p r o j e c t s

S U M M A R Yr e c e n t & p r e v i o u s w o r k 2 0 0 7 - 2 0 1 5

D a v i d e L a G u i d a r a - M A r c h A R B

o f f i c e s - f a ç a d e s - c o n s t r u c t i o n - r e c e p t i o n s - i n t e r i o r s - r e s i d e n t i a l - h i s t o r i c - r e s e a r c h d a v i d e l a g u i d a r a @ y a h o o . i t 0 7 5 5 3 9 4 8 0 6 8

ALL PORTFOLIOS

TRADITIONAL HOMES - Recent Work 2014-2015

MY REVIT KNOWLEDGE - PDF presentation 2015

HISTORIC BUILDINGS - 2013-2014

IDEAS & COMPETITIONS - 2012-2015

OFFICES & RECEPTIONS - Previous Work 2013-2014

SUMMARY

1. EXPERIENCE2. OFFICES3. RECEPTIONS4. REVIT5. RESIDENTIAL6. CONSTRUCTION & SITE7. HISTORIC BUILDINGS8. COMPETITIONS & SKETCHING

STURGIS ASSOCIATES BUILDINGS

NEW OFFICE PROPOSAL - LONDON

STURGIS ASSOCIATES LLP2013-2014

VISU VERUM DESIGN LIMITED2014-2015

STANZA DESIGN 2011-2013

Do not Scale. Dimensions must be checked and verified on site. © Copyright of this drawing is reserved by STANZA DESIGN LTD.It is not to be copied without consent.

DLG JK

Client/Job Title

Drawing Title

Scale

Drawn by

Date

Checked

1: 50 @ A2 2-10-2012

Job No. RevDwg No

ROKIT

73 OXFORD STREET LONDON W1D 2EP

20 MORTLAKE HIGH STREET LONDON SW14 8JN

ARCHITECTURE INTERIORS MANAGEMENT

e-mail: [email protected] Tel: 020 8994 0070

RO 1212 SK06

EXISTINGANDPROPOSAL

FRONTSHOP 1:50

EXISTING SHOPFRONT 1:50 PROPOSAL SHOPFRONT 1:50

4840

5800

2650

3460

70

0

new powder coated sign TBA

powder coated aluminium frame

granitemaking good

toughened clear glass

sliding folding doors

projecting sign

manifestation patterns

existingprojecting sign

AM 121371 WEST HILL ROADLONDONSW18 1LE

Do not Scale. Dimensions must be checked and verified on site. © Copyright of this drawing is reserved by STANZA DESIGN LTD.It is not to be copied without consent.

Rev.

Dwg No.Job No.

03-10-12

Date

SK04 F

REV.F 10 October 2012: new bedroom and wc size .

SECOND FLOOR PROPOSAL SKETCH

Do

rme

r W

indow

BEDROOM

TERRACE

3972

3910

edge existing floor

make new floor 670 mm lower

Do

rme

r W

indow

edge ceiling first floor

up

up

12

803

74

2

ceiling Ht:1990 mm

roof pitch line

D D

existing roofexisting roof

remove existing roof

existing roof

90

0

900

storage

1960

16

44

38

74

1375

18

46

2600

wardrobe

edge ceiling first floor

3090

37

04

11

30

86

2

RDA ARCHITECTS 2010-2011

UK experience in brief 2010-2015

IDEAS

LICATA DESIGN 2009PIRRUCCIO PRACTICE 2009

TOSCANO DESIGN 2008DI BARTOLO ARCHITECTS 2007

IDEAS

ITALY experience in brief 2007-2009

UNIVERSITY

RESEARCH

I am a qualified Italian architect, ARB registered in May 2014, based in London since 2010. I am currently working with V&V (interior design and property developer company) on different residential projects. I have been pas-sionately working for seven years, two in Italy and five in UK to large commercial offices and residential projects through different stages and styles. I always welcome new challenges to progress my career.

I am working to different traditional and contemporary houses in London and Cobham. designing Victorian de-tails for traditional new homes, experiencing on site, working with planning consultants, suppliers, engineers team, interior designers. The design process goes through planning and real time 3D visualisation. Complying with Code 4 and sustainable home concept, UK building regulation and cost ratio analysis. My experience in this practice includes a conversion in revisited Victorian style of a plot of seven semi-detached houses, a traditional mansion house, detailing and for a large contemporary house, assisting the building process in Wimbledon. Design for mouldings, architraves, porches, eaves, dentils, and also contemporary and mixed style façades

Working with Michael Winsley and Simon Sturgis Directors I was involved mainly in Commercial Offices, Residen-tial and Mixed Use projects principally in London. Assisting design of large and small projects, from feasibility studies to tender package. large contemporary of-fices and interiors complying BREEAM, energy performance. Solving complicate planning issues for historical and commercial buildings. Visuals and presentations that I produced were also an important part during the planning process. I have been attending regular RIBA CPD events. (VectorWorks 2013, part of BCO and Building Regulation part B, K, M1/M2, F, L ) CARBON EMISSION Between May and September 2013, I was part of the Sturgis Carbon Profiling LLP team, working on 42 planning applications, refurbishment and re-development projects on Listed Buildings and buildings within Conservation Areas in Belgravia and Mayfair. Retrofitting and transforming damaged Victorian and Georgian buildings, to improve the environmental performance and energy efficiency, reducing carbon emissions, enhancing biodiversity with green roofs, recovering energy with solar PV panels.

With Stanza design I was working in a residential and small commercial projects, assisting planning and technical drawings ( VectorWorks 2009-2010), including details and construction packages. It was a great experience assist-ing the director in all design process.My experience with RDA Architect included studies for some residential and public projects in London , working with 3D models and visuals , assisting the planning the planning process and a interesting reconstruction of an ancient city in 3D for Al Jazeera Film Documentary “ Lifta Reborn”.

In Italy (2007) I worked with Di Bartolo Architects, Gianmarco Toscano Design, Roberto Licata Design, Pirruccio Practice for residential and commercial projects, design of furniture and interiors.

