2012_reconditioning_catalog_final

12
2012 Reconditioning Catalog 1.877.4.HAR-TRU Topics Inside: º Scarification – Why It’s Critical º Introducing the Har-Tru Gator Spreader º Don’t Forget About the Nets & Posts º TNT Gauge

Upload: trevor-blanning

Post on 07-Mar-2016

215 views

Category:

Documents


1 download

DESCRIPTION

http://hartru.com/uploads/downloads/2012_Reconditioning_Catalog_FINAL.pdf

TRANSCRIPT

Page 1: 2012_Reconditioning_Catalog_FINAL

2012 Reconditioning Catalog

1.877.4.HAR-TRU

Topics Inside:

º Scarification – Why It’s Critical

º Introducing the Har-Tru Gator Spreader

º Don’t Forget About the Nets & Posts

º TNT Gauge

Page 2: 2012_Reconditioning_Catalog_FINAL

TABLE OF CONTENTS

Topics

• Scarification – Why It’s Crucial ............................................................................................

• Introducing the Har-Tru Gator Spreader .........................................................................

• Don’t Forget About the Nets & Posts ...............................................................................

• TNT Gauge ................................................................................................................................

Products

• Lute/Sacrifiers ...............................................................................................................

• Gator Rake ....................................................................................................................

• Tow Scarifier ..................................................................................................................

• Nets & Posts ..................................................................................................................

• TNT Gauge ....................................................................................................................

• QuickStart Lines ...........................................................................................................

Welcome to our reconditioning

newsletter and catalog. The objective of this issue is to share the latest information on methods for reconditioning courts and products that can make the process easier and more effective.

Page 3: 2012_Reconditioning_Catalog_FINAL

SCARIFICATION – WHY IT’S CRITICAL

Scarification is critical during reconditioning and at other times of the year. If you remember to do one thing this top dressing season,

remember to scarify your court before you add new material. This is a simple exercise that takes less than 10 minutes but can save you hours of hassle and frustration. A compacted, seasoned court has a very smooth surface and it’s difficult to get new Har-Tru to stick to it without proper preparation. Scarification is akin to sanding prior to painting. It loosens and breaks up the existing surface layer and this allows the new and old surface material to blend together. Remember as well that the Har-Tru directly out of the bag will be a different gradation than the Har-Tru on your court and it’s desirable to mix and homogenize the surface layer for best performance.Scarification is particularly critical before patching a court. During the reconditioning process it is

important to patch the high play areas such as baselines and service boxes so they don’t hold water or create irregular bounces. A typical patch may be ¼” thick and require 5-8 bags of Har-Tru to get the surface back to level. If you fail to scarify thoroughly prior to applying a patch the likelihood of the patch failing and coming apart from the surface during rolling or match play is very high. Just scratch or break up the court surface with any of our scarification tools discussed in this issue and the consistency and speed with which your patches will take to the court surface will be greatly improved.

Scarification is not only beneficial during reconditioning. It is extremely beneficial for a number

1w w w . h a r t r u . c o m • 1 . 8 7 7 . 4 . H A R - T R U ( 1 . 8 7 7 . 4 4 2 . 7 8 7 8 )

Page 4: 2012_Reconditioning_Catalog_FINAL

2w w w . h a r t r u . c o m • 1 . 8 7 7 . 4 . H A R - T R U ( 1 . 8 7 7 . 4 4 2 . 7 8 7 8 )

of other reasons and should be a part of your periodic maintenance program, performed once every 1-2 weeks.

Here are a few reasons why:

Har-Tru Courts Need to Breathe – Scarification keeps the court surface porous. This makes it receptive to water and allows water to evaporate freely from the surface when the court is used and when environmental conditions are right. This “breathing” – exchange of air and water - stabilizes the surface and insures consistent traction. Many courts remain porous with little assistance but some receive so much play that they get very hard and impervious. Sun baked courts in the south and west, indoor courts and sub-surface irrigated courts are particularly susceptible to having the surface layer get crusted over and locked up. Adding daily or weekly scarification prevents adverse conditions from taking hold and helps alleviate them if they do.

