2010+ victory cross country / cross roads installation · pdf file ·...

24
2010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish, SD 57783 | Toll Free 888.3WHEELS w w w . l e h m a n t r i k e s . c o m

Upload: lythu

Post on 21-Mar-2018

224 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

2010+ Victory Cross Country / Cross Roads Installation Guide

Nov 2014

125 Industrial Drive | Spearfish, SD 57783 | Toll Free 888.3WHEELS w w w . l e h m a n t r i k e s . c o m

Page 2: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

2

UNDERSTANDING SAFETY LABELS & INSTRUCTIONS

READ AND BECOME FAMILIAR WITH ALL WARNING, CAUTION SYMBOLS AND STATEMENTS LISTED BELOW AND IN THE TEXT OF THIS MANUAL BEFORE YOU BEGIN WORK.

DANGER, WARNINGS & CAUTION SYMBOLS

This is the safety alert symbol. When you see this symbol on your machine or in this manual, be alert to the potential for personal injury. Your safety is involved!

SAFETY ALERT WARNING indicates a potential hazard that may result in severe injury or death to the operator, by-stander or person (s) inspecting or servicing the vehicle.

WARNING

Indicates a potential hazard that may result in minor per-sonal injury or damage to the vehicle.

CAUTION

CAUTION indicates special precautions that must be taken to avoid vehicle damage or property damage.

CAUTION

NOTE provides key information by clarifying instructions.

NOTE:

IMPORTANT provides key reminders during disassembly, assembly and inspection of components.

IMPORTANT:

Page 3: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

3

General Information This kit is designed to be installed by a competent technician. Improper installation can affect the safe operation of your trike, which could also result in serious injury or death. Make sure you have a complete understanding of the work to be preformed. Unqualified installers are urged to have the unit installed by a trained technician.

• Always protect yourself when the vehicle is in the air. Make sure the vehicle is properly supported anytime you use a hoist or jack.

• Always use the proper tools.

• Protect your eyes by using proper safety glasses or goggles.

• Read through the installation instructions before you begin. Make sure you have all the proper tools, parts and skill set to perform the installation safely and completely.

• Verify that you have all components before assembly.

• Before installing your new Lehman kit, we recommend that your motorcycle be inspected and ser-viced by a qualified technician. Replace any worn or damaged parts before installing the trike kit.

• If the motorcycle has more than 12,000 miles, Lehman Trikes recommends installing a new drive belt during the trike conversion.

• CAUTION: This kit is not designed for use on lowered motorcycles. Interference between the tires and body may occur.

Overall Width   57.75" Overall Length (w/ EZ‐Steer)  106" Wheel Base (w/ EZ‐Steer)  67" Curb Weight   1170 lb Rear Tire Size   205/70‐15 

Rear Tire Pressure  26 PSI Rear Suspension  Double A‐Arm Independent  Storage  5 Cubic feet 

Rear Wheel Size  15x7, 4x4.5, +35mm Offset 

Page 4: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

4

Disassembly NOTE: Refer to the Victory service manual for detailed instructions on removal of OEM parts. 1. Load motorcycle on lift and secure front wheel. 2. Place motorcycle on center stand or scissor style jack. 3. Disconnect negative battery cable. 4. Remove seat, save mounting hardware. 5. Remove side covers. NOTE: Save tour box mounting hardware 6. Disconnect wiring and Remove tour box. (if

equipped) 7. Remove saddlebags (if equipped). 8. Remove saddlebag frames (if equipped). 9. Remove antenna and wiring. Plug is located

behind front fairing (Can be removed during EZ Steer installation if applicable)

10. Remove mufflers and rear heat shields. 11. Remove rear wheel. 12. Disconnect rear brake line at caliper and

remove caliper. 13. Remove rear fender. 14. Remove passenger floorboard assemblies,

save hardware. NOTE: See Fig. 1. for steps 15-17. 15. Remove shock linkage from swingarm. 16. Remove swingarm pivot shaft and remove

swingarm. Save pivot shaft and hardware. 17. Remove shock from motorcycle frame. NOTE: See Fig. 2. The Lehman differential is preassembled for shipping purposes. Swin-garm, rear frame and top frame must be re-moved for belt installation. RH park brake cable must also be disconnected from the balance bar.

