2011 together we make it happen - alicon...

59
1

Upload: duongdiep

Post on 13-Mar-2018

221 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

1

Page 2: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

2

Page 3: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

• Sales Rs. 25667 Lacs.

• One of the Largest Aluminium foundry in Low Pressure (LPDC) & Gravity Die

casting (GDC) in India.

• Core Competence.

Design of LPDC , GDC & Sand casting Parts.

Faster development of Prototype Parts.

In house Testing Facilities.

Casting Simulation.

• Casting for Automotive, Locomotive, Medical, Energy , Defense and Agricultural

segments.

alicon is involved in Design, Engineering and Casting of Aluminum

Components.

alicon

3

Page 4: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future alicon

• To serve the customer with low & high volume parts from India locations.

• Proven track record for cost competitiveness learning’s from Indian Market.

• One of the Largest foundries in LPDC & GDC process in India which offers frugal

engineering solutions.

• Pioneer Users of Pro-Cast in India.

• Capabilities of Handling both Low and High Volume.

• De-risking customers from currency fluctuation.

• Providing the better options by using strengths & ability of both organization

4

Page 5: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future alicon Castalloy in India

Alicon Castalloy Limited, Shikrapur,

Pune.(1995)

Alicon Cast alloy Limited Binola,

Haryana. (2006)

5

Hero Honda, Honda Motor,Suzuki ,

Sona Koyo,.

Maruti Suzuki, Bajaj Auto, Tata

Motors, Honda siel Cars, Mahindra

Greaves, Eicher, Royal Enfield, GE

Medical, Knorr Bremse, Tata Motor

Page 7: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future Sales Performance

Sales value in Rs. Lacs

7

18860 19780 18400

21210

25667

35500

0

5000

10000

15000

20000

25000

30000

35000

40000

2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 (Estimated)

Rs in Lacs.

Rs in Lacs. Linear (Rs in Lacs.)

Page 8: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

Alicon Castalloy Limited. , Pune,

India

Alicon Castalloy Limited. Binola

Alicon Manufacturing facilities

8

Alicon Castalloy Limited. Shikrapur Pune

Page 9: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future Plant facilities

Core Shop Facility Tilt GDC Die Casting Facility Cell - Casting & Machining

9

Page 10: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

Cylinder Heads Cylinder Heads for Motor Cycle

Cylinder Heads for Racing bikes Passenger Car

Product Gallery

Cylinder Heads for Commercial Vehicles

10

Page 11: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

Engine Mounting Brackets EGR Valve

Product Gallery

11

Page 12: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

CAC Tanks ( Radiator Intake & Outlet for Paccar & MAN Trucks) Rack Housing

Intake Manifold

Product Gallery

12

Page 13: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

13

Page 14: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

14

Alicon R & D Promise

• Collaborate Innovation, Co-creation

& Sustainable business in Light

Alloy Castings.

Grow the Society to make India

Proud.

Create Art to Part by Innovative

Ideas

Induce Indian Intelligence to

develop new Technology.

Generate new employment by

developing new Innovative

Products.

Develop product for Green &

Clean Environment.

Increase Export market & Develop

Import substitute.

Develop best Technology across

the globe for Low Pressure and

Gravity Die castings.

VISION

OBJECTIVES MISSION

Page 15: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

15

Sr. Location Area in Sq. Mtr

1 R & D Lab 140.95

2 R & D Design Office 451.25

3 R & D Tool Improvement Room 303.87

4 R & D LDPC Pilot plant 188.28

5 R & D GDC Pilot plant 405.38

Total 1489.73

R & D Centre – Floor Plan with area in sq. Mtrs

Page 16: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

16

R & D Testing Lab

Page 17: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

Spectrometer CMM Profile Projector

Millipore Testing Contour Measure Microscope Hardness Tester

Farro Arm

R & D Equipments

17

Page 18: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

Hot Tensile Testing Sieve Shaker Muffle Furnace

Core Gas Determination Bending Strength Testing

Scratch Hardness Tester

X-Ray Salt Spray Testing

18

R & D Equipments

Page 19: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

19

R & D Office

Page 20: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

20

R & D LPDC Cell ( Pilot Lot)

Page 21: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

21

R & D GDC Cell ( Pilot Lot)