Name: DAVIDE LA GUIDARA

Experience: 7 years within architectural practices Position: Architect 

D A V I D E L A G U I D A R A

 

Qualifications: MArch ARB

Equivalent Achitect RIBA Part III In Professional Practice

EXPERIENCE

1

STURGIS ASSOCIATES BUILDINGS

NEW OFFICE PROPOSAL - LONDON

STURGIS ASSOCIATES BUILDINGS

NEW OFFICE PROPOSAL - LONDON

101 BLACKFRIARS ROAD, LONDONnew multistorey office

A NEW CONTEMPORARY FACADE

I was involved since the very ealry stage to this project with Michael Winsley, converting an existing five storeys building to a seven storey new office.

CLADDING

The proposal include a cladding option to reuse the existing concrete structure and external walls and openings.Intalling insulates panels to the facade

EXISTING BUILDING

GA

CC HouseBlackfriars Road

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP

20 Perseverance WorksHackney Road London E2 8DD

(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:20 @ A1 23 01 14

DLG

/

Revision :

Draft

1402_SK_054

Option 1 Roof SectionExisting and Proposed

93-101 Blackfriars Road

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

- - - -

Fourth Floor

Roof

EXISTING SECTION

170

397

25

11

170

906

220

177

Fifth Floor

Roof

PROPOSED SECTION

400

470

150

2600

150

200

25

170

397

400

1700

906

NEW AIR CONDITIONING PLANTS.

NEW INSULATED FLAT ROOF ON RIB DECK SLAB WITH CONCRETE INFILL.

NEW STEEL BEAMS.

NEW SUSPENDED CEILING MINERAL FIBRE TILES WITH PAINTED PLASTERBOARD MARGINS.

NEW 150 mm HIGH METAL PAN RAISED FLOOR.

NEW RIB DECK SLAB WITH CONCRETE INFILL.

EXISTING ROOF SLAB AND STRUCTURE.

NEW STOREY PROPOSAL

BRISOLEILS, CLADDIND AND DESIGN

GA

CC HouseBlackfriars Road

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP

20 Perseverance WorksHackney Road London E2 8DD

(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:50 @ A1 23 01 14

DLG

A

Revision :

Draft

1402_SK_048

Proposed Section BB OP5

93-101 Blackfriars Road

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

A External ground level amended 25 02 14 DLG

First Floor

Second Floor

Third Floor

Fourth Floor

Fifth Floor

Sixth Floor

Ground Floor

Roof

new floor

new floor

new office space

A/Cunit

30

77

30

77

30

44

30

44

33

71

26

00 3

22

0

62

0

39

45

26

00 3

22

0

62

0

39

70

700

0 2 4 5 M

INCREASING OFFICE SPACE OPTIONS

GA

CC HouseBlackfriars Road

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP

20 Perseverance WorksHackney Road London E2 8DD

(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:50 @ A1 23 01 14

DLG

/

Revision :

Draft

1402_SK_016

Proposed Section BB OP1

93-101 Blackfriars Road

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

- - - -

Ground Floor

First Floor

Second Floor

Third Floor

Fourth Floor

Fifth Floor

Roof

new floor

new office space

A/Cunit

26

00 3

22

0

62

0

39

95

30

77

30

77

30

44

30

44

33

71

GA

CC HouseBlackfriars Road

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP

20 Perseverance WorksHackney Road London E2 8DD

(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:50 @ A1 23 01 14

DLG

/

Revision :

Draft

1402_SK_024

Proposed Section BB OP2

93-101 Blackfriars Road

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

- - - -

Ground Floor

First Floor

Second Floor

Third Floor

Fourth Floor

Fifth Floor

Sixth Floor

Roof

new floor

new floor

new office space

A/Cunit

30

77

30

77

30

44

30

44

33

71

26

00 3

22

0

62

0

39

45

26

00 3

22

0

62

0

39

70

GA

CC HouseBlackfriars Road

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP

20 Perseverance WorksHackney Road London E2 8DD

(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:50 @ A1 23 01 14

DLG

/

Revision :

Draft

1402_SK_032

Proposed Section BB OP3

93-101 Blackfriars Road

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

- - - -

Fifth Floor

Sixth Floor

Ground Floor

First Floor

Second Floor

Third Floor

Fourth Floor

Roof

new floor

new floor

new office space

A/Cunit

30

77

30

77

30

44

30

44

33

71

26

00 3

22

0

62

0

39

45

26

00 3

22

0

62

0

39

70

GA

CC HouseBlackfriars Road

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP

20 Perseverance WorksHackney Road London E2 8DD

(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:50 @ A1 23 01 14

DLG

/

Revision :

Draft

1402_SK_040

Proposed Section BB OP4

93-101 Blackfriars Road

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

- - - -

Third Floor

Fourth Floor

Fifth Floor

Sixth Floor

Ground Floor

First Floor

Second Floor

Roof

new floor

new floor

new office space

A/Cunit

30

77

30

77

30

44

30

44

33

71

26

00 3

22

0

62

0

39

45

26

00 3

22

0

62

0

39

70

GA

CC HouseBlackfriars Road

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP

20 Perseverance WorksHackney Road London E2 8DD

(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:50 @ A1 23 01 14

DLG

/

Revision :

Draft

1402_SK_048

Proposed Section BB OP5

93-101 Blackfriars Road

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

- - - -

First Floor

Second Floor

Third Floor

Fourth Floor

Fifth Floor

Sixth Floor

Ground Floor

Roof

new floor

new floor

new office space

A/Cunit

30

77

30

77

30

44

30

44

33

71

26

00 3

22

0

62

0

39

45

26

00 3

22

0

62

0

39

70

Option Option Option Option Option

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP20 Perseverance Works

Hackney Road London E2 8DD(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:20 @ A3 20/06/14

DLG

A

Revision :

-

1405_240_004

SCENARIO D - TYPICAL BAY PLAN & SECTION

BASING VIEW

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

A New exhaust/Intake grills on facade.23 06 14 DLG

N

New insulated aluminium cladding

New ceiling and lighting

New double glazed aluminium window (openable)

New raised floor system

New aluminium brisoleil

Intake/Exhaust grill(on each floor)

Plan Typical Bay

Scale 1:20

1

-

Section Through Typical Bay

Scale 1:20

2

-

0 2 4 5 M

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP20 Perseverance Works

Hackney Road London E2 8DD(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:20 @ A3 20/06/14