Swingarm

Rear Frame Top Frame

Fig. 1

Fig. 2

Page 5: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

5

ABS Pump Relocation– ABS Models Only 1. Remove ABS Pump mounting hardware from frame. Do not remove front brake lines from

pump. 2. Remove mounting bracket from pump. Remove grommets and spacers from bracket. 3. See Fig. 1. Remove entire rear brake line assembly from motorcycle. Disconnect line at master

cylinder and ABS pump.

4. See Fig. 2. Install original grommets and spacers to new ABS pump bracket as shown.

Fig. 1

Front brake line assembly ABS Pump

Install grommets and spacers to Lehman ABS pump bracket

Fig. 2

Page 6: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

6

5. See Fig. 3. Install new bracket to ABS pump using original hardware. • (1) ABS Bracket– S002350

6. See Fig. 4. Install banjo bolts, spacers and washers to block off rear brake line ports on pump. Torque banjo bolts to 16 ft-lbs. • (2) Banjo Bolts– CB6001 • (4) Banjo Washers- CGC6002 • (2) Spacer– S001067

7. Set pump assembly above frame until differ-ential assembly is installed.

8. Apply “ABS Disabled” sticker over ABS light on instrument cluster.

Block off ports for rear lines

Fig. 3

Fig. 4

Page 7: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

7

Swingarm Installation 1. See Fig. 1. Apply grease to plastic bushings and press into swingarm. Insert steel sleeves in

bushings.

2. See Fig. 2. Install swingarm to motorcycle and slide the pivot bolt though. Place two OEM wash-ers on the RH side as shown below.

3. See Fig. 2. Reattach both floorboards supports with OEM hardware in lower holes. For the LH side, Torque the lower 8mm screw to 19 ft-lbs. For the RH side, attach the floor board and torque the lower 10MM screw to 35 ft-lbs. Place the OEM washers and nuts onto the pivot bolt. Hand tighten pivot hardware.

1

2

2

3

4

3

1 2

Item # Description Part # QTY 1 OEM Nut OEM 2 2 OEM Washer OEM 4 3 Sleeve S002349 2 4 Bushing S002348 2 5 Swingarm S002347 1 6 OEM Pivot Shaft OEM 1

5

6

Fig. 1

Fig. 2

Page 8: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

8

Top Frame Installation 1. See Fig. 1. Mount Top Frame to the motorcycle sub-frame using the hardware indicated below.

Torque hardware to 19 ft-lbs evenly across all screws. • (2) M8x35 Hex Bolt– CB1622 • (2) M8x40 Socket Head Bolt– CB1975 • (4) M8x45– CB1986 • (8) M8 Lock Washers– CW2168 • (8) M8 Flat Washers– CW2167

M8x35 Hex Bolt w/ Flat and Lock Washer

M8x45 SHCS w/ Flat and Lock Washer

M8x40 SHCS w/ Flat and Lock Washer

Fig. 1

Page 9: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

9

Differential Installation 1. See Fig. 1. Remove 3 of the 4 cross tubes as shown below.

2. Pass drive belt over differential assembly and position onto rear pulley. 3. Reinstall the cross tubes and spacers. Apply anti seize to all bolts and torque the 3/4” x 2-1/2”

hex head screws to 150 ft-lbs. Torque the 1/2” x 2-1/4” hex head cap screw to 50 ft-lbs. 4. Guide differential under rear motorcycle frame while reinstalling belt past swingarm and onto front

drive pulley. 5. See Fig. 2. Attach body mounts to top frame using the 3/8” x 1-1/4” hex head cap screws. Torque

to 45 ft-lbs.