Core Shooter GDC Machine

Page 22: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

22

R&D Manpower with Educational Status

Slno Category Nos

1 Doctorate 0

2 Master Degree 2

3 Graduates / Engineering

Graduates 7

4 Diploma Holders 64

5 Others 14

Total 87

Present

Slno Category 2011-12 2012-13 2013-14

1 Doctorate 0 1 1

2 Master Degree 2 5 8

3 Graduates / Engineering

Graduates 7 15 25

4 Diploma Holders 64 75 92

5 Others 14 26 32

Total 87 122 158

Future

Page 23: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

23

Product Development Cycle

Page 24: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

24

Product Development Cycle

Page 25: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

CAD

AutoCAD

Catia V5 R17

UG NX-4/5

Pro – Engineer Wild

Fire 2/3

Soild Works

Auto Desk Inventor

2009

CAM

Delcam

Catia Machinist

CAE

LS Dyna

Hypermesh

Pro-Mesh

Pro Cast

Magma

P D M

Wind Chill 8.0

Create Art to Part by creating Innovative Ideas by some software used 3D Modeling based Design survive capable of

designing from concept through Specification, tool design & validation.

R & D Capabilities

25

Page 26: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future Simulation work samples

26

Page 27: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

Changed to LPDC after

PROCAST

Analysis to Increase Productivity &

Eliminate Defects

Converter Housing for AVTEC Ltd.

(Aprox. Wt-17.5 Kg)

Suitable for GDC

Casting Simulation for LPDC process

using PROCAST

Design & Simulation

27

Page 28: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

Rapid Prototyping (Objet and LOM method)

Prototypes based on resin

Max. size 320 x 320 x 200 mm

Presentation- and functional models

Model construction – Rapid Prototyping – Casted product Thin Wall Casting 1.8mm

CAD system

Pro-Engineer Wildfire 2

Interface for Step Iges VDA and others

Tool design Magma casting simulation

Rapid Prototype Development

28

TECHNOLOGIES

• Gravity die casting

• Sand casting

• Low pressure die casting

• Rapid prototyping

• X ray Inspection

• CAD – Pro Engineer

• Magma casting

• Solidification

ALLOYS APPLIED

• Al Si 7 Mg Al Si 9 Mg

• Al Si 10 Mg

• Al Si 12

• Al Si 12 Cu Ni Mg

• Al Si 8 Cu 3

• Al Si 6 Cu 4

Page 29: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

7 5

2 3

6

TOOL DESIGN FEA & CFD FOUNDRY SIMULATION

REVERSE ENGINEERING 3D CAD MODELLING CAD DRAFTING

1

CAD CONVERSION

4

8

TECHNICAL MANUALS

29

R & D Analysis Activities

Page 30: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

FORGING DIES LPDC DIE CAST DIES FEA – THERMAL ANALYSIS 3D MODELLING EXTRUSION DIES

FEA – STRUCTURAL FEA – MESHING DRAFTING & DETAILING TECHNICAL MANUALS

PRODUCT ENGG CASTING SIMULATION WEIGHT OPTIMIZATION EXTRUSION SIMULATION

WHITE LIGHT SCANNING

HPDC DIE CAST DIES

30

Simulation

Page 31: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

R & D ACHIEVEMENTS

Page 32: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

32

DEVELOPMENT OF MAIN BATTLE TANK WHEELS

FOR

MINISTRY OF DEFENCE, GOVT. OF INDIA

Page 33: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

33

Arjun Main Battle Tank

Tank weight reduced by 4.1 Tons, Speed Increased by 20 Km/hr.

Page 34: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

34

Arjun (Mark-2) New version Main Battle Tank

Tank weight reduced by 6.8 Tons, Speed Increased by 24 Km/hr.

Page 35: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

35

T 72 Main Battle Tank

Tank weight reduced by 2.7 Tons, Speed Increased by 18 Km/hr.

Page 36: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

36

Abhay Infantry fighting vehicle

India’s indigenously developed

Page 37: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

37

T -72 Bridge Layer Tank

Page 38: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

38

DEVELOPMENT OF MRI SCANNIG MACHINE PART

(MAGNETIC RESONANCE IMAGING)