DLG

A

Revision :

-

1405_240_004

SCENARIO D - TYPICAL BAY PLAN & SECTION

BASING VIEW

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

A New exhaust/Intake grills on facade.23 06 14 DLG

N

New insulated aluminium cladding

New ceiling and lighting

New double glazed aluminium window (openable)

New raised floor system

New aluminium brisoleil

Intake/Exhaust grill(on each floor)

Plan Typical Bay

Scale 1:20

1

-

Section Through Typical Bay

Scale 1:20

2

-

0 2 4 5 M

GA

CC HouseBlackfriars Road

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP

20 Perseverance WorksHackney Road London E2 8DD

(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:20 @ A1 23 01 14

DLG

/

Revision :

Draft

1402_SK_054

Option 1 Roof SectionExisting and Proposed

93-101 Blackfriars Road

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

- - - -

Fourth Floor

Roof

EXISTING SECTION

170

397

25

11

170

906

220

177

Fifth Floor

Roof

PROPOSED SECTION

400

470

150

2600

150

200

25

170

397

400

1700

906

NEW AIR CONDITIONING PLANTS.

NEW INSULATED FLAT ROOF ON RIB DECK SLAB WITH CONCRETE INFILL.

NEW STEEL BEAMS.

NEW SUSPENDED CEILING MINERAL FIBRE TILES WITH PAINTED PLASTERBOARD MARGINS.

NEW 150 mm HIGH METAL PAN RAISED FLOOR.

NEW RIB DECK SLAB WITH CONCRETE INFILL.

EXISTING ROOF SLAB AND STRUCTURE.

GA

CC HouseBlackfriars Road

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP

20 Perseverance WorksHackney Road London E2 8DD

(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:20 @ A1 23 01 14

DLG

/

Revision :

Draft

1402_SK_054

Option 1 Roof SectionExisting and Proposed

93-101 Blackfriars Road

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

- - - -

Fourth Floor

Roof

EXISTING SECTION

170

397

25

11

170

906

220

177

Fifth Floor

Roof

PROPOSED SECTION

400

470

150

2600

150

200

25

170

397

400

1700

906

NEW AIR CONDITIONING PLANTS.

NEW INSULATED FLAT ROOF ON RIB DECK SLAB WITH CONCRETE INFILL.

NEW STEEL BEAMS.

NEW SUSPENDED CEILING MINERAL FIBRE TILES WITH PAINTED PLASTERBOARD MARGINS.

NEW 150 mm HIGH METAL PAN RAISED FLOOR.

NEW RIB DECK SLAB WITH CONCRETE INFILL.

EXISTING ROOF SLAB AND STRUCTURE.

GA

CC HouseBlackfriars Road

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP

20 Perseverance WorksHackney Road London E2 8DD

(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:20 @ A1 23 01 14

DLG

/

Revision :

Draft

1402_SK_054

Option 1 Roof SectionExisting and Proposed

93-101 Blackfriars Road

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

- - - -

Fourth Floor

Roof

EXISTING SECTION

170

397

25

11

170

906

220

177

Fifth Floor

Roof

PROPOSED SECTION

400

470

150

2600

150

200

25

170

397

400

1700

906

NEW AIR CONDITIONING PLANTS.

NEW INSULATED FLAT ROOF ON RIB DECK SLAB WITH CONCRETE INFILL.

NEW STEEL BEAMS.

NEW SUSPENDED CEILING MINERAL FIBRE TILES WITH PAINTED PLASTERBOARD MARGINS.

NEW 150 mm HIGH METAL PAN RAISED FLOOR.

NEW RIB DECK SLAB WITH CONCRETE INFILL.

EXISTING ROOF SLAB AND STRUCTURE.

FACADE CONSTRUCTION & DETAILS

OFFICES

2OFFICES WITH STURGIS ASSOCIATES LLP

I was responsible for large building façades design, of-fice renovations and expansion, working with sustain-ability concept, BCO, Building Regulations, BREEAM.

I was involved in large projects as 101 Blackfriars road, from feasibility studies and reports to construction package.

(See Offices & Reception 2013-2014 portfolio)

proposed entrance

proposed entrance

proposed plans - option 5

proposed section - option 5

area schedules

facade detailing

proposed storeys sectionexisting storeys section

proposed facade

RECEPTIONS4 BOUVERIE STREET, LONDONnew multistorey office

8 EASTCHEAP, LONDONnew reception

N

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP20 Perseverance Works

Hackney Road London E2 8DD(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:50 @ A1 19-12-2013

MS

/

Revision :

TENDER

1316_200_001

EXISTING FLOOR PLANGROUND

8 EASTCHEAP

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

- - - -

LIFT LOBBY

Cupboard

RECEPTION

LIFT 1

LIFT 2

LIFT 3

ESCAPECORRIDOR

Reception Desk

Fire Escape

ExistingEntrance Doors

0 1 2 3 M

N

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP20 Perseverance Works

Hackney Road London E2 8DD(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:50 @ A1 19-12-2013

DLG

D

Revision :

TENDER

1316_220_001

PROPOSED FLOOR PLANGROUND RECEPTION

8 EASTCHEAP

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

ABCD

Amended wall face & lightingAmended reception deskReduced desk sizeNew desk & slatted bench

15 05 1427 05 144 06 1417 06 14

DLGDLGDLGDLG

Cupboard

LIFT 1

LIFT 2

LIFT 3

EscapeCorridor

FireEscape

RECEPTION0.01

1

1

A

B

A

B

New reception bench / tableHardwood finish or Hi-mac black gloss finishAs spec ref N10/131As spec ref N10/132

0 1 2 3 M

New entrance matting.As spec ref N10/300

New main entrance floor tiles to reception and lifts.As spec ref M40/116

New external stone tiles to match internal with non-slip finish.As spec ref M40/116

Plaster Skim FinishAs spec ref M20/280

Existing entrance glazed doors and screenretained

Existing glass panelingretained and made good.

Plaster Skim FinishAs spec ref M20/280

A B

A B

C C

New facetted wall with vertical lighting polished plaster finish.As spec ref M20/160 and Details on 1316_320_002.

