2012 mechanical design details
TRANSCRIPT
-
8/12/2019 2012 Mechanical Design Details
1/25
STANDARD DESIGN DETAILS
Division 23 - MECHANICAL
Release 2.0April 2012
Released by:Cleveland ClinicFacilities and Construction9500 Euclid Ave.Cleveland OH 44195
All information within this Document is considered CONFIDENTIAL and PROPRIETARY. Byreceipt and use of this Document, the recipient agrees not to divulge any of the information hereinand attached hereto to persons other than those within the recipients organization that havespecific need to know for the purposes of reviewing and referencing this information. Recipientalso agrees not to use this information in any manner detrimental to the interests of ClevelandClinic.
-
8/12/2019 2012 Mechanical Design Details
2/25
Cleveland Clinic
Standard Design Details
Copyright 2012
By the Cleveland Clinic
These Specifications, or parts thereof, may not be reproduced in any form without
the permission of the Cleveland Clinic.
-
8/12/2019 2012 Mechanical Design Details
3/25
Cleveland Clinic
Cleveland Clinic Standard Design Details: Division 23 - Mechanical
The following pages contain standard details for the design and construction of new and
renovated facilities at all domestic Cleveland Clinic locations. They shall be used by A/E
firms in the preparation of drawings and specifications for construction of facilities.
The general purpose of each Detail is to provide the preferred method for installation of
construction materials and equipment at Cleveland Clinic facilities regarding Codes and
FM Global compliance, execution and uniformity.
These Details are to be used as a part of Mechanical Bid and Construction documents.
They are intended to be used to address system design aspects of equipment and materials
that Cleveland Clinic desires to standardize among facilities, and identify prohibited
materials and construction practices.
The use of these Details is mandatory for all design or maintenance projects. Deviations
are discouraged. If project conditions arise which require a deviation, it shall be
thoroughly documented by the user and submitted to Cleveland Clinic for review and
approval using the Design Standards Revision Request document. Additionally, all
Cleveland Clinic staff, architects, engineers, and contractors are encouraged to participatein the ongoing development of these guidelines by communicating any suggestions by
use of the Revision Request document.
The Detail Drawings are in AutoCad format and categorized by system.
*****
-
8/12/2019 2012 Mechanical Design Details
4/25
Cleveland ClinicSTANDARD DESIGN DETAILS: DIVISION 23 - MECHANICAL
I. NOTES
a. NOTES DETAILS FILE NOTES
b. NOMENCLATURE EQUIPMENT TAG W/ ID. NOMENCLATURE
II. MECHANICAL DETAILS
a. M-001 COOLING COIL CONDENSATE TRAP WITH POSITIVE
PRESSUREb. M-002 COOLING COIL CONDENSATE TRAP WITH NEGATIVE
PRESSURE
c. M-003 CHILLED WATER COIL PIPING DETAIL, 2-WAY VALVE
d. M-004 AIR SEPARATOR EXPANSION TANKS AND MAKE-UP WATERPIPING SCHEMATIC
e.
M-005 END SUCTION PUMP DETAILf. M-006 RADIANT PANEL COIL PIPING DETAILg. M-007 MULTIPLE COIL PIPING DETAIL
h. M-008 HORIZONTAL FIRE DAMPER DETAIL
i. M-009 VERTICAL FIRE DAMPER DETAILj. M-010 FIRE DAMPER (3 HR. RATED)
k.j.M-0101COMBINATION FIRE-SMOKE DAMPER (PACKAGED UNITS)
l.k.M-0112TYPICAL DIFFUSER DETAIL
m.l. M-0123LINEAR DIFFUSER DETAILn.m. M-0134DUCTWORK BRANCH CONNECTIONS DETAILS
o.n.M-0145PIPE GUIDE FOR INSULATED PIPE DETAIL
p.o.M-0156RIGID INSULATION HANGER DETAILq.p.M-0167INSULATED PIPE ON CLEVIS HANGER
r.q.M-0178TYPICAL AIR HANDLING UNIT DIAGRAM
s.r.M-0189COOLING PLANT CONTROL DIAGRAMt.s.M-01920TYPICAL VARIABLE FREQUENCY DRIVE CONTROL
SAFETIES WIRING DIAGRAM - SERIES
**End of List**
-
8/12/2019 2012 Mechanical Design Details
5/25
-
8/12/2019 2012 Mechanical Design Details
6/25
-
8/12/2019 2012 Mechanical Design Details
7/25
-
8/12/2019 2012 Mechanical Design Details
8/25
-
8/12/2019 2012 Mechanical Design Details
9/25
-
8/12/2019 2012 Mechanical Design Details
10/25
-
8/12/2019 2012 Mechanical Design Details
11/25
-
8/12/2019 2012 Mechanical Design Details
12/25
-
8/12/2019 2012 Mechanical Design Details
13/25
-
8/12/2019 2012 Mechanical Design Details
14/25
-
8/12/2019 2012 Mechanical Design Details
15/25
-
8/12/2019 2012 Mechanical Design Details
16/25
-
8/12/2019 2012 Mechanical Design Details
17/25
-
8/12/2019 2012 Mechanical Design Details
18/25
-
8/12/2019 2012 Mechanical Design Details
19/25
-
8/12/2019 2012 Mechanical Design Details
20/25
-
8/12/2019 2012 Mechanical Design Details
21/25
-
8/12/2019 2012 Mechanical Design Details
22/25
-
8/12/2019 2012 Mechanical Design Details
23/25
-
8/12/2019 2012 Mechanical Design Details
24/25
-
8/12/2019 2012 Mechanical Design Details
25/25