(2015-cv) le phuoc china (eng)
TRANSCRIPT
CURRICULUM VITAE (CV) OF EXPERT
1. Proposed position : To be supplemeted
2. Current Firm : Transport Engineering Design Joint Stock Incorporated South (TEDI South)
3. Name of expert : LE PHUOC CHINA; Nationality: VIET NAM
4. Profession : Civil Engineer (Bridge, Road, Tunnel)
5. Date of birth : December 31st 1982
6. Membership in Professional Societies : Ho Chi Minh City Bridge, Road & Port Association
7. Employment record:
Time Name of Unit Reference Personnel Position
From May 2005 to June 2008 TEDI South
Mr. Luong Viet Ha Bridge Team LeaderCP: 0913 633 558Email: [email protected]
- Supervision Engineer in bridge and road;- Design Engineer in bridge and road;- Cost Estimator;
From July 2008 to April 2009
Joint Venture of: Nippon Koei Co., KRI International
Corporation, HAFICO Group Holding Co., Mekong
Economics Ltd.
Mr. YOKOTA eiichiTeam Leader CP: N/AEmail: [email protected]
- Bridge/Structural Engineer
From May 2009 to January 2011 TEDI South
Mr. Luong Viet Ha Bridge Team LeaderCP: 0913 633 558Email: [email protected]
- Supervision Engineer in bridge and road;- Bridge/Road Designer;- Design Engineer in bridge and road;- Appraisal Enginer in bridge and road;- Cost Estimator;
From Feb 2011 to April 2011
Joint Venture of: Yooshin Engineering Corporation & Sambo Engineering Co. Ltd.
Mr. SUN RAE OH Project ManagerCP: 0932 399 721Email: [email protected]
- Bridge Engineer.
From May 2011 to August 2011 TEDI South
Mr. Luong Viet Ha Bridge Team LeaderCP: 0913 633 558Email: [email protected]
- Bridge/Road Designer;- Supervision Engineer in bridge and road.
From Sept 2011 to Nov 2011
Nippon Koei Co.
Mr. Shinji TSUBOI Team Leader CP: N/AEmail: [email protected]
- Bridge Engineer
From Dec 2011 to Mar 2013
TEDI South Mr. Luong Viet Ha Chief of Design DivisionCP: 0913 633 558Email: [email protected]
- Supervision Engineer in bridge and road;- Design Manager in bridge and road;- Bridge/road Designer;
LE PHUOC CHINA, 1/18
- Cost Estimate;
From April 2013 to Dec 2013
Consortium of Nippon Koei & TEDI South
Mr. OKAMURA Tatsuya Project ManagerCP: 0938 675 215Email: [email protected]
- Assistance Resident Engineer (ARE) for Supervision Construction Stage.
From Jan 2014 to now
TEDI SouthMr. Luong Viet Ha Chief of Design DivisionCP: 0913 633 558Email: [email protected]
- Design Manager in bridge and road;- Supervision Engineer in bridge and road;- Bridge/road Designer; - Appraisal Enginer in bridge and road;- Cost Estimator.
8. The proposed assignment in the package:
Detail of proposed assignmentRecording of relevant works, assigments which be undertaken in previous projects to prove implementation ability in this assignment:
- Site setting out & Site supervision for bridge, road.- Directs and manages the daily activities of the site work- Control Site Manpower & Sub contractor at site as requested - Ensure all activities with best quality, safety and on time. - Make daily report to Site Manager - Coordinate with local sub-contractors- Other duties as assigned from time to time.
- Experience in Q/C is an advantage;
- Good knowledge about Construction Project
Management;
- Experience in supervision work.
- Coordinate with Authorities/the Owner.
- Good computer skill (Word, Excel, AutoCad,
MIDAS CIVIL, ...);
- Work under intense pressure;
- Individually work and team work skill
LE PHUOC CHINA, 2/18
Detail of Assignment The Projects/Structures
- Checking road, bridge design, safety trafic system on aligment to ensure safety traffic in service state and make safety traffic proposal report.
- Coordinate with Local Authorities and y Units.
(38) Project: Province Road ĐT 930, from Long My Town to High Technology Industry Zone, Construction Investment Project of Thu Thiem 2 Bridge, under “BT” Form Contract (Building – Transfer).
Location: Hau Giang Province.