Front

Body mount

3/8” x 1-1/4” Hex Bolts w/ Flat Washers and Lock Nuts

Leave front lower tube installed

Fig. 1

Fig. 2

Top frame

Page 10: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

10

Rear Frame and Swingarm 1. See Fig. 1. Position lower rear body frame inside of swing arm and install the 1/2” bolts through

the mounting holes. • (4) 1/2” x 3-1/2” Hex Head Bolts– CB2178 • (8) 1/2” Washers– CN3060

2. See Fig. 2. Attach the adjuster plate to swingarm as shown with adjuster bolt in place. Torque adjuster plate mounting hardware to 45 ft-lbs. • (2) 3/8” x 1-1/4” Hex Head Bolts– CB2018 • (2) 3/8” Flat Washers– CW2180 • (2) 3/8” Lock Nuts– CN3051

3. See Fig. 3. Leave approximately a 1/16” gap be-tween the top of the stud and the face of the nut for both sides on swingarm pivot shaft. It is critical to have correct spacing. Torque pivot shaft nuts to 85 ft-lbs.

4. The floorboards need to be swapped with the op-posite side such that the LH floorboard will be in the reversed position on the RH. Torque the re-place RHS to 18 ft-lbs. Do not attach the floorboard onto the LHS. The park brake will need to be in-stalled which is later in the instructions.

Fig. 1

Fig. 2

Fig. 3

Swingarm

Rear Frame

1/16” Gap

Attach plate to Swingarm

Aduster bolt

Page 11: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

11

Align and Tension Drive Belt 1. Set the belt tension and alignment by moving the independent drive train unit forward or rearward as

necessary using the adjuster bolts. Belt tension can be measured by total vertical movement and should be approximately ¾”-1” with a new belt.

Tip: Measure from the bracket to the face of the drive train on each side to get the alignment close. Then perform the next step.

2. To check the alignment, turn the sprocket by hand in the forward direction, noting whether the belt runs in the center of the pulley. If the pulley runs on the right side plate of the pulley, use the right hand adjuster bolts to move the right wheel rearward until the belt runs in the center. If the belt runs on the left side plate of the pulley, use the left adjuster bolts to move the left wheel rearward. Make small adjustments and recheck the alignment.

3. Once the belt is aligned, torque the four front 1/2" fasteners to 70 ft-lbs and double check belt align-ment. If alignment is off, please repeat alignment process.

Tighten all fasteners left loose for belt adjustment. Torque the four rear ½” fasteners to 70 ft-lbs. 4. Recheck belt tension and alignment after tightening the fasteners. 5. If belt is off to right or left go back to step 2.

Belt Centered

Page 12: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

12

Longer Side on RHS (10.80 Approximately) Shorter Side on LHS

(10.42 Approximately)

Install Anti-Roll Bar 1. See Fig. 1. Install Anti-Roll Bar with the short side on the LH side of trike as shown below.

2. See Fig. 2. Install hardware through anti-roll bar housing onto swingarm. Position the anti-roll bar on the frame so that the rod ends will be close to vertical when attached to the control arms. Torque hardware to 45 ft-lbs. • (4) 3/8” x 1-1/4” Hex Head Bolts– CB2018 • (8) 3/8” Flat Washers– CW2180 • (4) 3/8” Lock Nuts– CN3051

Fig. 1

Page 13: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

13

3. See Fig. 1. Attach rod-end to right control arm with the included hardware in the following order: 3/8” x2-1/4” bolt, washer, rod-end, washer, control arm, washer, and then nut. Torque to 45 ft-lbs. • (2) 3/8” x 2-1/4” Hex Head Bolts– CB2001 • (6) 3/8” Thin Flat Washers– CW2182 • (2) 3/8” Lock Nuts– CN3051

