered

and Dismissed

Ceramic:Considered

and Dismissed

Page 15: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

GLAZING ORIGINAL INSTALLATIONGLAZING ORIGINAL INSTALLATION

Original 1976 ConstructionOriginal 1976 Construction

Page 16: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

GLAZING EXISTING CONDITIONSGLAZING EXISTING CONDITIONS

2001 Replacementp

Page 17: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

GLAZING REPLACEMENT REQUIREMENTSGLAZING REPLACEMENT REQUIREMENTS

• Protection of Exhibits• Protection of Exhibits• Integrity of Original Design Concept

View of Exhibits from Exterior• View of Exhibits from Exterior• View of National Gallery from

Interior• Mitigate Solar Heat Gaing• Prevent Condensation with

Reintroduction of HumidificationReintroduction of Humidification

Page 18: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

TERRACE EXISTING CONDITIONSTERRACE EXISTING CONDITIONS

N h N hNorthwest Northeast

Southwest Southeast

Page 19: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

TERRACE EXISTING CONDITIONSTERRACE EXISTING CONDITIONS

M t l St i (N th t) HOK 1976 F St di W ll (W t t i ) HOK 1988Monumental Stair (Northeast) – HOK 1976 Free-Standing Wall (West stair) – HOK 1988

Ramp (Northwest) – 1991 Seat Wall (North Entrance Plaza) – HOK 1976 Low Perimeter Wall (SOUTH) – HOK 1976

Page 20: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

TERRACE EXISTING CONDITIONTERRACE EXISTING CONDITION

J e f f e r s o n D r i v e

ree

t S

W

ee

t S

W

7th

St

4th

Str

I n d e p e n d e n c e A v e n u e

Page 21: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

TERRACE IMPROVEMENT ALTERNATIVE:PROPOSED SITE PLANPROPOSED SITE PLAN

J e f f e r s o n D r i v eJ e f f e r s o n D r i v e

ree

t S

W

ee

t S

W

ree

t S

W

ee

t S

W

7th

St

4th

Str

7th

St

4th

Str

I n d e p e n d e n c e A v e n u eI n d e p e n d e n c e A v e n u e

Page 22: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

TERRACE IMPROVEMENT ALTERNATIVE:PROPOSED ACCESSIBILITY UPGRADEPROPOSED ACCESSIBILITY UPGRADE

E i tiExisting

Proposed

Page 23: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

TERRACE IMPROVEMENT ALTERNATIVE:PROPOSED NORTHWEST CORNERPROPOSED NORTHWEST CORNER

ExistingProposed

Page 24: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

TERRACE IMPROVEMENT ALTERNATIVE:PROPOSED NORTH ENTRANCEPROPOSED NORTH ENTRANCE

ExistingProposed

Page 25: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

TERRACE IMPROVEMENT ALTERNATIVE:PROPOSED NORTHEAST CORNERPROPOSED NORTHEAST CORNER

ProposedProposed

ExistingProposed

Page 26: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

TERRACE IMPROVEMENT ALTERNATIVE:PROPOSED SOUTHEAST CORNERPROPOSED SOUTHEAST CORNER

ProposedProposed

ExistingProposed

Page 27: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

TERRACE IMPROVEMENT ALTERNATIVE:PROPOSED SOUTH ENTRANCEPROPOSED SOUTH ENTRANCE

ExistingProposed

Page 28: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

TERRACE IMPROVEMENT ALTERNATIVE:PROPOSED SOUTHWEST CORNERPROPOSED SOUTHWEST CORNER

ExistingProposed

Page 29: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

TERRACE IMPROVEMENT ALTERNATIVE:MAINTAIN PERIMETER SECURITYMAINTAIN PERIMETER SECURITY

ExistingExisting

Proposed

Page 30: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

VESTIBULES EXISTING CONDITIONSVESTIBULES EXISTING CONDITIONS

Page 31: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

VESTIBULES EXISTING CONDITIONSVESTIBULES EXISTING CONDITIONS

FACILITIES MASTER PLAN REQUIREMENTSSecurity

• Mall Side: 4 Lanesa S de a es• Independence Ave Side: 3 Lanes

Inside Queuing• Maximum Wait Time: 5 Minutes Inside• Maximum Wait Time: 5 Minutes Inside Mall Side: 2,000sf Vestibule

