20130805 Crab Cavities FPC & Power Amplifiers status. Amplifiers. We have 6 x 352 MHz amplifiers 1 x 400 MHz amplifier We have started test with a first 352 MHz Due to Long Shutdown 1 no water -> on hold We will restart in September - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 20130805 Crab Cavities FPC & Power Amplifiers status

20130805Crab Cavities FPC &Power Amplifiers status

Page 2: 20130805 Crab Cavities FPC & Power Amplifiers status

2

Amplifiers We have

6 x 352 MHz amplifiers1 x 400 MHz amplifier

We have started test with a first 352 MHz

Due to Long Shutdown 1no water -> on hold

We will restart in September

We should qualify our first400 MHz amplifierbefore end 2013

We will launch modification of3 additional 400 MHz amplifiers(4 in total) beginning 2014

Eric Montesinos, CERN-BE-RF

SPS 352 MHz amplifier 1994-2000

Page 3: 20130805 Crab Cavities FPC & Power Amplifiers status

3

Amplifiers

Eric Montesinos, CERN-BE-RF

LLRF

Driver Final

Cryomodu

le

FPC

Transmission lines

Page 4: 20130805 Crab Cavities FPC & Power Amplifiers status

4

AmplifiersRegarding full

reflection operation we need a circulator

We are in contact with suppliers, should not be a problem except some additional integration difficulties

Eric Montesinos, CERN-BE-RF

LLRF

Driver Final

Cryomodu

le

FPC

Transmission lines (WG or Coax)

Circulator

Page 5: 20130805 Crab Cavities FPC & Power Amplifiers status

5

FPC vacuum side Will be the same window

for all 3 couplers Titanium flange AL2O3 - 99.6% disk ceramic 3D forged OFE Copper

antenna 3D forged OFE Copper Body

with Stainless Steel flanges 2 vacuum gauge ports

OD= 62 mm

ID = 27 mm

Eric Montesinos, CERN-BE-RF

Windows raw material under procurement Expected by end 2013

Page 6: 20130805 Crab Cavities FPC & Power Amplifiers status

6

FPC water cooled Regarding Power levels,

50 kW CW full reflection,i.e. 200 kW CW locallyinner antenna water cooled Helicoflex 8”

▪ OD/ID = 195/88.5 mm▪ 400 MHz – 137 kW

Helicoflex 9”▪ OD/ID = 216.7/99.4 mm▪ 400 MHz – 287 kW

Crab FPC antenna OD = 27 mm

Water tube Antenna OD/ID = 27/21 mm Water tube OD/ID=17/13 mm

CERN rule for couplers No soldering, welding,… between

water and vacuum We will have an exception on the

ceramic side

Eric Montesinos, CERN-BE-RF

EBWWater/vacuum

End-shape EBWCopper/copper

End-shape

Page 7: 20130805 Crab Cavities FPC & Power Amplifiers status

7

End-shape antenna

Eric Montesinos, CERN-BE-RF

4 rods14.5 mm rounding on the tip

Quarter Wave

Double Ridge

Page 8: 20130805 Crab Cavities FPC & Power Amplifiers status

8

Double Walled TubeNot included in the

FPC

Part of the cryomodule

Length still to be defined (regarding cryomodule design)

Cavity flanges tbc by cryomodule team

RF OD 62 mmEric Montesinos, CERN-BE-RF

62 mm

114 mmtbd

tbd

tbd

Page 9: 20130805 Crab Cavities FPC & Power Amplifiers status

9

Test box & WGTest box design

completed for 4 rods To be completed for

Double ridge and forQuarter Wave

Coaxial to Waveguide transition design completed

Antenna length awaiting DT design ?

Eric Montesinos, CERN-BE-RF

Page 10: 20130805 Crab Cavities FPC & Power Amplifiers status

10

IntegrationStill a lot to do, but we

are confident that whatever the space available, we will be able to match with it

Key parameter is the distance between beam axis and the water inlet on the top of the waveguide Cryomodule design must

take it into accountEric Montesinos, CERN-BE-RF

2308

max

imum

1200

DT 1108

Page 11: 20130805 Crab Cavities FPC & Power Amplifiers status

11

Schedule (December 2012)

Eric Montesinos, CERN-BE-RF

Cavities to be installed in SPS in December 2015 Cryostat fully tested Q3-2015 Cryostat fully dressed Q2-015 Couplers available for cryostat Q1-2015 Couplers RF processed 50 kW SW cw all phases Q4-2014 Couplers assembled in clean room Q2-2014 onto test box Special processes FPC + Test Box (Cleaning, Brazing, EB welding,

Gold plating, Ti coating) completed Q1-2014 All couplers + Test Box parts machined Q4-2013 All raw material delivered Q2-2013 All raw material ordered Q1-2013 (common) Coupler design completed February 2013 (+ Test Box !)

2013 2014 2015 2016

February

Page 12: 20130805 Crab Cavities FPC & Power Amplifiers status

12

Schedule August 2013

Eric Montesinos, CERN-BE-RF

Cavities to be installed in SPS in December 2015 Cryostat fully tested Q3-2015 ? Cryostat fully dressed Q2-2015 ? Couplers available for cryostat Q1-2015 Q3-2015 Couplers RF processed 50 kW SW cw all phases Q4-2014 Q2-2015 Couplers assembled in clean room Q2-2014 onto test box Q4-2014 Special processes FPC + Test Box (Cleaning, Brazing, EB welding,

Gold plating, Ti coating) completed Q1-2014 Q3-2014 All couplers + Test Box parts machined Q4-2013 Q2-2014 All raw material delivered Q2-2013 Q4-2013 All raw material ordered Q1-2013 Q2-2013 Coupler design completed February October 2013 (+ Test Box !)

2013 2014 2015 2016

February October

Page 13: 20130805 Crab Cavities FPC & Power Amplifiers status

13

Schedule August 2013

Eric Montesinos, CERN-BE-RF

Cavities to be installed in SPS in December 2015 Cryostat fully tested Q3-2015 ? Cryostat fully dressed Q2-2015 ? Couplers available for cryostat Q1-2015 Q3-2015 Couplers RF processed 50 kW SW cw all phases Q4-2014 Q2-2015 Couplers assembled in clean room Q2-2014 onto test box Q4-2014 Special processes FPC + Test Box (Cleaning, Brazing, EB welding,

Gold plating, Ti coating) completed Q1-2014 Q3-2014 All couplers + Test Box parts machined Q4-2013 Q2-2014 All raw material delivered Q2-2013 Q4-2013 All raw material ordered Q1-2013 Q2-2013 Coupler design completed February October 2013 (+ Test Box !)

2013 2014 2015 2016

February October

Urgent to decide the DT design

Page 14: 20130805 Crab Cavities FPC & Power Amplifiers status

14

Schedule FPC key dates3D drawings for approval :

February October 2013

2D drawings (EDMS): March November 2013

Prototypes ready for tests: March December 2014

Couplers ready for cavity assembly : December 2014 June 2015

Eric Montesinos, CERN-BE-RF

Page 15: 20130805 Crab Cavities FPC & Power Amplifiers status

15

Conclusion

Next steps : DT definition Launch couplers & test boxes

construction

Amplifier tests

Deal with integration issues