Sacarification Improves Traction – Scarification will generate sliding material. While not all courts need this it is generally a good thing for subsurface irrigated courts, indoor courts and crusty compacted courts. The optimal situation is to have enough surface material to

form a loose, granular, cushion between the compacted surface and the player’s feet. This allows for light drying of the loose surface material while the layer below maintains its moisture and stability. When a court seems bald or crusty scarify it immediately and as much as necessary to regenerate the sliding material. Many choose to add material instead. This is an acceptable solution but scarification may be less costly and less time consuming, and while it might look like that sliding material has gone away, it really has just been ground in and needs to be brought back up from the compacted layer.

Scarification Prevents Growth – Har-Tru can be a fertile environment for moss, weeds and algae. What prevents these from growing is regular agitation of the court surface. This occurs every time the court is used and/or swept. The low play areas along the fence and net lines are most susceptible as they get the least use but it is not uncommon for growth that started in these low play areas to creep out onto the playing area. This can make the surface unpredictably and dangerously slippery. It’s hard to eliminate growth once it has taken hold so at the first hint of a problem scarify daily or weekly as needed to eliminate it.

Tool Best Use Depth of Penetration Suggested Frequency

Lute Scarifier Patching/Localized hard spots/Growth on court edges

Shallow Hand tool – use as often as necessary

24” Hand Rake Growth on court edges/Localized hard spots

Medium – Deep Hand tool – use as often as necessary

72” Hand Rake Keep court porous Shallow – Medium Hand tool – use daily

Hand/Tow Model Gator Rake Top dressing/patching/Keep courts porous/Prevent growth

Medium Hand or tow tool – use daily

Court Devil Jr Growth on court edges/Localized hard spots/Patching

Medium – Deep Hand tool – use weekly or monthly

Court Devil Top dressing/Patching/Keep courts porous/Eliminate and prevent growth

Medium – Deep Tow tool – use weekly or monthly

Tow Scarifier Keep courts porous/Eliminate and prevent growth/Heavy top dressing

Deep Tow tool – Cannot be pulled over tapes – Use monthly or once or twice a year

Scarification Tools

Shallow = 1/32” Medium = 1/16” - ¼” Deep = ¼” – ½”

Page 5: 2012_Reconditioning_Catalog_FINAL

3w w w . h a r t r u . c o m • 1 . 8 7 7 . 4 . H A R - T R U ( 1 . 8 7 7 . 4 4 2 . 7 8 7 8 )

LUTE/SCARIFIERSCR04 - 30” SCR05 - 48”

The lute/scarifier is two tools in one – made of all-aluminum for scarifying, leveling and removing loose granules. It is strong and sturdy, yet light enough to use all day and excellent for spreading new material during top-dressing. The concave shape of the 30”-wide blade allows the tool to “float” along the surface, without grabbing or digging in. Also available in 48” width.

HAND GATOR RAKESCR1324 – 24”

The 24” wide hand rake is designed for agitating the court surface along the fence line to remove and prevent moss and other growth. It is also very effective when used on small hard-pan areas. It is very aggressive and chews up the court surface with very little effort.

TOW MODEL GATOR RAKESCR12TO

Weight Towers - SCR12WA. Weights not included.

The Har-Tru Gator Rake is one of the finest grooming and leveling tools we have ever offered. The product is all aluminum and stainless steel. The tine system is composed of stainless steel rods less than 1/8th inch in diameter that puts just the right bite into your court surface, leaving a finely groomed, highly manicured appearance. The Har-Tru Gator Rake can be towed behind a cart or pulled by hand depending on your needs. Weight can be added to the top of the rake on special weight towers (must be purchased separately) to increase the aggressiveness of the tool and help it dig into hard packed courts, regenerating loose sliding material.