Implementation stage: Detailed Design
Client: Transport Project Management Unit of Hau Giang Province
Add: 01 Dien Bien Phủ, ward 5, Vi Thanh city, Hau Giang province.
Type, Group and Classification of structure: Transportation structure, Group C
Classification of project: Class V.
Profession: Safety Traffic Appraisal Team Leader.
- Preparation of the plan, management and coordination for implementation of design;
- Prepare the Outline of Survey;
- Design the continuous PSC box girder;
- Analysis of superstructure and substructure;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with MOT, DoT and others Authority Units.
(37) Project: Construction Investment Project of Thu Thiem 2 Bridge, under “BT” Form Contract (Building – Transfer).
Location: Ho Chi Minh city.
Implementation stage: Engineering Design
Client: Dai Quang Minh Real Estate Corporation
Add: 10 Mai Chi Tho, An Loi Dong ward, Dist. 2, Ho Chi Minh city.
Type, Group and Classification of structure: Transportation structure, Group A
Classification of Bridge: Special Class.
Classification of Road: Class II.
Profession: Procedure/Bridge Engineer.
- Preparation of the plan, management and coordination for implementation of Feasible Study (FS);
- Study of the alternatives of alignment and structures;
- Report, explanatory to The
(36) Project: Construction Investment of Extension of Road No.319 and the intersection of Ho Chi Minh – Long Thanh – Dau Giay Expressway, under “BOT” Form Contract.
Location: Nhon Trach Dist., Dong Nai province.
Implementation stage: Feasible Study
LE PHUOC CHINA, 3/18
Clien/The Owner and relevant Authorities;
- Design of “super T” girder, “I” PSC girder (post tension);
- Analysis of major structures and substructures;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with survey Consultants and relevant Units.
Client: Department of Transportation of Dong Nai
Add: 18 Phan Chu Trinh, Quang Vinh ward, Bien Hoa city, Dong Nai province.
Type, Group and Classification of structure: Transportation structure, Group B, Class II.
Profession: Project Designer.
- Analysis, evaluation of the alternatives of basic design;
- Check the quantity table of structures (using cable stayed structure, PSC box girder).
- Check the application of norm and price/quotation.
- Check the cost estimate and total cost.
(35) Project: Construction Investment Project of Thu Thiem 2 Bridge, under “BT” Form Contract (Building – Transfer).
Location: Ho Chi Minh city.
Implementation stage: Feasible Study
Client: Dai Quang Minh Real Estate Corporation
Add: 10 Mai Chi Tho, An Loi Dong ward, Dist. 2, Ho Chi Minh city.
Type, Group and Classification of structure: Transportation structure, Group A
Classification of Bridge: Special Class.
Classification of Road: Class II.
Profession: Proof Check Engineer.
- Supervision during construction;
- Preparation of the plan, management and coordination for implementation of design and supervison works;
- Solution of technical issues and coordinate with others projects;
- Analysis of superstructure and substructure;
- Prepare/check the drawings;
(34) Project: Widening of National Highway No.1, Khanh Hoa province Section, (Km1374+525 – Km1445+000).
Location: Khanh Hoa province.
Implementation stage: Detailed Design
Client: Project Management Unit No.7 (PMU7)
Add: 63 Nguyen Xi, ward 26, Binh Thanh Dist., Ho Chi Minh city.
Type, Group and Classification of structure: Transportation structure, Group A, Class II.
LE PHUOC CHINA, 4/18
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with survey Consultants and relevant Units.
Profession: Bridge Designer/Supervision Engineer.
- Supervision, management and control the quality, safety, progress and environment during construction;
- Evaluate on method statement and instruct Contractor during construction;
- Report to Resident Engineer/Project Manager and the Owner;
- Explanatory to MOT, TCQM, SAC when they visit the site and check the construction documents.
- Inspect/approve acceptance documents for structures and whole project comply to regulations.
- Coordinate with Local Authorities about affection of project.
- Implementation of other tasks which assigned by Resident Engineer/Project Manager.
(33*) Project: Ho Chi Minh – Long Thanh – Dau Giay Expressway (Package 1b).
Location: Ho Chi Minh city and Dong Nai province.
Implementation stage: Supervision Construction
Client: Viet Nam Expressway Corporation (VEC)
Add: Floor 4, 5, 6, MITEC Buiding, Cau Giay New City, Yen Hoa ward, Cau Giay Dist., Ha Noi city.
Type, Group and Classification of structure: Transportation structure, Group A, Special Class.
