2014/07/02 fermi col - dte electric chapter 1 acrs ...hearing identifier: fermi_col_public email...
TRANSCRIPT
![Page 1: 2014/07/02 Fermi COL - DTE Electric Chapter 1 ACRS ...Hearing Identifier: Fermi_COL_Public Email Number: 1421 Mail Envelope Properties (OF0214916D.7DDEF0AB-ON85257D09.004C28A8-85257D09.004C3A28)](https://reader033.vdocuments.mx/reader033/viewer/2022060519/604daa6fa125bf2000576a13/html5/thumbnails/1.jpg)
1
PMFermiCOLPEm Resource
From: Nicholas A Latzy [[email protected]]Sent: Wednesday, July 02, 2014 9:53 AMTo: Brown, ChristopherCc: Govan, Tekia; Muniz, AdrianSubject: DTE Electric Chapter 1 ACRS PresentationAttachments: Chapter 1_Final.pptx
Christopher, Attached to the email is the DTE Electric Chapter 1 ACRS Presentation. Thank you. Nicholas A. Latzy Principal Engineer - Nuclear Engineering Major Enterprise Projects DTE Energy (313)235-9226 (See attached file: Chapter 1_Final.pptx)
![Page 2: 2014/07/02 Fermi COL - DTE Electric Chapter 1 ACRS ...Hearing Identifier: Fermi_COL_Public Email Number: 1421 Mail Envelope Properties (OF0214916D.7DDEF0AB-ON85257D09.004C28A8-85257D09.004C3A28)](https://reader033.vdocuments.mx/reader033/viewer/2022060519/604daa6fa125bf2000576a13/html5/thumbnails/2.jpg)
Hearing Identifier: Fermi_COL_Public Email Number: 1421 Mail Envelope Properties (OF0214916D.7DDEF0AB-ON85257D09.004C28A8-85257D09.004C3A28) Subject: DTE Electric Chapter 1 ACRS Presentation Sent Date: 7/2/2014 9:52:35 AM Received Date: 7/2/2014 10:23:26 AM From: Nicholas A Latzy Created By: [email protected] Recipients: "Govan, Tekia" <[email protected]> Tracking Status: None "Muniz, Adrian" <[email protected]> Tracking Status: None "Brown, Christopher" <[email protected]> Tracking Status: None Post Office: dteenergy.com Files Size Date & Time MESSAGE 263 7/2/2014 10:23:26 AM Chapter 1_Final.pptx 7430363 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
![Page 3: 2014/07/02 Fermi COL - DTE Electric Chapter 1 ACRS ...Hearing Identifier: Fermi_COL_Public Email Number: 1421 Mail Envelope Properties (OF0214916D.7DDEF0AB-ON85257D09.004C28A8-85257D09.004C3A28)](https://reader033.vdocuments.mx/reader033/viewer/2022060519/604daa6fa125bf2000576a13/html5/thumbnails/3.jpg)
Fermi 3 COLAPresentation to ACRS SubcommitteePresentation to ACRS SubcommitteeChapter 1
![Page 4: 2014/07/02 Fermi COL - DTE Electric Chapter 1 ACRS ...Hearing Identifier: Fermi_COL_Public Email Number: 1421 Mail Envelope Properties (OF0214916D.7DDEF0AB-ON85257D09.004C28A8-85257D09.004C3A28)](https://reader033.vdocuments.mx/reader033/viewer/2022060519/604daa6fa125bf2000576a13/html5/thumbnails/4.jpg)
Fermi 3 Site
![Page 5: 2014/07/02 Fermi COL - DTE Electric Chapter 1 ACRS ...Hearing Identifier: Fermi_COL_Public Email Number: 1421 Mail Envelope Properties (OF0214916D.7DDEF0AB-ON85257D09.004C28A8-85257D09.004C3A28)](https://reader033.vdocuments.mx/reader033/viewer/2022060519/604daa6fa125bf2000576a13/html5/thumbnails/5.jpg)
Chapter 1, Introduction and General Description of Plant
• ESBWR DCD Revision 10 Incorporated by reference
• Standard Material incorporated (including supplements and one departure)
• Additional site-specific material contained in Sections:
• 1 2 – General Plant Description• 1.2 – General Plant Description• Radwaste Building Reconfiguration Departure
• 1.4 – Identification of Agents and Contractors• Changed Company name to DTE Electric Company• Changed Company name to DTE Electric Company
• 1.5 – Post-Fukushima Near-Term Task Force Recommendations• Recommendations 4.2(Mitigating Strategies) and 7.1(SFP Instruments)
• 1.8 – Interfaces with Standard Design• Radwaste Building Reconfiguration Departure
• 1.12 – Impacts of Construction Activities on Fermi 2p• Management and Administrative Controls (ISG-22)