Extension joint.

970

Existing external floor vent retained andmade good

1320_003

1320_001

FINISHES

POLISHED PLASTERAs spec ref: M20/160

ALL OTHER WALLSWhite emulsion Þnish to RAL 9010 as spec ref: M60/110

CEILINGS White emulsion Þnish to RAL 9010 as spec ref: M60/110

New tenant sign board.As spec ref N10/133

New reception desk with chair,temperature/lighting controls and Fire

Control panel moved to fitAs spec ref N10/110As spec ref N10/130

New reception signage panel in backpainted glass with stainless steel edgeing.

As spec ref K13/150

Existing wall finished in polished plaster.As spec ref M20/160

Black hi-mac gloss finish withblack leather insert to desk.

Led lighting below desk.

Existing glass paneling removed andreplaced with plasterboard and finished in

polished plaster.As spec ref M20/160

Shelves below counter top withtemperature/lighting controls and Fire

Control panel moved to fit.

Telephone and intercom retained.

Existing security camera monitor and cameracontrol board retained.

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP20 Perseverance Works

Hackney Road London E2 8DD(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:25 @ A1 19-12-2013

DLG

A

Revision :

TENDER

1316_240_001

PROPOSED SECTION A-A, B-BGROUND RECEPTION

8 EASTCHEAP

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

A New desk & slatted bench. 16/06/2014-

FCL +2,800

B A

FFL +0

FCL +2,500

0 1.0 1.5 M

PROPOSED ENTRANCE SECTIONScale: 1:25

A-A

Existing internal doors spray painted.As spec ref L20/230

New faceted wall with vertical lighting polished plaster finish.As spec ref M20/160

Existing wall adjacentreception desk finished in

polished plaster.As spec ref M20/160

New reception signage panel in back painted glass with stainless steel edging.As spec ref K13/150

New building number.As spec ref N10/135

New entrance glazed screen.As spec ref L10/330

Existing fire exit retained.

New external stone tiles to match internal with non-slip finish.As spec ref M40/116

New reception desk(with Led strip on the bottom)and chair.As spec ref N10/110As spec ref N10/130

Planted skirting to match new stone floor tile.As spec ref M40/116

Existing surveillance camerato be retained.

1320_003

1320_001

New plasterboard celing with concealed lighting to edge or equal and approved. As spec ref K10/225

3

320_002

BA

appro

x 4

60

74

0

10

0

appro

x 5

20

Plaster Skim FinishAs spec ref M20/280

PROPOSED ENTRANCE SECTIONScale: 1:25

B-B

Existing metal lift indicatorsand call buttons retained and

cleaned.

Planted skirting to match new stone floor tile.As spec ref M40/116

New tenent sign board.As spec ref N10/133

New Electronic security swipeaccess reader with tenant intercom

(FBO).

New plasterboard celing with concealed lighting to edge or equal and approved. As spec ref K10/225

New entrance door frameglazed stainless steel.

As spec ref L20/480

New entrance matting.As spec ref N10/300

Relocate Intercom door release.

Relocate fire alarm button.

Relocate fire alarm from opposite wall.

Remove existing stone and supports.New Stud Plasterboard wall.As spec ref K10/125

New slatted bench.Black Hi-Mac gloss finish,

white table.

N

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP20 Perseverance Works

Hackney Road London E2 8DD(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:10 @ A1 19-12-2013

DLG

A

Revision :

TENDER

1316_230_004

PROPOSED RECEPTION DESKGROUND RECEPTION

8 EASTCHEAP

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

A New desk. 17/06/2014-

PROPOSED DESK ELEVATIONScale: 1:10

2

Existing workstation retained.

Existing security camera monitorand camera control board retained.

Telephone and intercom retained.

Desk interior grey lacqueredfinish.

All shelves, doors anddrawers below counter top

in lacquered finish to matchdesk colour.

Existing temperature/lighting controls and Fire Control panel relocated below counter top.

New reception desk with chairAs spec ref N10/110As spec ref N10/130

RECEPTIONPROPOSED DESK PLANScale: 1:10

1

2

3

4

55

New reception desk with chair.As spec ref N10/110As spec ref N10/130

Black hi-mac glossfinish. Led lighting

below desk.

Drawers below counter top.

Disabled reception side.

Hinged openable gate. Black Hi-mac gloss finish.

Telephone and intercom retained.

Existing security camera monitor and camera control board retained.

Black leather insert to desk.

Existing temperature/lighting controls and Fire Control panel relocated below counter top.

PROPOSED DESK ELEVATIONScale: 1:10

3

Recessed stainless steel planted skirting with concealed LED lighting

Hinged openable gate. Black Hi-mac gloss finish.

N

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP20 Perseverance Works

Hackney Road London E2 8DD(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:10 @ A1 19-12-2013

DLG

A

Revision :

TENDER

1316_230_005

PROPOSED RECEPTION DESKGROUND RECEPTION

8 EASTCHEAP

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

A New desk. 17/06/2014-

PROPOSED DESK ELEVATIONScale: 1:10

4

950

700

950

PROPOSED DESK SECTIONScale: 1:10

5

Drawers below counter top in lacquered finish to match desk colour.

Black hi-mac gloss finish with black leather insert to desk.

Recessed stainless steel planted skirting with concealed LED lighting

Hinged openable gate. Black Hi-mac gloss finish.

PROPOSED DESK ELEVATIONScale: 1:10

3

Recessed stainless steel planted skirting with concealed LED lighting

Hinged openable gate. Black Hi-mac gloss finish.

N

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP20 Perseverance Works

Hackney Road London E2 8DD(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:10 @ A1 19-12-2013

DLG

A

Revision :

TENDER

1316_230_005

PROPOSED RECEPTION DESKGROUND RECEPTION

8 EASTCHEAP

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

A New desk. 17/06/2014-

PROPOSED DESK ELEVATIONScale: 1:10

4

950

700

950

PROPOSED DESK SECTIONScale: 1:10

5

Drawers below counter top in lacquered finish to match desk colour.

Black hi-mac gloss finish with black leather insert to desk.

Recessed stainless steel planted skirting with concealed LED lighting

Hinged openable gate. Black Hi-mac gloss finish.