Profession: Assistance Resident Engineer (ARE).
(*): See the evaluation in Certificate by Mr. OKAMURA Tatsuya (Resident Engineer of Pk1b, Project Manager)
- Preparation of the plan, management and coordination for implementation of Feasible Study (FS);
- Study of the alternatives of alignment and structures;
- Report, explanatory to The Clien/The Owner and relevant Authorities;
- Design of “super T” girder, “I” PSC girder (post tension);
- Analysis of major structures and substructures;
(32) Project: Widening of National Highway No.1, Khanh Hoa province Section, (Km1374+525 – Km1445+000).
Location: Khanh Hoa province.
Implementation stage: Feasible Study
Client: Project Management Unit No.7 (PMU7)
Add: 63 Nguyen Xi, ward 26, Binh Thanh Dist., Ho Chi Minh city.
Type, Group and Classification of structure: Transportation structure, Group A, Class II.
Profession: Project Designer.
LE PHUOC CHINA, 5/18
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with survey Consultants and relevant Units
- Prepare the cost estimate.
- Preparation of the plan, management and coordination for implementation of Feasible Study (FS);
- Study of the alternatives of alignment and structures;
- Report, explanatory to The Clien/The Owner and relevant Authorities;
- Design of “super T” girder, “I” PSC girder (post tension);
- Analysis of major structures and substructures;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with survey Consultants and relevant Units
- Prepare the cost estimate.
(31) Project: Financial of Transportation to Improvement National Highway Road No.1
Location: Khanh Hoa province.
Implementation stage: Feasible Study
Client: Project Management Unit No.6 (PMU6)
Add: 278 Ton Duc Thang, Dong Da Dist., Ha Noi city.
Type, Group and Classification of structure: Transportation structure, Group A, Class II.
Profession: Design Manager.
- Coordinate with the Engineers from: Nippon Koei, Marubeni & KRI to analyse, verify technical factors of each bridge in project. Then prepare the recommendations.
- Analysis, comparision the alternatives and foundations.
- Report and explanatory to the Client/The Investor.
(30) Project: Preparatory Survey on Trung Luong – My Thuan Expressway
Location: Tien Giang province.
Implementation stage: Feasible Study
Client: Nippon Koei
Type, Group and Classification of structure: Transportation structure, Group A, Special Class.
LE PHUOC CHINA, 6/18
Profession: Appraisal Bridge Engineer.
- Coordinate with the Engineers from: KCI to design the bridge.
- Analysis comparision the alternatives and foundations.
- Analysis of superstructure (using extradosed type & “super T” and substructure;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Supervision construction and solution of technical issues;
- Design of approach road and drainage structures (box culvert and circular culvert).
(29) Project: An Dong Bridge, Ninh Thuan Coast Corridor Construction Investment.
Location: Ninh Thuan province.
Implementation stage: Technical Design
Client: Department of Transportation of Ninh Thuan
Add: 142 Road 21 Thang 8, Phan Rang – Thap Cham city.
Type, Group and Classification of structure: Transportation structure, Group B, Class I.
Profession: Bridge Designer.
- Coordinate with the Engineers from Yooshin and Sambo (Korea) to design the bridge.
- Analysis of superstructure and substructure;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with survey Consultants and relevant Units.
28(*). Project: Vinh Thinh Bridge Construction Project
Location: Ha Noi city, Vinh Phuc province
Implementation stage: Technical Design
Client: Thang Long Project Management Unit (PMU Thang Long)
Add: Group 23, Linh Nam ward, Hoang Mai Dist., Ha Noi city.
Type, Group and Classification of structure: Transportation structure, Group A, Class I.
Profession: Bridge Designer.
(*): See evaluation in Testimonial by Mr. SUN RAE OH (Project Manager)
- Coordinate with the Engineers from KCI (Korea) to design the bridge.
- Analysis of superstructure and substructure;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
(27) Project: Trung Luong – My Thuan Expressway Construction Investment Project.
Location: Tien Giang province
Implementation stage: Technical Design
Client: BIDV Development of Expressway Company (BDEC)
LE PHUOC CHINA, 7/18
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with survey Consultants and relevant Units.
Add: Floor 3, 472 Nguyen Thi Minh Khai, ward 2, Dist 3, Ho Chi Minh city.
Type, Group and Classification of structure: Transportation structure, Group A, Special Class.
