Sevor Solar PV Farm Project Proposal 16/10/2012

TRANSCRIPT

Page 1: 20121016 sev1 aee_parish-presentation_mio-awi-pptx

© aee renewables plc / september 2012 / p.1

Sevor solar PV farm Project proposal

status : 16.10.2012

Page 2: 20121016 sev1 aee_parish-presentation_mio-awi-pptx

© aee renewables plc / september 2012 / p.2

project details key facts – project status, performance

LOCATION: South Marston, Swindon, Wiltshire

Location / status data

STATUS: Pre-application

ROLE OF AEE: Project developer, project manager, co-investor

IRRADIATION I YIELD (p.a.): circa 1106 kWh/qm I 850 kWh/kWp

PARTNER: EPC (construction) and investment partners to be determined

Performance data

AREA: 23.8ha (red line)

COMPONENTS: Modules: JA Solar JAP6-72-290 37,440 x 290Wp polycrystalline units 1,956 x 991 x 45 mm (h x w x d) 520 string inverters (Siemens SINVERT PVM 20) Table pitch: 20 degrees Clear row distance: 4.7m Galvanised steel foundations

POWER GENERATION (plan): approx. 9.23m kWh/a ; CO2 reduction: ca. 10,000 t/a; supply: around 2250 standard UK households (OFGEM)

INSTALLED CAPACITY: 10.86MWp

Page 3: 20121016 sev1 aee_parish-presentation_mio-awi-pptx

© aee renewables plc / september 2012 / p.3

technical information I modules layout plan (original planning)

Page 4: 20121016 sev1 aee_parish-presentation_mio-awi-pptx

© aee renewables plc / september 2012 / p.4

technical information II aerial perspectives (original planning)

Page 5: 20121016 sev1 aee_parish-presentation_mio-awi-pptx

© aee renewables plc / september 2012 / p.5

extended project insights supply concept alternatives (grid connected)

o  Directly connected to the existing grid."

o  Up to 9.23m kWh of green electricity produced close to your parish will be fed into the national grid on an annual basis.. "

> "South Marston‘s contribution to the national renewable energy targets.!

Page 6: 20121016 sev1 aee_parish-presentation_mio-awi-pptx

© aee renewables plc / september 2012 / p.6

extended project insights supply concept alternatives (honda connected)

o  Supplying largest Industry in South Marston with clean energy."

o  Besides 4.2m kWh green electricity p.a. already supplied with, annual production of approx. 9.2m kWh and 10,000 t CO2 reduction"

> "UK‘s largest project to supply local industry with green electricity.!

Page 7: 20121016 sev1 aee_parish-presentation_mio-awi-pptx

© aee renewables plc / september 2012 / p.7

extended project insights South Marston Farm in operation

o  The South Marston farm site from the air"

o  Supplying largest Industry in South Marston with clean energy."

o  Besides 4.2m kWh green electricity p.a. already supplied with, annual production of approx. 7m kWh and 10,000 t CO2 reduction"

> "UK‘s largest project to supply local industry with green electricity.!

Page 8: 20121016 sev1 aee_parish-presentation_mio-awi-pptx

© aee renewables plc / september 2012 / p.8

extended project insights South Marston Farm in operation

o  Lessons learned!

o  DECC changes to tariffs changed everything last year, post-planning approval"

o  Intense time pressure coupled with excessive demands from county archaeologist forced design changes to foundations (these won’t be as visible after grass cover established by spring)"

o  Time pressure also forced change to connection point – building and connecting a new substation to local grid could not have happened before tariff cut deadline. Honda provided that option with existing facility."

o  Some residents understandably disappointed to lose opportunity to buy locally-produced green energy"

o  New ROC funding scheme allows bigger projects with certainty beyond March 2013."

o  Construction partner was chosen too quickly, too sloppy, too dismissive of residents’ needs and will not be used again"

o  Delays in clearing snagging list, partly due to inhospitable weather conditions, meant spring planting season was missed for 2012. It will be in full bloom in summer 2013."