RECEPTION WALL PANELS - ELEVATIONScale: 1:10

1

New stone floor tile & planted skirting.Spec Ref. M40/116

New floor screed to entrance hall.Spec Ref. M10/150

New perimeter Concert M downlighteror equal and approved.

New plasterboard celing with concealed lighting to edge.As spec ref K10/225

New polished plasterboard.As spec ref M20/160

LED strip on wall panel. Concealed Concert Starline Flexor equal and approved with plastic diffuser to front.

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP20 Perseverance Works

Hackney Road London E2 8DD(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

MW

1:10 & 1:2 @ A1 19-12-2013

DLG

A

Revision :

TENDER

1316_320_002

DETAIL 2 FEATURE WALLGROUND RECEPTION

8 EASTCHEAP

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

A Amended wall details. 17/06/2014-

New polished plasterboard.As spec ref M20/160

Metal Stud backing frame support off existing wall.

Existing wall.LED strip on wall panel. Concealed Concert Starline Flexor equal and approved with plastic diffuser to front.

RECEPTION WALL PANELS -SECTIONScale: 1:10

2

3

320_002

WALL LED STRIP DETAILScale: Half Actual Size

3

Two layers plasterboard withnew polished finish.

As spec ref M20/160

Metal Studs backing frame support off existing wall.

LED strip on wall panel.Concealed Concert Starline Flex

or equal and approved with plasticdiffuser to front.

2mm Stainless Steel edge.

Existing wall.

N

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP20 Perseverance Works

Hackney Road London E2 8DD(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

-

1:10 @ A1 03-06-2014

DLG

A

Revision :

TENDER

1316_320_004

PROPOSED RECEPTION SLATTEDBENCH

8 EASTCHEAP

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

A Amended notes. 17/06/2014DLGa

pp

rox 4

60

74

0

10

0

ap

pro

x 5

20

PROPOSED RECEPTION SLATTED BENCH - ELEVATIONScale: 1:10

1

New reception bench / tableHardwood Þnish or Hi-mac black gloss ÞnishAs spec ref N10/131As spec ref N10/132

NOTE:Progressive increased gap between proposed slats bench as drawn below.

202122mm 20 21 22404142mm 40 41 42mm

PROPOSED RECEPTION SLATTED BENCH - PLANScale: 1:10

2

1490 700 2170

4520

8080

644

Plaster Skim Finish on existing blockworkwall. As spec ref M20/280

1320_002

New tenant sign board.As spec ref N10/133

2320_002

New main entrance floor tiles to receptionand lifts.

As spec ref M40/116

65x38 mm Back slats fixed onto plywoodpanel. Black LD Hi Macs.

Black LD Hi Macs frame.

4No. Hebgo fixed steel brackets fromHafele, ref 287.44.470

fixed to existing blockwork wall.

Removeable leather covered cushions withfire retardatnt finish and foam filling.

As spec ref K13/151

Skirting.

TABLE: 38 mm white LG Hi Macs solidsurface or equal and approved,

thermoformed, no visible seams.As spec ref K13/151

18 mm plywood hanged to wall with Z-Clips system.White laminate finish onto visible parts between slats.

Removeable leather covered cushions withfire retardatnt finish and foam filling.

As spec ref K13/151

TABLE: 38 mm white LG Hi Macs solidsurface or equal and approved,

thermoformed, no visible seams.As spec ref K13/151

65x38 mm Back slats fixed onto plywoodpanel. Black LD Hi Macs.

18 mm plywood hanged to wall withZ-Clips system. White finish onto visible

parts between slats.

Z-ClipsAs spec ref K13/151

Plaster Skim Finish on existint block workwall. As spec ref M20/280

Black LD Hi Macs cornice.

Black LD Hi Macs cornice.

2320_001

N

Project :

Title :

Scale :

Drawing No. :

Status :

Date :

Drawn by : Checked by :

© STURGIS ASSOCIATES LLP

A S O C ES TAI S

SS T U R G I

STURGIS ASSOCIATES LLP20 Perseverance Works

Hackney Road London E2 8DD(T) +44 (0) 20 7613 2500(F) +44 (0) 20 7613 3455

[email protected] www.sturgis.co.uk

-

1:10 & 1:2 @ A1 03-06-2014

DLG

A

Revision :

TENDER

1316_320_005

PROPOSED RECETION SLATTEDBENCH DETAILS

8 EASTCHEAP

1.-Do not scale this drawing. The Contractor is to verify all dimensions & conditions on site and report any discrepencies to the Architect before proceeding.

2.- This drawing is to be read in conjunction with all relevant project documentation.

3.- This drawing is subject to the approval of the appropriate Statutory Authorities.

DateDescriptionRev. Chck by

A Amended notes 17/06/2014DLG

RECEPTION SLATTED BENCH - SECTIONScale: 1:10

1

1.1

425 140

100

ap

pro

x 4

60

740

425 140

100

ap

pro

x 4

60

740

RECEPTION SLATTED BENCH : detailScale: Half Actual Size

1.1

RECEPTION TABLE BENCH - SECTIONScale: 1:10

2

2.1

RECEPTION TABLE BENCH : detailScale: Half Actual Size

2.1

New stone floor tile & planted skirting.Spec Ref. M40/116

Plaster Skim FinishAs spec ref M20/280

New reception bench / tableHardwood Þnish or Hi-mac black gloss ÞnishAs spec ref N10/131As spec ref N10/132

Z-ClipsAs spec ref K13/151

65x38 mm vertical slat: black LG Hi Macs solid surface or equal and approved, thermoformed, no visible seams.As spec ref K13/151

18 mm plywood hanged to wall with Z-Clips system. White laminate finish onto visible parts between slats.

18 mm Plywood.

4No. Hebgo fixed steel brackets from Hafele, ref 287.44.470fixed to existing blockwork wall.

Removeable leather covered cushions with fire retardatnt finish and foam filling.As spec ref K13/151

20 mm cornice Black LG Hi Macs or equal hardwood

20 mm cornice Black LG Hi Macs or equal hardwood

wood batten to fix cornice

Plaster Skim FinishAs spec ref M20/280

Z-ClipsAs spec ref K13/151

18 mm plywood hanged to wall with Z-Clips system. White laminate finish onto visible parts between slats.