Profession: Bridge Designer.
- Preparation of the plan, management and coordination for implementation of Feasible Study (FS);
- Study of the alternatives of alignment and structures (free cantilever method (FCM), steel arch and extradosed);
- Report, explanatory to The Clien/The Owner and relevant Authorities;
- Design of “super T” girder, “I” PSC girder (post tension);
- Analysis of major structures and substructures;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with survey Consultants and relevant Units
- Prepare the cost estimate.
(26) Project: Tan Loc Bridge.
Location: Can Tho province
Implementation stage: Feasible Study
Client: Department of Transportation of Can Tho
Add: 1B Ngo Huu Hanh, Ninh Kieu Dist., Can Tho city.
Type, Group and Classification of structure: Transportation structure, Group B, Class I.
Profession: Bridge Designer.
- Preparation of the plan, management and coordination for implementation of design/supervision;
- Analysis of major structures and substructures;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check
(25) Project: Construction Investment of Dong Quang Bridge and the Connecting Highway to Road TL316.
Location: Phu Tho province
Implementation stage: Detailed Design
Client: Ao Vua Joint Stock Corporation
Add: Tan Linh ward, Ba Vi Dist., Ha Noi city.
Type, Group and Classification of structure: Transportation structure, Group B, Class I.
Profession: Bridge Designer.
LE PHUOC CHINA, 8/18
Consultants;
- Coordinate with survey Consultants and relevant Units.
- Supervision during construction;
- Preparation of the plan, management and coordination for implementation of design/supervision;
- Analysis of major structures and substructures;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with survey Consultants and relevant Units;
- Construction solution of technical issues and coordinate with relevant projects.
(24) Project: Phu Thuan Bridge
Location: Ho Chi Minh city
Implementation stage: Detailed Design
Client: Phat Dat Real Estate Development Corporation
Add: 422 Dao Tri road, Phu Thuan ward, Dist.7, Ho Chi Minh city.
Type, Group and Classification of structure: Transportation structure, Group B, Class IV.
Profession: Bridge Designer.
- Preparation of the plan, management and coordination for implementation of design/supervision;
- Analysis of major structures and substructures;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with survey Consultants and relevant Units.
(23) Project: Construction Investment of Surrounding Road of Phu Quoc Island, Bai Thom – Ham Ninh Section.
Location: Phu Quoc Island, Kien Giang province
Implementation stage: Detailed Design
Client: Department of Transportation of Kien Giang
Add: 1190 Nguyen Trung Truc road, An Binh ward, Rach Gia city, Kien Giang province.
Type, Group and Classification of structure: Transportation structure, Group B, Class III.
Profession: Bridge Designer.
- Preparation of the plan, management and coordination for implementation of Feasible Study (FS);
(22) Project: Phu Thuan Bridge.
Location: Ho Chi Minh city
Implementation stage: Feasible Study
LE PHUOC CHINA, 9/18
- Study of the alternatives of alignment;
- Report, explanatory to The Clien/The Owner and relevant Authorities;
- Analysis of major structures and substructures;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with survey Consultants and relevant Units
- Prepare the cost estimate.
Client: Phat Dat Real Estate Development Corporation
Add: 422 Dao Tri road, Phu Thuan ward, Dist.7, Ho Chi Minh city.
Type, Group and Classification of structure: Transportation structure, Group B, Class IV.
Profession: Bridge Designer.
- Preparation of the plan, management and coordination for implementation of Feasible Study (FS);
- Study of the alternatives of alignment;
- Report, explanatory to The Clien/The Owner and relevant Authorities;
- Analysis of major structures and substructures;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with survey Consultants and relevant Units.
(21) Project: Construction Investment of Surrounding Road of Phu Quoc Island, Bai Thom – Ham Ninh Section.
Location: Phu Quoc Island, Kien Giang province
Implementation stage: Feasible Study
Client: Department of Transportation of Kien Giang
Add: 1190 Nguyen Trung Truc road, An Binh ward, Rach Gia city, Kien Giang province.
Type, Group and Classification of structure: Transportation structure, Group B, Class III.
Profession: Bridge Designer.
- Preparation of the plan, management and coordination for implementation of Feasible Study (FS);
- Study of the alternatives of
(20) Project: An Dong Bridge, Ninh Thuan Coast Corridor Construction Investment.
Location: Ninh Thuan province.