+ 480sf Screening Equipment Independence Side: 1 500sf Vestibule Independence Side: 1,500sf Vestibule

+ 360sf Screening EquipmentProtected Outdoor Queuing

Page 32: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

VESTIBULE ALTERNATIVESVESTIBULE ALTERNATIVES

FLIGHT

GLASS BOX

Page 33: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

VESTIBULE ALTERNATIVE: FLIGHTNORTH ENTRANCENORTH ENTRANCE

Page 34: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

VESTIBULE ALTERNATIVE: FLIGHT NORTH ENTRANCENORTH ENTRANCE

Page 35: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

VESTIBULE ALTERNATIVE: FLIGHT SOUTH ENTRANCESOUTH ENTRANCE

Page 36: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

VESTIBULE ALTERNATIVE: FLIGHT SOUTH ENTRANCESOUTH ENTRANCE

Page 37: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

VESTIBULE ALTERNATIVE: GLASS BOX NORTH ENTRANCENORTH ENTRANCE

Page 38: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

VESTIBULE ALTERNATIVE: GLASS BOX NORTH ENTRANCENORTH ENTRANCE

Page 39: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

VESTIBULE ALTERNATIVE: GLASS BOX SOUTH ENTRANCE (WITH BIPV SOLAR PANELS)SOUTH ENTRANCE (WITH BIPV SOLAR PANELS)

Page 40: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

VESTIBULE ALTERNATIVE: GLASS BOX SOUTH ENTRANCE (WITH BIPV SOLAR PANELS)SOUTH ENTRANCE (WITH BIPV SOLAR PANELS)

Page 41: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

SOLAR PANEL ALTERNATIVE: ROOF MOUNTED PHOTOVOLTAICSROOF-MOUNTED PHOTOVOLTAICS

• 70,000 sf roof area• 1,300 PV panels• 21.5% efficient• 345-watt each

• Could generateapproximately630,000 KWh/yr

• Equivalent ofroughly 7% to 10%of electrical load ofrevitalized building 345 watt each revitalized building

Page 42: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

SOLAR PANEL ALTERNATIVE: ROOF MOUNTED PHOTOVOLTAICSROOF-MOUNTED PHOTOVOLTAICS

Page 43: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

SOLAR PANEL ALTERNATIVE: SOUTH WALL BIPV’SSOUTH WALL BIPV’S

South Wall BIPV Applied

Sto All Sides:Considered

and DismissedDismissed

Page 44: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

SOLAR PANEL ALTERNATIVE: SOLAR CANOPYSOLAR CANOPY

Thin Film PV’s Applied to Canopy of

South VestibuleVestibule

Page 45: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

PROJECT SCOPE AND ALTERNATIVES

Page 46: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

SCHEDULE / NEXT STEPSSCHEDULE / NEXT STEPS

Milestone Date

Public Scoping Meeting November 12, 2014

End of Public Scoping Period November 28, 2014

Consulting Parties Meeting February 22, 2016

Preparation of Environmental Assessment Public Review Draft

February 2016 through May 2016Assessment Public Review Draft May 2016

Predicted EA Public Review Period June 2016

Section 106 Consultation February 2016 throughJuly 2016

Predicted Preparation of Decision Document

July 2016

Page 47: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

OPPORTUNITIES FOR PUBLIC COMMENTOPPORTUNITIES FOR PUBLIC COMMENT

• Today: Provide your comments for inclusion in the meeting minutes

• Submit comments electronically by March 22, 2016 to: www.ncpc.gov [email protected]@ p g

• Submit written comments by March 22, 2016 to:Attn: Vivian LeeNCPCNCPC401 9th Street NW, Suite 500Washington, D.C. 20004

Page 48: 2016 02-22 Consulting Parties Meeting Presentation FINAL · 22.02.2016  · CONSULTING PARTIES MEETINGCONSULTING PARTIES MEETING #2 22 FEBRUARY 2016 ... Monumental Stair (Northeast)

DISCUSSION OF EFFECTSDISCUSSION OF EFFECTS