GE HEALTH CARE,

Page 39: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

39

Front support and Foot switch

Machine rotates 3000 RPM

Page 40: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

40

Smart Cathode

Machine rotates 3000 RPM

Page 41: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

41

MRI SCAN Machine

Page 42: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

42

Electrical Environment friendly CAR

Page 43: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

43

Gear Box Casing

LPDC

Earth Moving Equipment Part

Page 44: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

44

Converted Steel Bracket to Aluminium

Page 45: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

45

Gas Turbine Power Generation Parts

Page 46: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

46

Product Gallery – India

Page 47: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

47

Intake Manifold

GDC

Product Gallery – India

Page 48: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

48

Product Gallery – India

Page 49: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

49

Product Gallery – India

Page 50: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

50

Combine Manifold with Cylinder head Cover

Page 51: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

51

Doorlock

Weight: 0,30 kg

Gravity die

casting

Console

Weight: 0,4 kg

Gravity die

casting

Valve housing

Weight: 7,3 kg

Gravity die

casting

Housing

Weight: 1,4 kg

Gravity die casting

High Speed railway breaking system Parts

Page 52: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

Year 2008-09

No. of RFQ’s 79

Regretted RFQ’s 10

Quoted 58

Order Hit 11

Win RATIO (%) 19

Year 2009-10

No. of RFQ’s 414

Regretted RFQ’s 94

Quoted 245

Order Hit 75

Win RATIO (%) 31

Business Finalized “Win Ratio”

Year 2010-11

No. of RFQ’s 210

Regretted RFQ’s 61

Quoted 149

Order Hit 62

Win RATIO (%) 42

0

20

40

60

Year2008-09

Year2009-10

Year2010-11

Year2011-12

1931

42

11.83

Ratio %

Year 2011-12

No. of RFQ’s 182

Regretted RFQ’s 03

Quoted 169

Order Hit 20

Win RATIO (%) 11.83%

Page 53: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

Brackets – 10 Parts

Manifold – 1 Part

Year 2011/12

Year 2011/12

Year 2011/12 BFT – 1no

Cyl Head – 1no

Pipe – 2nos

Adaptor – 1no

Bracket – 2 nos

Manifold – 1 nos

Year 2011/12 4 Parts –

IM, Cam Box

4 Parts :

Cyl. Head, Block &

Cover Year 2012 G30 Project

Cylinder Head – 6 nos

BFT – 2 nos

Year 2011 Cylinder Head – 1 no

Year 2012

New Parts added - Automotive

Page 54: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future

Housing – 3 nos

Cover – 3 nos

Year 2012

Year 2012

11 Parts

Cover & Housing

Year 2012 4 parts

Housing, manifold

& Cover

New Parts added – Non -Automotive

Page 55: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future R & D Ongoing Projects

AREVA- Holder Contact Sphere

BEHR- Renault Air Right Tank

BEHR- Renault Air Left Tank

Haldex Concentric Pumps- Oil Pump Housing

BEHR- Scania Air Right Tank

BEHR- Scania Air Left Tank

New Product

Development

New Product

Development

New Product

Development

New Product

Development

New Product

Development

New Product

Development

Under

Process

Under

Process

Under

Process

Under

Process

Under

Process

Under

Process

Page 56: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future R & D Ongoing Projects (Status)

JCB- 4.8 Ltrs Intake Manifolds

MSIL- OMNI Intake Manifolds

Vikas Ensa- Neptune 4 cyl Housing

Vikas Ensa- Neptune 6 cyl Housing

Piaggio- Oil Sump

MSIL- YG4 Intake Manifolds

New Product

Development

New Product

Development

New Product

Development

New Product

Development

New Product

Development

New Product

Development

Under

Process

Under

Process

Under

Process

Under

Process

Under

Process

Under

Process

Page 57: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future R & D Projects (Future)

Ingersoll Rand- Manifold

Harley Davidson – Cylinder Head Rear

Harley Davidson – Cylinder Head Front

Siemens- Housing FA X S3

Siemens- Housing Cable Termination

Siemens- Housing 2/3 X S2

New Product

Development

New Product

Development

New Product

Development

New Product

Development

New Product

Development

New Product

Development

2012

2012

2012

2013

2013

2013

Page 58: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future R & D Projects (Future)

Siemens- Cover S2/S3(Rectangular)

Siemens- Cover 2/3 X S2/s3

Harley Devidson- Cylinder Front/ Cylinder Rear/ Cyl Head Front/

Cyl Head Rear

HSCI-Air Intake Manifold/ Inlet pipe/ Outlet Pipe /Inlet Water/

Outlet Water/ Outlet cooler/Inlet Cooler/ assly Inter cooler Inlet/

Assly Inter cooler outlet

Tata Cumins- Fly wheel Housing

New Product

Development

New Product

Development

New Product

Development

New Product

Development

New Product

Development

2013

2013

2013

2014

2014

Page 59: 2011 Together We Make It Happen - Alicon Groupalicongroup.co.in/Downloads/TechnicalPresentation.pdf · PROCAST Analysis to Increase Productivity & Eliminate Defects ... PRODUCT ENGG

2011 Together We Make It Happen

Casting The Future