Implementation stage: Feasible Study
LE PHUOC CHINA, 10/18
alignment and structures (Extradosed, Cable stayed and Free cantilever method (FCM));
- Report, explanatory to The Clien/The Owner and relevant Authorities;
- Analysis of major structures and substructures;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with survey Consultants and relevant Units
- Prepare the cost estimate.
Client: Department of Transportation of Ninh Thuan
Add: 142 Road 21 Thang 8, Phan Rang – Thap Cham city.
Type, Group and Classification of structure: Transportation structure, Group B, Class I.
Profession: Bridge Designer.
- Management of survey team to monitor the settlement of pier P8 in 14 days (24 hours/day) with multi-combination loading;
- Summarize, analyse, and report the result to the Nippon Koei & Chodai Experts;
- Discussion and explanatory to Nippon Koei and Chodai experts.
(19) Project: Can Tho Bridge
Location: Can Tho province.
Implementation stage: Monitoring survey of pier after completion of construction.
Client: Nippon Koei
Type, Group and Classification of structure: Transportation structure, Group A, Special Class.
Profession: Assistance Resident Engineer (ARE).
- Analysis of superstructure and substructure;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with survey Consultants and relevant Units;
- Authority supervision during construction;
- Construction solution of technical issues and coordinate with relevant
(18) Project: Vinh Hy Bridge, Ninh Thuan Coast Corridor Construction Investment.
Location: Ninh Thuan province.
Implementation stage: Detailed Design
Client: Department of Transportation of Ninh Thuan
Add: 142 Road 21 Thang 8, Phan Rang – Thap Cham city.
Type, Group and Classification of structure: Transportation structure, Group C, Class III.
Profession: Bridge Designer.
LE PHUOC CHINA, 11/18
projects.
- Analysis of retaining wall and pile slab;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Construction solution of technical issues;
- Explanatory to Appraisal Authorities and Proof Check Consultants.
(17) Project: Kenh Nuoc Man Bridge.
Location: Long An province.
Implementation stage: Detailed Design
Client: Department of Transportation of Long An
Add: 66 Hung Vuong road, ward 2, Tan An city, Long An province.
Type, Group and Classification of structure: Transportation structure, Group B, Class II.
Profession: Structural Engineer.
- Analysis of superstructure and substructure;
- Prepare/check the drawings;
- Prepare/check quantity of structures.
(16) Project: Sau Nan, package 27 (Km0+000÷Km25+000), Nam Can – Dat Mui Section, Ho Chi Minh Highway.
Location: Ca Mau province.
Implementation stage: Technical Design
Client: Ho Chi Minh Project Management Unit
Add: 106 Thai Thinh road, Dong Da Dist., Ha Noi city.
Type, Group and Classification of structure: Transportation structure, Group B, Class IV.
Profession: Bridge Engineer.
- Study of the alternatives of alignment and structures (Extradosed, Hollow slab girder, and Free cantilever method (FCM));
- Analysis of major structures and substructures;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Prepare the cost estimate.
(15) Project: Gia Rai Moi Bridge.
Location: Bac Lieu province.
Implementation stage: Feasible Study
Client: Department of Transportation of Bac Lieu
Add: 09 Nguyen Tat Thanh road, ward 1, Bac Lieu city, Bac lieu province.
Type, Group and Classification of structure: Transportation structure, Group B, Class II.
Profession: Bridge Engineer.
- Analysis of superstructure and substructure;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Authority supervision during
(14) Project: Trang Bang Bridge, Package 19, Chon Thanh – Duc Hoa Section, Ho Chi Minh Highway.
Location: Tay Ninh province.
Implementation stage: Technical Design
Client: Ho Chi Minh Project Management Unit
LE PHUOC CHINA, 12/18
construction. Add: 106 Thai Thinh road, Dong Da Dist., Ha Noi city.
Type, Group and Classification of structure: Transportation structure, Group B, Class III.
Profession: Bridge Engineer.
- Coordinate with the Engineers from Nippon Koei to design the bridge.
- Analysis of superstructure and substructure;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Report to Group Leader regularly.
(13*) Project: Ho Chi Minh – Long Thanh – Dau Giay Expressway, Capital Loan from ADB No.2374-VIE
Location: Ho Chi Minh city & Dong Nai province.
Implementation stage: Technical Design
Client: Viet Nam Expressway Corporation (VEC)
Add: Floor 4, 5, 6, MITEC Buiding, Cau Giay New City, Yen Hoa ward, Cau Giay Dist., Ha Noi city.