4. Adjust left side rod-end until it aligns with the left control arm mounting hole.

5. Tighten jam nut on the left side rod end as-sembly.

6. Attach rod end to left control arm just as was done to right control arm. Torque to 45 ft-lbs. Brakes 1. See Fig. 1. Assemble the new brake lines and residual valve and install as shown using the fol-

lowing hardware. Route front of new brake line to master cylinder in original location. • (1) Rear Brake Line, 29”- S002367 • (1) Front Brake Line, 23.5”- S002368 • (1) Residual Valve- GB1146 • (2) Clamps– S001654

2. See Fig. 2. Attach front brake line to master cylinder with brake light switch. • (1) Brake Light Switch– S002369 • (2) Banjo Washers– GC6002

Front line/clamp

Front line/clamp

Residual Valve

Fig. 1

Fig. 1

Fig. 2

OEM Master Cylinder Switch

Line

Page 14: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

14

3. Route new brake light switch wiring to original brake light switch connector on LH side of mo-torcycle and connect.

4. 4. See Fig. 3. Attach brake block to bolt on

swing arm using 1/4” locknut and washer. Torque to 11 ft-lbs. Connect both rear brake lines to t-block. • (1) Brake Block– S002163 • (1) 1/4” Flat Washer– CW2005 • (1) 1/4” Lock Nut– CN3040

5. See Fig. 4. Route the rear brake line around the LHS passenger floorboard as shown be-low. Attach the rear line to the brass block on swingarm. Torque banjo bolt to 16 ft-lbs. • (1) Banjo Bolt– CB6001 • (2) Banjo Washers– GC6002

6. See Fig. 5. Verify new brake reservoir hous-ing is assembled as shown. • (1) Reservoir Bracket– S002356 • (1) Reservoir Tank– S002357 • (1) Cap– S002358 • (1) Tank Mount– S002359 • (2) M6 x 1 Flange Head Screws– CB1905 • (2) M6 Flange Lock Nut– CN1902

Rear brake line

Fig. 3

Fig. 4

Fig. 5

Tank

Bracket

Tank Mount

Page 15: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

15

5. See Fig. 6. Install new reservoir assembly to original bracket on motorcycle. New bracket will mount to the inside of the existing bracket with star washer between the two brackets. • (1) M6 x 1 Flange Head Screws– CB1905 • (1) M6 Flange Lock Nut– CN1902 • (1) Star Washer– CW2067

5. See Fig. 6. Install new rubber hose between reservoir and master cylinder. Secure with clamps on each end. • (5”) 5/16” Brake Hose– CH2016 • (2) Clamps- CC2016

5. See Fig. 7. ABS Models Only- Finish mount-ing ABS pump to the top frame using the origi-nal hardware. Secure lines and wiring to frame.

7. Use the specified brake fluid in the owner’s manual and bleed the rear brake system. Thoroughly bleed the system of any air using the upper bleeders and lower bleeders on rear brake caliper.

Fig. 6

Secure wiring to upper frame

Fig. 7

OEM bracket

Page 16: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

16

Park Brake 1. See Fig. 1. Verify park brake cables are

routed in front of rubber body mounts and se-cured to upper A-arms on both sides.

2. See Fig. 2. Verify cables are secured to bal-ance bar as shown.

Fig. 1

Fig. 2

Page 17: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

17

Exhaust Installation 1. See Fig’s. 1 & 2. Install exhaust extensions onto OEM header pipes (longer extension is used on

the LHS). Reuse the factory clamps plus additional clamp provide for RH side. Keep all the clamps slightly loose until the mufflers are installed. • (1) Exhaust Clamp– S001412 • (1) RH Exhaust Extension– S002351 • (1) LH Exhaust Extension– S002352

2. See Fig. 3. Install muffler brackets to body mount frame with rubber isolators as shown. Tighten the nuts until a few threads of the bolts are visible. • (1) RH Muffler Bracket– S002353 • (1) RH Muffler Bracket– S002354 • (6) Muffler Isolators– S002225

NOTE: See Fig. 3. Verify rear body mounts are installed before mounting mufflers.