18 mm Plywood.

4No. Hebgo fixed steel brackets from Hafele, ref 287.44.470fixed to existing blockwork wall.

20 mm cornice Black LG Hi Macs or equal hardwood

20 mm cornice White LG Hi Macs or equal hardwood

wood batten to fix cornice

TABLE: 38 mm white LG Hi Macs solid surface or equal and approved, thermoformed, no visible seams.As spec ref K13/151

Plaster Skim FinishAs spec ref M20/280

Existing blockwork wall.

Black LD Hi Macs cornice.

4No. Hebgo fixed steel brackets fromHafele, ref 287.44.470

fixed to existing blockwork wall.

Removeable leather covered cushions withfire retardant finish and foam filling.

As spec ref K13/151

18 mm Plywood.

Plaster Skim FinishAs spec ref M20/280

Existing blockwork wall.

Black LD Hi Macs cornice.

4No. Hebgo fixed steel brackets fromHafele, ref 287.44.470

fixed to existing blockwork wall.

18 mm Plywood.

TABLE: 38 mm white LG Hi Macs solidsurface or equal and approved,

thermoformed, no visible seams.As spec ref K13/151

65x38 mm vertical slat: black LG Hi Macs solid surface or equal and approved, thermoformed, no visible seams.As spec ref K13/151

65x38 mm Back slats fixed onto plywoodpanel. Black LD Hi Macs.

65x38 mm Back slats fixed onto plywoodpanel. Black LD Hi Macs.

New floor screed to entrance hall.Spec Ref. M10/150

New stone floor tile & planted skirting.Spec Ref. M40/116

New floor screed to entrance hall.Spec Ref. M10/150

3INTERIORS WITH STURGIS ARCHITECTS LLP

I was involved in contemporary receptions design, from initial stage to construction package and specifications.

4 Bouverie Street and Eastcheap shown in this page are just few selec-ted ( see Offices & Reception 2013-2014 portfolio).

proposed existing proposed reception

proposed reception

existing reception

proposed existing

proposed reception elevations

proposed bench details

proposed

proposed bench details

proposed reception desk

proposed wall panels - elevation

proposed wall led strip - details

proposed wall panels - section

REVIT KNOWLEDGEMASSING

MASSING WITH VOIDS

CURVED MASSES

WALLS BY SUR-FACE

PLANS & REFER-ENCE PLANS

USING A SEC-TION BOX

CREATING IN-TERIORS

USING VISIBILITY SETTING

WORKING WITH PERSPECTIVE

SECTIOND DE-TAILS

SECTION DE-TAILING

USING LEGENDS AND AREA CAL-LOUTS

OPTIONS FOR ROOM CAL-LOUTS

CREATING FLOORS BY MASS

CREATING CUR-TAIN WALLS AND FACADES

CREATING VIEWS

PLACING BAL-CONY COMPON-ENTS

DRAWING FRONT VIEWS

DEVELOPING MASS INTO A BUILDING EN-

CREATING DIN-AMICS TOWER MASSES

LARGE BUILDING ENVELOPES

DINAMIC BUILD-ING ENVELOPES & FLOORS

CREATING AT-RIUM INTO A BUILDING MASS

CREATING VIEWS WITH SHADOWS

USING PARA-METRES

CREATING MA-TERIALS AND ACCURATE

USING DINAM-ICS COMPON-ENTS APPLIED

MODELING COMPLEX FURNITURE

CREATING MASS STUDIES FOR A TOWER: LEVELS

CONCEPTUAL MASSING

4REVIT SKILLS

I have been working with Autodesk Revit 2013since October 2014.

I am able to use Revit for 3D modeling and 2D drawing.

I can create both simple and complex 3D masses for studies, schedule of quantities and areas, 3D components and furniture families.

3D - 2D - DETAILING - PARAMETRES

I can use levels and reference planes to assign parameters to the project, creating high level of details using section views and annotate tools.

I can create building projects with customized walls, roofs and floors ( assembling layers and elements as bricks, blockworks, insulation, finishes).

I can easily create complex walls, floors and roofs from masses or surfaces.

RESIDENTIALROSEMARY LODGE, WIMBLEDONseven semidetached houses

12m

12m

T1

T14

T16

T17

T18

T20

PROPOSED TREE TOREPLACE EXISTING T15

T31 T32T33

T34

T35

T36

T44

T46

T47

T41

T42

T43

T40

T39

T48

T49

T50T51

T52

T53

T54

T37

T38

T56

T57

PROPOSED TREE TOREPLACE EXISTING T15

NEW TREES TOREPLACE G10

PROPOSED TREES TOREPLACE T12 & T13

NEW TREE TOREPLACE T7

NEW TREE TOREPLACE T4

NEW TREE TOREPLACE T2

T58

NEW TREE TOREPLACE T6

NEW TREE TOREPLACE T8

T19

SOLVING PLANNING ISSUES

There were some difficulties with the previous planning pro-cess regarding the orientation of the two buildings on the east side and some issues with the symmetry.

These were solved by proposing a new layout which I have documented on the right hand side.

East elevation before

East elevation after

TRANSFORMING A SCENARIO

My contribution to this seven house development project was to enhance the style and the appearance of the pro-posed buildings.

I choose a Victorian style which matched the expectation of the client and transformed the previous unanimous look into a successful proposal.

The amendments include larger Victorian sash windows with precast stone surroundings, new balconies under the gables, customised stone rails, porches and mouldings.

My proposal for the rear facade was a mixed style of contem-porary and a continuity of the Victorian appearence.

site plan before site plan after

PROPOSING BETTER INTERIORS

In enhancing the exteriors, It was inevitable to solve some space issues, as the symmetry of the plans and the staircases.

Each building is comprehensive of two semi detached houses,The party wall meant that it had to be situated in the middle. This generated a perfect symmetry in the facades.

One of the interior amendments was onto the rear, I created a open plan kitchen-dining-and family room with an elegant spiral staircase that lead into a vast basement complete with Cinema room and gym amongst other amenities.