Type, Group and Classification of structure: Transportation structure, Group A, Special Class.
Profession: Bridge/Structural Engineer.
(*): See evaluation in Testimonial by Mr. YOKOTA eiichi (Team Leader)
- Study of the alternatives of structures;
- Prepare/check the drawings;
- Prepare/check quantity of structures.
(12) Project: Chin Ruoi Bridge, Chin Ruoi – Xeo Nhau Highway
Location: Kien Giang province.
Implementation stage: Feasible Study
Client: Department of Transportation of Kien Giang
Add: 1190 Nguyen Trung Truc road, An Binh ward, Rach Gia city, Kien Giang province.
Type, Group and Classification of structure: Transportation structure, Group B, Class II.
Profession: Bridge Engineer.
- Analysis of superstructure and substructure;
- Prepare/check the drawings;
- Prepare/check quantity of structure;
- Authority supervision during construction.
(11) Project: Road No.941, Development Infrastructure of Cuu Long Delta (WB Loan, Code WB5).
Location: An Giang province.
Implementation stage: Detailed Design & Feasible Study
Client: Department of Transportation of An Giang
Add: 01 Ly Thuong Kiet road, My Binh ward, Long Xuyen city, An Giang province.
Type, Group and Classification of structure:
LE PHUOC CHINA, 13/18
Transportation structure, Group B, Class III.
Profession: Bridge Engineer.
- Analysis of superstructure and substructure;
- Prepare/check the drawings;
- Prepare/check quantity of structure;
- Authority supervision during construction.
(10) Project: Bon Tong – Mot Ngan Highway
Location: Hau Giang province.
Implementation stage: Detailed Design
Client: Department of Transportation of Hau Giang
Add: 01 Dien Bien Phu road, ward 5, Vi Thanh city, Hau Giang province.
Type, Group and Classification of structure: Transportation structure, Group B, Class II.
- Analysis of retaining wall;
- Prepare/check the drawings;
- Prepare/check quantity of structure;
- Supervision during construction.
(09) Project: Nguyen Van Cu Bridge
Location: Ho Chi Minh city.
Implementation stage: Detailed Design
Client: Transportation Management Unit No.1
Add: 03 Ba Thang Hai road, ward 11, Dist.10, Ho Chi Minh (Floor 2, Thai Son Buiding)
Type, Group and Classification of structure: Transportation structure, Group B, Class I.
Profession: Road/Structural Engineer.
- Analysis of superstructure and substructure;
- Prepare/check the drawings;
- Prepare/check quantity of structure;
- Supervision during construction.
(08) Project: Cai Xep bridge, Cai Gia Nho bridge & Nha Man bridge, Improvement National Road No. 80, My Thuan – Vam Cong Section.
Location: Dong Thap province.
Implementation stage: Technical Design
Client: Project Management Unit No.7 (PMU7)
Add: 63 Nguyen Xi, ward 26, Binh Thanh Dist., Ho Chi Minh city.
Type, Group and Classification of structure: Transportation structure, Group B, Class II.
Profession: Bridge Engineer.
- Analysis of superstructure and substructure;
- Prepare/check the drawings;
- Prepare/check quantity of structure;
(07) Project: Long Kieng Bridge
Location: Ho Chi Minh city.
Implementation stage: Detailed Design
Client: Transportation Management Unit No.4
LE PHUOC CHINA, 14/18
- Explanatory to Appraisal Authorities and Proof Check Consultants.
Add: 272 Co Bac road, Co Giang ward, Dist.1, Ho Chi Minh
Type, Group and Classification of structure: Transportation structure, Group B, Class III.
Profession: Bridge Engineer.
- Report, explanatory to The Clien/The Owner and relevant Authorities;
- Analysis of major structures and substructures;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with survey Consultants and relevant Units
- Prepare the cost estimate.
(06) Project: Long Kieng Bridge
Location: Ho Chi Minh city.
Implementation stage: Feasible Study
Client: Transportation Management Unit No.4
Add: 272 Co Bac road, Co Giang ward, Dist.1, Ho Chi Minh
Type, Group and Classification of structure: Transportation structure, Group B, Class III.
Profession: Bridge Engineer.