Make sure rubber body mounts are installed before mounting mufflers.

Fig. 2 Fig. 1

RH Side LH Side

Fig. 3

Page 18: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

18

3. See Fig. 4. Place mufflers over exhaust extensions with clamps in place. Attach mufflers to brack-ets using the original flange head bolts. Torque hardware to 20 ft-lbs.

4. Adjust the extensions and mufflers until the best fit is achieved. Make sure the mufflers are at the same angle relative to the body frame otherwise the gap around the muffler to the body may differ. Torque the OEM exhaust clamps to 35 ft-lbs.

5. See Fig. 5. Trim both heat shields. Cut shields behind rear clamp as shown.

6. See Fig. 6. Bend front tab on LH heat shield as shown.

7. Reinstall heat shields in original locations.

Fig. 4

Remove rear section from shield

RH heat shield shown

Before After

Fig. 5

Fig. 6

Page 19: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

19

Side Panel Modification 1. See Fig’s 1 & 2. Trim both LH and RH side panels to fit around sway bar. Keep both panels loose

on the Trike after cutting.

Fig. 1 Fig. 2

RH panel shown RH panel shown

Grab Handle Installation 1. See Fig. 3. Mount grab handles to body using

the following hardware. Install spacers between handles and body. • (2) Grab Handle– S001035 • (4) Grab Handle Spacer– S001701 • (4) 5/16” x 1-1/4” Button Head Bolt– CB1163 • (4) 5/16” Fender Washer– CW2109 • (4) 5/16” Lock Washer– CW2046 • (4) Rubber Washer– FG1002

Page 20: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

20

Body Installation NOTE: The installation /alignment of the body is an important process to find the correct po-sition of the body in relation to the wheels. The pre-drilled holes in the body are for ship-ping purposes. Re-drill the holes if necessary once the body is properly aligned. NOTE: Verify steps 1-4 are complete before installing body to trike. 1. See Fig. 1. Verify park brake cables are

routed in front of rubber body mounts and se-cured to upper A-arms on both sides.

2. See Fig. 2. Verify cables are secured to bal-ance as shown.

3. See Fig. 3. Verify all the rubber body mounts are in place before installing body. The three rear mounts should be loose. • (7) Body Mounts– S002156

4. Verify wire harness and taillights are installed and secure. Taillights are mounted with the following hardware. • (8) M4 x 8 Socket Head Screws– CB1704 • (8) #6 Stainless Flat Washers– CW2086 • (2) Taillights– S002335 • (2) Taillight Grommets- GG0011 • (1) Crossfire Wire Harness– S002305

5. Carefully position the body to the trike frame. Secure the body with the following hardware (original shipping hardware). Tighten hard-ware evenly to 20 ft-lbs. • (7) 3/8” Fender Washers– CW2180 • (7) 3/8” “Thin” Locknuts– CN3055

Fig. 1

Fig. 3

Fig. 2

Cables installed

Page 21: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

21

5. See Fig. 4. Attach balance bar to front of body as shown using the following hardware. Bolt head, fender washer and rubber washer should be installed from inside the trunk with flat washers and lock nuts on the bracket side. • (3) 1/4” x 1-1/4” Hex Head Bolts • (3) 1/4” Fender Washers • (3) 1/4” Flat Washers • (3) Rubber Washers– FG1002 • (3) 1/4” Lock Nuts

6. See Fig. 5. Attach park brake bracket to LH passenger floorboard. Install bracket be-tween OEM parts. • (1) Park Brake Bracket- S002355

7. See Fig. 6. Adjust park brake calipers as needed. Verify the hand lever is in the down position. On each caliper hand tighten the adjuster bolt until it contacts the pivot arm, then back off half a turn. Tighten the jam nut to lock the adjuster bolt in place.

8. Test the park brake operation and adjust the balance bar and calipers as needed. Verify that the wheels are able to rotate freely when the park brake is disengaged.