Page 6: 2012_Reconditioning_Catalog_FINAL

w w w . h a r t r u . c o m • 1 . 8 7 7 . 4 . H A R - T R U ( 1 . 8 7 7 . 4 4 2 . 7 8 7 8 )

4

COURT DEVIL JR.SCR02

This smaller hand-model Court Devil is designed for maintaining areas along court perimeters and beneath the net line. It is also great for loosening localized hard spots. Weight 85 lbs., width 16”.

TOW SCARIFIERSCR03SCR03NAI - Replacement nails

This 48”-wide heavy-duty tow model scarifier is truly a workhorse for loosening the top surface on Har-Tru courts. It is especially good for indoor courts and sun-baked southern courts with excess calcium build up. The unit is heavy enough to allow its two rows of case-hardened nails to really penetrate the surface. •Staggerednailsoneachrowpreventclumps. •Sizedtofitbetweenthealleytape. •Leveredwheelsliftunitovertapessotapescan be left in place. •Adjustabletowhitchfitsmostutilityvehicles. •Adjustablesteelrailslowernailsastheyweardown. •Removable steel plate allows for easy nail replacement. •40Dnails–3/16”diameterby5”long

COURT DEVILSCR01

Designed to agitate the court surface without removing or damaging existing line tapes. It helps prevent and break up mineral deposits, mold, algae and fungus that may tighten the court surface. The court is scarified with circular steel blades mounted on free-turning axles. Weight 105 lbs., width 48”.

Page 7: 2012_Reconditioning_Catalog_FINAL

INTRODUCING THE HAR-TRU GATOR SPREADER

Many of our customers have fallen in love with the TruFlo spreaders we carry - understandably. These spreaders do an exceptional job of laying out Har-Tru in a smooth, even blanket even under damp sur-face conditions. So why introduce a new spreader? The Har-Tru Gator Spreader is a contractor-grade

product specifically designed to handle the rigors of heavy top dressing. Additionally, unlike the TruFlo line, the Gator Spreader is an adjustable rate spreader that al-lows you to fine tune the flow of material according to your needs. The solid, 14 gauge, galvaneal body holds up to 6 bags. The wheels and bear-ings are designed to support 1200 LBS of weight. The unit is 59” wide and comes as a tow or hand model. Minimal assembly required.

w w w . h a r t r u . c o m • 1 . 8 7 7 . 4 . H A R - T R U ( 1 . 8 7 7 . 4 4 2 . 7 8 7 8 )

5

Page 8: 2012_Reconditioning_Catalog_FINAL

How nice it is to gaze upon a Har-Tru court that has just been reconditioned. You may have worked all day and as the sun gets low the deep, textured, green color emerges, bringing out the pristine, new, white tapes. It’s remarkable that after this fine work so many facilities will put up dirty, 5 year old, nets on rusty,

scratched-up posts. The reality is that a player stepping out on the court is far more likely to notice the net and posts than the court surface. You can do something about that.

1. Once reconditioning is complete pull out your posts, thoroughly sand them down and repaint them us-ing an outdoor spray paint. Eventually net posts should be replaced for both safety and aesthetic reasons. There is no hard, fast rule about how long they can last but watch out for rusting and flaking around the bases of the posts where they come into contact with the court surface.

When its time for replacement you may want to consider aluminum. Aluminum is a bit more expensive but will maintain its appearance and structural integrity longer than steel. If your posts are not in sleeves but were installed directly into a permanent foundation it is possible to retrofit new posts over the top of them, rather than having to dig up your old posts. This involves cutting the existing posts

w w w . h a r t r u . c o m • 1 . 8 7 7 . 4 . H A R - T R U ( 1 . 8 7 7 . 4 4 2 . 7 8 7 8 )

6

DON’T FORGET ABOUT THE NETS & POSTS!

Page 9: 2012_Reconditioning_Catalog_FINAL

w w w . h a r t r u . c o m • 1 . 8 7 7 . 4 . H A R - T R U ( 1 . 8 7 7 . 4 4 2 . 7 8 7 8 )

7

off 18” above the ground and then installing new posts directly over the top. Your existing posts must be 2 7/8” outside diameter posts for this to work.