Page 9: 20121016 sev1 aee_parish-presentation_mio-awi-pptx

© aee renewables plc / september 2012 / p.9

extended project insights development scenarios (amended module planning)

Part of the 5.7ha field nearest the village could be locked in as part of the development and reserved as greenspace for the community to use ....!

...bike trails"

...open parkland"

...wildflower reserve"

renewables plc / september 2012 / september 2012 / september p.9

Page 10: 20121016 sev1 aee_parish-presentation_mio-awi-pptx

© aee renewables plc / september 2012 / p.10

extended project insights development scenarios (amended module planning)

o  Lowering the direct visual impact from the village"

o  Creating a benefit for children and adults"

o  Building small sections of solar allotments available for priority purchase by local residents, and connected to lower voltage line along Nightingale Lane "

o  Fostering flora and fauna"

> "Dedicated greenspace for the local community to fend off the inevitable urban expansion of Swindon into adjoining villages as per Eastern Development plans!

Converting part of the southernmost field for community use

Page 11: 20121016 sev1 aee_parish-presentation_mio-awi-pptx

© aee renewables plc / september 2012 / p.11

benefits for the community

Ecological & environmental benefits Social & educational benefits

o  Ecological impact – diversification of fauna and flora as the site thrives without fertiliser for the life of the project "

o  Increase flood prevention"

o  Active reduction of carbon footprint"

o  PV system as quiet and visually unobtrusive energy plant"

o  Sheep grazing continues use of the land as an agricultural plot"

o  Cooperation with local schools to educate and inspire the younger generation about the benefits of renewable energy and why it is important to our future"

o  Site visits - to learn about solar parks as a valuable, functioning member of the world’s energy portfolio"

o  Presentations with facts and figures to incorporate into a variety of subjects – mathematics, biology, physics, geography, economics "

o  Job skills training – helping local job seekers acquire the skills to become part of a rapidly growing industry"

o  Donation to the parish council in the form of solar panels for the village hall, a direct link to renewable energy, or as an annual donation to spend on community issues."

“Good to be part of the renewable energy development in UK. And I can still use my land for sheep grazing. I decided to work with aee renewables ‘cause they were the most genuine people I got to know within this sector so far.“

Chris C. , landowner & farmer, Beechgrove Farm, Axminster

Page 12: 20121016 sev1 aee_parish-presentation_mio-awi-pptx

© aee renewables plc / september 2012 / p.12

benefits for the community

Affiliate Partnership.

� � � � � � � � �� � � � � � � � � �

Switching to Good Energy, the UK’s only supplier of 100% renewable energy, for

households or businesses near AEE solar farm projects means…�

...make your contribution to avoid CO2 emissions (approx. 2 tons per year for a typical

household) and slow down climate change.

…use local green electricity even without your own solar panels, you know where it comes from.

…do something good and pay less by benefitting from an immediate £50 credit per

residential household or enterprise and, if the local AEE project gets planning consent and is built, an

additional credit of £50 in each of the following three years.

renewables plc.

Page 13: 20121016 sev1 aee_parish-presentation_mio-awi-pptx

© aee renewables plc / september 2012 / p.13

other key developments- Eastern Development Area

o  The Eastern Development Area plans to extend Swindon by 9000+ houses"

o  South Marston will be on the boundary of this development planned for start in 2014!

o  Could Sevor Farm help provide renewable energy for this development instead of a proposed CHP plant close to the site?"

EDA Development

Sevor Farm Development

Page 14: 20121016 sev1 aee_parish-presentation_mio-awi-pptx

© aee renewables plc / september 2012 / p.14

Contact

Bath Office"UK Project Management"

Ralph Doering (Project Manager): +44 7901 717478"" " " [email protected]"

Adam Withers (Project Planner): +44 7960 876013"" " " [email protected]"