- Report, explanatory to The Clien/The Owner and relevant Authorities;
- Analysis of major structures and substructures;
- Prepare/check the drawings;
- Prepare/check quantity of structures;
- Explanatory to Appraisal Authorities and Proof Check Consultants;
- Coordinate with survey Consultants and relevant Units
- Prepare the cost estimate.
(05) Project: Rach Dia Bridge
Location: Ho Chi Minh city.
Implementation stage: Feasible Study
Client: Transportation Management Unit No.4
Add: 272 Co Bac road, Co Giang ward, Dist.1, Ho Chi Minh
Type, Group and Classification of structure: Transportation structure, Group B, Class III.
Profession: Bridge Engineer.
- Authority supervision during construction;
- Report, explanatory to The Clien/The Owner and relevant Authorities.
(04) Project: Quan Lo – Phung Hiep Road, Package 8 (Do bridge, Dan Quan 2 bridge, Xeo Cai bridge and the road)
Location: Soc Trang province.
Implementation stage: Construction Supervision
LE PHUOC CHINA, 15/18
Client: Project Management Unit No.7 (PMU7)
Add: 63 Nguyen Xi, ward 26, Binh Thanh Dist., Ho Chi Minh city.
Type, Group and Classification of structure: Transportation structure, Group A, Class II.
Profession: Supervison Engineer.
- Prepare the reinforcing drawings and calculate the quantity of structures;
- Technical issues report in Authority supervision;
- Report, explanatory to The Clien/The Owner and relevant Authorities.
(03) Project: Hung Vuong bridge
Location: Phu Yen province.
Implementation stage: Detailed Design, Technical Design and Feasible Study
Client: Department of Transportation of Phu Yen
Add: 72 Le Duan road, ward 7, Tuy Hoa city, Phu Yen province.
Type, Group and Classification of structure: Transportation structure, Group B, Class I.
Profession: Bridge Engineer.
- Prepare the reinforcing drawings and calculate the quantity of structures;
- Technical issues report in Authority supervision.
(02) Project: Tan An bridge & the Viaduct (Package 28, 29, 32), Ho Chi Minh – Trung Luong Expressway
Location: Ho Chi Minh city, Long An province and Tien Giang province.
Implementation stage: Technical Design
Client: Cuu Long Corporation For Investment Development And Project Management Of Infrastructure (Cuu Long CIPM)
Add: 127B Dinh Tien Hoang road, ward 3, Binh Thanh Dist., Ho Chi Minh city.
Type, Group and Classification of structure: Transportation structure, Group A, Special Class.
Profession: Bridge Engineer.
- Prepare the reinforcing drawings and calculate the quantity of structures;
- Technical issues report in Authority supervision.
(01) Project: Thay Tieu bridge (lane NM, NF, SF), Nguyen Van Linh Highway
Location: Ho Chi Minh city
Implementation stage: Detailed Design
Client: Phu My Hung Corporation
Add: 801 Nguyen Van Linh road, Tan Phu ward, Dist. 7,
LE PHUOC CHINA, 16/18
Ho Chi Minh city.
Type, Group and Classification of structure: Transportation structure, Group C, Class IV.
Profession: Bridge Engineer.
9. Education, certicicates and training
The professional labour license as below:
Civil Engineer license code. KS-08-00756 Certified year: 2010
Supervision Engineer license code GS1-08-18783-A Certified year: 2015
Cost Estimator license code (Class 2) 08-1733 Certified year: 2012
Professional techincal training:
Appraisal Officer of safety transportation system training Year 2015;
Cost estimator training Year 2012;
Project management training Year 2012;
Construction supervision training Year 2009;
Labour safety training Year 2007.
Education:
Master of Engineering in Bridge and Tunnel, graduated in 2009 at Ho Chi Minh city University of Technology, study subject: Construction of Bridge and Tunnel; Study period: from August 2007 to Oct 2009; Form of study: Full - time;
Civil Engineer in Bridge and Road, graduated in 2005 at University of Transport and Communication, study subject: Construction of Bridge and Road; Study period: from August 2000 to May 2005; Form of study: Full – time.
Language: English (TOEIC, professional working proficiency)
Reference: as above mentioned (in Article 7)
10. Contact InformationEmail : [email protected]
Telephone : 090 359 695
Skype : lephuoc_china
I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.
Ho Chi Minh city, Nov 20th 2015
Signature of expert
LE PHUOC CHINA, 17/18
LE PHUOC CHINA
LE PHUOC CHINA, 18/18