2. Nets generally hold up 3-5 years, depending on the type of net you purchase but the head bands will typically get covered with mold and mildew within one year. Instituting a regime to clean the headband with mild dish soap and a soft scrub brush or wash cloth will help preserve the net’s appearance for much longer. Note that the use of bleach, heavy detergent soap or coarse brushes may cause the headband to prematurely crumble. If you use a net with a canvas headband there is not any good way to clean it once mildew sets in.

POSTS

We represent what we believe to be the best net manufacturers in the world. Before our private label goes on, each model is thoroughly tested.

The Best NetsNETS

NET STOCK # WARRANTY STYLE NET BODY HEADBAND SIDEBAND GROMMETS DOWELS DESCRIPTION

ULTIMATE NETULT 5 Year Taper Machine Woven Double Layer 3.0 Matte Stainless Steel 16 MM The full double net Double All Rows Finish for ultimate durability

GRAND SLAM NETGSL 5 Year Taper Hand Woven Double Layer 3.0 Matte Stainless Steel 16 MM Fitted net with hand made Double Top Finish knots and great durability

CHALLENGER NETCLG 4 Year Regular Machine Woven Double Layer 2.5 Matte Stainless Steel 12 MM Good durability Double Top Finish

PRO TOUR NETPRO 4 Year Taper Machine Woven Double Layer 2.5 Matte Stainless Steel 12 MM Fitted net with Double Top Finish good durability

FUTURE NETFUT 3 Year Regular Single Single Layer 2.5 Matte Solid Brass 12 MM Best value Finish

ULTIMATE GRAND SLAM CHALLENGER & FUTURE PRO TOUR

The Har-Tru Net Post LineProduct Number Description Material Shape Wind Mechanism Color Options Cap Options

PST10 Har-Tru Deluxe Internal Wind Post Aluminum Tear Drop Internal Black/Green SilverPST10R Har-Tru Deluxe Internal Wind Retrofit Post Aluminum Tear Drop Internal Black/Green SilverPST20 Har-Tru Advantage External Wind Post Aluminum Round Internal Black/Green SilverPST30 Har-Tru Advantage Internal Wind Post Aluminum Round External Black/Green SilverPSTSTE Har-Tru Classic Steel Post Steel Round External Black/Green N/A

The Har-Tru Net Post Line

Page 10: 2012_Reconditioning_Catalog_FINAL

While you are sprucing up your nets and posts you may want to consider adding a TNT, net

tensioning gauge to some or all of your courts. New this year, this innovative product provides a simple and reliable solution to consistent net tension. A shot that hits the net cord is challenging enough. Competitive players want the experience to be the same from court to court and the TNT gauge allows for greater predictability by synchronizing net tension across a multiple courts.

Perhaps more importantly, the TNT gauge promotes safety. If someone bounces or falls

on the net, the cord and the posts can be dangerously stressed. With the TNT gauge installed the spring yields first reducing risk and protecting players. This product has been used and tested at the professional and collegiate levels. Order them for your facility today.

w w w . h a r t r u . c o m • 1 . 8 7 7 . 4 . H A R - T R U ( 1 . 8 7 7 . 4 4 2 . 7 8 7 8 )

TNT GAUGE

8

Page 11: 2012_Reconditioning_Catalog_FINAL

10 & UNDER TENNIS LINESHar-Tru has developed the first set of temporary and permanent lines specifically for Har-Tru courts. The temporary lines can be installed by one person in 5-7 minutes. The permanent lines are colored dark green to blend into the Har-Tru surface.

36’ Temporary Lines – TAPQS36 Our 36’ temporary lines come in red, to match the red ball used on 36’courts and to show up sharply against the Har-Tru green. The system comes in two pieces, an outside rectangle and an inside I. The pieces are attached together with Velcro and secured to the court surfaces with just 10 nails. Nails are included with the lines. Lines are 1” wide.

60’ Temporary Lines – TAPQS60These lines are identical to the 36’ lines except they are colored orange to match the orange ball used in 60’ tennis. 10 nails (included) secure these to the court. There are no Velcro connections with the 60’ lines. All intersections are stitched together. Lines are 1 1/2” wide.