9. Install the boot over the hand lever. 10. Once final brake adjustments are made, in-

stall rear wheels and torque to 85 ft-lbs.

Adjuster Bolt

Fig. 6

Fig. 4

Fig. 5

Park brake bracket

Page 22: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

22

Trunk Door 1. See Fig. 1. Install door seal to body as shown.

Start seam in bottom center of trunk opening with lip on seal facing outward. • (5’) Door Seal– CW2536

2. Install door to hinges using the provided Phillips head screws. Adjust door as need and tighten all hinge hardware.

3. Wire license plate light to door matching the fol-lowing wires. Place excess wiring inside door. • (1) License Plate Light– S002377 • Black wire (-) on door to Black wire on light • Blue wire (+) on door to Red wire on light

4. See Fig. 2. Install license plate light to door. Screws are included with light assembly.

5. See Fig. 2. Install license plate to door using the following hardware. Install Spacers between rubber insert and license plate. • (2) 10-32” Rubber Inserts– CN2103 • (2) 1/4” Spacers– S001369 • (2) 10-32” x 1” Button Head Screws- CB2016 • (2) #10 Flat Washers– CW2002

6. See Fig. 2. Install trunk lock to door. • (1) Trunk Lock– S001593

7. See Fig. 3. Install badges to body below trunk door as shown. • (1) Lehman Badge– S001532 • (1) Crossfire Badge– S002340 • (1) LLS Badge– GB1328

8. See Fig. 4. Install terminals and connector to wiring on inside of door and connect to main harness inside trunk. Match colors from door wiring to main harness. Secure harness to LH door hinge with cable ties as needed. • (2) Female Terminal– GH0023-7 • (1) Male Connector– GH0023-4 • (5) 5” Cable Tie– CT1014

Fig. 2

Light

Lock

Plate Mounting

Fig. 3

Fig. 1

Fig. 4

Page 23: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

23

Tour Box Installation– Touring Models. 1. See Fig. 1. Install tour box mounting brackets

to top frame as shown using the following hard-ware. Hand tighten hardware until box is mounted. • (4) M8 x 25 Socket Head Bolts– CB1989 • (4) M8 Flat Washers– CW2165 • (4) M8 Lock Washers– CW2168

1. See Fig. 2. Install tour box to brackets using the original mounting hardware. Plug tour box wiring into main harness and secure wiring as needed with cable ties.

2. Tighten all tour box mounting hardware. 3. See Fig. 3. Plug trike body harness into main

OEM harness. Verify wiring is routed on RH side of motorcycle frame. Secure harness to frame as needed with cable ties.

4. See Fig. 3. Route ground wire from harness module to RH gas tank mounting bolt as shown.

5. Route power wire under RH side of gas tank with OEM wiring. Continue down LH front frame rail and install to positive battery termi-nal. Secure power wire with cable ties as needed.

6. Install seat using original mounting hardware. 7. Install modified OEM side covers.

Connect to OEM harness

Connect ground to tank

Place module in frame

Route power to battery under tank on LH side

Fig. 2

Fig. 3

Fig. 1

Tour Box brackets

Page 24: 2010+ Victory Cross Country / Cross Roads Installation · PDF file · 2015-04-202010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014 125 Industrial Drive | Spearfish,

24

Hidden Antenna Installation– Fairing models Note: Antenna may be installed during EZ-Steer installation if applicable. 1. See Fig. 1. Carefully remove outer headlight

trim on fairing. 2. See Fig. 2. Remove headlight mounting hard-

ware and carefully remove headlight from fair-ing. Unplug headlight connectors from backside of light.

3. See Fig. 3. Unplug OEM antenna connector located in upper LH side of fairing. Install hid-den antenna to OEM connector. Clean inside of fairing were hidden antenna will mount. Re-move protective tape from antenna and install on inside of fairing along the top.

4. Test radio operation and reinstall headlight and trim.

Remove trim

Fig. 1

Fig. 2

Fig. 3

Install antenna along inside of fairing