T1

T14

T16

T17

T18

T20

PROPOSED TREE TO

REPLACE EXISTING T15

T31 T32T33

T34

T35

T36

T44

T46

T47

T41

T42

T43

T40

T39

T48

T49

T50

T51

T52

T53

T54

T37

T38

T56

T57

PROPOSED TREE TO

REPLACE EXISTING T15

NEW TREES TO

REPLACE G10

PROPOSED TREES TOREPLACE T12 & T13

NEW TREE TO

REPLACE T7

NEW TREE TO

REPLACE T4

NEW TREE TO

REPLACE T2

T58

NEW TREE TO

REPLACE T6

NEW TREE TOREPLACE T8

T19

12m

12m

T1

T14

T16

T17

T18

T20

PROPOSED TREE TOREPLACE EXISTING T15

T31 T32T33

T34

T35

T36

T44

T46

T47

T41

T42

T43

T40

T39

T48

T49

T50T51

T52

T53

T54

T37

T38

T56

T57

PROPOSED TREE TOREPLACE EXISTING T15

NEW TREES TOREPLACE G10

PROPOSED TREES TOREPLACE T12 & T13

NEW TREE TOREPLACE T7

NEW TREE TOREPLACE T4

NEW TREE TOREPLACE T2

T58

NEW TREE TOREPLACE T6

NEW TREE TOREPLACE T8

T19

T1

T14

T16

T17

T18

T20

PROPOSED TREE TOREPLACE EXISTING T15

T31 T32T33

T34

T35

T36

T44

T46

T47

T41

T42

T43

T40

T39

T48

T49

T50T51

T52

T53

T54

T37

T38

T56

T57

PROPOSED TREE TOREPLACE EXISTING T15

NEW TREES TOREPLACE G10

PROPOSED TREES TOREPLACE T12 & T13

NEW TREE TOREPLACE T7

NEW TREE TOREPLACE T4

NEW TREE TOREPLACE T2

T58

NEW TREE TOREPLACE T6

NEW TREE TOREPLACE T8

T19

T1

T14

T16

T17

T18

T20

PROPOSED TREE TOREPLACE EXISTING T15

T31 T32T33

T34

T35

T36

T44

T46

T47

T41

T42

T43

T40

T39

T48

T49

T50T51

T52

T53

T54

T37

T38

T56

T57

PROPOSED TREE TOREPLACE EXISTING T15

NEW TREES TOREPLACE G10

PROPOSED TREES TOREPLACE T12 & T13

NEW TREE TOREPLACE T7

NEW TREE TOREPLACE T4

NEW TREE TOREPLACE T2

T58

NEW TREE TOREPLACE T6

NEW TREE TOREPLACE T8

T19

before

after

Basement First Floor Second FloorGround Floor

Basement First Floor Second FloorGround Floor

New site appearence.

South-east Building

kitchen and dining room staircase from the kichen to the basement basement

PROPOSED BUILDINGS CONSTRUCT ABILITY OPTIONS

This project was essentially based on the design and research of the traditional style.

However through this research I continuously paid attention to the construction implications. I used this research to analyse and designate the best option.

For example the sash windows were a important design aspect of this type of building style.

To achieve the best outcome I composed details which helped me explain how to build the surrounding stone and determine the wall sizes.

These fundamental details were used as crucial parameters and drove the most important decisions.

CHOOSING THE RIGHT MATERIALS

Materials were also crucial to this project as the site is under the conservation area in Wimbledon.

The site was composed of a original Victorian house (shown as the retained north-west building.)

This and in conjunction with the with traditional styled sur-rounding buildings principally Victorian and Georgian, played a crucial part in determining the material choices. darrk blue roof slates creamy portland stone flemish red bricks

CREATING STYLES OPTIONS

Even though the early proposal was a generic outline, not specifying in details the appearance, it was necessary to review some crucial aspect.

Such as the extension on the rear ground floor to the garden whereby I created balconies in the front, rear and side facade.

One important aspect was the connection of the roof and gables to the rest of the building. This I had to achieve without compromising the integrity and appearance of the entire facade.

The solution was to start the gable from the top cornice above the first floor.

rear elevations after

rear elevations before

west elevations before west elevations after side elevation before (south) side elevation afterSouth west building, front elevation transformation.

(with VISU VERUM DESIGN LIMITED)

5Since 2014 I have been responsible with Visu Verum Design Limited to design unique houses with traditional style, from scratch to hte end completion. (See Traditional Homes 2014-2015 portfolio)

CONSTRUCTION & SITEPEEK CRESCENT, WIMBLEDONnew traditional three storeys house

WORKING ON SITE

Peek Crescent house is located in Wimbledon, four storeys tra-ditional building under construction, including a basement and a large garden.

I was called to solve some issue during the building process,initially regarding the round windows location, and later for the gable cornice and the pavement details connecting the ground floor to the garden.

SKETCHING ISSUES

I started a comparison between the site in progress survey and the construction drawings.

I found out that the building workers built an higher window sill ( by two brick courses) so the opening was too close to the gables.

Building site, from Marryat Road. Front Elevation.

Second floor level , and view of the wrong opening.

General sketch survey of the second floor opening.

SOLVING FACADE ISSUE ON SITE

By reaserching and confronting all pieces of information I managed to prevent the wrong gable cornice specification and installment that was previosly produced by another company.

CREATING NEW GABLE CORNICES

I produced an alternative option and agreed with Bannersgate Engineers that it was stable and compatible with the rest of the roof construction.

That starts a chain of amendments which affected also the size of the dentil. ( see next page).

Analilys, front elevation construction drawing. opening curve beam, and proposed 3D .