36’ & 60’ Permanent Lines – TAPQSGP60 The 60’ lines are made from our Herringbone tape but are colored green. These are designed for courts that are regularly used for both full size and 60’ play. The green color helps the 60’ layout blend into the court when the regulation size court is in use. These lines are nailed into the court surface similar to standard court lines. Each box comes with 180’ of tape, enough for one 60’ court or one 36’ court.

PAT

ENT

PEN

DIN

G

Har-Tru Maintenance Certification Seminars The Har-Tru Maintenance Certification Seminars focus on indoor, outdoor and bubbled Har-Tru

courts. Seminar attendees get 2 days of intense classroom and “hands-on” learning around clay court construction, the latest tools and the best maintenance practices.

August 20-23, 2012 ......................................................................John McEnroe Tennis Academy, Randall’s Island, NY

September 13-16, 2012 ................................................................... Pelican Landing Tennis Center, Bonita Springs, FL

September 22-26, 2012 .......................................................................International Tennis Hall of Fame, Newport, RI

October 15-17, 2012 ............................................................................................... Farmington CC, Charlottesville, VA

October 21-25, 2012 .................................................................................................Racquet Club of Irvine, Irvine, CA

Introducing

USPTA Teaching professionals receive 6 continuing education credits for attending any of these seminars.

Page 12: 2012_Reconditioning_Catalog_FINAL

HAR-TRU Sports

2200 Old Ivy Road, Suite 100Charlottesville, VA 22903

When you want complete confidence for installing,

improving, upgrading and maintaining your tennis courts,

turn to Har-Tru® Consulting.

Har-Tru looks well beyond the court surface to design an all-inclusive plan for creating the most compelling tennis experience possible, drawing on our 100 combined years of clay court expertise. Clients use these services:

> For construction and maintenance guidance prior to facility renovations or new construction

> To identify capital improvement needs for long-term planning and budgeting

> To investigate the possibility of converting hard courts to clay courts

In addition, we can provide tailored maintenance programs and on-site training for your staff, adapted for your particular facility’s needs.

Har-Tru Consulting offers the following options:

HaR-TRu MainTEnancE TRaining and cERTificaTionA two-day certification seminar that will train your staff in every single aspect of effective and efficient court upkeep and construction, from irrigation to fencing to weed control and regular reconditioning. Certificates will be awarded to participants.

iRRigaTion SySTEM dESign and MainTEnancEA survey that identifies your current water system, how it operates, and how enhancements can be made—including recommendations on how to improve operating pressure, gallons-per-minute, general system components, and effective coverage.

ownER’S REpRESEnTaTivE conSulTingOur consulting service can be invaluable during the critical stages of construction, rebuilding and reconditioning. We can help you convert your old hard courts to Har-Tru, ClayTech® or HydroCourt surfaces. In addition, we can assist in developing a long-term plan for success, from court selection to installation and beyond.

onE-day faciliTy viSiTDuring our one-day facility visit, we’ll inspect your courts and consult with you to identify opportunities around spring reconditioning, court opening, daily and periodic maintenance, annual budgeting and control of operating expenses.

couRT analySiS SuRvEyHar-Tru consultants will check your courts for proper slope, survey court thickness and base material, and examine your equipment, amenities and irrigation system.

ligHTing analySiS SuRvEyWe offer a full lighting analysis service, including system design, installation and maintenance. We analyze your existing lighting system, generating a photometric map that illustrates how improvements can be made—from changing bulbs to installing the latest energy-efficient light fixtures.

The information gathered for the Court Analysis Survey (CAS) and Lighting Analysis Survey (LAS) is put into a bound, full-color, easy-to-read report—complete with photos, charts and computer-generated drawings specific to the facility being analyzed. Har-Tru personnel can also present the CAS and LAS information to a club’s board of directors, resort management, tennis committee, members or other groups of interest.

> 3-dimensional perspective cuRREnT STaTE

heavy wash-out area >

> 3-dimensional perspective dESiREd STaTE