Section of the round openings on the second floor

BUILDING NEW DENTILS

0207 183 9683

[email protected]

www.visuverum.co.uk

PROJECT

DRAWING TITLE

PROJECT STAGE

CLIENT NAME:

DRAWING BY: CHECKED BY:

TYPE SCALE DATE REVISED

DRAWING N

Woodcock House, Gibbard Mews, High

Street, Wimbledon, SW19 5BY

Tel:

Email:

Webpage:

NOTES

ORIGINAL

REV DATE INITIALS DESCRIPTION

BAIRAM VALIYEV 1 PEEK CRESCENT PC001

CONSTRUCTIONCON

EAVES DETAILS

DD004A

ARCHITECTURE 1:2,1:5 02.02.15 05.02.15

BM KC

Scale: 1:5

TYPICAL EAVES DETAIL1 Scale: 1:2

FASCIA MOULDING DETAIL2

715

535

2535

375

2600

400

3000

9310

FFL +9.310M

FFL +0.00M

FFL +9.310M

FFL +0.00M

Detail 121A110

1650

1515

2390435 970 425

140 150

2045

140

150

150

2445

2425

150

5

1865

2410

570

2305

425

145

125100

55

100

50

90

100

375

200

35

225

90

200 125100

135

450

425

FFL +0.00M

Detail 121A110

1000

150

1015

500

1300

1015

1180

225

225

80

200 125

425

0m0m 0.2 0.4 0.8 2m

SCALE 1:20

0207 183 9683

[email protected]

www.visuverum.co.uk

PROJECT

DRAWING TITLE

PROJECT STAGE

CLIENT NAME:

DRAWING BY: CHECKED BY:

TYPE SCALE DATE REVISED

DRAWING N

Woodcock House, Gibbard Mews, High

Street, Wimbledon, SW19 5BY

Tel:

Email:

Webpage:

NOTES

BAIRAM VALIYEV 1 PEEK CERESCENT

CONSTRUCTIONCON

GABLE ROOF DETAILS

DD003A

ARCHITECTURE AS SHOWN 20.01.15 21.01.15

BM MA

1:50

AMENDED DIZ FRONT ELEVATIONA

1:5

GABLE ROOF EAVES DETAIL1

1:20

FRONT GABLE3 1:20

SIDE GABLE SECTION4

1:5

TYPICAL EAVES DETAIL2 APP

RO

VED

A 21.01.15Side Gable Eaves Detail, Oriel Window and

Typical Eaves details amended

1:50

AMENDED DIZ MARRYAT ROAD ELEVATIONB

71

55

35

25

35

37

52

60

04

00

30

00

93

10

FFL +9.310M

FFL +0.00M

FFL +9.310M

FFL +0.00M

Detail 121A110

1650

1515

2390435 970 425

140 150

2045

140

150

150

2445

2425

150

5

1865

2410

570

2305

425

145

125100

55

10

05

09

01

00

37

5

200

35

22

59

0

200 125100

13

5

45

0

425

FFL +0.00M

Detail 121A110

1000

15

0

10

15

50

0

1300

10

15

11

80

22

5

22

5

80

200 125

425

0m0m 0.2 0.4 0.8 2m

SCALE 1:20

0207 183 9683

[email protected]

www.visuverum.co.uk

PROJECT

DRAWING TITLE

PROJECT STAGE

CLIENT NAME:

DRAWING BY: CHECKED BY:

TYPE SCALE DATE REVISED

DRAWING N

Woodcock House, Gibbard Mews, High

Street, Wimbledon, SW19 5BY

Tel:

Email:

Webpage:

NOTES

BAIRAM VALIYEV 1 PEEK CERESCENT

CONSTRUCTIONCON

GABLE ROOF DETAILS

DD003A

ARCHITECTURE AS SHOWN 20.01.15 21.01.15

BM MA

1:50

AMENDED DIZ FRONT ELEVATIONA

1:5

GABLE ROOF EAVES DETAIL1

1:20

FRONT GABLE3 1:20

SIDE GABLE SECTION4

1:5

TYPICAL EAVES DETAIL2 APP

RO

VED

A 21.01.15Side Gable Eaves Detail, Oriel Window and

Typical Eaves details amended

1:50

AMENDED DIZ MARRYAT ROAD ELEVATIONB

Second floor level , and dentils location. New eaves and gable cornice profile. Cornice dormer details.

WORKING WITH THE LANDSCAPE DESIGNER

I was working with Marc Piechocky, landscape designer at V&V, to coordinate and supply missing information and details during the external footpath construction.

Assisting the site manager I produced some details according to the client preference.

I proposed a grey durable stone for exterior suitable for the pave-ment and the external staircase connection the basement to the upper garden.

The choice was to specify a 30 mm thick portland stone, consequen-tially the site manager was able to calculate accurately the new pave-ment level and install the surrounding french door stones.

Landscape plan.

Part of the basement floor plan. Details of external pavement section.

6My experience at V&V included assisting the site manager’s during the construction process, developing solutions and details to solve particular issues in a very short time.

All my proposals were successfully built.

(See Traditional Homes 2014-2015 portfolio)

HISTORIC BUILDINGS

7RETROFITTING HISTORIC BUILDINGS

Many project with Sturgis Associates LLP between August 2013 and December 2013 were located in Mayfair and Belgravia.

I was proposing alterations to existing graded II lis-ted buildings in conservation area, retrofit projects to enhance the energy performance and the SAP rate including CO2 emissions.

The proposed alteration included floors, roofs, insulation to the walls, secondary glazing, natural ventilation, solar PV panels.

(See Historic Buildings 2013 portfolio)

existing windows proposed window section with secondary glazingexisting and proposed windows

COMPETITIONS & SKETCHING

8VAUXHALL THE MISSING LINK - 2012 LIFTA REBUILT 2012 BRITISH HOME AWARDS - PASSIHAUS 2014

VAUXHALL

I was in a team with Ferrari Architects and Davies Land-scape Architects for “Vaux-hall the missing link”.Competition for a new Vaux-hall masterplan in 2012.

PASSIVHAUS

I was in a team with Stur-gis Architects LLP for the Sunday Time British Home Awards 2014, competing for an innovative British passivhaus.

(Shown on the left: my first proposal).

LIFTA

In 2012 I was assigned by RDA Architects to work at “LIFTA REBORN” project for Al Jazeera Documentary.

Through a passionate re-search I was able to replicate the exact 3D configuration of Lifta, small historic town nearby Jerusalem, before being demolished during the war of 1947.

proposed masterplan

proposed winter garden winter garden - south view studies for future cities

new building sketch studies corian for facade : detailing & studies

studies for a PV solar facade studies for a PV solar facade

first proposal for passivhaus competition

environmental analisys for passivhaus

Lifta old plan before 1947

model in progress

Lifta’s ruines today

Lifta 3D model